Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Discovery Compilation (ALLCO Set 9, OCC Set 19, OCC Set 20).

Files4

Search terms highlighted
Eversource rate increase is on 35 pages across 3 files of the text below, highlighted. Go to the first matchClear highlighting
Words on different pages
1 page match
8 pages match
  1. Page 86 of 141

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-19 Date Issued September 21, 2026 OCC-784 Page 1 of 1 Date Filed: October 05, 2026 Witness: Leanne M. Landry, John G. Griffin and Jeffrey D. Turano Request from: Office of Consumer Counsel Question: Exhibit CLP-ADDITIONS-12 refers at several points to the capitalization of major storm costs. State the amount of storm cost capitalized to Basic Business in each year 2017 through 2025, provide the accounting policy distinguishing capitalized storm cost from operation and maintenance expense, and identify any amount included both in those capitalized totals and in the storm costs for which recovery is sought in Exhibit CLP-STORM-1. Response: Please refer to the chart below for the amount of storm costs capitalized to Basic Business each year from 2017-2025. Please refer to OCC-784, Attachment 1, for the Company’s Capital versus Expense Criteria policy. None of the dollars below are included in the storm cost recovery sought in Exhibit CLP-STORM-1.
  2. Page 87 of 141

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-19 Date Issued September 21, 2026 OCC-785 Page 1 of 1 Date Filed: October 05, 2026 Witness: David L. Gladey, Leanne M. Landry and Jeffrey D. Turano Request from: Office of Consumer Counsel Question: Exhibit CLP-ADDITIONS-12, shows Regulatory Commitments actual expenditures of $116 million in 2017 (p. 28) against $5.0 million planned for 2025 in the renamed Regulatory category (p. 167). Explain the decline, and identify each regulatory commitment satisfied between 2017 and 2025 with its year of completion, and each commitment outstanding at December 31, 2025. Also, state when and why the category was renamed. Response: The main reason for the decline is the shift in System Resiliency/Expanded Reliability from the Regulatory Commitments category to the Reliability category. System Resiliency was approved in Docket No. 17-10-46, for the years 2018, 2019, and 2020 with recovery through the capital tracker (ESI). Since recovery of System Resiliency ended until potential recovery in the next distribution rate case, it was removed from the Regulatory Commitments category. Another reason for the decline is completion of work for certain Regulatory Commitment categories. Hi Over Lo Voltage Removal work was completed in 2023 and Network 500 kcmil Cable Replacement Program work was completed in 2024. 4.8kv Grounding and Transmission Distribution Reliability Performance (TDRP) are ongoing programs. There is no real significance to the category being renamed from Regulatory Commitments to Regulatory in the annual capital plan. It is still called “Regulatory Commitments” in the Company’s financial systems.
  3. Page 88 of 141

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-19 Date Issued September 21, 2026 OCC-786 Page 1 of 1 Date Filed: October 05, 2026 Witness: David L. Gladey, John P. Dipaola-Tromba, Leanne M. Landry and Jeffrey D. Turano Request from: Office of Consumer Counsel Question: Across the Key Investment pages of Exhibit CLP-ADDITIONS-12, resiliency work: right-of-way lines, pole integrity, smart switches and substation security, appears under Regulatory Commitments in the 2019 through 2022 plan books and under Reliability from 2023. State when the reclassification was made and why, and provide this work on a consistent basis for each year 2017 through 2025. Substation security no longer appears in that line item from 2023; state where it is now reported. Response: System Resiliency was approved in Docket No. 17-10-46, for the years 2018, 2019, and 2020 with recovery through the capital tracker (ESI). Since recovery of System Resiliency ended until potential recovery in the next distribution rate case, it was removed from the Regulatory Commitments category. The reclassification was made in 2023 as there is continued work needed in these program areas. Please refer to OCC-786, Attachment 1, for the right-of-way lines, pole integrity, smart switches, and substation security categories from 2017-2025. Substation Security for distribution, essentially ended as a “program” in 2023 as a majority of the work under the program was completed. While there are no significant planned investments in substation security, any capital spending on new or emergent distribution substation security work would be reflected under the Substation Reliability category.
  4. Page 89 of 141

