Discovery Compilation (ALLCO Set 9, OCC Set 19, OCC Set 20).
Files4
Docket No. 26-05-10 Discovery Compilation October 14 2026.pdf
PDF · 154 KB · 1 pageText searchable
Download Docket No. 26-05-10 Discovery Compilation October 14 2026.pdfRead the text of Docket No. 26-05-10 Discovery Compilation October 14 2026.pdf
ALLCO Set 9 COMBINED.pdf
PDF · 746 KB · 61 pagesText searchable
Download ALLCO Set 9 COMBINED.pdfRead the text of ALLCO Set 9 COMBINED.pdf
OCC Set 19_COMBINED.pdf
PDF · 1.4 MB · 141 pagesText searchable
Download OCC Set 19_COMBINED.pdfRead the text of OCC Set 19_COMBINED.pdf
OCC Set 20 COMBINED.pdf
PDF · 1.0 MB · 98 pagesText searchable
Download OCC Set 20 COMBINED.pdfRead the text of OCC Set 20 COMBINED.pdf
Page 91 of 141
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-19 Date Issued September 21, 2026 OCC-789 Page 1 of 2 Date Filed: October 05, 2026 Witness: Leanne M. Landry and Jeffrey D. Turano Request from: Office of Consumer Counsel Question: For each annual program on the Annual Projects tabs of Exhibit CLP-ADDITIONS-4, provide the unit cost applied in each year 2017 through 2025 – per pole, distribution transformer, switch or recloser, mile of overhead conductor, mile of underground cable, and meter – together with the source data and the budget-to-actual variance. Response: “Unit cost metrics” are not a reliable means of tracking these types of annual projects due to the scale and scope of the overall endeavor. The Company explained in its testimony, Exhibit CLPADDITIONS-1, beginning on page 25, the following process applicable to annual projects: A large volume of work occurs on the system on a daily basis associated with projects that are repetitive, numerous, and routine. These jobs are authorized in the aggregate, or by an annual program authorization. Individual review and authorization of each of these thousands of work orders is not necessary because the jobs are small in scope and highly repetitive in nature – therefore, the costs are highly consistent with the same cost drivers occurring over and over. Reviewing and approving each of these projects independently would require increased staffing levels for little or no marginal benefit, would unnecessarily slow the entire process down, and would negatively impact the Company’s ability to undertake routine jobs on a reasonable schedule to continue to provide safe and reliable service. In essence, annual programs represent non-discretionary operational programs required to efficiently operate the electric distribution system. Typically, these program budgets are set each year based on historical averages that may fluctuate depending on supply chain challenges driving up material prices (e.g., pre-capitalized transformers) and customer growth or retraction (e.g., new customer connection annual). The review and approval of annual programs has evolved. Prior to 2024, these programs were documented and supported by the Company’s capital book which is sent to the Board of Trustees in January/February of each year. This serves as documentation and approval of the capital plan. Prior to 2024, Eversource managed and balanced its capital plan across the Company and all other entities. Monthly workplans and financial reports sent to Operations and FinancePage 92 of 141
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-19 Date Issued September 21, 2026 OCC-789 Page 2 of 2 leadership served as the monitoring tool. Since the annuals were based on historical estimates, there were variances, both plus and minus, across the years. Following the RAM hearings at PURA in 2023 and a discussion on annual project documentation, beginning in 2024, the annual programs now have project authorization documents in addition to the Capital Book. Also, beginning in 2018, these annuals have been summarized in the annual RAM/ESI filing with an annual filing requirement to summarize budget versus actual variances greater than +/- 10%. To support the variances in the annuals from 2018-2025, the Company included these variance explanations in the project documentation support.Page 93 of 141
