Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Discovery Compilation (ALLCO Set 9, OCC Set 19, OCC Set 20).

Files4

Search terms highlighted
Eversource rate increase is on 35 pages across 3 files of the text below, highlighted. Go to the first matchClear highlighting
Words on different pages
1 page match
8 pages match
  1. Page 65 of 141

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-19 Date Issued September 21, 2026 OCC-767 Page 1 of 1 Date Filed: October 05, 2026 Witness: Christopher Leigh Request from: Office of Consumer Counsel Question: (Cybersecurity) Please refer to OCC-128 Attachment 1, section 8.1, Please provide a copy of the Data Breach Incident Response Manual. Please provide information regarding the Manual, including when it was originally developed, when it was most recently updated, and how the Company incorporates lessons learned from data breach incidents into subsequent updates to the Manual and its processes. Please provide an example of when the process in the Manual was used/followed. Response: The Personal Information Incident Response Plan was originally developed in June 2013. The plan has been revised several times with the last update in March 2026 (please refer to OCC-767, Attachment 1 CONFIDENTIAL, for the most updated plan). During a privacy-related event in May, the organization leveraged its established Personal Information Incident Response Plan as a guiding framework for response and coordination activities. The plan is subject to periodic review, including an annual assessment, to ensure continued relevance, accuracy, and alignment with organizational processes. As part of this review process, updates are incorporated as appropriate to reflect operational experience, regulatory requirements, and evolving business needs, while also facilitating knowledge transfer and responder preparedness.
  2. Page 66 of 141

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-19 Date Issued September 21, 2026 OCC-768 Page 1 of 1 Date Filed: October 05, 2026 Witness: Christopher Leigh Request from: Office of Consumer Counsel Question: (Cybersecurity) Has the Company ever determined, through its vendor security review process, that a prospective or existing vendor’s security controls or practices were insufficient? If so, please describe the circumstances, including (1) what security deficiencies were identified, (2) whether the vendor was permitted to proceed or continue providing services, and (3) what action the Company took in response—for example, requiring remediation, imposing additional security requirements, delaying or denying the engagement, or terminating the vendor relationship. Response: Yes. As part of Eversource’s Vendor Risk Management (VRM) Program, vendors are assessed using a risk-based review process that includes cybersecurity due diligence activities designed to identify potential security control gaps, deficiencies, or other risks. When security deficiencies are identified, Eversource evaluates the nature of the deficiency, the sensitivity of the data or systems involved, the criticality of the service being provided, and the vendor’s ability to remediate the issue. Examples of security deficiencies that may be identified during a review include concerns related to data residency, security documentation, control implementation, or other cybersecurity practices. When deficiencies are identified, Eversource evaluates the associated risk and determines the appropriate course of action. Actions may include requesting additional information, requiring remediation of identified gaps, developing remediation plans with defined timelines and milestones. Depending on the severity of the identified risk and the vendor’s remediation commitments, Eversource may permit an engagement to proceed with documented conditions, delay the engagement until identified deficiencies are addressed, require formal risk acceptance where residual risk remains, or elect not to proceed with or continue the engagement when risks cannot be mitigated to an acceptable level. Eversource maintains records of vendor risk assessments, remediation activities, approval decisions, and follow-up actions as part of its governance and oversight process.
  3. Page 67 of 141

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-19 Date Issued September 21, 2026 OCC-769 Page 1 of 1 Date Filed: October 05, 2026 Witness: John P. DiPaola-Tromba, Sean D. Redding and Jenna Turner Request from: Office of Consumer Counsel Question: (MS24E) Please refer to Exhibit ACCT-2(CLP-5A-03)(MS24E), p. 76-77. Please confirm that this vendor was on standby for 13 hours on March 12 and for 13 hours on March 13 and performed no work during that time. Response: The tree crew worked two 16-hour overnight shifts on March 11-12, 2024, and March 12-13, 2024, which was billed as work time. There is no standby designation or rate for tree crews. The crew did not record ticket locations on March 12 or March 13.
  4. Page 68 of 141

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-19 Date Issued September 21, 2026 OCC-770 Page 1 of 1 Date Filed: October 05, 2026 Witness: John P. DiPaola-Tromba, Sean D. Redding and Jenna Turner Request from: Office of Consumer Counsel Question: (MS24E) Please refer to Exhibit ACCT-2(CLP-5A-03)(MS24E), p. 79-80. Please confirm that this vendor was on standby for 16 hours each day on March 11 and March 12 and performed no work during that time. Response: The tree crew worked two 16-hour shifts on March 11-12, 2024, which was billed as work time. There is no standby designation or rate for tree crews. The crew did not record any ticket locations.
  5. Page 69 of 141

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-19 Date Issued September 21, 2026 OCC-771 Page 1 of 1 Date Filed: October 05, 2026 Witness: John P. DiPaola-Tromba, Sean D. Redding and Jenna Turner Request from: Office of Consumer Counsel Question: (MS24E) Please refer to Exhibit ACCT-2(CLP-5A-03)(MS24E), p. 86-88. The dates on the time sheet (3/11-3/13) do not match the dates on the Tree Contractor Work Location (3/9-3/12 and 3/15). Please clarify the dates for which work is being charged or this invoice. Response: Referring to Exhibit ACCT-2(CLP-5A-03)(MS24E), pages 86-88, the work being charged to MS24E was performed on March 11-13, 2024. The contractor correctly identified the date and work location on the timesheet but did not correctly transcribe the date on the Emergency Restoration Tree Contractor Work Location report.
  6. Page 70 of 141

