Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Discovery Compilation (ALLCO Set 9, OCC Set 19, OCC Set 20).

Files4

Search terms highlighted
Eversource rate increase is on 35 pages across 3 files of the text below, highlighted. Go to the first matchClear highlighting
Words on different pages
1 page match
8 pages match
26 pages match
  1. Page 70 of 98

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-20 Date Issued September 22, 2026 OCC-856 Page 1 of 1 Date Filed: October 06, 2026 Witness: Brendan J. O’Brien, Garrett J. Murray, Marc J. Richards and Gary A. Iadarola Request from: Office of Consumer Counsel Question: (Environmental Remediation) Refer to Exhibit CLP-ENV-5. In estimating 2026-2028 environmental remediation costs, the Company utilized a 30% contingency factor. Please provide prior precedent where the Authority has allowed the recovery of forecasted costs that included escalation for a contingency factor. Indicate how a contingency factor meets the “known and measurable” standard. Response: Remediation budgets that have been approved in prior rate cases (CL&P and Yankee Gas) have included contingencies. Due to the variability in the type and volume of remediation conducted from site to site, the amount of contingency that is warranted will always vary. The amount of investigation data and complexity of the geology and constituents of concern (COC) affect the amount of contingency that is warranted. If the project is a straight forward excavation of impacted soil at a site where the geology is consistent and the impacts are well defined, the contingency is usually set at 10%. At sites where the impacts may not be as well defined due to many factors (complex geology, multiple COCs, soil and groundwater contamination is present, multiple remediation technologies are needed, etc.) the contingency would therefore need to be larger (sometimes up to 50%). This is standard practice in the industry and no environmental cleanup projects are initiated without a project-specific contingency. Recognizing that the sequence, timing, and magnitude of response activities can vary from site to site depending upon the size of the site, the degree of contamination, nearby sensitive receptors, land ownership, the degree of oversight and control exercised by regulators, and many other sitespecific factors, the Company’s testimonies at Exhibit CLP-ENVIRONMENTAL-1, beginning at page 6 and Exhibit CLP-REVREQ-1, beginning at page 43, describes its proposal to continue the deferral treatment of such costs rather than putting a fixed amount into base distribution rates.
  2. Page 71 of 98

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-20 Date Issued September 22, 2026 OCC-857 Page 1 of 4 Date Filed: October 07, 2026 Witness: Douglas P. Horton Request from: Office of Consumer Counsel Question: (Capital Support Mechanism) On p. 101 of Exhibit CLP-ELP-1, the Company states that, “As part of the Company’s annual RAM compliance filing, actual plant additions placed in service during the applicable plan year will be reconciled against the approved forecast.” In the Company’s response to EOE-156, Witness Horton states that prudence reviews would be included in the annual reconciliation process. a. Provide a detailed plan for how the Company envisions the annual reconciliation process would proceed and how long the process would take both as a whole, and for each step. Please identify what filings would be made, whether and how discovery would be allowed, and what types of determinations would be required by the Authority. b. Where in the reconciliation process will the distinction and differences be identified between realized annual plant addition costs and the associated rate base, and the return, taxes, and deprecation on rate base that are included in the going-in revenues? c. Will the annual PBR reconciliations be assessments of the whole Company’s rate base with calculations of commensurate return, tax and depreciation, or will it be an incremental adjustment based on annual plant additions? Please explain. d. Provide one or more examples, as appropriate, showing how the annual capital recovery process, including reconciliation, would function, including detailed calculations in the form to be used in the annual adjustment filings. e. Provide a list of all types of costs that will be included in the capital recovery reconciliations. Response: a. The Company has given this process a lot of thought based on discussions throughout the PBR dockets. Based on input from those sessions, the Company’s proposal is to align the Performance Based Multi-Year Rate Plan (PBMRP) with the Rate Year, and as much as possible, aligns with the existing annual RAM ratemaking process. As such, the Company proposes that PBMRP adjustments occur on each July 1, starting with July 1, 2027, and annually thereafter. For each year that the PBMRP mechanism is in effect, the Company would submit an Annual PBR Plan Compliance Filing to PURA in the annual RAM proceeding. The annual compliance filing would include, among other things: (1) the calculation of the annual revenue-cap adjustment;
  3. Page 72 of 98