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-19 Date Issued September 21, 2026 OCC-787 Page 1 of 1 Date Filed: October 05, 2026 Witness: David L. Gladey, Leanne M. Landry and Jeffrey D. Turano Request from: Office of Consumer Counsel Question: Exhibit CLP-ADDITIONS-12 at p. 145 refers to “significant Line capacity project carryover work from 2022 that led to higher spending in 2023.” For each year 2017 through 2025, identify every project whose spending carried from one plan year into the next, with the planned and actual inservice date, the planned and actual cost, and the reason for the delay. Response: Please refer to OCC-787, Attachment 1, for line capacity projects with carryover work including the year the project delay occurred, total authorized and actual cost, planned and actual in-service dates, and the reason for the delay. Please note that there are multiple actual in-service dates by project because work orders are placed in-service, not projects. Also, please note that the “Line capacity project carryover work” in 2023 accounted for only approximately $4 to $5 million of the incremental increase between 2022 and 2023.
  5. Page 90 of 141

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-19 Date Issued September 21, 2026 OCC-788 Page 1 of 1 Date Filed: October 06, 2026 Witness: Leanne M. Landry and Jeffrey D. Turano Request from: Office of Consumer Counsel Question: Exhibit CLP-ADDITIONS-4, reports project number, description, category, type and cost, but no asset quantities. For every project and work order listed, provide the assets installed, replaced or retired by asset class and quantity, in native electronic format joinable to that exhibit by project number. Response: Please refer to OCC-788, Attachment 1, through OCC-788, Attachment 2, for a listing of project additions and retirements including asset class and quantity. Note that since 2017 certain adjustments were made as work orders shift to different projects and may result in insignificant offsetting variances across the years. It should also be noted that the quantity associated with a retirement unit should not necessarily be interpreted as a one-for-one count of individual physical assts installed and retired. Depending on the type of property, the quantity may represent a single install or retirement transaction, or lot, rather than a discrete number of units. Accordingly, quantities should be considered in conjunction with the applicable retirement unit and the manner in which the property is maintained in the fixed asset records.
  6. Page 91 of 141

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-19 Date Issued September 21, 2026 OCC-789 Page 1 of 2 Date Filed: October 05, 2026 Witness: Leanne M. Landry and Jeffrey D. Turano Request from: Office of Consumer Counsel Question: For each annual program on the Annual Projects tabs of Exhibit CLP-ADDITIONS-4, provide the unit cost applied in each year 2017 through 2025 – per pole, distribution transformer, switch or recloser, mile of overhead conductor, mile of underground cable, and meter – together with the source data and the budget-to-actual variance. Response: “Unit cost metrics” are not a reliable means of tracking these types of annual projects due to the scale and scope of the overall endeavor. The Company explained in its testimony, Exhibit CLPADDITIONS-1, beginning on page 25, the following process applicable to annual projects: A large volume of work occurs on the system on a daily basis associated with projects that are repetitive, numerous, and routine. These jobs are authorized in the aggregate, or by an annual program authorization. Individual review and authorization of each of these thousands of work orders is not necessary because the jobs are small in scope and highly repetitive in nature – therefore, the costs are highly consistent with the same cost drivers occurring over and over. Reviewing and approving each of these projects independently would require increased staffing levels for little or no marginal benefit, would unnecessarily slow the entire process down, and would negatively impact the Company’s ability to undertake routine jobs on a reasonable schedule to continue to provide safe and reliable service. In essence, annual programs represent non-discretionary operational programs required to efficiently operate the electric distribution system. Typically, these program budgets are set each year based on historical averages that may fluctuate depending on supply chain challenges driving up material prices (e.g., pre-capitalized transformers) and customer growth or retraction (e.g., new customer connection annual). The review and approval of annual programs has evolved. Prior to 2024, these programs were documented and supported by the Company’s capital book which is sent to the Board of Trustees in January/February of each year. This serves as documentation and approval of the capital plan. Prior to 2024, Eversource managed and balanced its capital plan across the Company and all other entities. Monthly workplans and financial reports sent to Operations and Finance
  7. Page 92 of 141

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-19 Date Issued September 21, 2026 OCC-789 Page 2 of 2 leadership served as the monitoring tool. Since the annuals were based on historical estimates, there were variances, both plus and minus, across the years. Following the RAM hearings at PURA in 2023 and a discussion on annual project documentation, beginning in 2024, the annual programs now have project authorization documents in addition to the Capital Book. Also, beginning in 2018, these annuals have been summarized in the annual RAM/ESI filing with an annual filing requirement to summarize budget versus actual variances greater than +/- 10%. To support the variances in the annuals from 2018-2025, the Company included these variance explanations in the project documentation support.
  8. Page 93 of 141

