Discovery Compilation (ALLCO Set 9, OCC Set 19, OCC Set 20).
Files4
Docket No. 26-05-10 Discovery Compilation October 14 2026.pdf
PDF · 154 KB · 1 pageText searchable
Download Docket No. 26-05-10 Discovery Compilation October 14 2026.pdfRead the text of Docket No. 26-05-10 Discovery Compilation October 14 2026.pdf
ALLCO Set 9 COMBINED.pdf
PDF · 746 KB · 61 pagesText searchable
Download ALLCO Set 9 COMBINED.pdfRead the text of ALLCO Set 9 COMBINED.pdf
OCC Set 19_COMBINED.pdf
PDF · 1.4 MB · 141 pagesText searchable
Download OCC Set 19_COMBINED.pdfRead the text of OCC Set 19_COMBINED.pdf
OCC Set 20 COMBINED.pdf
PDF · 1.0 MB · 98 pagesText searchable
Download OCC Set 20 COMBINED.pdfRead the text of OCC Set 20 COMBINED.pdf
Page 35 of 98
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-20 Date Issued September 22, 2026 OCC-835 Page 3 of 3 The number of FTEs included in the original filing was fifty-eight (58). This number was a preliminary number and included FTEs contemplated in the Advancing the Grid plan that is above and beyond the Targeted System Plan (“TSP”) requested for review and approval in this application. The updated number of incremental FTEs to be included in the Rate Year of the Company’s cost of service is forty-one (41). Included in the forty-one (41) full-time positions are twenty-one (21) in Vegetation Management, five (5) Power Quality positions, two (2) in Distribution Planning & Forecasting and one (1) Asset Health, these are contingent on PURA’s approval in this case. In addition, for Grid Modernization there are seven (7) for Control Room Operations, three (3) for Data Innovation, and two (2) for Field Communications that the Company will consider hiring based on business needs and changing requirements as necessary, but most likely not all requested. The Vegetation Management positions allow the Company the opportunity to improve the system’s reliability and improve cost-efficiency by transitioning more work in-house to restructure vegetation management performance for the benefit of our customers. While the twenty-one (21) Vegetation Management positions appear to be incremental, in reality there is only 1 incremental resource. Of the twenty-one (21), eight (8) of the FTEs are the result of 16 employees who currently split their time 50%/50% between O&M and capital work shifting to solely working on the proposed combined O&M program, if approved, results in the equivalent of 8 incremental employees working on the O&M program; twelve (12) resources would be converted from contracted resources to internal resources of which the Company’s proposed vegetation management expenses in Exhibit CLP-REVREQ-2, Work Paper C-3.31 reflect the reduction in outside contractor services; and one (1) resource would be truly incremental. The Grid Modernization positions are needed to support large-scale distributed energy resource (“DER”) integration and clean-energy advancement; develop and deploy advanced tools and analytics for integrated distribution system planning and grid modernization; and drive increased innovation and application of GenAI, LLM and machine learning capabilities. The Company is also providing as OCC-333, Attachment 2, which is a corrected Exhibit CLP-TSP-3, page 43 of 149 that has been updated with the corrected number of FTEs in the parenthesis in the text boxes on the right.Page 36 of 98
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-20 Date Issued September 22, 2026 OCC-836 Page 1 of 2 Date Filed: October 06, 2026 Witness: Brendan J. O’Brien, Garrett J. Murray and Marianne Eichler Request from: Office of Consumer Counsel Question: Payroll. Refer to the response to OCC-357(b). Identify the last time the company made organizational changes that resulted in reducing its employee count and/or curtailing other expenses and capital spending. Response: The Company regularly evaluates organizational effectiveness to identify opportunities to enhance efficiency and better serve its customers. Eversource’s evaluation is that its overall staffing levels are conservative for the obligations that the Company has to its distribution customers throughout Connecticut. Consistently, the Company’s concerns are that its staffing levels are inherently challenging to existing employees who shoulder the burden of the Company’s necessary work processes, regulatory requirements and customer commitments and obligations, particularly when contemplating the frequent need for storm duty. Beginning in 2025, the Company has engaged in efforts to review the enterprise organization to determine whether there are efficiencies that could be achieved with staffing changes, among other changes. With respect to capital