  1. Page 54 of 98

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-20 Date Issued September 22, 2026 OCC-845 Page 1 of 3 Date Filed: October 06, 2026 Witness: John P. DiPaola-Tromba, Sean D. Redding and Jenna Turner Request from: Office of Consumer Counsel Question: (MS24E) Please refer to Exhibit ACCT-2(CLP-5A-05)(MS24E), p. 4-14. Did the Company receive completed and/or attached Emergency Restoration Tree Contractor Work Location forms for these timesheets? If so, please provide. If no, please explain how the Company validated these invoices. Response: Referring to Exhibit ACCT-2(CLP-5A-05)(MS24E), pages 12-14, the Emergency Restoration Tree Contractor Location report is provided on page 14. The individual and tree crews referred to in Exhibit ACCT-2(CLP-5A-05)(MS24E), pages 4-11, were performing post-storm tree work and may not have completed Emergency Restoration Tree Contractor Location reports. Please refer to the Company’s response to OCC-842 i, which describes the multiple pathways that post-storm tree work may be found by and submitted to the Company, how the post-storm tree work is organized and completed, and how the Company Arborists oversee and verify that the post-storm tree work is correctly charged to the right storm event. Prior Referenced Response: i OCC-842 Question (STORM) a. Does the Company limit vegetation management work performed after storms solely to work caused by the storm? b. If yes to a, please describe how the Company verifies that all trees cut by the vegetation management company had storm damage (for example, if a tree was touching the line, how does the Company verify if this was caused by storm damage or growth?). OCC-842 Response Yes, the Company limits post-storm vegetation management work to damage caused by the storm. Please refer to the Company’s response to EOE-201 in PURA Docket No. 24-03-30:
  2. Page 55 of 98

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-20 Date Issued September 22, 2026 OCC-845 Page 2 of 3 During storm events, especially those that include high winds, rain, snow, or ice, trees may fail entirely, or parts of a tree may be damaged. When an entire tree fails or a part of a tree is damaged and impacts electrical infrastructure, the tree or tree part is cleared as part of storm restoration. However, trees that are damaged by then storm but have not fallen often remain following an event. Damage to the trunk or a large leader or branches in the canopy may result in a standing tree that is compromised structurally. Storms may cause trees to develop cracks or seams that will cause the tree to fail in the short term. Some trees that are uprooted during a storm event may fall over slowly or may be held up in other trees that will temporarily hold their weight but fail in the near term. Branches in trees may be broken but remain hanging in the tree’s canopy, dangling above electrical infrastructure, and waiting for a future wind to finalize the break or dislodge a broken limb from the tree. These future potential threats to the system are often not resolved in real time during the restoration portion of the event because the Company’s priority is to clear vegetation that poses an immediate safety or reliability risk (including blocked roads) and restore customers. Therefore, the Company returns after an event to address storm damaged trees and limbs that the Company finds to be a threat to reliability and public safety. Patrolling for and removing storm damaged vegetation is a standard part of utility vegetation management storm response and is not included in the Company’s normal vegetation management cycle. The Company has described post vegetation storms in previous storm cost recovery testimony. These storm damaged tree conditions are identified through follow up items noted on restoration events, non-outage events identified during the restoration post restoration patrols by operations, engineering or vegetation management or inquiries from customers or towns. There may be a delay in providing the assessment and mitigation to storm damage locations as the information from the patrols by other Eversource departments or locations provided by customers or towns may be received at different time periods after the completion of restoration. Mitigation of a storm damaged tree depends on the condition and location of the tree, access to tree and requirements to mitigate the damage as there is variable effort and time needed to complete the work. This can vary from cutting a single broken limb to requiring a crane or scheduling an outage to mitigate the risk to the system, workers and the public. Following an event, tree contractors may be instructed to complete storm damage patrols and perform mitigation trimming or tree removals by Eversource Arborists. Each Area Work Center (“AWC”) has an Eversource Arborist who has extensive experience and is familiar with the area that coordinates tree contractor resources during both restoration and post-storm vegetation sweeps. The AWC Arborist will direct post-storm patrols depending on the level of vegetation damage sustained during a storm event. Localized areas that experienced a higher magnitude of tree caused outages are assigned more detailed sweeps. If vegetation damage was widespread, post-storm sweeps will encompass the entire service area. Eversource Arborists provide the tree contractors with overhead circuit or town maps to be patrolled for broken limbs and storm damaged trees based on where the storm impacted the Company’s system. Guidelines are provided to the tree contractors as to what constitutes storm damaged vegetation. Please refer to EOE-201, Attachment 1, in PURA Docket No. 24-03-30, for the Company’s Vegetation Management Storm Patrol Guidelines. Eversource’s tree contractors have practical experience and are trained to recognize the signs of recent storm damage. Conducting vegetation patrols post-storm is an industry wide practice. Contractors will immediately remove broken trees or branches as they discover them throughout their patrols. Occasionally, a job may require specialty equipment or a scheduled outage to complete the job safety. Any locations requiring additional scheduling to complete are relayed back to the supervising AWC Arborist for high priority scheduling. The Arborists oversee this contractor tree work and verify timesheets are correctly billed to the right storm event.
  3. Page 56 of 98

