Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Discovery Compilation (ALLCO Set 9, OCC Set 19, OCC Set 20).

Files4

Search terms highlighted
Eversource rate increase is on 35 pages across 3 files of the text below, highlighted. Go to the first matchClear highlighting
Words on different pages
1 page match
8 pages match
  1. Page 132 of 141

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-19 Date Issued September 21, 2026 OCC-807 Page 1 of 1 Date Filed: October 05, 2026 Witness: Lavelle A. Freeman and Elli Ntakou Request from: Office of Consumer Counsel Question: Refer to Exhibit CLP-TSP-3, at p. 7. The Company states that the Sustained tier maintains current reliability at minus 0.7 minutes of SAIDI, and that the Targeted System Performance tier improves performance by 6.1 minutes. Provide the calculation that produces the 6.1 minutes, identify the programs credited with the improvement, and state the SAIDI benefit assigned to each. Response: The SAIDI improvement is attributable to the following programs: Programs RELIABILITY IMPROVE SPEC PROJ SMART SWITCHES PROGRAM Capital Improvement Total - Vegetation Improvement + System Degradation Net Impact to SAIDI Sustained Performance Targeted Performance -4.7 -8.9 -9.2 -14 -2.3 15.6 -0.7 -10.4 -19.3 -2.3 15.6 -6.1 System Actual SAIDI improvements will vary based on a number of factors and minor storm events occurring within a given year and the pace at which aging infrastructure impacts system reliability. In the year that the reliability upgrades are implemented, reliability performance will continue to be a function of the type of circumstances experienced by the system in that year (emergent work, pole hits, storm impact, asset failures and other circumstances). Reliability benefits will not necessarily be experienced immediately upon implementation of the reliability upgrade, as the benefit of these investments accrue over the lifetime of the asset. In addition, historical events cannot be assumed to repeat themselves in the same location. For example, capital improvements may be performed in one section of an overhead line where historical events have occurred, however those events may not recur at that location, or may occur again at a location downstream of the new plant addition in the future. For this reason, ReBOT utilizes historical outages that recur more frequently, indicating a concurrence of issues and a higher probability of recurrence, rather than focusing on large, isolated events.
  2. Page 133 of 141

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-19 Date Issued September 21, 2026 OCC-808 Page 1 of 1 Date Filed: October 05, 2026 Witness: Lavelle A. Freeman, Leanne M. Landry, Elli Ntakou and Jeffrey D. Turano Request from: Office of Consumer Counsel Question: Refer to Exhibit CLP-TSP-3, at p. 7. There are no dedicated resiliency investment in the Sustained tier. Exhibit CLP-ADDITIONS-12, records system resiliency and expanded reliability spending in every year from 2019 through 2025, covering right-of-way lines, pole integrity, smart switches and substation security. Identify the storm resiliency work in the Targeted System Performance tier that was not already performed under those programs. Response: The system resiliency and expanded reliability programs recorded in Exhibit CLP-ADDITIONS12, addressed individual components and functions on the existing system, including right-of-way lines, pole integrity, smart switches, and substation security. These programs were performed using a different approach than the storm resilience work proposed under the Targeted System Performance Plan. The programs in Exhibit CLP-ADDITIONS-12 were aimed at providing foundational resilience and reliability applicable to specific system components based on industry best practices, technology advances and Company standards. The storm resiliency work included in the Targeted System Performance tier is designed from a different perspective that leverages a more proactive, holistic and longer-term approach that is informed by data analytics not historically available to the Company. Specifically, the storm resiliency work in the Targeted System Performance tier consists of full zone-level rebuilds starting in the zones with the highest potential for cost-effective resiliency improvement. These zones are identified using a data-driven methodological approach to identify at-risk zones based on historical performance, as well as predicted performance based on construction type, tree conditions, and customer impact. In these zones, the Company will replace the existing bare-wire construction with spacer cable, an insulated-conductor design that can tolerate incidental tree contact, installed on current design standard poles. Therefore, rather than addressing individual components, this work is focused on replacing the complete bare wire overhead line spans in each targeted zone with a construction type that is more storm-resistant. This type of approach was not historically implemented for the programs identified in Exhibit CLP-ADDITIONS-12.
  3. Page 134 of 141

