  1. Page 59 of 98

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-20 Date Issued September 22, 2026 OCC-848 Page 1 of 1 Date Filed: October 06, 2026 Witness: John P. DiPaola-Tromba, Sean D. Redding and Jenna Turner Request from: Office of Consumer Counsel Question: (MS24E) Please refer to Exhibit ACCT-2(CLP-5A-05)(MS24E), p. 90-92. Did this crew perform work at any site or were they on standby at the Work Center on March 11 and March 13? If they performed work, please indicate where they worked and how the Company knows about and validated that work. Response: The Company presumes that OCC is referring to Exhibit ACCT-2(CLP-5A-05)(MS24E), pages 91-93, as pages 90-92 contain the last page of one invoice and the first two pages of another invoice. The individual referred to in Exhibit ACCT-2(CLP-5A-05)(MS24E), pages 91-93, is providing contractor tree crew supervision and dispatching to support storm restoration. The contractor's supervisory personnel do not maintain records of specific crew dispatch locations during storm events because they are not personally responding to each work site. Their role is to supervise operations and dispatch the tree crews performing the work to locations identified through the Company's restoration process.
  2. Page 60 of 98

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-20 Date Issued September 22, 2026 OCC-849 Page 1 of 1 Date Filed: October 06, 2026 Witness: John P. DiPaola-Tromba, Sean D. Redding and Jenna Turner Request from: Office of Consumer Counsel Question: (MS24E) Please refer to Exhibit ACCT-2(CLP-5A-06)(MS24E), p. 1-6. Did these crews perform work at any site or were they on standby at the Cheshire Work Center on March 11 and March 12? If they performed work, please indicate where they worked and how the Company knows about and validated that work. Response: The individual referred to in Exhibit ACCT-2(CLP-5A-06)(MS24E), pages 1-3, is providing contractor tree crew supervision and dispatching to support storm restoration. The contractor's supervisory personnel do not maintain records of specific crew dispatch locations during storm events because they are not personally responding to each work site. Their role is to supervise operations and dispatch the tree crews performing the work to locations identified through the Company's restoration process. The tree crew referred to in Exhibit ACCT-2(CLP-5A-06)(MS24E), pages 4-6, worked two 16hour shifts on March 11, 2024, and March 12, 2024, which was billed as work time. There is no standby designation or rate for tree crews. The crew did not record any ticket locations.
  3. Page 61 of 98

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-20 Date Issued September 22, 2026 OCC-850 Page 1 of 1 Date Filed: October 06, 2026 Witness: John P. DiPaola-Tromba, Sean D. Redding and Jenna Turner Request from: Office of Consumer Counsel Question: (MS24E) Please refer to Exhibit ACCT-2(CLP-5A-06)(MS24E), p.13-18. Did these crews perform work at any site or were they on standby at the Cheshire Work Center on March 11 and March 12? If they performed work, please indicate where they worked and how the Company knows about and validated that work. Response: The individual referred to in Exhibit ACCT-2(CLP-5A-06)(MS24E), pages 13-15, is providing contractor tree crew supervision and dispatching to support storm restoration. The contractor's supervisory personnel do not maintain records of specific crew dispatch locations during storm events because they are not personally responding to each work site. Their role is to supervise operations and dispatch the tree crews performing the work to locations identified through the Company's restoration process. The tree crew referred to in Exhibit ACCT-2(CLP-5A-06)(MS24E), pages 16-18, worked two 16hour shifts on March 11, 2024, and March 12, 2024, which was billed as work time. There is no standby designation or rate for tree crews. The crew did not record any ticket locations.
  4. Page 62 of 98

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-20 Date Issued September 22, 2026 OCC-851 Page 1 of 1 Date Filed: October 06, 2026 Witness: Mark P. Baldwin, Christopher Colorio, Lavelle A. Freeman and Elli Ntakou Request from: Office of Consumer Counsel Question: (STORM) For each claimed storm event, perform an IEEE 1366 Major Event Day analysis and identify whether the storm would qualify as a MED based on daily SAIDI. Response: Please refer to the table below for the requested information: STORM MS24A011 MS24B011 MS24C011 MS24D011 MS24E011 MS24F011 MN24Q011 MS24G011 MS24H011 MN24X011 MS24J011 MS24K011 MN25K011 MN25M011 IEEE Major Event Day No No No No Yes Yes Yes Yes No Yes Yes Yes Yes Yes
  5. Page 63 of 98