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-20 Date Issued September 22, 2026 OCC-845 Page 3 of 3 Immediate threats as described in the guidelines are addressed as the patrol is performed or as soon as a crew can be committed to the work. Inventories and tracking is done by the crew and indicated on the timesheet or storm location sheet. Storm damaged trees that are potential threats as described in the guidelines are not tracked in a standardized way as they are identified and communicated through various means including customer calls, communications from towns, or provided lists from Engineering patrols. Please refer to EOE-201, Attachment 2, in PURA Docket No. 2512-13, for an example copy of an invoice with an Engineering patrol storm damaged tree list. The volume of storm damaged vegetation following a strong storm system may be significant. Storms such as high wind events, heavy snow, ice events, lighting, microbursts and thunderstorms may all result in compromised trees that did not fail immediately but are threats to reliability and public safety. The time required to address lingering vegetation hazard may vary from the time it takes to remove a broken branch to days for removing a large storm compromised tree. Given the tree crews available and on system, it may take anywhere from days to weeks to months to receive and address all storm damaged trees from a specific storm event. Working on storm damaged vegetation is entirely separate than scheduled vegetation management work and is managed and billed as such. The Eversource AWC Arborist oversees contractor tree crews removing storm damaged vegetation which may be reported from various sources beyond tree contractor patrols. Following a storm event, tree wardens and customers will call in to report storm damaged vegetation that are immediate threats which adds to the volume of damaged trees discovered on patrols. Not all trees can be removed immediate upon discovery due to the instability of the trees. Depending on the tree condition and location, arranging a crane or special equipment may be needed to complete the tree removal safely. Storm damaged trees are more likely to require specialty equipment due to the unpredictable nature of their stability compared to regularly scheduled vegetation work. Arrangement may also be needed to temporarily turn off power while the tree work is completed if the tree’s instability cannot be controlled or non-insulated equipment such as a crane is required.
  4. Page 57 of 98

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-20 Date Issued September 22, 2026 OCC-846 Page 1 of 1 Date Filed: October 06, 2026 Witness: John P. DiPaola-Tromba, Sean D. Redding and Jenna Turner Request from: Office of Consumer Counsel Question: (MS24E) Please refer to Exhibit ACCT-2(CLP-5A-05)(MS24E), p. 27-30. Did this crew perform work at any site or were they on standby at the Newtown Work Center on March 11 and 12? If they performed work, please indicate where they worked and how the Company knows about and validated that work. Response: The tree crew worked a 16-hour overnight shift on March 11-12, 2024, which was billed as work time. There is no standby designation or rate for tree crews. The crew did not record any ticket locations.
  5. Page 58 of 98

