    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-19 Date Issued September 21, 2026 OCC-778 Page 1 of 1 Date Filed: October 05, 2026 Witness: John P. DiPaola-Tromba, Sean D. Redding and Jenna Turner Request from: Office of Consumer Counsel Question: (MS24E) Please refer to Exhibit ACCT-2 (CLP-5A-04) (MS24E), p. 7-9. This invoice and the associated time sheet indicate work performed on March 18-March 22, 2024, and indicate only that the work was for “STRM” without indicating a specific event. Please explain why the Company allocated these invoices to event MS24E and how it verified this allocation. Response: Referring to Exhibit ACCT-2 (CLP-5A-04) (MS24E), pages 7-9, the timesheet and Emergency Restoration Tree Contractor Work Location report indicate post-storm work performed to mitigate storm-damaged trees, after the MS24E restoration event was completed, in towns of New Fairfield, New Milford, and Warren. Storm-damaged tree conditions are identified through follow up items noted on restoration events, non-outage events, identified during the restoration, post-restoration patrols by operations, engineering or vegetation management, or inquiries from customers, municipalities, or tree wardens. The Company Arborist’s oversee this post-storm tree work and verify that the timesheets are correctly billed to the correct storm event.
  2. Page 78 of 141

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-19 Date Issued September 21, 2026 OCC-779 Page 1 of 1 Date Filed: October 05, 2026 Witness: Leanne M. Landry and Jeffrey D. Turano Request from: Office of Consumer Counsel Question: Refer to Exhibit CLP-ADDITIONS-12. Please provide, for each year 2017 through 2025, the approved capital plan and actual expenditures by category. For each category and year in which actual expenditures exceeded the plan, identify the projects responsible, explain the variance, and provide the document authorizing the excess. Response: CLP-ADDITIONS-12 provides a detailed overview of the Capital Investment Plan from 2017 through 2025 at the CT Electric Operations organizational level. The overview identifies key investments by operating company disaggregated by investment category. For CL&P, these categories are Basic Business, New Customer, Peak Load/Capacity, Regulatory Commitments, Reliability, Facilities, Information Technology (“IT”), and Other Investments. Analysis performed at this level is to provide departmental leaders an overview of the annual budget ultimately proposed to the Board of Trustees and changes made in prior years. In addition to information provided as part of CLP-ADDITIONS-12, please refer to CIEC-008, Attachment 1, for a summary of budgeted distribution capital expenditures for each of the years 2018 through 2025, as annually filed in compliance with Docket No. 17-10-46. These annual compliance filings (and their associated variance explanations in OCC-266, Attachment 1 through OCC-266, Attachment 7) analyze total company variances between budget and actual on a year-to-year basis.
  3. Page 79 of 141

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-19 Date Issued September 21, 2026 OCC-780 Page 1 of 2 Date Filed: October 05, 2026 Witness: David L. Gladey, Leanne M. Landry and Jeffrey D. Turano Request from: Office of Consumer Counsel Question: Exhibit CLP-ADDITIONS-12 shows a 2023 Connecticut Distribution plan of $466.4 million (PDF p. 121) against 2023 actual expenditures of $557.9 million (PDF p. 145). Explain each driver of the $91.5 million variance in dollar terms, identify each project or program added to the 2023 plan after the plan was set, and provide the 2023 capital variance analysis presented to Company management and to the Board of Trustees. Response: CLP-ADDITIONS-12 provides the annual capital investment plan from 2017 through 2025 at the CT Electric Operations organizational level. The table provides a list of projects added to the 2023 plan (over $500,000). The two largest projects added to the 2023 capital investment plan for CL&P were the trip-saver program and circuit patrol fixes. Trip savers are installed to reduce the number of outages caused by transient type events (tree, animal, lightning, etc.). A trip saver is a self-powered, electronically controlled, single-phase, cutout-mounted vacuum interrupter recloser. It is designed to eliminate the sustained interruption that occurs when a lateral fuse cutout operates in response to a transient fault. This device saves outages, improves restoration time to customers and reduces truck rolls. It also eliminates momentary circuit interruptions that occur when a substation circuit breaker or source-side line recloser would trip to prevent a lateral fuse cutout from operating in response to a transient fault. Additionally, the Company addressed circuit-patrol deficiencies identified by a third party. Distribution circuits patrolled by the third party documented deficiencies that were required to address asset and system improvements. The identified upgrades were completed to maintain a reliability of service to customers.
  4. Page 80 of 141

