Discovery Compilation (ALLCO Set 9, OCC Set 19, OCC Set 20).

Files4

Search terms highlighted
Eversource rate increase is on 35 pages across 3 files of the text below, highlighted. Go to the first matchClear highlighting
Words on different pages
1 page match
8 pages match
26 pages match
  1. Page 63 of 98

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-20 Date Issued September 22, 2026 OCC-852 Page 1 of 3 Date Filed: October 06, 2026 Witness: Mark P. Baldwin, Christopher Colorio, Lavelle A. Freeman and Elli Ntakou Request from: Office of Consumer Counsel Question: (STORM) Identify each storm that exceeded the dollar threshold but did not qualify as an IEEE 1366 MED, and explain why extraordinary recovery is still appropriate. Response: While informative, IEEE 1366 Major Event Days (“MEDs”) is not any type of measure of a “major storm event” or “catastrophic” storm event for operational or ratemaking purposes. Many of the Company’s ERP events do not meet the definition of MED, nor should an ERP event meet the definition. With respect to the IEEE reliability standard, a reporting day with a SAIDI greater than the threshold value is designated as a MED. The threshold value, or “TMED,” defines when the system is experiencing outage severity beyond what is normally expected for the system, based on the utility’s historical outage performance. That historical outage performance includes the Company’s response to ERP events that are experienced year-to-year with restoration occurring within a reasonable time frame for the system, thereby limiting the duration of customer outages. This is a critical feature of the IEEE MED calculation. Please refer to OCC-852, Attachment 1, which provides a description of the calculation of the IEEE TMED (Threshold for Major Event Days). As noted, the methodology flags and excludes from the reliability measure those days that exceed a threshold based on the past four years of daily SAIDI. The fundamental intent of calculating the threshold value as part of the IEEE MED metric is evident through the calculation in that it sets the threshold at 2.5 standard deviations over the mean. To help contextualize this, in a normal distribution, only 1.24% of samples have a value that are 2.5 standard deviations above the mean. In other words, the days above the TMED have an uncharacteristically high SAIDI and are performance outliers (low frequency, high impact). Such days can be days with unusually intense weather causing customer outages to endure or days with events having non-weather-related causes that inordinate customer interruptions and associated durations. For example, in Docket No. 25-12-13, the Company provided the example of 04/11/2019, which was a day that qualified as an IEEE MED and for exclusion from IEEEbased reliability metrics reporting. The outage events that contributed to the high daily SAIDI were related to a plane crash, not a weather event. Thus, the IEEE methodology is focused on the identification of days that are uncharacteristically high in SAIDI regardless of the cause of the
  2. Page 64 of 98

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-20 Date Issued September 22, 2026 OCC-852 Page 2 of 3 event, which is consistent with the fact that IEEE MED is designed to be a reporting methodology focused on delineating the system’s normal performance in terms of outage duration (SAIDI). Because it is designed to be a reliability measure focused on outage durations for customers, MED is designed to remove from the measure of reliability only those days that are exceptional from an outage duration (SAIDI) perspective so that electric utilities can measure the level of reliability (i.e., non-outage conditions for customers) more accurately and consistently. To achieve that outcome, TMED is designed to single out only very substantial outage durations, which would be only those events where the customer outages are so “dense” within a day that the utility cannot limit the duration of those outages to the levels existing in the historical data. As a result, by definition, the IEEE reliability standard is in no way indicative of the measure of storm damage or associated customer outages, and nor would it serve as an appropriate storm threshold for determining “major” or “catastrophic” storms from a ratemaking perspective. To the contrary, MED contemplates that the Company normally will move quickly to restore customers after weather events in the timeframes historically achieved, so that only events with extensive customer outage durations (such as the days during Storm Isaias restoration) beyond recent historical experience are excluded from the reliability measure. Looking at it in reverse, if the damage from a storm event caused customer outages that were not addressed because the Company did not secure crews to restore power to customers and did not resolve those customer outages in line with historical performance, then those customer outages would linger, potentially triggering a TMED at some point in time, as compared to historical data. However, this type of response by the Company would be unacceptable from a customer perspective. In addition, over time, these longer duration restorations would become “normalized” in the IEEE MED computation and would no longer trigger a MED, which is a concept that is completely antithetical to the requirements of the ERP and would be unacceptable to customers, rendering MED to be an ineffective tool for identification of “major” or “catastrophic” impacts to customers or to the Company. The crux of the issue is that there is no general nexus between the IEEE MED result and the actual storm impacts or resulting customer outages, because there the IEEE MED does not generate any expectation as to the actual value of the SAIDI that will qualify as an outlier (or an uncharacteristically high SAIDI days). For this reason, the IEEE MED also inappropriate benchmark to determine the number of crews that should have been procured to assist with storm restoration, as is implied by the question. Moreover, the IEEE MED is a backward-looking metric and not a forward-looking planning tool, i.e., it is only calculable after-the-fact based on actual, historical data. As an ex-post metric that is calculated after the fact, the IEEE MED cannot serve as an input to Eversource’s restoration processes, storm preparedness, storm response or associated costs incurred. Eversource prepares for storm events using weather forecasts, outage-prediction models and experience and expertise, among other factors to understand the expected level of outages and procure appropriate crews
  3. Page 65 of 98