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-20 Date Issued September 22, 2026 OCC-857 Page 2 of 4 (2) the new proposed rate using the PBR formula; (3) an earnings-sharing computation; (4) cost documentation for the Company’s capital investments; (5) the calculation and reconciliation of the annual capital-cap adjustment; (6) documentation of metric performance and resulting penalties or incentives; and (7) bill impacts of the new rate by rate class. (8) as applicable, any request for exogenous cost recovery. With respect to the capital-support mechanism or “F” factor in the formula, the Company proposes a mechanism based on a fixed annual capital investment level for each year of the PBMRP, with reconciliation through PURA’s annual RAM proceedings. The fixed annual investment level would initially be set at the Company’s capital forecast, as approved in this proceeding, and would be subject to downward-only reconciliation 1 in the event that either i) the Company’s actual plant in service is lower than projected and utilized in establishing the initial F-Factor for that Rate Year or ii) PURA ultimately denies as imprudent a level of investment that was initially included in the F Factor allowance. In this way, customers are assured that rates ultimately reflect the costs of system investments that are actually in service, and have been found prudently incurred by PURA. As described in its Exhibit CLP-ELP-1 testimony, the Company has presented different investment trajectories in the Company’s 5-Year targeted system performance (TSP) and is proposing to establish the capital support mechanism of the PBR adjustment consistent with the annual capital funding requirements presented in Figure 7 of the Exhibit CLPELP-1 testimony. As part of the Company’s annual RAM compliance filing, actual plant additions placed in service during the applicable plan year would be reconciled against the approved forecast that would have been utilized in the prior PBMRP filing to establish the F-Factor initially. Following PURA’s determination that the Company’s actual plant additions are prudent, used and useful, the Company’s allowed rate base and associated revenue requirement for 1 The Company notes that the revenue decoupling mechanism (RDM) will continue to operate and reconcile actual revenues to the target revenues, as adjusted by the PBMRP. The Company’s reference to a ‘downward only’ reconciliation is meant to reflect that the revenue target utilized in the RDM will not be adjusted upward in the event actual plant additions exceed the level originally reflected in the F-Factor allowance. In that circumstance, the FFactor allowance is capped at the fixed level projected in this proceeding. Capital that is placed in service above the cap would not be included in rates until a future rate case proceeding, and only then on a prospective basis.
  4. Page 73 of 98Match

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-20 Date Issued September 22, 2026 OCC-857 Page 3 of 4 that year will be limited to the lesser of (1) the total revenue requirement for the forecasted capital approved in this proceeding; or (2) the total revenue requirement for the actual plant in service. As described previously, if the Company’s actual capital additions exceeds the forecasted amount approved in this proceeding, the Company would not be permitted to seek recovery of the incremental investment during the initial four-year PBMRP Term. Any such investment would instead remain subject to review and consideration in a subsequent base rate proceeding or successor PBMRP Term. The Company’s proposed capital funding mechanism sets a defined cap on capital recovery during the plan term, providing customers with greater rate certainty and placing the risk (and cost) of increased capital spending on the Company during the course of the PBMRP. The annual reconciliation further protects customers by blocking recovery of investments that are delayed, deferred, canceled, or not placed in service, since those costs would not be reflected in the “F” factor upon reconciliation, which is based on plant in service. For these reasons, the proposal aligns cost recovery with prudent investment and incentivizes efficient execution of the capital program, all while minimizing customer over-collection. Based on the above framework, an exhibit that demonstrates a revenue requirement consisting of: (1) a reconciliation of actual plant additions placed in service during the previous calendar year against the approved forecast (also referred to as the F-factor allowance) for that calendar year, and (2) the F-factor allowance for the new Rate Year beginning July 1st, would be filed on or about March 1st of each year consistent with the timing of all other RAM component reconciliations. Concurrent with that timing, all plant additions documentation for the previous calendar year included in the above reconciliation will also be filed on or about March 1st as part of the same filing. Further, under the Company’s proposed timeline, the revenue requirement resulting from the reconciliation of the prior year’s F-factor allowance and the new Rate Year’s F-factor allowance will go into effect on July 1, following the March 1st filing. As part of the RAM process, PURA performed prudence reviews of capital documentation filed for the ESI, including discovery, between March 1st and September 1st, the date on which additional RAM rate changes were made. Even though PBMRP rates would go into effect on July 1st, the Company proposes that this timeline continues to be used for capital prudence reviews under the PBMRP. To the extent PURA’s prudence review warrants any adjustment to the revenue requirement that went into effect on July 1, the Company will calculate the excess revenue collected from customers over the period of July 1 through August 31 and include this amount, plus carrying costs for those 2 months, in the RDM’s allowed revenue target for the July 1 through June 30th Rate Year. b. Please refer to subpart (d) of this question.
  5. Page 74 of 98Match