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-19 Date Issued September 21, 2026 OCC-790 Page 1 of 2 Date Filed: October 05, 2026 Witness: Leanne M. Landry and Jeffrey D. Turano Request from: Office of Consumer Counsel Question: Summed across 2017 through 2025, Exhibit CLP-ADDITIONS-3 shows annual programs and annual work orders of approximately $2,289.8 million of the net distribution plant additions. For each annual program and annual work order, provide the authorization documentation required under the Project Authorization Policies at Exhibits CLP-ADDITIONS-10A and 10B, or, if no project-level authorization was required, identify the approval governing the annual amount and the policy provision permitting it. Response: Please refer to Exhibits CLP-ADDITIONS-6 and CLP-ADDITIONS-12 where the Company has provided Project Authorization Forms and Annual Capital Plan Books, respectively. CLP-ADDITIONS-1, beginning on page 25, also notes the following with regard to annual projects and their approval process: A large volume of work occurs on the system on a daily basis associated with projects that are repetitive, numerous, and routine. These jobs are authorized in the aggregate, or by an annual program authorization. Individual review and authorization of each of these thousands of work orders is not necessary because the jobs are small in scope and highly repetitive in nature – therefore, the costs are highly consistent with the same cost drivers occurring over and over. Reviewing and approving each of these projects independently would require increased staffing levels for little or no marginal benefit, would unnecessarily slow the entire process down, and would negatively impact the Company’s ability to undertake routine jobs on a reasonable schedule to continue to provide safe and reliable service. In essence, annual programs represent nondiscretionary operational programs required to efficiently operate the electric distribution system. Typically, these program budgets are set each year based on historical averages that may fluctuate depending on supply chain challenges driving up material prices (e.g., pre-capitalized transformers) and customer growth or retraction (e.g., new customer connection annual). The review and approval of annual programs has evolved. Prior to 2024, these programs were documented and supported by the Company’s capital book which is sent to the Board of Trustees in January/February of each year. This serves as documentation and approval of the capital plan. Prior to 2024, Eversource managed and balanced its capital plan across the Company and all other entities. Monthly workplans and financial reports sent to Operations and Finance leadership served as the monitoring tool. Since the annuals were based on historical estimates, there werePage 94 of 141
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-19 Date Issued September 21, 2026 OCC-790 Page 2 of 2 variances, both plus and minus, across the years. Following the RAM hearings at PURA in 2023 and a discussion on annual project documentation, beginning in 2024, the annual programs now have project authorization documents in addition to the Capital Book. Also, beginning in 2018, these annuals have been summarized in the annual RAM/ESI filing with an annual filing requirement to summarize budget versus actual variances greater than +/- 10%. To support the variances in the annuals from 2018-2025, the Company included these variance explanations in the project documentation support.Page 95 of 141
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-19 Date Issued September 21, 2026 OCC-791 Page 1 of 1 Date Filed: October 05, 2026 Witness: Leanne M. Landry and Jeffrey D. Turano Request from: Office of Consumer Counsel Question: State whether the “Pre-Construction Estimated Costs” column in Exhibit CLP-ADDITIONS-4, reflects the estimate at initial Project Authorization Form approval or as revised by a Supplemental Authorization Form, as described at p. 18, and 32–33, of Exhibit CLP-ADDITIONS-1. Where an estimate was revised, provide the original and revised figures and the date of each revision. Response: The “Pre-Construction Estimated Costs” column in Exhibit CLP-ADDITIONS-4, indicates the latest approved amount for each project. This would be either the current Project Authorization Form (PAF) or, if applicable, Supplemental Authorization Form (SAF). In an effort to be responsive to this request, the Company requests the Office of Consumer Counsel to refer to Exhibit CLP-ADDITIONS-6, in which the Company has provided folders containing PAF (and SAF information, if applicable) support for capital additions. Furthermore, Exhibit CLPADDITIONS-11, is designed to assist reviewers in understanding the various parts of CL&P’s capital document submission, including folder structures and breakdown as well as an overview on PAF/SAF submittals.Page 96 of 141