investment, the Company has submitted the testimony of the Company’s Leadership Panel (Exhibit ELP-1) and Targeted System Performance (“TSP”) Plan Panel (Exhibit CLP-TSP-1). These panels explain that the level of capital investment needs to increase on the Company’s system over historical levels because the system is not keeping up with the operating conditions that challenge the system. The TSP Panel explains that the system has reached an “inflection point” where it is necessary to make a step change to advance data-driven strategies not possible historically, in order to improve performance, efficiency and cost-effectiveness, while meeting affordability goals for customers. The Company does not view that organizational changes would lessen the cost of capital investment. Efforts that the Company is focusing on center on rigorous cost management in the planning and execution of capital projects. With respect to performance on operating costs, the Company has been relatively successful in containing O&M costs. Since PURA’s prior rate review in the 2018 rate case, Docket No. 17-1046 (April 18, 2028), the Company has worked diligently to contain O&M expense by deploying rigorous budgetary and procurement controls across all operating functions, in addition to using other strategies to achieve operational efficiencies everywhere possible. This hard work paid off for customers with tangible impacts. Specifically, inflation in the general economy, as measured by the Gross Domestic Product Price Index (“GDP-PI”), trended at approximately 30% over thePage 37 of 98
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-20 Date Issued September 22, 2026 OCC-836 Page 2 of 2 period 2016 through 2025. By comparison, the Company’s general O&M expenses (excluding storm costs and vegetation management) increased by approximately 16 percent over the same time frame, saving customers an estimated $45 million annually, as compared to aggregate inflation trends. See, Exhibit CLP-ELP-1, at 34-35. The Company does view that organizational changes would decrease O&M expense.Page 38 of 98
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-20 Date Issued September 22, 2026 OCC-837 Page 1 of 1 Date Filed: October 06, 2026 Witness: Brendan J. O’Brien, Garrett J. Murray and John G. Griffin Request from: Office of Consumer Counsel Question: Service Company Payroll. Refer to the response to OCC-332. Provide the service company payroll charged to CL&P broken out by expense and capital in each year 2021, 2022, 2023, 2024, 2025, the Test Year and the Rate Year. Response: Please refer to OCC-837, Attachment 1, for the amount of Eversource Energy Service Company payroll charged to CL&P for years 2021 through 2025. Please refer to Exhibit CL&P-REVREQ2 Schedule C-3.5 WP C-3.5 Page 2 of 3 line 49 for the Rate Year O&M payroll expense of $64,731,000. The Company utilized the Test Year capitalization ratios to account for the portion of the payroll expense that should be capitalized for the Rate Year and removed from the payroll expense to exclude those costs from the cost of service.Page 39 of 98
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-20 Date Issued September 22, 2026 OCC-838 Page 1 of 3 Date Filed: October 08, 2026 Witness: Brendan J. O’Brien and Garrett J. Murray Request from: Office of Consumer Counsel Question: CL&P Payroll. Refer to the response to OCC-332 which states in a normal year it is expected CL&P employees will charge 100% of their time to CL&P. a. State whether 2025 was a normal year and whether CL&P employees charged 100% of their time to CL&P. b. Provide the last non-normal year where CL&P employees did not charge 100% of their time to CL&P. Response: First, it is important to note that the Company’s payroll expense schedule includes base labor and overtime associated with blue sky work and does not include incremental storm labor. The intent of the Company’s pro-forma payroll expense adjustment is to normalize the labor activity in the Test Year by utilizing actual salaries for filled and active positions as of the end of the Test Year (calendar year 2025). The Company’s statement in its response to interrogatory OCC-332 i that the Test Year pro-forma payroll expense assumes that “[i]n a normal year it is expected that CL&P employees will charge 100% of their time to CL&P” is intended to account for the fact that every year there are circumstances where CL&P employees will charge time to affiliates for non-storm work, and vice versa, affiliate companies will charge time to CL&P for their work on the CL&P distribution system for non-storm work. This reciprocal work reflects the advantage of having affiliates within the local area who can