1 page match
8 pages match
  1. Page 97 of 141

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-19 Date Issued September 21, 2026 OCC-792 Page 2 of 3 Lower ranked devices may not be included based on detailed reviews of each specific location. For example, the recommended trip saver location may not have the required load current for the device to operate properly, the fault rating may exceed the rating of the trip saver or the device may not coordinate properly. Smart Switch Program – Smart Switch (Reclosers) Rankings Please refer to OCC-792, Attachment 4 CONFIDENTIAL - Smart Switch (2027 Smart Switch Reclosers) for the zone locations where reclosers will be installed to reduce customers zones to less than 500 customers in 2027 based on the ReBot optimization tool prioritized by SAIDI. Lower ranked devices may not be included if those locations were already designed within existing projects or if no further sectionalizing was possible. Reliability Program – Reliability (Reconductoring) Rankings Please refer to OCC-792, Attachment 5 CONFIDENTIAL – 2027 Reconductoring for zones that will be reconductored in 2027 based on the ReBot optimization tool prioritized by SAIDI. Lower ranked devices may not be included if those locations were already designed within existing projects. Prior Referenced Response: i EOE-151 Question: (VEGETATION MANAGEMENT PROGRAM) Refer to Exhibit CLP-ELP-1, p. 67. Please provide the cost benefit analyses the Company performed for determining reliability projects for the 2025 Test Year. EOE-151 Response: As part of compliance with Docket No. 17-12-03RE08, the Company performed the referenced Benefit-Cost Analysis (“BCA”) in 2023 using historical reliability projects, their associated costs, and their observed impact on SAIDI and SAIFI. In 2024, the BCA results were incorporated into the Reliability Budget Optimization Tool (“ReBOT”). ReBOT uses the BCA results as a baseline to determine the cost-optimal reliability mitigation measure for each zone. It first creates a list of zones eligible for reliability mitigation by evaluating historical outage performance at the individual-zone level. The tool then estimates the potential reduction in customer interruptions and customer minutes of interruption associated with various eligible remediation alternatives. The estimated reliability benefit of each alternative is then evaluated relative to its estimated project cost using $/SAIDI or SAIFI per unit reduction as the metric to determine the most cost-effective mitigation measure. This process identifies and prioritizes potential device deployments and
  2. Page 98 of 141

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-19 Date Issued September 21, 2026 OCC-792 Page 3 of 3 other remediation alternatives that are expected to provide the greatest reliability improvement in a cost-effective manner. The initial ReBOT recommendations were produced in late 2024. Due to the timing of the Company’s project-planning cycle, the recommendations were used to support project selection for the 2025 and 2026 TripSaver Program. ReBOT’s use was subsequently expanded to support both the TripSaver, Smart Switch and reconductoring Programs in 2027. ReBOT is an evolving analytical tool, and the Company continues to refine its methodology and expand its application as additional experience and data become available. The BCA and ReBOT are used as project-screening and prioritization tools and are not intended to predict the precise impact of future projects or programs. Final project selection also considers engineering judgment, constructability, local system conditions, operational requirements, and other project-specific factors. As such, benefits and costs of each project may differ from the tool’s results for a multitude of reasons.
  3. Page 99 of 141

