Discovery Compilation (ALLCO Set 9, OCC Set 19, OCC Set 20).
Files4
Docket No. 26-05-10 Discovery Compilation October 14 2026.pdf
PDF · 154 KB · 1 pageText searchable
Download Docket No. 26-05-10 Discovery Compilation October 14 2026.pdfRead the text of Docket No. 26-05-10 Discovery Compilation October 14 2026.pdf
ALLCO Set 9 COMBINED.pdf
PDF · 746 KB · 61 pagesText searchable
Download ALLCO Set 9 COMBINED.pdfRead the text of ALLCO Set 9 COMBINED.pdf
OCC Set 19_COMBINED.pdf
PDF · 1.4 MB · 141 pagesText searchable
Download OCC Set 19_COMBINED.pdfRead the text of OCC Set 19_COMBINED.pdf
OCC Set 20 COMBINED.pdf
PDF · 1.0 MB · 98 pagesText searchable
Download OCC Set 20 COMBINED.pdfRead the text of OCC Set 20 COMBINED.pdf
Page 85 of 98
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-20 Date Issued September 22, 2026 OCC-858 Page 11 of 12 The capital investments the Company must make to provide electric service to customers in the State of Connecticut is a “local” concept. Those investments are driven by the circumstances and objectives of the State of Connecticut and the history and current status of the distribution grid in Connecticut. Those circumstances and objectives, which require longterm system planning and appropriate capital resources, are not encapsulated by a single index. O&M, though it is similarly influenced by local circumstances, does not change at the same rate as capital investment. For example, the Company’s annual capital investment is expected to increase nearly 40% from $549 million in 2025 to $758 million by 2028, or more than 11% annually, on average. In contrast, over the same timeframe O&M (excluding storm funding and vegetation management) is projected to increase approximately 3-4% annually. The Company’s proposed PBMRP aligns revenues with drivers of cost while maintaining the incentive to control costs. In addition, under PBR theory, where capital inputs are contemplated in the indexed formula, then the X factor is negative, implying that the annual adjustment is inflation plus an additional factor. The testimony of London Economics in Exhibit CLP-PBR-1 reviews the results of their total factor productivity study producing this result. In this case, the Company elected to adhere as closely as possible to PURA’s (draft) CT-Bar in order to remain synched with PURA’s policy direction. (b) How will the Company’s proposed treatment of capital expenditures be expected to produce customer cost savings or otherwise improve customer affordability relative to including capital expenditures within a revenue cap formula. There are three main opportunities for customer benefit in the PBR framework, which are: (1) the opportunity to leverage the stay-out term to drive operational efficiency and cost savings; (2) the opportunity to spread rate changes out over time to smooth impacts for customers and employ the concept of gradualism rather than promoting the cost and inefficiency of a traditional rate-case cycle; and (2) the opportunity to develop a systematic investment plan that promotes operational efficiency and cost-saving procurement strategies, while taking advantage of the smoothing impacts of the PBR framework to mitigate cost impacts. The Company has submitted substantial testimony and documentation in this proceeding to provide insight into the level of capital investment that is needed on the system to provide adequate service to customers and to support the economic vitality of the State of Connecticut. Customers benefit directly when investment can be undertaken on a planned, systematic and consistent basis over time because (1) it is consistently more expensive to complete infrastructure projects tomorrow rather than today due to price inflation and other factors; and (2) the Company’s process inputs (i.e., primarily labor and materials) cost less when procured on a planned and systematic basis rather than on an emergent basis. Although difficult to define in terms of the overall cost trends, there are significant benefits for customers in an operating approach that is consistent, systematic, planned and carefully managed, which is an outcome that the Company is hoping to promote with its proposals in this proceeding. Bottomline – the Company is looking to establish a ratemaking framework that will promote efficiency of operations for the benefit of customers and the F-Factor is the optimal mechanism for that purpose. Assuming that OCC’s referenced alternative for a capital-cost mechanism “within a revenue cap formula,” means that the PBMRP would rely exclusively on an “I-X” revenue cap formula, with or without X defined with a negative factor, the Company’s experience isPage 86 of 98