respond to necessary work to operate and maintain the distribution system given the emerging needs throughout each year. There is no “normal” level of affiliate work during blue sky days that the Company could quantify and therefore no “nonnormal” years which would be applicable. When the Company calculates the Test Year pro-forma for CL&P employees, it is assumed that 100% of their time is charged to CL&P. That same pro-forma calculation assumes that no affiliates will charge their time to CL&P for non-storm work, thereby removing all affiliate labor charged to CL&P in the Test Year. Said another way, the labor related to CL&P charging affiliates and affiliates charging CL&P is normalized through the Company’s Test Year pro-forma calculation by removing and charges from affiliates to CL&P and including only 100% of CL&P’s labor.Page 40 of 98
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-20 Date Issued September 22, 2026 OCC-838 Page 2 of 3 Prior Referenced Response: i OCC-332 Question Payroll. State whether the Company used the same forecasting methodology used in the prior rate case. If not, explain in detail all changes. OCC-332 Response: Yes. The Company utilized a similar methodology that was used in the prior CL&P rate case in Docket No. 17-10-46 which was also the methodology used in the last Yankee Gas rate case in Docket No. 24-12-01 to calculate the Test Year Pro-Forma (“TYPF”) payroll expense as well as the Rate Year payroll expense. The Company’s Test Year payroll data consists of hundreds of thousands of lines of individual transactions that are unique each and every year. Those transactions can vary based on a number of different conditions throughout the year such as weather events, supply chain issues, personnel availability, capital budgets and much more. To determine the normalized Test Year level of payroll expense, the Company performs an independent evaluation of the payroll expense utilizing actual employee salary information as of the end of the Test Year as described in greater detail below and supported by detailed calculations provided as attachments to this response. (1) In order to calculate the TYPF level of payroll expense, the Company first begins with a listing of actual CL&P and Eversource Energy Service Company (“Service Company”) salaries for each employee position that is filled and active as of December 31, 2025. It is important to begin with only those positions that are filled and active as those are the positions the Company is experiencing actual expenses for. This also ensures that an imputed vacancy rate is accounted for as the Company typically does not have 100% filled and active positions at any single point in time and therefore it would be inappropriate to include all positions (inclusive of unfilled and inactive positions) in the TYPF calculation. Please refer to OCC-332, Attachment 1, for the full listing of CL&P and Service Company employee salaries as of December 31, 2025. (2) In a normal year it is expected that CL&P employees will charge 100% of their time to CL&P and therefore the amounts shown on OCC-332, Attachment 1, page 1, lines 6 through 10, support the TYPF amounts shown on Exhibit CLP-REVREQ-2, Work Paper C-3.5, page 1, lines 15 through 19. In a normal year it is typical for Service Company employees to charge their time to multiple operating companies throughout the year, and therefore the Company takes the total Service Company salaries shown in OCC-332, Attachment 1, page 38, lines 6 through 16, and allocates those costs to CL&P. In order to do so, the Company utilized the actual labor charged to CL&P by each Source Cost Center (“SCC”) and compared that to the total actual labor charges for each of the same SCCs. Please see OCC-332, Attachment 2, for the calculation of the amount of Service Company salaries allocated to CL&P and OCC-332, Attachment 3, for the actual 2025 allocation of labor by SCC utilized in the calculation in OCC-332, Attachment 2. The allocated amounts shown in OCC332, Attachment 2, page 1, lines 8 through 18, support the amounts shown in Exhibit CLP-REVREQ-2, Work Paper C-3.5, page 1, lines 33 through 42. (3) The base salaries calculated in items (1) and (2) above are total salaries prior to the split between capital and O&M; therefore, the final necessary adjustment to those CL&P allocated salary amounts is to account for the portion that will be capitalized, which is then removed from the payroll expense schedule. In order to do so, the Company utilized the actual Test Year capitalization ratios. Please see OCC-332, Attachment 4, for the calculation of the Test Year capitalization percentages.Page 41 of 98