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-20 Date Issued September 22, 2026 OCC-852 Page 3 of 3 and resources. The restoration times, crew procurements and restoration costs depend on the level of damage incurred and the Company’s execution of the restoration and response effort. This means that, in most circumstances, the duration of customer outages will most likely not fall outside the deadband of a 2.5 standard deviation.
  4. Page 66 of 98

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-20 Date Issued September 22, 2026 OCC-853 Page 1 of 1 Date Filed: October 06, 2026 Witness: Christopher E. Colorio, Mark P. Baldwin, John G. Griffin and Leanne M. Landry Request from: Office of Consumer Counsel Question: (STORM) Explain whether Eversource has any after-action process to determine whether prestaging was excessive, and whether any costs have ever been excluded from storm recovery because forecasted impacts did not materialize. Response: The concept of evaluating pre-staging on a hindsight basis as “excessive” is not a valid concept. The concept of an “excessive” pre-staging would mean that the Company pre-staged more crews than it actually needed, which is information that it does not have until after the event has actually occurred. The Company does not have a crystal ball to determine what is going to happen as a result of information it receives about an upcoming weather event. Instead, the Company prepares for and respond to threats to the electric system based on the best available information at the time, taking into account the best-case and worst-case scenario, while erring on the side of caution and conservative implementation of its Emergency Response Plan. Finding out, after the fact, that a particular event did not occur as forecast, is not a “lessons learned.” Rather, it reflects the very challenge of storm planning, which is that actual circumstances are unknown until they occur and actions are taken to scale response. After action reviews and any informal lessons learned are intended to improve the safety and efficiency of storm response and restoration where the Company has a reasonable expectation that the same or similar circumstances will happen again, which is a concept that could never apply to the evaluation of a randomly occurring weather event – each of which is completely unique.
  5. Page 67 of 98

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-20 Date Issued September 22, 2026 OCC-854 Page 1 of 2 Date Filed: October 06, 2026 Witness: Brendan J. O’Brien, Garrett J. Murray and Timothy J. Griffin Request from: Office of Consumer Counsel Question: (Environmental Remediation) Per a footnote in Settlement Agreement Attachment 3, in Docket Number 17-10–46, the Company was allowed $2.289 million for environmental O&M expenses in Rate Year 1, $2.381 million in Rate Year 2, and $2.467 million in Rate Year 3. a. Were the O&M expenses incurred in the prior rate plan's rate years of a similar nature to the $1.93 million requested in the current rate application? Explain. b. Were there any environmental remediation costs being deferred prior to the time of the last rate case? c. If yes, indicate the amounts deferred annually. d. Were there any deferred environmental remediation costs being amortized or recovered prior to the time of the last rate case? e. Were there any deferred environmental remediation costs being amortized/recovered and as a result of the approved settlement agreement in Docket No. 17-10-46? f. If yes, indicate the amounts amortized or recovered annually. Response: a. Yes. As shown on WP C-3.13 of the Company’s July 14, 2026, filing in this docket, the categories of cost that make up the $1.93 million requested in the current rate application include: (1) Clean Up & Disposal of Waste Material; (2) Manholes & Vaults; (3) Licensing & Permitting; and (4) Environmental Outside Services. There was also a fifth category, Reserve Site Remediation, but a pro forma adjustment removed the costs associated with this category that were related to reserve adjustment accruals associated with new environmental sites. The environmental O&M expenses included in Docket No. 17-10-46 were presented in the Company’s November 22, 2017, filing WP C-3.8, page 1 of 3, in categories identified as: (1) Overhead Environmental Cleanup; (2) Underground; (3) Environmental – Other; (4) Maintenance of Property Units; (5) Substation; and (6) Maintenance of Str. Lighting Equipment. Despite the differences in categories in each of the filings, the dollars that make up the costs in each filings’ Environmental schedule were identified using the same
  6. Page 68 of 98