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-19 Date Issued September 21, 2026 OCC-793 Page 1 of 1 Date Filed: October 05, 2026 Witness: Leanne M. Landry, Jeffrey D. Turano and Marisa B. Paruta Request from: Office of Consumer Counsel Question: Refer to Exhibit CLP-ADDITIONS-1, p. 45. Approximately $4.3 billion of capital additions has been placed in service since January 1, 2017. Identify all such additions retired, abandoned or written off before the end of their depreciable life, with the in-service and retirement dates, the original cost, the amount remaining in rate base, and the reason. Response: Please refer to OCC-793, Attachment 1, for all additions of specific property since January 1, 2017, that were retired before the end of their depreciable life including in-service and retirement dates, original cost, amounts remaining in rate base and the reason for retirement. Retirements of specific property are generally recorded at the full value of the individual asset, whereas mass property retirements are accounted for using the applicable mass property retirement methodology. In some cases, specific property asset retirements are partial, or trended. This occurs when the original asset record includes units of property not separately unitized at the time of installation. When the original cost of the retired asset cannot be specifically identified, the Company utilizes the Handy-Whitman index to trend the replacement cost back to the original installation year to estimate its historical cost. The estimated amount is then retired from the existing asset and charged to the accumulated depreciation account. This process ensures that the cost of the replacement is removed from utility plant while the remaining portion of the original asset continues to be reflected in plant in service. CL&P predominantly utilizes the Broad Group Procedure to depreciate utility property. Under the Broad Group Procedure, homogenous assets are grouped together and depreciated under a single average service life. When an asset within the group is retired, the asset is considered fully accrued, regardless of the asset’s actual service life, and accumulated depreciation is debited for the full book cost of the asset. If an asset is retired prior to the average service life, any impact to depreciation expense will be recovered over time by assets that exceed the average service life of the group. The asset retirement dispersion is analyzed in future depreciation studies when creating an updated, proposed average service life and accompanying accrual rate.
  4. Page 100 of 141

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-19 Date Issued September 21, 2026 OCC-794 Page 1 of 1 Date Filed: October 06, 2026 Witness: Leanne M. Landry and Jeffrey D. Turano Request from: Office of Consumer Counsel Question: Refer to Exhibit CLP-ADDITIONS-4 reports projects and programs whose actual cost exceeds the pre-construction estimate by more than 25 percent, a number of which carry no entry in the Project Notes / Variance Explanations column. Identify each such project, and for each provide the variance explanation and the supplemental authorization, or state the policy provision under which no supplemental authorization was required. Response: Please refer to OCC-794, Attachment 1, for Projects listed on CLP-ADDITIONS-4 with actual costs exceeding the pre-construction estimate by more than 25% along with the variance explanation or policy provision reference. The Company will supplement this response for annual program projects with variances greater than 25%.
  5. Page 101 of 141

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-19 Date Issued September 21, 2026 OCC-795 Page 1 of 3 Date Filed: October 06, 2026 Witness: David L. Gladey, Lavelle Freeman, Steven Lamontagne, Elli Ntakou, Leanne M. Landry and Jeffrey D. Turano Request from: Office of Consumer Counsel Question: Refer to Exhibit CLP-ADDITIONS-12. Planned Reliability capital falls 41 percent, from $209.4 million for 2023 at page 121 of to $123.4 million for 2025 at page 167, and the 2025 book gives the reason as regulatory recovery risk. Exhibit CLP-TSP-1 at page 42 describes approximately $667.3 million in 2027 as the baseline investment necessary to maintain existing reliability levels. State: a. Whether the 2025 planned amount was below the level the Company considered necessary to maintain reliability at the time the plan was set b. If so, the shortfall in dollars and the work deferred, and c. The reliability effect of that deferral in SAIDI, SAIFI and customer interruptions. Response: a. To confirm, the amount of $667.3M is the total baseline investment for all categories of investment and necessary to maintain the overall reliability of the system – it is not the dedicated reliability investment. In 2027, the amount of dedicated reliability investment is $236.6M (comparable to $209.4 million in 2023 and $123.4 million in 2025). No, the 2025 investment amount was not below the level the Company considered necessary to maintain reliability in the short term. Please refer to the Company’s response to OCC-781 i. In re-scaling the 2025 capital work, the Company took significant care to identify capital work that could be toggled back without an immediate impact to safety and reliability. For example, proactive, preventive replacement of Substation Elimination-Line Work was reduced following several years of increased investment because the Company can maintain safety and reliability in the short run with repairs rather than replacement of this infrastructure. Also, the work deferred from the 2025 plan listed in OCC-781, Attachment 2, is planned for completion either as part of the 2026 capital plan, or as part of the Company’s work plan over the next few years. b. Please refer to the Company’s response to OCC-781 and OCC-781, Attachment 2. c. Please refer to the Company’s response to OCC-781 and OCC-781, Attachment 2.
  6. Page 102 of 141Match