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-20 Date Issued September 22, 2026 OCC-838 Page 3 of 3 In summary, the Company starts by taking actual salaries of active / filled positions as of December 31, 2025, and allocates those to CL&P and further assigns a portion to expense and capital all based on actual Test Year information. That resulting TYPF payroll expense becomes the basis for payroll expense increases utilizing annual merit adjustments. The difference between the TYPF amount above and the actual Test Year expense results in the $2.778 million pro-forma increase (or approximately 2%). In addition, the Company is proposing incremental Full Time Equivalents (“FTEs”) in Exhibit CLP-REVREQ-2, page 3 of 3. Page 3 of 3 shows the number of employees the Company expects to hire in each business area (i.e. Vegetation Management, Grid Modernization, Engineering Capital, Distribution System Planning, Asset Health and Field Engineering). It also shows the expected salary, hiring date, and resulting O&M payroll expense included in the Company’s COS. This treatment is consistent with the Company’s incremental FTE request in Docket No. 17-10-46.Page 42 of 98
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-20 Date Issued September 22, 2026 OCC-839 Page 1 of 1 Date Filed: October 06, 2026 Witness: Brendan J. O’Brien and Garrett J. Murray Request from: Office of Consumer Counsel Question: Field Operations Expense (Overhead Lines Operations & Maintenance). Refer to Schedule C-3.0, line 32, and Schedule C-3.16. Explain in detail the reason for the $3.433 million increase in expense in the Rate Year over the 2025 level. Provide documentation supporting the increase (quotes, invoices, contracts) Response: The Company is unable to follow the references in the interrogatory to: (1) Schedule C-3.0, line 32, which is Fee Free expense as compared to; (2) Schedule C-3.16, which is Field Operations (Overhead Lines – Operations and Maintenance); and (3) a reference to a $3.433 million increase that the Company is unable to tie back to either the Fee Free expense or Field Operations expense. In an effort to be responsive, the Company interprets the question to relate solely to Schedule C3.16 Field Operations (Overhead Lines-Operation & Maintenance), noted on line 33, of Schedule C-3.0, which has an increase in expense of $2.623 million in the Rate Year over the 2025 level. The Company first adjusted the $19.467 million 12/31/2025 Test Year level of Field Operation Expenses (Overhead Lines Operations & Maintenance) by $1.286 million as shown on line 25, column (C) of Schedule WP C-3.16. The $1.286 million pro forma adjustment removed out of period adjustments totaling $1.320 million and $(34) of costs associated with the Line Crew Rodeo. The 2025 Test Year Pro Forma amount of $20.753 million represents a normalized level of Field Operation Overhead Line expenses. The $1.337 million Rate Year increase was calculated using the projected GDP-PI inflation factor for the Interim and Rate Year period. The Company used this approach to determine the Rate Year amount because GDP-PI measures the change in prices of goods and services produced in the United States and the Field Operations schedule is composed of a wide range of costs including outside contractors, permits and fees, police services, and employee expenses. The Field Operations Overhead Line Maintenance Rate Year amount of $22.090 million represents a $2.623 million increase over the $19.467 million 2025 Test Year amount; $1.286 million Test Year Pro Forma Adjustment plus $1.337 million Rate Year adjustment equals $2.623 million.Page 43 of 98
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-20 Date Issued September 22, 2026 OCC-840 Page 1 of 4 Date Filed: October 06, 2026 Witness: Brendan J. O’Brien and Garrett J. Murray Request from: Office of Consumer Counsel Question: O&M expenses. Refer to the response to OCC-375(f) Explain in detail what the “optimization of O&M” throughout Connecticut Operations” refers to. Response: The Company goes through a rigorous budget process each year and works to balance the needs of all organizations to ensure it provides safe and reliable service to customers. During the course of the year, the Company balances the financial needs across the organization and, in some cases, spending may be adjusted up or down during the year as circumstances warrant. For 2025, the vegetation management spending was reduced from prior years, while still aligned with the amount included in distribution rates. As noted in the joint direct testimony of John P. DiPaola-Tromba, Sean D. Redding, and Jenna Turner, the Company is entering into a new four-year cycle subject to the results of a competitive