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-19 Date Issued September 21, 2026 OCC-780 Page 2 of 2 CD02197:2023 Trip Saver Program CD02169:TRC Circuit Patrol Fixes STRM22CP:CL&P MAJOR STORMS 2022 CD02133:Rentschler Field - New Service CS00675:Falls Village 9A Replace XFMR CD02275:Western Lateral Contributors to CEM CD01866:2023 ROW Priority 3 Poles CD02296:Eversource CT Hot Line Clamp Repl. CS00663:Stevenson 12A Install Mobile CD02270:Eastern CEMI-Lateral Reconductoring CD02030:6A7 Overload CD02334:Great Pond, Windsor NS CD02162:RECOMMENDATION FOR I-95 CD02121:11R50 PILC Cable Replacement CD02004:Canton 5R6 – Contingency Overload CD01852:ROW 030 Priority Structures CD02279:1B12 PILC Cable Replacement CD02045:48C7 Overload Project CD01559:11W47 PILC Cable Replacement 2023 Actual $ 21,972,108 $ 20,016,591 $ 4,096,195 $ 3,963,530 $ 3,159,632 $ 1,869,115 $ 1,644,692 $ 1,226,920 $ 1,154,330 $ 1,150,698 $ 1,096,932 $ 1,092,976 $ 1,089,367 $ 997,460 $ 733,499 $ 687,618 $ 659,215 $ 568,537 $ 561,296 Please refer to OCC-780, Attachment 1, for the December 2023 CT Electric Operations Budget Results, which includes the 2023 capital variance analysis that was presented to Company management. Please refer to OCC-780, Attachment 2 CONFIDENTIAL, for the February 5, 2024 CL&P Board of Directors letter, which includes a 2023 variance analysis for capital expenditures.
  5. Page 81 of 141

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-19 Date Issued September 21, 2026 OCC-781 Page 1 of 2 Date Filed: October 05, 2026 Witness: Donald J. Scacco Jr., Digaunto Chatterjee, Douglas P. Horton, Leanne M. Landry and Jeffrey D. Turano Request from: Office of Consumer Counsel Question: Exhibit CLP-ADDITIONS-12 at p. 167 identifies as the first major variance driver for 2024 vs 2025 “Decrease in overall CT capital plan due to regulatory recovery risk.” Explain what the Company means by that phrase, and identify each investment deferred, reduced or cancelled in the 2025 plan for that reason, with the amount, the period of deferral, and the reliability or safety consequence assessed at the time, together with the documents recording each decision. State whether any such investment is now included in the docket no. 26-05-10 or specifically in the proposed TSP Plan in Exhibit CLP-TSP-1. Response: Please refer to OCC-781, Attachment 1, for a detailed description of why the 2025 CT capital plan was reduced relating to regulatory recovery risk. Please refer to OCC-781, Attachment 2, for a list of deferred projects for the 2025 capital plan with deferred amounts greater than $500,000. It is important to note that the budget reduction affected only the 2025 fiscal year, which was a fiscal period bookended by an increase in capital expenditures for reliability in 2023 and 2026. As a result, there is no “reliability or safety consequence” associated with such a short-term deviation in budget expenditures. The reliability impact associated with reduced capital investment is identified in OCC-781, Attachment 1, as in the range of 12-15 percent over the next five years, assuming no improvement in the reduced expenditure level. This projection flows from the fact that the electric distribution system is a dynamic operating platform constructed to have a sufficient level of flexibility to withstand the numerous intrinsic and extrinsic operating conditions that influence the system’s performance in any given year, or even in any given week or day. In that context, capital expenditures within one year are not generally viewed as having a discrete, discernible impact (positive or negative) on reliability performance. System reliability is a continually moving target that fluctuates up or down in the short term as a result of a number of factors, including randomly occurring operating conditions. In the longer term, reliability performance will trend up or down across time, on a system basis, with consistent investment (or a lack of consistent investment). For example, over five years, reliability-focused plant additions would be expected to have a positive, discernible impact, if consistently made over that five-year
  6. Page 82 of 141Match