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-20 Date Issued September 22, 2026 OCC-852 Page 1 of 3 Date Filed: October 06, 2026 Witness: Mark P. Baldwin, Christopher Colorio, Lavelle A. Freeman and Elli Ntakou Request from: Office of Consumer Counsel Question: (STORM) Identify each storm that exceeded the dollar threshold but did not qualify as an IEEE 1366 MED, and explain why extraordinary recovery is still appropriate. Response: While informative, IEEE 1366 Major Event Days (“MEDs”) is not any type of measure of a “major storm event” or “catastrophic” storm event for operational or ratemaking purposes. Many of the Company’s ERP events do not meet the definition of MED, nor should an ERP event meet the definition. With respect to the IEEE reliability standard, a reporting day with a SAIDI greater than the threshold value is designated as a MED. The threshold value, or “TMED,” defines when the system is experiencing outage severity beyond what is normally expected for the system, based on the utility’s historical outage performance. That historical outage performance includes the Company’s response to ERP events that are experienced year-to-year with restoration occurring within a reasonable time frame for the system, thereby limiting the duration of customer outages. This is a critical feature of the IEEE MED calculation. Please refer to OCC-852, Attachment 1, which provides a description of the calculation of the IEEE TMED (Threshold for Major Event Days). As noted, the methodology flags and excludes from the reliability measure those days that exceed a threshold based on the past four years of daily SAIDI. The fundamental intent of calculating the threshold value as part of the IEEE MED metric is evident through the calculation in that it sets the threshold at 2.5 standard deviations over the mean. To help contextualize this, in a normal distribution, only 1.24% of samples have a value that are 2.5 standard deviations above the mean. In other words, the days above the TMED have an uncharacteristically high SAIDI and are performance outliers (low frequency, high impact). Such days can be days with unusually intense weather causing customer outages to endure or days with events having non-weather-related causes that inordinate customer interruptions and associated durations. For example, in Docket No. 25-12-13, the Company provided the example of 04/11/2019, which was a day that qualified as an IEEE MED and for exclusion from IEEEbased reliability metrics reporting. The outage events that contributed to the high daily SAIDI were related to a plane crash, not a weather event. Thus, the IEEE methodology is focused on the identification of days that are uncharacteristically high in SAIDI regardless of the cause of the
  6. Page 64 of 98

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-20 Date Issued September 22, 2026 OCC-852 Page 2 of 3 event, which is consistent with the fact that IEEE MED is designed to be a reporting methodology focused on delineating the system’s normal performance in terms of outage duration (SAIDI). Because it is designed to be a reliability measure focused on outage durations for customers, MED is designed to remove from the measure of reliability only those days that are exceptional from an outage duration (SAIDI) perspective so that electric utilities can measure the level of reliability (i.e., non-outage conditions for customers) more accurately and consistently. To achieve that outcome, TMED is designed to single out only very substantial outage durations, which would be only those events where the customer outages are so “dense” within a day that the utility cannot limit the duration of those outages to the levels existing in the historical data. As a result, by definition, the IEEE reliability standard is in no way indicative of the measure of storm damage or associated customer outages, and nor would it serve as an appropriate storm threshold for determining “major” or “catastrophic” storms from a ratemaking perspective. To the contrary, MED contemplates that the Company normally will move quickly to restore customers after weather events in the timeframes historically achieved, so that only events with extensive customer outage durations (such as the days during Storm Isaias restoration) beyond recent historical experience are excluded from the reliability measure. Looking at it in reverse, if the damage from a storm event caused customer outages that were not addressed because the Company did not secure crews to restore power to customers and did not resolve those customer outages in line with historical performance, then those customer outages would linger, potentially triggering a TMED at some point in time, as compared to historical data. However, this type of response by the Company would be unacceptable from a customer perspective. In addition, over time, these longer duration restorations would become “normalized” in the IEEE MED computation and would no longer trigger a MED, which is a concept that is completely antithetical to the requirements of the ERP and would be unacceptable to customers, rendering MED to be an ineffective tool for identification of “major” or “catastrophic” impacts to customers or to the Company. The crux of the issue is that there is no general nexus between the IEEE MED result and the actual storm impacts or resulting customer outages, because there the IEEE MED does not generate any expectation as to the actual value of the SAIDI that will qualify as an outlier (or an uncharacteristically high SAIDI days). For this reason, the IEEE MED also inappropriate benchmark to determine the number of crews that should have been procured to assist with storm restoration, as is implied by the question. Moreover, the IEEE MED is a backward-looking metric and not a forward-looking planning tool, i.e., it is only calculable after-the-fact based on actual, historical data. As an ex-post metric that is calculated after the fact, the IEEE MED cannot serve as an input to Eversource’s restoration processes, storm preparedness, storm response or associated costs incurred. Eversource prepares for storm events using weather forecasts, outage-prediction models and experience and expertise, among other factors to understand the expected level of outages and procure appropriate crews
  7. Page 65 of 98

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-20 Date Issued September 22, 2026 OCC-852 Page 3 of 3 and resources. The restoration times, crew procurements and restoration costs depend on the level of damage incurred and the Company’s execution of the restoration and response effort. This means that, in most circumstances, the duration of customer outages will most likely not fall outside the deadband of a 2.5 standard deviation.
  8. Page 66 of 98