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-19 Date Issued September 21, 2026 OCC-809 Page 1 of 2 Date Filed: October 05, 2026 Witness: David L. Gladey, Lavelle Freeman, John P. Dipaola-Tromba, Jennifer A. Schilling and Elli Ntakou Request from: Office of Consumer Counsel Question: Refer to Exhibit CLP-TSP-3, at p. 8. The Company shows the Targeted System Performance tier adding $374 million over five years above the Sustained tier, described as Enhanced Reliability, Asset Health and Resiliency Programs. Identify every program funded by that $374 million, with the amount and year for each, and state what each delivers that the Sustained tier does not. Response: The breakdown of the $374M per program and per year is as follows: Year of Program 2027 2028 2029 2030 2031 Total Resilience ($1,000) Asset Health ($1,000) 5,000 25,000 30,000 40,000 55,000 155,000 7,688 17,440 19,897 45,137 53,175 143,337 Enhanced Reliability ($1,000) 10,000 15,280 15,680 16,113 18,685 75,758 Please refer to CLP-TSP-3, page 11, listing the benefits of the incremental spending on these programs from Sustained to Targeted System Performance Plan, namely rows “RE08 Resilience/ Reliability” for columns Resilience and Enhanced Reliability and “Asset Health Risk” for the Asset Health column, above. There are multiple asset-health initiatives included in the $374M differential over the years 20272031. For example, $25M is included in the 2030 and 2031 investments for substation aging infrastructure replacements and transformer asset health programs. These investments would facilitate additional replacements of aging substation batteries, station service transformers, electromechanical relays, and circuit breakers. Transformer asset health is allocated $15M of the incremental investment each year in 2030 and 2031. This would facilitate the replacement of two additional substation transformers. These additional units bring the quantity of planned transformer replacements to the recommended level of eight replacements per year versus the six replacements in the Sustained plan. This plan includes $155M of resiliency funding focused on
  4. Page 135 of 141

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-19 Date Issued September 21, 2026 OCC-809 Page 2 of 2 targeted reconductoring with spacer cable design to improve storm performance and lower storm cost. Smart switch funding is accelerated by $27M to more quickly reduce the number of zones that impact over 500 customers and aging infrastructure is also accelerated in right-of-way ($22M), underground cable PILC replacement ($27M), and overhead bare Cu replacement ($20M) to prevent additional failures of these aging assets impacting both reliability and operational flexibility. Customer focused funding is also included to address CEMI ($21M) and to improve poor town scorecard performance ($27M) which typically impacts smaller groups of customers experiencing poor reliability performance. In all of these categories, the work included in the Targeted System Performance tier is designed from a different perspective that leverages a more proactive, holistic and longer-term approach informed by data analytics not historically available to the Company. In each of the investment categories, programs and projects are identified using a data-driven methodological approach to identify at-risk zones based on historical performance, as well as predicted performance based on construction type, tree conditions, and customer impact. The fundamental theory in this shift to a more data-driven planning function is to drive efficiency and effectiveness so that the dollars invested go further and achieve more for customers due to the ability to harness analytical constructs to inform decisions.
  5. Page 136 of 141

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-19 Date Issued September 21, 2026 OCC-810 Page 1 of 1 Date Filed: October 05, 2026 Witness: David L. Gladey, Lavelle Freeman, John P. Dipaola-Tromba, Jennifer A. Schilling and Elli Ntakou Request from: Office of Consumer Counsel Question: Refer to Exhibit CLP-TSP-3, at p. 11. In the table, The Targeted System Performance column is blank for Substation Capacity, DER Enablement, Substation Transformer Replacements per Year, Average Fleet Age in 2040, and Oldest Unit in 2040. Provide the value for each of those rows under the Targeted System Performance tier. The Sustained tier and the Targeted System Performance tier both expecting one transformer failure per year starting in 2030, both showing Grid Mod average annual impact of $14 million, and both showing vegetation management of $91 million per year starting in 2028. State what the incremental $374 million changes in each of those three measures. Response: Exhibit CLP-TSP-3, at p. 11, rows are blank for Substation Capacity and DER Enablement as there are no incremental investments specifically for substation peak load/capacity projects under the Targeted System Performance plan. As shown in Exhibit CLP-TSP-3, at p. 93-95, all substation peak load/capacity projects are either in the (current) 2026 Plan or the Sustained Performance Plan. The row of information noted for Substation Transformer Replacements/Year in the Advancing the Grid column was incorrectly placed and should have been noted under the Targeted System Performance plan. These incremental funds of $15M per year starting in 2030 support the increase of the average quantity of transformer replacements from six to eight units per year. The increased quantity of replacements reduces the risk of aging transformers failing and creating abnormal system conditions and customer impacts. Lowering the risk enables the reduction in the funding necessary to cover transformer failures starting in 2030 and allows this funding to be diverted into other areas of need within the asset health portfolio. The $374M changes in the investment plans from the Sustained tier to the Targeted System Performance plan do not include any proposed changes to the investments for Substation Capacity, DER Enablement, Grid Mod, or Vegetation (O&M).
  6. Page 137 of 141