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-20 Date Issued September 22, 2026 OCC-857 Page 4 of 4 c. Please refer to subpart (d) of this question. d. Please refer to the example shown in EOE-156, Attachment 1, pages 4 through 12, showing how the annual capital recovery process, including reconciliation, would function, including detailed calculations in the form to be used in the annual adjustment filings. Please note that pages 4, through 12, show an illustrative example for all four Rate Years contemplated for the duration of the PBMRP; however, the annual filing would only be for a single year of the PBMRP. As part of this example, please refer to the differences between realized annual plant addition costs and the associated rate base, and the return, taxes, and depreciation on rate base that are included in the going-in revenues found in EOE-156, Attachment 1, worksheet “PBR-7 Going-In Capital RR”, Lines 13-16. Additionally, the detailed calculations shown in EOE-156, Attachment 1, pages 4 through 12, demonstrate that the annual PBR reconciliations will be an assessment of the Company’s total accumulated depreciation included in base distribution rates (i.e., customers will be receiving credit for the increase in the Company’s accumulated depreciation for all capital included in base distribution rates), as opposed to the Company’s entire rate base (the Company considers its entire rate base to include other rate base items such as deferred assets and liabilities, etc.). e. The revenue requirement for capital recovery will include appropriate recovery of net plant in service, accumulated deferred income taxes (“ADIT”) and accumulated depreciation for the cumulative additional plant additions and will include a pre-tax return on investment (i.e. return on rate base including income taxes), return of investment (i.e. depreciation), property taxes, gross earnings tax and uncollectible expense.
  6. Page 75 of 98

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-20 Date Issued September 22, 2026 OCC-858 Page 1 of 12 Date Filed: October 06, 2026 Witness: Douglas P. Horton Request from: Office of Consumer Counsel Question: Refer to Exhibit CLP-ELP-1, figure 7. Please explain whether the amounts shown in Figure 7 are capital expenditures versus plant additions. Please explain any differences in the nature, or timing of the amounts shown in Figure 7 and the amounts of plant addition that would be used in comparing [i.e., determining “lessor of”] annual plant addition costs in the annual reconciliation filings. a. Please identify, in disaggregated table form, all of the component costs included in each category of the amounts shown in Figure 7. Response: Plant additions and capital expenditures represent two different ways of viewing the same underlying investment. Capital expenditures are generally organized and managed around specific business objectives, programs, projects, or asset installation efforts, such as substation expansions, feeder rebuilds, pole replacement programs, or other distribution system investments. Capital expenditures are incurred over the course of project execution and may span multiple months or years depending on project scope, complexity, and construction schedules. Plant additions, by contrast, are recognized when utility assets are placed in service and meet the applicable accounting criteria for recording as utility plant. Accordingly, a plant addition is generally recorded at a specific point in time, whereas the associated capital expenditures may have been incurred over an extended period. The Company develops its forecast of plant additions using its capital investment plans, project schedules, anticipated in-service dates when possible, and historical experience. However, actual in-service dates may differ from forecasted in-service dates (where available) due to changes in project scope, construction sequencing, permitting, material availability, operational considerations, weather, or other factors. Consequently, the timing of annual plant additions may differ from the timing of annual capital expenditures. While such timing differences may occur in any given year, over a multi-year period it is reasonable to expect that plant additions, together with associated cost of removal, will generally track with capital expenditures.
  7. Page 76 of 98