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-19 Date Issued September 21, 2026 OCC-795 Page 2 of 3 Prior Referenced Response: i OCC-781 Question: Exhibit CLP-ADDITIONS-12 at p. 167 identifies as the first major variance driver for 2024 vs 2025 “Decrease in overall CT capital plan due to regulatory recovery risk.” Explain what the Company means by that phrase, and identify each investment deferred, reduced or cancelled in the 2025 plan for that reason, with the amount, the period of deferral, and the reliability or safety consequence assessed at the time, together with the documents recording each decision. State whether any such investment is now included in the docket no. 26-05-10 or specifically in the proposed TSP Plan in Exhibit CLP-TSP-1. OCC-781 Response: Please refer to OCC-781, Attachment 1, for a detailed description of why the 2025 CT capital plan was reduced relating to regulatory recovery risk. Please refer to OCC-781, Attachment 2, for a list of deferred projects for the 2025 capital plan with deferred amounts greater than $500,000. It is important to note that the budget reduction affected only the 2025 fiscal year, which was a fiscal period bookended by an increase in capital expenditures for reliability in 2023 and 2026. As a result, there is no “reliability or safety consequence” associated with such a short-term deviation in budget expenditures. The reliability impact associated with reduced capital investment is identified in OCC-781, Attachment 1, as in the range of 12-15 percent over the next five years, assuming no improvement in the reduced expenditure level. This projection flows from the fact that the electric distribution system is a dynamic operating platform constructed to have a sufficient level of flexibility to withstand the numerous intrinsic and extrinsic operating conditions that influence the system’s performance in any given year, or even in any given week or day. In that context, capital expenditures within one year are not generally viewed as having a discrete, discernible impact (positive or negative) on reliability performance. System reliability is a continually moving target that fluctuates up or down in the short term as a result of a number of factors, including randomly occurring operating conditions. In the longer term, reliability performance will trend up or down across time, on a system basis, with consistent investment (or a lack of consistent investment). For example, over five years, reliability-focused plant additions would be expected to have a positive, discernible impact, if consistently made over that five-year period, and conversely, capital expenditures that are consistently reduced from year-to-year would be expected to have a discernible negative impact on reliability over a multi-year period. The intrinsic and extrinsic factors that impact reliability and preclude a direct assessment of reliability benefits (or detriments) in the shorter term include the location of future events on the system, the impact of minor weather event days, aging infrastructure failures outpacing the rate of replacement, surrounding tree conditions and many other factors. In addition, at the time that the Company identified the need for reduced capital expenditures, the Company took significant care to identify capital work that could be toggled back without an immediate impact to safety and reliability. For example, proactive, preventive replacement of underground, direct-buried 4kV cable was reduced following several years of increased investment because (1) the Company can maintain safety and reliability in the short run with repairs rather than replacement of this infrastructure; and (2) the Company’s investment approach is changing now based on its experience with the proactive replacement program for 4kV.
  7. Page 103 of 141

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-19 Date Issued September 21, 2026 OCC-795 Page 3 of 3 The work deferred from the 2025 plan listed in OCC-781, Attachment 2, is planned for completion either as part of the 2026 capital plan, or as part of the Company’s work plan over the next few years.
  8. Page 104 of 141