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-19 Date Issued September 21, 2026 OCC-792 Page 1 of 3 Date Filed: October 05, 2026 Witness: Digaunto Chatterjee, Lavelle A. Freeman and Elli Ntakou Request from: Office of Consumer Counsel Question: Refer Exhibit CLP-TSP-1, p. 60, “the Benefit Cost Analysis (BCA) tool is utilized to determine the most cost-effective reliability improvement work to perform based on historical event data to meet a desired reliability outcome.” State the date the tool was first used to select distribution reliability work, provide its ranked candidate list and the work performed for each year it was used, and explain each case in which lower-ranked work proceeded. Response: Please refer to the Company’s response to EOE-151 i. Per that response, the first results of the ReBOT tool were used to drive reliability work in 2024 to support the selection of the 2025 TripSaver program. ReBOT works as a tool that enables agility in planning reliability programs and projects and as such, ReBOT lists the optimal cost mitigation for all eligible zones, in decreasing order of cost effectiveness as measured by $/SAIDI saved and $/SAIFI reduction. In other words, because work happens for a multitude of reasons and there are typically multiple need triggers, it is possible that projects ranked lower when only considering SAIFI and SAIDI benefits, proceeded when assessing other system needs and potential project benefits. All rankings provided within the attachments below are based on the specific program/work type identified from the ReBot tool. Smart Switch Program – Trip Saver Rankings Please refer to OCC-792, Attachment 1 CONFIDENTIAL - Smart Switch (2025 Trip Savers) for the trip saver locations installed in 2025 based on the ReBot optimization tool prioritized by SAIFI. Please refer to OCC-792, Attachment 2 CONFIDENTIAL - Smart Switch (2026 Trip Savers) for the trip saver locations that will be installed in 2026 based on the ReBot optimization tool prioritized by SAIFI. Please refer to OCC-792, Attachment 3 CONFIDENTIAL - Smart Switch (2027 Trip Savers) for the trip saver locations that will be installed in 2027 based on the ReBot optimization tool prioritized by SAIDI. These locations are still in the design stage.Page 97 of 141
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-19 Date Issued September 21, 2026 OCC-792 Page 2 of 3 Lower ranked devices may not be included based on detailed reviews of each specific location. For example, the recommended trip saver location may not have the required load current for the device to operate properly, the fault rating may exceed the rating of the trip saver or the device may not coordinate properly. Smart Switch Program – Smart Switch (Reclosers) Rankings Please refer to OCC-792, Attachment 4 CONFIDENTIAL - Smart Switch (2027 Smart Switch Reclosers) for the zone locations where reclosers will be installed to reduce customers zones to less than 500 customers in 2027 based on the ReBot optimization tool prioritized by SAIDI. Lower ranked devices may not be included if those locations were already designed within existing projects or if no further sectionalizing was possible. Reliability Program – Reliability (Reconductoring) Rankings Please refer to OCC-792, Attachment 5 CONFIDENTIAL – 2027 Reconductoring for zones that will be reconductored in 2027 based on the ReBot optimization tool prioritized by SAIDI. Lower ranked devices may not be included if those locations were already designed within existing projects. Prior Referenced Response: i EOE-151 Question: (VEGETATION MANAGEMENT PROGRAM) Refer to Exhibit CLP-ELP-1, p. 67. Please provide the cost benefit analyses the Company performed for determining reliability projects for the 2025 Test Year. EOE-151 Response: As part of compliance with Docket No. 17-12-03RE08, the Company performed the referenced Benefit-Cost Analysis (“BCA”) in 2023 using historical reliability projects, their associated costs, and their observed impact on SAIDI and SAIFI. In 2024, the BCA results were incorporated into the Reliability Budget Optimization Tool (“ReBOT”). ReBOT uses the BCA results as a baseline to determine the cost-optimal reliability mitigation measure for each zone. It first creates a list of zones eligible for reliability mitigation by evaluating historical outage performance at the individual-zone level. The tool then estimates the potential reduction in customer interruptions and customer minutes of interruption associated with various eligible remediation alternatives. The estimated reliability benefit of each alternative is then evaluated relative to its estimated project cost using $/SAIDI or SAIFI per unit reduction as the metric to determine the most cost-effective mitigation measure. This process identifies and prioritizes potential device deployments andPage 98 of 141