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-20 Date Issued September 22, 2026 OCC-858 Page 2 of 12 The amounts shown in Figure 7 are forecasted capital expenditures associated with the Company’s planned investment programs. As stated in its response to OCC-423 i and other interrogatories, the Company’s annual F-Factor reconciliation would consider specifically the plant additions actually placed in-service through the calendar year-end prior to a given annual filing. For subpart (a) of this request, please refer to OCC-858, Attachment 1. Prior Referenced Response: i OCC-423 Question: Exhibit CLP-ELP-1 Please explain in detail why the Company believes its proposed treatment of capital expenditures under the PBMRP, including the use of forecasted capital expenditures and the F-Factor, is preferable to including capital expenditures within the Revenue Cap Formula framework as proposed in the Docket No. 21-05-15RE01 Proposed Final Decision. In your response, a. b. c. Please explain why the Company believes O&M expenses are appropriately subject to an externally indexed revenue cap, while capital expenditures require separate recovery through an F-Factor based on a fixed annual capital investment forecast. Please explain how the Company’s proposed treatment of capital expenditures is expected to produce customer cost savings or otherwise improve customer affordability relative to including capital expenditures within a revenue cap formula. Please explain how the proposed F-Factor mitigates or avoids any incentive to favor capital expenditures over O&M solutions, including in circumstances where either a capital or O&M solution could be used to address the same system need. OCC-423 Response: The Company appreciates OCC’s thoughtful and analytical questions on the Company’s proposed performance based multi-year rate plan (“PBMRP”) and looks forward to further discussion on the development of a workable PBR framework for the Company’s customers. To cover the issues raised in the question, the Company’s response is organized as follows: 1. Review of relevant aspects of the Company’s PBMRP. 2. Considerations on the design of capital-driven revenue support. 3. Specific responses to parts (a), (b) and (c), above. 1. Review of the Relevant Aspects of the Company’s PBMRP Ultimately, the Company’s goal in this proceeding is to establish a sustainable, cohesive ratemaking framework that advances electric utility service in the State of Connecticut in an affordable manner for customers, over a long term. This is the Company’s goal because the CL&P system needs investment for reliability, resiliency and modernization. For this investment to be affordable for customers, a coherent ratemaking plan needs to be instituted that will consider the interests of customers over a longer term than just the next rate case. That framework
  8. Page 77 of 98