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-20 Date Issued September 22, 2026 OCC-854 Page 2 of 2 cost elements from the Company’s Powerplan cost repository, with two exceptions. First, there was one additional cost element for Compliance Assistance-Fees-Plans included in Environmental in the 2017 filing that was included in the Field Operations (Overhead Lines) and Residual schedules in the current filing (the test year amount in the 2017 filing was $28,382 and the test year amounts in the current filing were $5,795 in the Field Operations (Overhead Lines) schedule and $11,924 in the Residual schedule, for a total of $17,719). Second, the cost element for Reserve Site Remediation in the 2017 filing in the amount of $79,082 was not removed from the Environmental schedule using a pro forma adjustment the way it was removed in the current rate application. b - d. No. As explained in the November 22, 2017, testimony of Company witnesses Catherine Finneran and Timothy Griffin in Docket No. 17-10-46, there was no current recovery from customers for environmental investigation and remediation costs at the time of the last rate case. Between 1998 and 2003, with small amounts received through 2013, the Company had pursued and achieved recoveries of $15.170 million for environmental investigation and remediation costs from several of the Company’s historical insurance carriers and a third party. Because the Company had not recovered expenses for environmental investigation and remediation costs in electric rates, in essence it had used these recoveries to pay for the Company’s investigation and remediation of its environmental liabilities, including manufactured gas plants (MGPs) and other Company sites. By the end of September of 2017 (just prior to the filing of the Company’s rate case in November 2017), the Company spent $8.4 million with an additional $4.9 million recorded to the environmental liability that was charged to shareholders via a “below the line” account. Therefore, the Company was $1.9 million away from spending or charging to shareholders an amount equal to the proceeds received. e. - f. No, as demonstrated in the March 29, 2018, Settlement Amendment Update to Settlement Agreement Attachment 5, Other Amortization Expense, there were no deferred environmental remediation costs being amortized/recovered as a result of the approved settlement agreement in Docket No. 17-10-46.
  7. Page 69 of 98

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-20 Date Issued September 22, 2026 OCC-855 Page 1 of 1 Date Filed: October 06, 2026 Witness: Marc J. Richards and Gary A. Iadarola Request from: Office of Consumer Counsel Question: (Environmental Remediation) Refer to the Direct Testimony of Marc J. Richards, Gary A. Iadarola and Claire B. Connolly, Exhibit CLP-ENV-1, p. 24. Was the 50/50 cost sharing agreement with Yankee Gas for Site #9, Winsted Former MGP, approved by the Authority? Provide cites to the request made by the companies and decisions and rulings from the Authority approving the treatment of costs. Response: Order No. 5 from the Department of Public Utility Control’s (“Department”) 1988 decision in Docket No. 88-04-28 approving the sale of the CL&P gas division to Yankee Gas directed “CL&P and Yankee [to] submit an executed copy of the environmental liability sharing agreement to the Department within 30 days following the date of spin-off.” Re Connecticut Light & Power Co., 99 P.U.R.4th 102, 1988 WL 391275 (Conn.D.P.U.C.) (Dec. 21, 1988). On July 31, 1989, Yankee Gas and CL&P filed their Environmental Liability and Indemnity Agreement with PURA (the “Agreement”). Decision, January 10, 1990, Docket No. 88-04-28, Application of The Connecticut Light and Power Company for Approval of Steps Regarding the Divestiture of Gas Business; Phase III, at 3. The Department concluded that the Agreement established a reasonable process whereby future environmental liabilities may be allocated between CL&P and Yankee Gas and determined that the companies had complied substantially with all the Department’s orders, to date, related to the divestiture. Id. at 5. The Site is currently utilized by both Yankee Gas and CL&P.
  8. Page 70 of 98

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-20 Date Issued September 22, 2026 OCC-856 Page 1 of 1 Date Filed: October 06, 2026 Witness: Brendan J. O’Brien, Garrett J. Murray, Marc J. Richards and Gary A. Iadarola Request from: Office of Consumer Counsel Question: (Environmental Remediation) Refer to Exhibit CLP-ENV-5. In estimating 2026-2028 environmental remediation costs, the Company utilized a 30% contingency factor. Please provide prior precedent where the Authority has allowed the recovery of forecasted costs that included escalation for a contingency factor. Indicate how a contingency factor meets the “known and measurable” standard. Response: Remediation budgets that have been approved in prior rate cases (CL&P and Yankee Gas) have included contingencies. Due to the variability in the type and volume of remediation conducted from site to site, the amount of contingency that is warranted will always vary. The amount of investigation data and complexity of the geology and constituents of concern (COC) affect the amount of contingency that is warranted. If the project is a straight forward excavation of impacted soil at a site where the geology is consistent and the impacts are well defined, the contingency is usually set at 10%. At sites where the impacts may not be as well defined due to many factors (complex geology, multiple COCs, soil and groundwater contamination is present, multiple remediation technologies are needed, etc.) the contingency would therefore need to be larger (sometimes up to 50%). This is standard practice in the industry and no environmental cleanup projects are initiated without a project-specific contingency. Recognizing that the sequence, timing, and magnitude of response activities can vary from site to site depending upon the size of the site, the degree of contamination, nearby sensitive receptors, land ownership, the degree of oversight and control exercised by regulators, and many other sitespecific factors, the Company’s testimonies at Exhibit CLP-ENVIRONMENTAL-1, beginning at page 6 and Exhibit CLP-REVREQ-1, beginning at page 43, describes its proposal to continue the deferral treatment of such costs rather than putting a fixed amount into base distribution rates.
  9. Page 71 of 98

