Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Discovery Compilation (ALLCO Set 9, OCC Set 19, OCC Set 20).

Files4

Search terms highlighted
Eversource rate increase is on 35 pages across 3 files of the text below, highlighted. Go to the first matchClear highlighting
Words on different pages
1 page match
8 pages match
  1. Page 72 of 141

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-19 Date Issued September 21, 2026 OCC-774 Page 1 of 1 Date Filed: October 05, 2026 Witness: John P. DiPaola-Tromba, Sean D. Redding and Jenna Turner Request from: Office of Consumer Counsel Question: (MS24E) Please refer to Exhibit ACCT-2(CLP-5A-03)(MS24E), p. 97-99. Please clarify if the crew performed any work or was on standby at the Cheshire Work Center for 3 hours on March 11 and 13 hours on March 12. Response: The tree crew worked a 16-hour overnight shift on March 11-12, 2024, which was billed as work time. There is no standby designation or rate for tree crews. The crew did not record any ticket locations.
  2. Page 73 of 141

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-19 Date Issued September 21, 2026 OCC-775 Page 1 of 2 Date Filed: October 05, 2026 Witness: John P. DiPaola-Tromba, Sean D. Redding and Jenna Turner Request from: Office of Consumer Counsel Question: (MS24E) Please refer to Exhibit ACCT-2(CLP-5A-03)(MS24E), p. 97-99. a. It appears on page 104 that the work order and activity code has white out and a new work order and activity code was added. Please indicate what was originally written in those boxes and who changed them. b. Please clarify if the crew performed any work or was on standby at the Cheshire Work Center for 3 hours on March 11 and 13 hours on March 12. Response: a. The Company presumes that OCC is referring to Exhibit ACCT-2(CLP-5A-03)(MS24E), pages 103-105, and not Exhibit ACCT-2(CLP-5A-03)(MS24E), pages 97-99, which were referred to in OCC-774. Referring to Exhibit ACCT-2(CLP-5A-03)(MS24E), page 104, the storm code was corrected from MN24F to MS24E after the Company reviewed the crew’s work assignment and determined that the work was performed in support of the MS24E restoration effort. The original entry was a tree crew personnel error. The Company Arborist verifies the correction using their personal crew assignment, scheduling, and operational knowledge, which confirmed the work was associated with MS24E. The revised timesheet reflects this correction and aligns the record with the appropriate storm event. The Company Arborist’s signature is the verification the work was billed correctly. b. The tree crew worked a 16-hour overnight shift on March 11-12, 2024, which was billed as work time. There is no standby designation or rate for tree crews. The crew did not record any ticket locations. Prior Referenced Response: i OCC-774 Question: (MS24E) Please refer to Exhibit ACCT-2(CLP-5A-03)(MS24E), p. 97-99. Please clarify if the crew performed any work or was on standby at the Cheshire Work Center for 3 hours on March 11 and 13 hours on March 12.
  3. Page 74 of 141

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-19 Date Issued September 21, 2026 OCC-775 Page 2 of 2 i OCC-774 Response: The tree crew worked a 16-hour overnight shift on March 11-12, 2024, which was billed as work time. There is no standby designation or rate for tree crews. The crew did not record any ticket locations.
  4. Page 75 of 141

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-19 Date Issued September 21, 2026 OCC-776 Page 1 of 1 Date Filed: October 05, 2026 Witness: John P. DiPaola-Tromba, Sean D. Redding and Jenna Turner Request from: Office of Consumer Counsel Question: (MS24E) Please refer to Exhibit ACCT-2 (CLP-5A-03) (MS24E), p. 106-108. Please clarify if this crew performed any work or was on standby for 3 hours on March 11 and 13 hours on March 12. Response: The tree crew worked a 16-hour overnight shift on March 11-12, 2024, which was billed as work time. There is no standby designation or rate for tree crews. The crew did not record any ticket locations.
  5. Page 76 of 141

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-19 Date Issued September 21, 2026 OCC-777 Page 1 of 1 Date Filed: October 05, 2026 Witness: John P. DiPaola-Tromba, Sean D. Redding and Jenna Turner Request from: Office of Consumer Counsel Question: (MS24E) Please refer to Exhibit ACCT-2 (CLP-5A-04) (MS24E), p. 4-6. Please clarify if the crew performed any work or was on standby at the Cheshire Work Center for 3 hours on March 11 and 13 hours on March 12. Response: The tree crew worked a 16-hour overnight shift on March 11-12, 2024, which was billed as work time. There is no standby designation or rate for tree crews. The crew did not record any ticket locations.
  6. Page 77 of 141