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-19 Date Issued September 21, 2026 OCC-781 Page 2 of 2 period, and conversely, capital expenditures that are consistently reduced from year-to-year would be expected to have a discernible negative impact on reliability over a multi-year period. The intrinsic and extrinsic factors that impact reliability and preclude a direct assessment of reliability benefits (or detriments) in the shorter term include the location of future events on the system, the impact of minor weather event days, aging infrastructure failures outpacing the rate of replacement, surrounding tree conditions and many other factors. In addition, at the time that the Company identified the need for reduced capital expenditures, the Company took significant care to identify capital work that could be toggled back without an immediate impact to safety and reliability. For example, proactive, preventive replacement of underground, direct-buried 4kV cable was reduced following several years of increased investment because (1) the Company can maintain safety and reliability in the short run with repairs rather than replacement of this infrastructure; and (2) the Company’s investment approach is changing now based on its experience with the proactive replacement program for 4kV. The work deferred from the 2025 plan listed in OCC-781, Attachment 2, is planned for completion either as part of the 2026 capital plan, or as part of the Company’s work plan over the next few years.
  7. Page 83 of 141

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-19 Date Issued September 21, 2026 OCC-782 Page 1 of 2 Date Filed: October 06, 2026 Witness: David L. Gladey, Leanne M. Landry and Jeffrey D. Turano Request from: Office of Consumer Counsel Question: Exhibit CLP-ADDITIONS-12 at p. 121 attributes the decrease in planned 2023 Basic Business expenditures to “unusually high emergent work ($34M) in 2022.” Identify the work comprising that $34 million by project or work order, and for each event provide date, location, asset class, failure cause and cost, and whether the asset had previously been assessed as deficient. State the criteria the Company applies to classify work as emergent rather than planned, and provide the written standard in effect in 2022. Response: CLP-ADDITIONS-12 provides the annual capital investment plan from 2017 through 2025 at the CT Electric Operations organizational level. The referenced $34 million is the variance between 2022 actual ($85 million) and 2023 budget ($51 million). Please refer to OCC-782, Attachment 1, for a listing of 2022 work order details comprising the $85 million. Please refer to the Company’s response to OCC-568 i, and note that emergent work “includes items identified through routine inspections and maintenance as well as emergent/emergency equipment replacements in a substation or on the overhead and underground distribution system.” Prior Referenced Response: i OCC-568 Question: In Exhibit CLP-TSP-3, Page 42, Eversource provides a table with investment categories by year. Please clarify how the following categories are mutually exclusive: a. b. c. d. Reliability Capacity Emergent Asset Health OCC-568 Response: Projects and programs shown in Exhibit CLP-TSP-3, at 42, are placed into a category by the main driver for the scope of work, although the project and/or programs may resolve multiple system concerns. For example the identified need to begin project or program development could be identified as capacity, however, a secondary driver could be asset health. In this instance the investment would be placed in the capacity category corresponding to the main driver of
  8. Page 84 of 141