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-20 Date Issued September 22, 2026 OCC-858 Page 3 of 12 needs to balance: (1) the reliability and performance requirements of the Company’s customers and the broader State of Connecticut; (2) customer rate stability and affordability; (3) incentives for cost efficiency in utility operations; and (4) implementation of a revenue support mechanism sufficient to cover the cost of delivering these objectives to customers. The Company’s PBMRP is designed to address these objectives in a holistic, balanced way. To do this, the Company started with the ratemaking framework under discussion in PURA’s PBR docket (Docket No. 21-0515RE01), while also introducing certain new elements to remediate the flaws that would ultimately hinder PURA’s (draft) PBR model from supporting the necessary stay-out terms. For any multi-year rate plan to be successful, it needs to be grounded in the reality of the utility’s costs, while also incorporating features that innately push the utility to be more efficient. That is not to say every dollar of the utility’s costs will be (or should be) recovered. Rather, the allowed revenues need to be sufficient to afford the utility a reasonable opportunity to cover its cost of service to customers, including a reasonable rate of return on equity (“ROE”) where the utility is operating prudently and efficiently, as required by state law. A framework in which the utility has no reasonable opportunity to earn its ROE, regardless of how hard it strives for efficiency, simply becomes self-defeating because the utility will exercise its statutory rights to a distribution rate proceeding, thereby muting the most powerful efficiency feature of a multi-year rate plan, which is the stay-out term. A framework that underestimates the actual cost to run the system and/or affords the utility no reasonable chance to earn its allowed ROE, year after year, also results in under-investment and a system that not only lacks innovation, but falls further and further behind at a significant – albeit potentially unseen – cost to customers. As a result, a lasting, productive framework is one that is soundly informed by – not detached from – the drivers of the utility’s real cost of service, including its cost of capital. In this context, the two most critical features of the Company’s PBMRP are as follows: A going-in revenue requirement that reasonably reflects the Company’s actual operating expenses and cost of investment in the Rate Year, so that through effective management and prudent decision making, the Company can achieve the true efficiency gains that will be needed to stretch the approved revenue requirement over the stay-out term. Without a reasonable opportunity to maintain financial integrity over a stay-out period, as measured by the authorized ROE, the utility cannot focus on innovation and efficiency gains – and will instead file for the next rate case to make up ground. To accomplish this goal, the overall paradigm must “hang” together, making the base revenue requirement a pivotal element. The many components of a PBR plan, including going-in rates, as well as the subsequent rate adjustments, must work in concert with performance objectives and the capital investment requirements expected of the Company – for the benefit of customers, i.e., the entire framework must work to the benefit of customers, not only in relation to the price they will pay, but also in relation to supporting the level of service that they need and expect. Revenue support for incremental capital investment to support long-term system goals. The Company operates in a capital-intensive industry and has a substantial need to acquire cash on a systematic basis to operate its business. As annual capital investments regularly exceed net cash from operations (i.e. cash receipts from customers net of operating cash outflows), the Company must look to other capital sources to fund those investments. Those sources are the debt and equity investors supplying the cash to capital markets. This means the Company must compete with all other entities participating in those markets to attract capital. It is simply not possible for the Company to go to those markets and demand cash for free, or at below-market rates relative to the investor’s risk when other entities participating in the same capital markets offer compensation for the use of funds over time.
  9. Page 78 of 98Match

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-20 Date Issued September 22, 2026 OCC-858 Page 4 of 12 The Company provided extensive analysis and discussion on the cost of capital throughout Docket No. 21-05-15RE01, including specifically as it relates to CT-Bar. PURA’s treatment with respect to going-in revenue requirements as well as any ongoing capital-driven revenue support mechanism, such as CT-Bar, is paramount to whether the Company, with effective management and sound decision-making, can responsibly cede its right to file for a rate amendment, whereas that is otherwise the only tool the utility has to align its revenues and costs and have a reasonable chance at earning its authorized ROE, which, over time, is necessary in order to attract the capital necessary to meet the standards of service expected of the Company’s customers. The lack of a valid revenue requirement component within the CT-Bar that would allow recovery of the cost of capital associated with incremental capital investment over the term of the PBMRP is a non-starter from a policy perspective, creating an obstacle that would block a utility from giving up its right to file for rate modifications over the multi-year period in question. This is particularly accurate in the present environment in which significant increases in the level of necessary system investments are expected (and planned). Simply put, the CT-Bar, as previously envisioned in PURA’s draft PBR decision, fully prevented the Company from having any practical chance at staying out of a rate case, and therefore, would never work to create a reasonable PBR framework. The Company’s proposed PBMRP in this docket is designed to track the design of the CT-Bar as closely as possible, given that this was PURA’s developing framework. However, the Company’s PBMRP addresses the two primary faults in PURA’s RE01 framework that would prevent the implementation of a workable PBR framework, which are (1) the deviations from ratemaking fundamentals that grossly understate the “going in” revenue requirement; and (2) modification of the CT-Bar to reflect the revenue requirement applicable to capital investment, which would include recovery of the cost of capital and the cost of removal over the course of the PBMRP term. The Company’s F-Factor also corrects for the mechanical error of deducting depreciation expense from new plant additions, rather than from rate base. In particular, the Company’s proposed F-Factor is designed to recover no more than the revenue necessary to support a discrete amount of ongoing system investment, recognizing that the cost of capital is a lawful and factual cost of service that must be incorporated into the revenue requirement calculation for the Company, as it is for any utility. 2. Considerations on the Design of Capital-Driven Revenue Support CT-Bar, as defined in PURA’s Proposed Final Decision, issued in Docket No. 21-05-15RE01, on July 14, 2025 (the “RE01-PFD”), had several sensible qualities that the Company supported. However, those “sensible” qualities were overcome by certain critically flawed concepts that would need to be modified or eliminated in order for the Company to consider committing to a stay-out. The positive and negative CT-Bar qualities are outlined briefly here and discussed in greater detail below, including with respect to similarities or differences to the Company’s proposed F-Factor. Summary of constructive features of PURA’s RE01-PFD: 1) Acknowledgement that current revenue support for ongoing investment is essential; 2) No category of capital investment was summarily or preemptively excluded from CT-Bar;
  10. Page 79 of 98Match