solicitation that the Company is currently conducting. The Company’s estimation is that the cost of the Vegetation Management Plan will increase above the level last included in base rates in 2018, because of unavoidable increases in vendor costs over the historical time interval, as well as to accommodate the trim cycle for all overhead circuits, implement new programs, including LiDAR, and other programs, including Mid-Cycle. Please refer to OCC-102 i, for the drivers of the proposed increases from the Test Year to the proposed budget in the Rate Year. Prior Referenced Response: i OCC-102 Question: (VMP/Budget) Provide a budget breakdown, including allocation and actuals, for prior years, across the same line items provided in the proposed program budget for 2027 as outlined in Exhibit CLP-VMP-2, page 25 of 29 (noting that there is a VMP costs by program component on page 26, of Exhibit CLP-VMP-1, but it does not use all the same line items making comparison a challenge). a. b. c. For each line item with an increase in the proposed 2027 from the actual 2025 expenditure, explain and qualify all the drivers of the proposed increase. The 2027 budget breakdown, provided on Exhibit CLP-VMP-2, page 25 of 29, totals 89.6mill, the same as the total request in the . What will the contribution from Frontier of 13.5M be spent on? Please provide the Company’s analysis demonstrating that the proposed budget does not result in diminishingPage 44 of 98
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-20 Date Issued September 22, 2026 OCC-840 Page 2 of 4 returns each year? d. Provide any analyses comparing the benefits achieved during the initial ETT cycle to those achieved during subsequent cycles. OCC-102 Response: Please refer to Exhibit OCC-102, Attachment 1, for the requested breakdown of the 2025 cost (Exhibit CLP-VMP-1, page 26) and the proposed budget for 2027 (Exhibit CLP-VMP-2, page 25). a. The following program components are new programs and do not have a direct Test Year comparison: Risk Tree Removals (“RTR”), Reliability Tree Work (“RTW”), and LiDAR. The following programs had increases from the Test Year actual in 2025 to the proposed budget in 2027: • The Roadside Schedule Maintenance increase reflects the estimated costs for a four-year scheduled maintenance cycle with contractor increases due to inflation. The proposed plan shifts away from prioritization and field assessment towards a strategy of maintaining the entire circuits all at once. This approach is driven by the LiDAR pilot results showing high levels of vegetation encroachment 3 years post trimming on circuits due for scheduled maintenance the following year. The budget was developed using cost per mile estimates that include contractor rate increases. Actual costs will be updated at the completion of the current RFP for 2027-2030 vegetation management pricing. • The RTR budget is converted funds from previous Enhanced Tree Removal (“ETR”) capital dollars to expense dollars. • Distribution Rights-of-Way (“D ROW”) is being funded with previous Customer Focus Enhanced Tree Trimming (“ETT”) and Expense funds to support the scheduled distribution ROWs cycle for side trimming and brush control, including maintenance ETT where ETT specification was achieved. • Emergency is a planned budget to cover blue sky emergency tree contractor call outs to outage and non-outage tree OMS events. The 2027 proposed budget is an increase over the 2025 actual, however the proposed budget has remained steady at $2,000,000 for several years. The emergency program spend is highly weather dependent and the budget must account for busier years. • Vines was increased to allow for two years of backbone circuit miles to be treated instead of one year. The circuit backbones that are not due for mid-cycle or scheduled maintenance will be treated for vines each year. Through this approach, all backbone miles will be covered for vine treatment every year. • Emergent Work has been increased to support the volume of customer and tree warden inquiries regarding dead and declining trees and in anticipation of increased tree stress and mortality due to beech leaf disease and spotted lanternfly. • Mid-Cycle is a historic program that is being funded again given the results of the LiDAR analysis. The LiDAR analysis shows there is encroachment across the system that should be addressed sooner due to consent limitations and varying tree growth rates. The program will support hot spot trimming across approximately 1,000 to 1,200 miles of backbone each year.
As listed on the current system
Corres. 10/14/2026 [26-05-10] (Keegan Werlin LLP) - Discovery Compilation (ALLCO Set 9, OCC Set 19, OCC Set 20).