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-19 Date Issued September 21, 2026 OCC-772 Page 1 of 1 Date Filed: October 05, 2026 Witness: John P. DiPaola-Tromba, Sean D. Redding and Jenna Turner Request from: Office of Consumer Counsel Question: (MS24E) Please refer to Exhibit ACCT-2(CLP-5A-03)(MS24E), p. 91-93. Please clarify if this crew performed any work or was stationed at the “Darien Yard” the entire time. Response: The individual referred to in Exhibit ACCT-2(CLP-5A-03)(MS24E), pages 91-93, is providing contractor tree crew supervision and dispatching to support storm restoration. The contractor’s supervisory personnel do not maintain records of specific crew dispatch locations during storm events because they are not personally responding to each work site. Their role is to supervise tree crew operations and dispatch the tree crews performing the work to locations identified through the Company’s restoration process.
  7. Page 71 of 141

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-19 Date Issued September 21, 2026 OCC-773 Page 1 of 1 Date Filed: October 05, 2026 Witness: John P. DiPaola-Tromba, Sean D. Redding and Jenna Turner Request from: Office of Consumer Counsel Question: (MS24E) Please refer to Exhibit ACCT-2(CLP-5A-03)(MS24E), p. 94-96. Please clarify if the crew performed any work or was on standby at the Cheshire Work Center for 3 hours on March 11 and 13 hours on March 12. Response: The tree crew worked a 16-hour overnight shift on March 11-12, 2024, which was billed as work time. There is no standby designation or rate for tree crews. The crew did not record any ticket locations.
  8. Page 72 of 141

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-19 Date Issued September 21, 2026 OCC-774 Page 1 of 1 Date Filed: October 05, 2026 Witness: John P. DiPaola-Tromba, Sean D. Redding and Jenna Turner Request from: Office of Consumer Counsel Question: (MS24E) Please refer to Exhibit ACCT-2(CLP-5A-03)(MS24E), p. 97-99. Please clarify if the crew performed any work or was on standby at the Cheshire Work Center for 3 hours on March 11 and 13 hours on March 12. Response: The tree crew worked a 16-hour overnight shift on March 11-12, 2024, which was billed as work time. There is no standby designation or rate for tree crews. The crew did not record any ticket locations.
  9. Page 73 of 141

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-19 Date Issued September 21, 2026 OCC-775 Page 1 of 2 Date Filed: October 05, 2026 Witness: John P. DiPaola-Tromba, Sean D. Redding and Jenna Turner Request from: Office of Consumer Counsel Question: (MS24E) Please refer to Exhibit ACCT-2(CLP-5A-03)(MS24E), p. 97-99. a. It appears on page 104 that the work order and activity code has white out and a new work order and activity code was added. Please indicate what was originally written in those boxes and who changed them. b. Please clarify if the crew performed any work or was on standby at the Cheshire Work Center for 3 hours on March 11 and 13 hours on March 12. Response: a. The Company presumes that OCC is referring to Exhibit ACCT-2(CLP-5A-03)(MS24E), pages 103-105, and not Exhibit ACCT-2(CLP-5A-03)(MS24E), pages 97-99, which were referred to in OCC-774. Referring to Exhibit ACCT-2(CLP-5A-03)(MS24E), page 104, the storm code was corrected from MN24F to MS24E after the Company reviewed the crew’s work assignment and determined that the work was performed in support of the MS24E restoration effort. The original entry was a tree crew personnel error. The Company Arborist verifies the correction using their personal crew assignment, scheduling, and operational knowledge, which confirmed the work was associated with MS24E. The revised timesheet reflects this correction and aligns the record with the appropriate storm event. The Company Arborist’s signature is the verification the work was billed correctly. b. The tree crew worked a 16-hour overnight shift on March 11-12, 2024, which was billed as work time. There is no standby designation or rate for tree crews. The crew did not record any ticket locations. Prior Referenced Response: i OCC-774 Question: (MS24E) Please refer to Exhibit ACCT-2(CLP-5A-03)(MS24E), p. 97-99. Please clarify if the crew performed any work or was on standby at the Cheshire Work Center for 3 hours on March 11 and 13 hours on March 12.
  10. Page 74 of 141

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-19 Date Issued September 21, 2026 OCC-775 Page 2 of 2 i OCC-774 Response: The tree crew worked a 16-hour overnight shift on March 11-12, 2024, which was billed as work time. There is no standby designation or rate for tree crews. The crew did not record any ticket locations.
26 pages match

As listed on the current system

Corres. 10/14/2026 [26-05-10] (Keegan Werlin LLP) - Discovery Compilation (ALLCO Set 9, OCC Set 19, OCC Set 20).

This filing on the current system (opens in a new tab)