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-20 Date Issued September 22, 2026 OCC-858 Page 5 of 12 3) CT-Bar takes effect with Rate Year 1; and 4) CT-Bar aligns capital revenue support with the capital investments of the DSP. Summary of unworkable features of PURA’s RE01-PFD: 1) Exclusion of the recognition in the CT-Bar of the cost of capital between rate cases. 2) Exclusion of cost of removal in the CT-Bar. 3) Application of depreciation expense as a reduction to plant additions rather than rate base. Constructive features of PURA’s RE01-PFD: 1) Positive #1: Acknowledgement that current revenue support for ongoing investment is essential to the integrity of the PBR framework. First, that the CT-Bar even existed in PURA’s RE01-PFD is genuine acknowledgement that some form of revenue support for Rate Year investment is essential to support a PBR framework. As discussed at length in that docket, the Company anticipates significant system investment over the next five years to advance the state’s clean energy and reliability goals. Revenue support for ongoing system investment is crucial for any multi-year rate plan, whether in the form of the Company’s proposed PBMRP, step increases, or any other ratemaking framework. CT-Bar’s inclusion in RE01-PFD is a clear indication that incremental revenue support for ongoing system investments is a necessity. 2) Positive #2: No category of capital investment was summarily or preemptively excluded from CT-Bar. Second, the RE01-PFD did not exclude particular categories of capital investment. For example, capital investments in facilities, fleet and information technology are viewed as permissible categories for revenue support in the CT-Bar framework. This is consistent with the Company’s proposed F-Factor in this proceeding. 3) Positive #3: CT-Bar takes effect as of Month 1 of Rate Year 1. The Company provided extensive discussion and analysis throughout Docket No. 21-05-15RE01 technical sessions and data responses regarding the “going-in” revenue requirement and the detrimental financial consequences of limiting capital investments to a period of time removed from the rate year. Ignoring for a moment the CT-Bar’s deficiencies, having the mechanism take effect Month 1 of Rate Year 1 minimizes or eliminates those detrimental timing consequences, particularly in light of the fact that PURA has in recent years moved away from its prior practice of implementing future-test years in base rate proceedings, instead favoring a strict historical Test Year practice as it relates to plant additions. Revenue decoupling is a factor to consider here because the revenue decoupling mechanism (“RDM”) subsumes all sales growth to the extent that it is occurring, funneling incremental sales revenues back to customers. RDM is supported by valid policy reasons; however, the fact is that there are capital costs associated with adding new customers. Historically, when consistent and steady levels in the range of ~3$ per year of annual growth in sales and revenues was available to a utility to help offset the cost of incremental capital additions between rate cases, the pressing need for incremental revenue support

As listed on the current system

Corres. 10/14/2026 [26-05-10] (Keegan Werlin LLP) - Discovery Compilation (ALLCO Set 9, OCC Set 19, OCC Set 20).

This filing on the current system (opens in a new tab)