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-19 Date Issued September 21, 2026 OCC-778 Page 1 of 1 Date Filed: October 05, 2026 Witness: John P. DiPaola-Tromba, Sean D. Redding and Jenna Turner Request from: Office of Consumer Counsel Question: (MS24E) Please refer to Exhibit ACCT-2 (CLP-5A-04) (MS24E), p. 7-9. This invoice and the associated time sheet indicate work performed on March 18-March 22, 2024, and indicate only that the work was for “STRM” without indicating a specific event. Please explain why the Company allocated these invoices to event MS24E and how it verified this allocation. Response: Referring to Exhibit ACCT-2 (CLP-5A-04) (MS24E), pages 7-9, the timesheet and Emergency Restoration Tree Contractor Work Location report indicate post-storm work performed to mitigate storm-damaged trees, after the MS24E restoration event was completed, in towns of New Fairfield, New Milford, and Warren. Storm-damaged tree conditions are identified through follow up items noted on restoration events, non-outage events, identified during the restoration, post-restoration patrols by operations, engineering or vegetation management, or inquiries from customers, municipalities, or tree wardens. The Company Arborist’s oversee this post-storm tree work and verify that the timesheets are correctly billed to the correct storm event.
  7. Page 78 of 141

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-19 Date Issued September 21, 2026 OCC-779 Page 1 of 1 Date Filed: October 05, 2026 Witness: Leanne M. Landry and Jeffrey D. Turano Request from: Office of Consumer Counsel Question: Refer to Exhibit CLP-ADDITIONS-12. Please provide, for each year 2017 through 2025, the approved capital plan and actual expenditures by category. For each category and year in which actual expenditures exceeded the plan, identify the projects responsible, explain the variance, and provide the document authorizing the excess. Response: CLP-ADDITIONS-12 provides a detailed overview of the Capital Investment Plan from 2017 through 2025 at the CT Electric Operations organizational level. The overview identifies key investments by operating company disaggregated by investment category. For CL&P, these categories are Basic Business, New Customer, Peak Load/Capacity, Regulatory Commitments, Reliability, Facilities, Information Technology (“IT”), and Other Investments. Analysis performed at this level is to provide departmental leaders an overview of the annual budget ultimately proposed to the Board of Trustees and changes made in prior years. In addition to information provided as part of CLP-ADDITIONS-12, please refer to CIEC-008, Attachment 1, for a summary of budgeted distribution capital expenditures for each of the years 2018 through 2025, as annually filed in compliance with Docket No. 17-10-46. These annual compliance filings (and their associated variance explanations in OCC-266, Attachment 1 through OCC-266, Attachment 7) analyze total company variances between budget and actual on a year-to-year basis.
  8. Page 79 of 141

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-19 Date Issued September 21, 2026 OCC-780 Page 1 of 2 Date Filed: October 05, 2026 Witness: David L. Gladey, Leanne M. Landry and Jeffrey D. Turano Request from: Office of Consumer Counsel Question: Exhibit CLP-ADDITIONS-12 shows a 2023 Connecticut Distribution plan of $466.4 million (PDF p. 121) against 2023 actual expenditures of $557.9 million (PDF p. 145). Explain each driver of the $91.5 million variance in dollar terms, identify each project or program added to the 2023 plan after the plan was set, and provide the 2023 capital variance analysis presented to Company management and to the Board of Trustees. Response: CLP-ADDITIONS-12 provides the annual capital investment plan from 2017 through 2025 at the CT Electric Operations organizational level. The table provides a list of projects added to the 2023 plan (over $500,000). The two largest projects added to the 2023 capital investment plan for CL&P were the trip-saver program and circuit patrol fixes. Trip savers are installed to reduce the number of outages caused by transient type events (tree, animal, lightning, etc.). A trip saver is a self-powered, electronically controlled, single-phase, cutout-mounted vacuum interrupter recloser. It is designed to eliminate the sustained interruption that occurs when a lateral fuse cutout operates in response to a transient fault. This device saves outages, improves restoration time to customers and reduces truck rolls. It also eliminates momentary circuit interruptions that occur when a substation circuit breaker or source-side line recloser would trip to prevent a lateral fuse cutout from operating in response to a transient fault. Additionally, the Company addressed circuit-patrol deficiencies identified by a third party. Distribution circuits patrolled by the third party documented deficiencies that were required to address asset and system improvements. The identified upgrades were completed to maintain a reliability of service to customers.
  9. Page 80 of 141