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-20 Date Issued September 22, 2026 OCC-853 Page 1 of 1 Date Filed: October 06, 2026 Witness: Christopher E. Colorio, Mark P. Baldwin, John G. Griffin and Leanne M. Landry Request from: Office of Consumer Counsel Question: (STORM) Explain whether Eversource has any after-action process to determine whether prestaging was excessive, and whether any costs have ever been excluded from storm recovery because forecasted impacts did not materialize. Response: The concept of evaluating pre-staging on a hindsight basis as “excessive” is not a valid concept. The concept of an “excessive” pre-staging would mean that the Company pre-staged more crews than it actually needed, which is information that it does not have until after the event has actually occurred. The Company does not have a crystal ball to determine what is going to happen as a result of information it receives about an upcoming weather event. Instead, the Company prepares for and respond to threats to the electric system based on the best available information at the time, taking into account the best-case and worst-case scenario, while erring on the side of caution and conservative implementation of its Emergency Response Plan. Finding out, after the fact, that a particular event did not occur as forecast, is not a “lessons learned.” Rather, it reflects the very challenge of storm planning, which is that actual circumstances are unknown until they occur and actions are taken to scale response. After action reviews and any informal lessons learned are intended to improve the safety and efficiency of storm response and restoration where the Company has a reasonable expectation that the same or similar circumstances will happen again, which is a concept that could never apply to the evaluation of a randomly occurring weather event – each of which is completely unique.
  9. Page 67 of 98

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-20 Date Issued September 22, 2026 OCC-854 Page 1 of 2 Date Filed: October 06, 2026 Witness: Brendan J. O’Brien, Garrett J. Murray and Timothy J. Griffin Request from: Office of Consumer Counsel Question: (Environmental Remediation) Per a footnote in Settlement Agreement Attachment 3, in Docket Number 17-10–46, the Company was allowed $2.289 million for environmental O&M expenses in Rate Year 1, $2.381 million in Rate Year 2, and $2.467 million in Rate Year 3. a. Were the O&M expenses incurred in the prior rate plan's rate years of a similar nature to the $1.93 million requested in the current rate application? Explain. b. Were there any environmental remediation costs being deferred prior to the time of the last rate case? c. If yes, indicate the amounts deferred annually. d. Were there any deferred environmental remediation costs being amortized or recovered prior to the time of the last rate case? e. Were there any deferred environmental remediation costs being amortized/recovered and as a result of the approved settlement agreement in Docket No. 17-10-46? f. If yes, indicate the amounts amortized or recovered annually. Response: a. Yes. As shown on WP C-3.13 of the Company’s July 14, 2026, filing in this docket, the categories of cost that make up the $1.93 million requested in the current rate application include: (1) Clean Up & Disposal of Waste Material; (2) Manholes & Vaults; (3) Licensing & Permitting; and (4) Environmental Outside Services. There was also a fifth category, Reserve Site Remediation, but a pro forma adjustment removed the costs associated with this category that were related to reserve adjustment accruals associated with new environmental sites. The environmental O&M expenses included in Docket No. 17-10-46 were presented in the Company’s November 22, 2017, filing WP C-3.8, page 1 of 3, in categories identified as: (1) Overhead Environmental Cleanup; (2) Underground; (3) Environmental – Other; (4) Maintenance of Property Units; (5) Substation; and (6) Maintenance of Str. Lighting Equipment. Despite the differences in categories in each of the filings, the dollars that make up the costs in each filings’ Environmental schedule were identified using the same
  10. Page 68 of 98

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-20 Date Issued September 22, 2026 OCC-854 Page 2 of 2 cost elements from the Company’s Powerplan cost repository, with two exceptions. First, there was one additional cost element for Compliance Assistance-Fees-Plans included in Environmental in the 2017 filing that was included in the Field Operations (Overhead Lines) and Residual schedules in the current filing (the test year amount in the 2017 filing was $28,382 and the test year amounts in the current filing were $5,795 in the Field Operations (Overhead Lines) schedule and $11,924 in the Residual schedule, for a total of $17,719). Second, the cost element for Reserve Site Remediation in the 2017 filing in the amount of $79,082 was not removed from the Environmental schedule using a pro forma adjustment the way it was removed in the current rate application. b - d. No. As explained in the November 22, 2017, testimony of Company witnesses Catherine Finneran and Timothy Griffin in Docket No. 17-10-46, there was no current recovery from customers for environmental investigation and remediation costs at the time of the last rate case. Between 1998 and 2003, with small amounts received through 2013, the Company had pursued and achieved recoveries of $15.170 million for environmental investigation and remediation costs from several of the Company’s historical insurance carriers and a third party. Because the Company had not recovered expenses for environmental investigation and remediation costs in electric rates, in essence it had used these recoveries to pay for the Company’s investigation and remediation of its environmental liabilities, including manufactured gas plants (MGPs) and other Company sites. By the end of September of 2017 (just prior to the filing of the Company’s rate case in November 2017), the Company spent $8.4 million with an additional $4.9 million recorded to the environmental liability that was charged to shareholders via a “below the line” account. Therefore, the Company was $1.9 million away from spending or charging to shareholders an amount equal to the proceeds received. e. - f. No, as demonstrated in the March 29, 2018, Settlement Amendment Update to Settlement Agreement Attachment 5, Other Amortization Expense, there were no deferred environmental remediation costs being amortized/recovered as a result of the approved settlement agreement in Docket No. 17-10-46.