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-19 Date Issued September 21, 2026 OCC-792 Page 3 of 3 other remediation alternatives that are expected to provide the greatest reliability improvement in a cost-effective manner. The initial ReBOT recommendations were produced in late 2024. Due to the timing of the Company’s project-planning cycle, the recommendations were used to support project selection for the 2025 and 2026 TripSaver Program. ReBOT’s use was subsequently expanded to support both the TripSaver, Smart Switch and reconductoring Programs in 2027. ReBOT is an evolving analytical tool, and the Company continues to refine its methodology and expand its application as additional experience and data become available. The BCA and ReBOT are used as project-screening and prioritization tools and are not intended to predict the precise impact of future projects or programs. Final project selection also considers engineering judgment, constructability, local system conditions, operational requirements, and other project-specific factors. As such, benefits and costs of each project may differ from the tool’s results for a multitude of reasons.Page 99 of 141
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-19 Date Issued September 21, 2026 OCC-793 Page 1 of 1 Date Filed: October 05, 2026 Witness: Leanne M. Landry, Jeffrey D. Turano and Marisa B. Paruta Request from: Office of Consumer Counsel Question: Refer to Exhibit CLP-ADDITIONS-1, p. 45. Approximately $4.3 billion of capital additions has been placed in service since January 1, 2017. Identify all such additions retired, abandoned or written off before the end of their depreciable life, with the in-service and retirement dates, the original cost, the amount remaining in rate base, and the reason. Response: Please refer to OCC-793, Attachment 1, for all additions of specific property since January 1, 2017, that were retired before the end of their depreciable life including in-service and retirement dates, original cost, amounts remaining in rate base and the reason for retirement. Retirements of specific property are generally recorded at the full value of the individual asset, whereas mass property retirements are accounted for using the applicable mass property retirement methodology. In some cases, specific property asset retirements are partial, or trended. This occurs when the original asset record includes units of property not separately unitized at the time of installation. When the original cost of the retired asset cannot be specifically identified, the Company utilizes the Handy-Whitman index to trend the replacement cost back to the original installation year to estimate its historical cost. The estimated amount is then retired from the existing asset and charged to the accumulated depreciation account. This process ensures that the cost of the replacement is removed from utility plant while the remaining portion of the original asset continues to be reflected in plant in service. CL&P predominantly utilizes the Broad Group Procedure to depreciate utility property. Under the Broad Group Procedure, homogenous assets are grouped together and depreciated under a single average service life. When an asset within the group is retired, the asset is considered fully accrued, regardless of the asset’s actual service life, and accumulated depreciation is debited for the full book cost of the asset. If an asset is retired prior to the average service life, any impact to depreciation expense will be recovered over time by assets that exceed the average service life of the group. The asset retirement dispersion is analyzed in future depreciation studies when creating an updated, proposed average service life and accompanying accrual rate.Page 100 of 141
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-19 Date Issued September 21, 2026 OCC-794 Page 1 of 1 Date Filed: October 06, 2026 Witness: Leanne M. Landry and Jeffrey D. Turano Request from: Office of Consumer Counsel Question: Refer to Exhibit CLP-ADDITIONS-4 reports projects and programs whose actual cost exceeds the pre-construction estimate by more than 25 percent, a number of which carry no entry in the Project Notes / Variance Explanations column. Identify each such project, and for each provide the variance explanation and the supplemental authorization, or state the policy provision under which no supplemental authorization was required. Response: Please refer to OCC-794, Attachment 1, for Projects listed on CLP-ADDITIONS-4 with actual costs exceeding the pre-construction estimate by more than 25% along with the variance explanation or policy provision reference. The Company will supplement this response for annual program projects with variances greater than 25%.