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-20 Date Issued September 22, 2026 OCC-857 Page 1 of 4 Date Filed: October 07, 2026 Witness: Douglas P. Horton Request from: Office of Consumer Counsel Question: (Capital Support Mechanism) On p. 101 of Exhibit CLP-ELP-1, the Company states that, “As part of the Company’s annual RAM compliance filing, actual plant additions placed in service during the applicable plan year will be reconciled against the approved forecast.” In the Company’s response to EOE-156, Witness Horton states that prudence reviews would be included in the annual reconciliation process. a. Provide a detailed plan for how the Company envisions the annual reconciliation process would proceed and how long the process would take both as a whole, and for each step. Please identify what filings would be made, whether and how discovery would be allowed, and what types of determinations would be required by the Authority. b. Where in the reconciliation process will the distinction and differences be identified between realized annual plant addition costs and the associated rate base, and the return, taxes, and deprecation on rate base that are included in the going-in revenues? c. Will the annual PBR reconciliations be assessments of the whole Company’s rate base with calculations of commensurate return, tax and depreciation, or will it be an incremental adjustment based on annual plant additions? Please explain. d. Provide one or more examples, as appropriate, showing how the annual capital recovery process, including reconciliation, would function, including detailed calculations in the form to be used in the annual adjustment filings. e. Provide a list of all types of costs that will be included in the capital recovery reconciliations. Response: a. The Company has given this process a lot of thought based on discussions throughout the PBR dockets. Based on input from those sessions, the Company’s proposal is to align the Performance Based Multi-Year Rate Plan (PBMRP) with the Rate Year, and as much as possible, aligns with the existing annual RAM ratemaking process. As such, the Company proposes that PBMRP adjustments occur on each July 1, starting with July 1, 2027, and annually thereafter. For each year that the PBMRP mechanism is in effect, the Company would submit an Annual PBR Plan Compliance Filing to PURA in the annual RAM proceeding. The annual compliance filing would include, among other things: (1) the calculation of the annual revenue-cap adjustment;
  10. Page 72 of 98

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-20 Date Issued September 22, 2026 OCC-857 Page 2 of 4 (2) the new proposed rate using the PBR formula; (3) an earnings-sharing computation; (4) cost documentation for the Company’s capital investments; (5) the calculation and reconciliation of the annual capital-cap adjustment; (6) documentation of metric performance and resulting penalties or incentives; and (7) bill impacts of the new rate by rate class. (8) as applicable, any request for exogenous cost recovery. With respect to the capital-support mechanism or “F” factor in the formula, the Company proposes a mechanism based on a fixed annual capital investment level for each year of the PBMRP, with reconciliation through PURA’s annual RAM proceedings. The fixed annual investment level would initially be set at the Company’s capital forecast, as approved in this proceeding, and would be subject to downward-only reconciliation 1 in the event that either i) the Company’s actual plant in service is lower than projected and utilized in establishing the initial F-Factor for that Rate Year or ii) PURA ultimately denies as imprudent a level of investment that was initially included in the F Factor allowance. In this way, customers are assured that rates ultimately reflect the costs of system investments that are actually in service, and have been found prudently incurred by PURA. As described in its Exhibit CLP-ELP-1 testimony, the Company has presented different investment trajectories in the Company’s 5-Year targeted system performance (TSP) and is proposing to establish the capital support mechanism of the PBR adjustment consistent with the annual capital funding requirements presented in Figure 7 of the Exhibit CLPELP-1 testimony. As part of the Company’s annual RAM compliance filing, actual plant additions placed in service during the applicable plan year would be reconciled against the approved forecast that would have been utilized in the prior PBMRP filing to establish the F-Factor initially. Following PURA’s determination that the Company’s actual plant additions are prudent, used and useful, the Company’s allowed rate base and associated revenue requirement for 1 The Company notes that the revenue decoupling mechanism (RDM) will continue to operate and reconcile actual revenues to the target revenues, as adjusted by the PBMRP. The Company’s reference to a ‘downward only’ reconciliation is meant to reflect that the revenue target utilized in the RDM will not be adjusted upward in the event actual plant additions exceed the level originally reflected in the F-Factor allowance. In that circumstance, the FFactor allowance is capped at the fixed level projected in this proceeding. Capital that is placed in service above the cap would not be included in rates until a future rate case proceeding, and only then on a prospective basis.

As listed on the current system

Corres. 10/14/2026 [26-05-10] (Keegan Werlin LLP) - Discovery Compilation (ALLCO Set 9, OCC Set 19, OCC Set 20).