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-19 Date Issued September 21, 2026 OCC-780 Page 2 of 2 CD02197:2023 Trip Saver Program CD02169:TRC Circuit Patrol Fixes STRM22CP:CL&P MAJOR STORMS 2022 CD02133:Rentschler Field - New Service CS00675:Falls Village 9A Replace XFMR CD02275:Western Lateral Contributors to CEM CD01866:2023 ROW Priority 3 Poles CD02296:Eversource CT Hot Line Clamp Repl. CS00663:Stevenson 12A Install Mobile CD02270:Eastern CEMI-Lateral Reconductoring CD02030:6A7 Overload CD02334:Great Pond, Windsor NS CD02162:RECOMMENDATION FOR I-95 CD02121:11R50 PILC Cable Replacement CD02004:Canton 5R6 – Contingency Overload CD01852:ROW 030 Priority Structures CD02279:1B12 PILC Cable Replacement CD02045:48C7 Overload Project CD01559:11W47 PILC Cable Replacement 2023 Actual $ 21,972,108 $ 20,016,591 $ 4,096,195 $ 3,963,530 $ 3,159,632 $ 1,869,115 $ 1,644,692 $ 1,226,920 $ 1,154,330 $ 1,150,698 $ 1,096,932 $ 1,092,976 $ 1,089,367 $ 997,460 $ 733,499 $ 687,618 $ 659,215 $ 568,537 $ 561,296 Please refer to OCC-780, Attachment 1, for the December 2023 CT Electric Operations Budget Results, which includes the 2023 capital variance analysis that was presented to Company management. Please refer to OCC-780, Attachment 2 CONFIDENTIAL, for the February 5, 2024 CL&P Board of Directors letter, which includes a 2023 variance analysis for capital expenditures.
  10. Page 81 of 141

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-19 Date Issued September 21, 2026 OCC-781 Page 1 of 2 Date Filed: October 05, 2026 Witness: Donald J. Scacco Jr., Digaunto Chatterjee, Douglas P. Horton, Leanne M. Landry and Jeffrey D. Turano Request from: Office of Consumer Counsel Question: Exhibit CLP-ADDITIONS-12 at p. 167 identifies as the first major variance driver for 2024 vs 2025 “Decrease in overall CT capital plan due to regulatory recovery risk.” Explain what the Company means by that phrase, and identify each investment deferred, reduced or cancelled in the 2025 plan for that reason, with the amount, the period of deferral, and the reliability or safety consequence assessed at the time, together with the documents recording each decision. State whether any such investment is now included in the docket no. 26-05-10 or specifically in the proposed TSP Plan in Exhibit CLP-TSP-1. Response: Please refer to OCC-781, Attachment 1, for a detailed description of why the 2025 CT capital plan was reduced relating to regulatory recovery risk. Please refer to OCC-781, Attachment 2, for a list of deferred projects for the 2025 capital plan with deferred amounts greater than $500,000. It is important to note that the budget reduction affected only the 2025 fiscal year, which was a fiscal period bookended by an increase in capital expenditures for reliability in 2023 and 2026. As a result, there is no “reliability or safety consequence” associated with such a short-term deviation in budget expenditures. The reliability impact associated with reduced capital investment is identified in OCC-781, Attachment 1, as in the range of 12-15 percent over the next five years, assuming no improvement in the reduced expenditure level. This projection flows from the fact that the electric distribution system is a dynamic operating platform constructed to have a sufficient level of flexibility to withstand the numerous intrinsic and extrinsic operating conditions that influence the system’s performance in any given year, or even in any given week or day. In that context, capital expenditures within one year are not generally viewed as having a discrete, discernible impact (positive or negative) on reliability performance. System reliability is a continually moving target that fluctuates up or down in the short term as a result of a number of factors, including randomly occurring operating conditions. In the longer term, reliability performance will trend up or down across time, on a system basis, with consistent investment (or a lack of consistent investment). For example, over five years, reliability-focused plant additions would be expected to have a positive, discernible impact, if consistently made over that five-year
26 pages match

As listed on the current system

Corres. 10/14/2026 [26-05-10] (Keegan Werlin LLP) - Discovery Compilation (ALLCO Set 9, OCC Set 19, OCC Set 20).

This filing on the current system (opens in a new tab)