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-19 Date Issued September 21, 2026 OCC-796 Page 1 of 1 Date Filed: October 06, 2026 Witness: Leanne M. Landry and Jeffrey D. Turano Request from: Office of Consumer Counsel Question: On the Annual Projects Pre 2022 tab of Exhibit CLP-ADDITIONS-4, the 2017 and 2019 Line Reliability annual programs report actual cost 231.89 percent and 233.24 percent above estimate (lines 53 and 95), and the 2019 Emergent Line annual program reports 51.87 percent above estimate (line 90). For each, state how the estimate was set, explain the variance, and how the overrun was authorized. Response: Line Reliability and Emergent Line annual programs, and all annuals programs in general, are estimated based upon historical trends. As estimates, the Company always retains a level of flexibility in the budget process to address contingencies that inevitably occur during the year. Actual circumstances for Line Reliability annual programs in 2017 and 2019 and Emergent Line annual programs in 2019 exceeded historical trends used for the estimate. Regarding Line Reliability, the Company’s Western region experienced an increase in reliability work in those years. The work in this area arose from the Company’s experience in larger storms that happened in this area in this timeframe. In addition, the Company has experienced increases in the number of customer outage events on the overhead, underground and network system caused by factors other than Major Storm events, which is accounted for within the Emergent Line category. Examples of the factors affecting this cost category include vegetation-initiated overhead events, pole and line damage and associated events due to motor vehicle accidents, unplanned asset failures, residential direct-buried cable failures; underground cable or switchgear events, and network events. Many of these events are the result of weather patterns that occur on the system without rising to the level of a catastrophic event. For example, the Company is experiencing more numerous “minor” weather events during the year caused by frequent wind events during blue sky or grey sky days that cause damage to the system.
  9. Page 105 of 141

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-19 Date Issued September 21, 2026 OCC-797 Page 1 of 1 Date Filed: October 13, 2026 Witness: Leanne M. Landry and Jeffrey D. Turano Request from: Office of Consumer Counsel Question: Refer to Exhibit CLP-ADDITIONS-12 shows planned transformer purchases rising from $27 million in the 2019 plan (p. 44) to $40 million in the 2025 plan (p. 166). For each year 2017 through 2025, state the number of distribution transformers purchased, installed, and held in inventory at year end, the average unit price paid, and the number installed to replace failed units as distinct from those serving new load. Response: Please refer to the Table below for the transformers received/purchased, issued/installed and the average unit price for poletop, three phase and single phase transformers: The year end inventory balance as of December 31, 2025 is 9,206 transformers (6,979 poletop, 1,029 3 phase, 969 single phase and 229 other) Of the transformers installed each year, approximately 50% are driven by new customer load the other 50% are for emergent work.
  10. Page 106 of 141Match

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-19 Date Issued September 21, 2026 OCC-798 Page 1 of 3 Date Filed: October 06, 2026 Witness: David L. Gladey, Steven Lamontagne, Leanne M. Landry and Jeffrey D. Turano Request from: Office of Consumer Counsel Question: Exhibit CLP-ADDITIONS-12 shows planned underground residential direct buried cable work declining from $43 million in the 2020 plan (p. 64) to $28 million in the 2025 plan (p. 166). State the total circuit miles of direct buried cable on the system, the miles replaced in each year 2017 through 2025, the cost per mile realized, the miles remaining at December 31, 2025, and the failure rate of the replaced and remaining populations. Response: Over the time period covered by this question, the Company has implemented differing approaches for addressing reliability concerns associated with direct buried cables. Historically, the Company addressed reliability issues on direct buried cables mainly as repair work, when the need arose, with targeted replacement work performed on an as-needed basis. However, the Company was experiencing rising reliability and costs concerns on an emergent basis associated with this infrastructure, causing the Company to come to the conclusion that a more proactive and comprehensive replacement program would mitigate these concerns. Therefore, beginning in 2019, the Company implemented a more proactive, preventive replacement approach for underground, direct-buried cable, which increased replacement costs as compared to historical work, but would have the benefit of obviating future repair costs. Under this approach, the Company instituted a plan to replace and upgrade longer segments of cable around failure points, eliminating the risk of future failure in those areas. Because of the continuing impacts on the system for reliability and the need to address these concerns in the most cost-effective, feasible manner, the Company has continued to innovate on its construction methods for this replacement program. Beginning in 2024, the Company instituted a hybrid approach combining proactive replacements with repair work to extend the life of segments that had not experienced as many failures. In addition, the Company began using new installation methods for placing new cable in conduit (i.e., cable in conduit construction or “CIC”). Collectively, these measures have reduced both the amount of miles replaced and the time for construction, helping to mitigate construction cost increases driven by increases in labor and materials costs.