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-20 Date Issued September 22, 2026 OCC-847 Page 1 of 1 Date Filed: October 06, 2026 Witness: John P. DiPaola-Tromba, Sean D. Redding and Jenna Turner Request from: Office of Consumer Counsel Question: (MS24E) Please refer to Exhibit ACCT-2(CLP-5A-05)(MS24E), p. 34-36. Did this crew perform work at any site or were they on standby at the Newtown Work Center on March 11 and 12? If they performed work, please indicate where they worked and how the Company knows about and validated that work. Response: This individual referred to in Exhibit ACCT-2(CLP-5A-05)(MS24E), pages 34-36, is providing contractor tree crew supervision and dispatching to support storm restoration. The contractor's supervisory personnel do not maintain records of specific crew dispatch locations during storm events because they are not personally responding to each work site. Their role is to supervise operations and dispatch the tree crews performing the work to locations identified through the Company's restoration process.
  6. Page 59 of 98

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-20 Date Issued September 22, 2026 OCC-848 Page 1 of 1 Date Filed: October 06, 2026 Witness: John P. DiPaola-Tromba, Sean D. Redding and Jenna Turner Request from: Office of Consumer Counsel Question: (MS24E) Please refer to Exhibit ACCT-2(CLP-5A-05)(MS24E), p. 90-92. Did this crew perform work at any site or were they on standby at the Work Center on March 11 and March 13? If they performed work, please indicate where they worked and how the Company knows about and validated that work. Response: The Company presumes that OCC is referring to Exhibit ACCT-2(CLP-5A-05)(MS24E), pages 91-93, as pages 90-92 contain the last page of one invoice and the first two pages of another invoice. The individual referred to in Exhibit ACCT-2(CLP-5A-05)(MS24E), pages 91-93, is providing contractor tree crew supervision and dispatching to support storm restoration. The contractor's supervisory personnel do not maintain records of specific crew dispatch locations during storm events because they are not personally responding to each work site. Their role is to supervise operations and dispatch the tree crews performing the work to locations identified through the Company's restoration process.
  7. Page 60 of 98

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-20 Date Issued September 22, 2026 OCC-849 Page 1 of 1 Date Filed: October 06, 2026 Witness: John P. DiPaola-Tromba, Sean D. Redding and Jenna Turner Request from: Office of Consumer Counsel Question: (MS24E) Please refer to Exhibit ACCT-2(CLP-5A-06)(MS24E), p. 1-6. Did these crews perform work at any site or were they on standby at the Cheshire Work Center on March 11 and March 12? If they performed work, please indicate where they worked and how the Company knows about and validated that work. Response: The individual referred to in Exhibit ACCT-2(CLP-5A-06)(MS24E), pages 1-3, is providing contractor tree crew supervision and dispatching to support storm restoration. The contractor's supervisory personnel do not maintain records of specific crew dispatch locations during storm events because they are not personally responding to each work site. Their role is to supervise operations and dispatch the tree crews performing the work to locations identified through the Company's restoration process. The tree crew referred to in Exhibit ACCT-2(CLP-5A-06)(MS24E), pages 4-6, worked two 16hour shifts on March 11, 2024, and March 12, 2024, which was billed as work time. There is no standby designation or rate for tree crews. The crew did not record any ticket locations.
  8. Page 61 of 98