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-19 Date Issued September 21, 2026 OCC-811 Page 1 of 2 Date Filed: October 05, 2026 Witness: David L. Gladey, Lavelle Freeman, John P. Dipaola-Tromba, Jennifer A. Schilling, Leanne M. Landry, Elli Ntakou and Jeffrey D. Turano Request from: Office of Consumer Counsel Question: For New Customer, Peak Load and Capacity, and substation transformer replacement, provide the five-year amount in each of the three tiers shown at page 7, of Exhibit CLP-TSP-3. For each category, state the amount already placed in service during 2017 through 2025 as recorded in Exhibit CLP-ADDITIONS-12, and what remains to be built. Response: Below, the table provides the five-year total planned investments in the categories of New Customer, Peak Load & Capacity, and Substation Transformer Asset Health (replacements). The investment values noted are for ongoing or future planned projects. These investments are not included in the 2017-2025 in-service plant addition values. 5-Year Amounts by Tier: Program 2027-2031 Investment ($M) Targeted Sustained System Performance Performance $400.0 $400.0 $393.0 $393.0 New Customer Peak Load / Capacity S/S Transformer Asset $243.3 Health $273.3 Advancing the Grid $447.6 $403.7 $273.3 Please refer to the table below for amounts placed in service from 2017 through 2025 for the New Customer, Peak Load and Capacity, and substation transformer replacement categories.
  7. Page 138 of 141

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-19 Date Issued September 21, 2026 OCC-811 Page 2 of 2 CL&P Distribution 2017-2025 In-Service Plant Additions New Customer-ED Peak Load / Capacity-ED S/S TRANSFORMER RELIABILITY 2017-2025 $ 383,195,893 $ 278,911,851 $ 76,997,671 For clarification purposes, Exhibit CLP-ADDITIONS-12, reflects the values of capital expenditures, not the values for in-service plant additions.
  8. Page 139 of 141

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-19 Date Issued September 21, 2026 OCC-812 Page 1 of 2 Date Filed: October 05, 2026 Witness: Lavelle A. Freeman and Gerhard Walker Request from: Office of Consumer Counsel Question: Refer to Exhibit CLP-TSP-1, at 49. a. Provide hourly load forecast in MW and MWh for next 10 years for each proposed capacity project. b. Provide the contingency standard applied to the proposed stations including the normal and emergency ratings at feeder and substation level. Response: a. The Company does not currently generate an hourly load forecast. b. Please refer to CLF-SC-023, Attachment 1, for the Distribution System Planning Guide (“DSPG”). All substation contingency limits are defined by the Load Carrying Capability, or “LCC.” Specifically, substation ratings are defined starting on page 22, of the DSPG. For substation capacity projects referenced in the Sustained performance plan, the LCC ratings are provided in the individual tables in OCC-591, Attachment 1. For Feeders, the contingency standard per the DSPG is as follows: Contingent Operation (N-1) Cables During contingent system conditions of the electric system, load levels may not exceed Normal Ratings for Cables. System changes are developed when cable limits are expected to exceed 100% of Normal rating during contingency operations. Operating above the Normal rating may involve loss of life or loss of tensile strength for conductors, loading must be reduced after one load cycle (24hour period). Wires During contingency system conditions of the electric system, load levels may not exceed the following criteria:
  9. Page 140 of 141

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-19 Date Issued September 21, 2026 OCC-812 Page 2 of 2 • • NH – Wires shall not exceed emergency rating, as per Distribution System Planning and Design Criteria Guidelines (ED-3002) CT/MA – Wires shall not exceed normal rating For feeder capacity projects, the normal ratings are provided in OCC-594, Attachment 1.
  10. Page 141 of 141

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-19 Date Issued September 21, 2026 OCC-813 Page 1 of 1 Date Filed: October 05, 2026 Witness: Lavelle A. Freeman, Gerhard Walker and David L. Gladey Request from: Office of Consumer Counsel Question: Refer to Exhibit CLP-TSP-1 at 49. List all projects included in both New Customer Load and Peak Load/Capacity categories. For each individual project, include: a. A summary of the project scope, including the existing conditions and proposed solution. i. breakdown of project cost, including labor, materials, overhead, and contingency, etc. ii. The year of the constraint driving the project. b. The in-service year for the project. i. State whether NWA solutions were considered for each project, and if so, provide the analysis, including benefit-cost-analysis. Response: a. The 2027 New Service and Load Capacity Projects are shown in OCC-813, Attachment 1 CONFIDENTIAL. b. New customer load projects are not subject to NWA considerations per PURA’s ruling in its Final Decision in Docket No. 24-08-08. For peak load/capacity projects, the Company submitted all projects to the process monitor as part of Docket No. 25-08-08 and the ongoing Docket No. 26-08-08. As these projects proceed through the solution selection and engineering stages, NWA and other alternatives will be vetted. The results will be submitted during the annual grid needs filing as part of the NWS docket. As part of that PURA approved process, the complete Benefit Cost Analysis (BCA) is available only after projects advance to a competitive solicitation, as the analysis relies on pricing and solution details provided by developers through the solicitation process. Without developerspecific cost information, a comprehensive BCA cannot be completed. As noted in PURA’s Final Decision in Docket No. 26-08-08, no project was ordered to proceed with a competitive solicitation.
26 pages match

As listed on the current system

Corres. 10/14/2026 [26-05-10] (Keegan Werlin LLP) - Discovery Compilation (ALLCO Set 9, OCC Set 19, OCC Set 20).

This filing on the current system (opens in a new tab)