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-19 Date Issued September 21, 2026 OCC-782 Page 2 of 2 the work, although it resolves multiple system concerns such as asset health. The project and program investments in each of the categories are only accounted for in that category and are not included in additional categories. Exhibit CLP-TSP-3, pages 45 through 95 give additional information to describe the categories noted. a. Reliability projects are work on the system associated with improving or maintaining SAIDI and SAIFI metrics. Projects in this category could also include double pole removals and the smart switch program. b. Capacity projects are created to prevent equipment damage due to thermal overloads which could result in customer outages, while also providing operational flexibility to enable outages to be isolated and restored through alternate sources based on Eversource design criteria. They address peak load and capacity needs across the distribution system. c. Emergent project work includes items identified through routine inspections and maintenance as well as emergent/emergency equipment replacements in a substation or on the overhead and underground distribution system. d. Asset Health includes the replacement of aging or obsolete equipment that has reached the end of its useful life in order to maintain safe and reliable system performance. Within this scope, key asset types include transformers, switchgear, poles, PILC, conductor, cables, breakers, batteries, reclosers, station service transformers, protective relays, gas monitors, and switches for example. The need for replacement is determined based on inspections, testing, equipment age, safety considerations, operating performance, changes in standards, equipment obsolescence, and spare parts availability.
  9. Page 85 of 141

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-19 Date Issued September 21, 2026 OCC-783 Page 1 of 1 Date Filed: October 05, 2026 Witness: David L. Gladey, Leanne M. Landry and Jeffrey D. Turano Request from: Office of Consumer Counsel Question: Exhibit CLP-ADDITIONS-12 shows the planned Basic Business line item for emergent equipment replacement rising from $46 million in the 2019 plan (p. 44) to $71 million in the 2025 plan (p. 166). Provide the planned and actual amount for this line item for each year 2017 through 2025, explain the increase and provide the analysis supporting the 2025 amount. Reconcile the increase with the statement in Exhibit CLP-TSP-3 at p. 55 that “As proactive asset health investment increases in future years, emergent work is anticipated to decrease.” Response: CLP-ADDITIONS-12 provides an overview of the annual capital investment plan from 2017 through 2025 at the CT Electric Operations organizational level. The Company has experienced increases in the cost of material and labor in the category of Emergent Equipment Replacement because these are unplanned events that have to be addressed on a reactive basis. In addition, the Company has experienced increases in the number of customer outage events on the overhead, underground and network system caused by factors other than Major Storm events, which is accounted for within the Emergent Equipment Replacement category. Examples of the factors affecting this cost category include vegetation-initiated overhead events, pole and line damages and associated events due to motor vehicle accidents, unplanned asset failures, residential direct-buried cable failures; underground cable or switchgear events, and network events. Many of these events are the result of weather patterns that occur on the system without rising to the level of a catastrophic event. For example, the Company is experiencing more numerous “minor” weather events during the year caused by frequent wind events during blue sky or grey sky days that cause damage to the system. As presented in OCC-586, Attachment 1, Emergent Equipment Failures are projected to decrease $8M a year in 2030 and 2031 associated with proactive substation-related infrastructure investments. A consistently applied proactive investment plan will have the benefit of reducing Emergent Equipment Replacement over a multi-year term. A theory of a relatively more proactive investment plan is that it will address infrastructure conditions before there is a system failure.
  10. Page 86 of 141

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-19 Date Issued September 21, 2026 OCC-784 Page 1 of 1 Date Filed: October 05, 2026 Witness: Leanne M. Landry, John G. Griffin and Jeffrey D. Turano Request from: Office of Consumer Counsel Question: Exhibit CLP-ADDITIONS-12 refers at several points to the capitalization of major storm costs. State the amount of storm cost capitalized to Basic Business in each year 2017 through 2025, provide the accounting policy distinguishing capitalized storm cost from operation and maintenance expense, and identify any amount included both in those capitalized totals and in the storm costs for which recovery is sought in Exhibit CLP-STORM-1. Response: Please refer to the chart below for the amount of storm costs capitalized to Basic Business each year from 2017-2025. Please refer to OCC-784, Attachment 1, for the Company’s Capital versus Expense Criteria policy. None of the dollars below are included in the storm cost recovery sought in Exhibit CLP-STORM-1.