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-20 Date Issued September 22, 2026 OCC-850 Page 1 of 1 Date Filed: October 06, 2026 Witness: John P. DiPaola-Tromba, Sean D. Redding and Jenna Turner Request from: Office of Consumer Counsel Question: (MS24E) Please refer to Exhibit ACCT-2(CLP-5A-06)(MS24E), p.13-18. Did these crews perform work at any site or were they on standby at the Cheshire Work Center on March 11 and March 12? If they performed work, please indicate where they worked and how the Company knows about and validated that work. Response: The individual referred to in Exhibit ACCT-2(CLP-5A-06)(MS24E), pages 13-15, is providing contractor tree crew supervision and dispatching to support storm restoration. The contractor's supervisory personnel do not maintain records of specific crew dispatch locations during storm events because they are not personally responding to each work site. Their role is to supervise operations and dispatch the tree crews performing the work to locations identified through the Company's restoration process. The tree crew referred to in Exhibit ACCT-2(CLP-5A-06)(MS24E), pages 16-18, worked two 16hour shifts on March 11, 2024, and March 12, 2024, which was billed as work time. There is no standby designation or rate for tree crews. The crew did not record any ticket locations.
  9. Page 62 of 98

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-20 Date Issued September 22, 2026 OCC-851 Page 1 of 1 Date Filed: October 06, 2026 Witness: Mark P. Baldwin, Christopher Colorio, Lavelle A. Freeman and Elli Ntakou Request from: Office of Consumer Counsel Question: (STORM) For each claimed storm event, perform an IEEE 1366 Major Event Day analysis and identify whether the storm would qualify as a MED based on daily SAIDI. Response: Please refer to the table below for the requested information: STORM MS24A011 MS24B011 MS24C011 MS24D011 MS24E011 MS24F011 MN24Q011 MS24G011 MS24H011 MN24X011 MS24J011 MS24K011 MN25K011 MN25M011 IEEE Major Event Day No No No No Yes Yes Yes Yes No Yes Yes Yes Yes Yes
  10. Page 63 of 98

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-20 Date Issued September 22, 2026 OCC-852 Page 1 of 3 Date Filed: October 06, 2026 Witness: Mark P. Baldwin, Christopher Colorio, Lavelle A. Freeman and Elli Ntakou Request from: Office of Consumer Counsel Question: (STORM) Identify each storm that exceeded the dollar threshold but did not qualify as an IEEE 1366 MED, and explain why extraordinary recovery is still appropriate. Response: While informative, IEEE 1366 Major Event Days (“MEDs”) is not any type of measure of a “major storm event” or “catastrophic” storm event for operational or ratemaking purposes. Many of the Company’s ERP events do not meet the definition of MED, nor should an ERP event meet the definition. With respect to the IEEE reliability standard, a reporting day with a SAIDI greater than the threshold value is designated as a MED. The threshold value, or “TMED,” defines when the system is experiencing outage severity beyond what is normally expected for the system, based on the utility’s historical outage performance. That historical outage performance includes the Company’s response to ERP events that are experienced year-to-year with restoration occurring within a reasonable time frame for the system, thereby limiting the duration of customer outages. This is a critical feature of the IEEE MED calculation. Please refer to OCC-852, Attachment 1, which provides a description of the calculation of the IEEE TMED (Threshold for Major Event Days). As noted, the methodology flags and excludes from the reliability measure those days that exceed a threshold based on the past four years of daily SAIDI. The fundamental intent of calculating the threshold value as part of the IEEE MED metric is evident through the calculation in that it sets the threshold at 2.5 standard deviations over the mean. To help contextualize this, in a normal distribution, only 1.24% of samples have a value that are 2.5 standard deviations above the mean. In other words, the days above the TMED have an uncharacteristically high SAIDI and are performance outliers (low frequency, high impact). Such days can be days with unusually intense weather causing customer outages to endure or days with events having non-weather-related causes that inordinate customer interruptions and associated durations. For example, in Docket No. 25-12-13, the Company provided the example of 04/11/2019, which was a day that qualified as an IEEE MED and for exclusion from IEEEbased reliability metrics reporting. The outage events that contributed to the high daily SAIDI were related to a plane crash, not a weather event. Thus, the IEEE methodology is focused on the identification of days that are uncharacteristically high in SAIDI regardless of the cause of the