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-19 Date Issued September 21, 2026 OCC-790 Page 1 of 2 Date Filed: October 05, 2026 Witness: Leanne M. Landry and Jeffrey D. Turano Request from: Office of Consumer Counsel Question: Summed across 2017 through 2025, Exhibit CLP-ADDITIONS-3 shows annual programs and annual work orders of approximately $2,289.8 million of the net distribution plant additions. For each annual program and annual work order, provide the authorization documentation required under the Project Authorization Policies at Exhibits CLP-ADDITIONS-10A and 10B, or, if no project-level authorization was required, identify the approval governing the annual amount and the policy provision permitting it. Response: Please refer to Exhibits CLP-ADDITIONS-6 and CLP-ADDITIONS-12 where the Company has provided Project Authorization Forms and Annual Capital Plan Books, respectively. CLP-ADDITIONS-1, beginning on page 25, also notes the following with regard to annual projects and their approval process: A large volume of work occurs on the system on a daily basis associated with projects that are repetitive, numerous, and routine. These jobs are authorized in the aggregate, or by an annual program authorization. Individual review and authorization of each of these thousands of work orders is not necessary because the jobs are small in scope and highly repetitive in nature – therefore, the costs are highly consistent with the same cost drivers occurring over and over. Reviewing and approving each of these projects independently would require increased staffing levels for little or no marginal benefit, would unnecessarily slow the entire process down, and would negatively impact the Company’s ability to undertake routine jobs on a reasonable schedule to continue to provide safe and reliable service. In essence, annual programs represent nondiscretionary operational programs required to efficiently operate the electric distribution system. Typically, these program budgets are set each year based on historical averages that may fluctuate depending on supply chain challenges driving up material prices (e.g., pre-capitalized transformers) and customer growth or retraction (e.g., new customer connection annual). The review and approval of annual programs has evolved. Prior to 2024, these programs were documented and supported by the Company’s capital book which is sent to the Board of Trustees in January/February of each year. This serves as documentation and approval of the capital plan. Prior to 2024, Eversource managed and balanced its capital plan across the Company and all other entities. Monthly workplans and financial reports sent to Operations and Finance leadership served as the monitoring tool. Since the annuals were based on historical estimates, there were
  9. Page 94 of 141

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-19 Date Issued September 21, 2026 OCC-790 Page 2 of 2 variances, both plus and minus, across the years. Following the RAM hearings at PURA in 2023 and a discussion on annual project documentation, beginning in 2024, the annual programs now have project authorization documents in addition to the Capital Book. Also, beginning in 2018, these annuals have been summarized in the annual RAM/ESI filing with an annual filing requirement to summarize budget versus actual variances greater than +/- 10%. To support the variances in the annuals from 2018-2025, the Company included these variance explanations in the project documentation support.
  10. Page 95 of 141

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-19 Date Issued September 21, 2026 OCC-791 Page 1 of 1 Date Filed: October 05, 2026 Witness: Leanne M. Landry and Jeffrey D. Turano Request from: Office of Consumer Counsel Question: State whether the “Pre-Construction Estimated Costs” column in Exhibit CLP-ADDITIONS-4, reflects the estimate at initial Project Authorization Form approval or as revised by a Supplemental Authorization Form, as described at p. 18, and 32–33, of Exhibit CLP-ADDITIONS-1. Where an estimate was revised, provide the original and revised figures and the date of each revision. Response: The “Pre-Construction Estimated Costs” column in Exhibit CLP-ADDITIONS-4, indicates the latest approved amount for each project. This would be either the current Project Authorization Form (PAF) or, if applicable, Supplemental Authorization Form (SAF). In an effort to be responsive to this request, the Company requests the Office of Consumer Counsel to refer to Exhibit CLP-ADDITIONS-6, in which the Company has provided folders containing PAF (and SAF information, if applicable) support for capital additions. Furthermore, Exhibit CLPADDITIONS-11, is designed to assist reviewers in understanding the various parts of CL&P’s capital document submission, including folder structures and breakdown as well as an overview on PAF/SAF submittals.
26 pages match

As listed on the current system

Corres. 10/14/2026 [26-05-10] (Keegan Werlin LLP) - Discovery Compilation (ALLCO Set 9, OCC Set 19, OCC Set 20).

This filing on the current system (opens in a new tab)