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-20 Date Issued September 22, 2026 OCC-858 Page 12 of 12 that it is not adequate to support necessary capital investment, while raising issues for stakeholders. With the negative X factor, there is no direct link between the actual cost of capital plant additions and the revenue collection through customer rates, leaving it to be insufficient to support necessary capital investments and unsatisfactory for stakeholders that want transparency between the costs collected in rates and the rates that customers pay. As a result, achieving the efficiency needed to support a cost-effective capital plan is illusory in this model. (c) How does the proposed F-Factor mitigate or avoid any incentive to favor capital expenditures over O&M solutions, including in circumstances where either a capital or O&M solution could be used to address the same system need? In the Company’s experience, implementation of the X factor mechanism (with a negative X factor) to cover capital investment was thought to be a mechanism that would promote efficient solutions between capital and O&M because the revenue allowance was not predicated on actual plant additions; rather, was simply formulaic. In 2017, the Massachusetts Department of Public Utilities (“MDPU”) approved a negative X factor within a revenue cap for NSTAR Electric Company d/b/a Eversource Energy – and it remained operative for the five-year term of the plan. However, the fact is that – during an extended stay-out period, there is no incentive to incur any greater level of expense than is absolutely necessary to run the business. Therefore, there is no greater impetus than would exist in any event to make the optimal choice between expense and capitalization, where such a choice exists. And again, with the negative X factor, the MDPU felt it had no line of sight as to whether funds allowed to NSTAR Electric through the annual PBR allowance were, indeed, being leveraged for system investment. Therefore, in 2022, the MDPU instituted the K-Bar providing an allowance for system infrastructure projects, coupled with reporting requirements on investment levels. The MDPU maintained the I-X formula to cover the O&M portion of the approved revenue requirement, which is what the Company is proposing in this case. In reality, there are very few instances when system needs can be easily transitioned between a capital-work solution or a work solution that can be expense. The prudence review is the primary and most effective tool that regulators possess for evaluating these situations.Page 87 of 98
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-20 Date Issued September 22, 2026 OCC-859 Page 1 of 6 Date Filed: October 06, 2026 Witness: Douglas P. Horton Request from: Office of Consumer Counsel Question: (Capital support mechanism) PURA defined six calculation steps for the CT-Bar as outlined in the 2021-05-15RE01 Proposed Final Decision. Compare the Company’s proposed F-factor with each of the six steps of the CT-Bar calculation methodology, indicating where and when the proposed step has or will occur in the Company’s approach to the present proceeding. For each of the six CT-Bar calculation steps, explicitly name the different approach that the Company plans to employ in calculating going-in rates and the proposed F-Factor. In the response, specifically include the following: a. Identify when and how the amount of total depreciation expense associated with capital projects placed in service as of the end of the evidentiary record will be included in going-in rates (i.e., step 3); b. Identify when and how the forecasted capital additions will be reduced by the value of the depreciation expense in Step 3; and, c. Identify all CT-Bar calculation steps that are absent from or inconsistent with the Company’s proposed F-factor approach. Response: Please refer to the Company’s performance-based revenue formula filed in its response to interrogatory EOE-156 as Attachment 1. For the F-Factor calculations, specifically, please refer to worksheets “PBR-4 F-Factor,” which includes the development of F-Factor rate base as well as the corresponding calculations of depreciation expense and required pre-tax return on rate base, and “PBR-5 F-Factor Property Tax.” As an initial matter, the Company notes that, aside from its own analyses and models filed throughout the technical sessions of Docket No. 21-05-15RE01, there is no publicly available working CT-bar model with which the Company, or any other party, can estimate CT-bar outputs with precision. Put differently, no publicly available working model demonstrates the calculations contemplated for the CT-bar other than those developed by the Company. Specifically, the only calculations available are those developed by the Company to advance discussion in Docket No. 21-05-15RE01, as well as the highly simplified, non-working “Hypothetical Representation” presented in Table 2 of the proposed final decision (“RE01-PFD”), at pages 38-39. Accordingly,Page 88 of 98
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-20 Date Issued September 22, 2026 OCC-859 Page 2 of 6 the Company’s response to this interrogatory is based on its extensive involvement in Docket No. 21-05-15RE01, including the Company’s K-bar calculations that preceded the CT-bar, and the Company’s good-faith efforts to translate the narrative description of CT-bar in the Revised Straw Proposal dated February 27, 2025 into working calculations, such as those filed in response to interrogatory UPA-076 in that proceeding. The Company genuinely evaluated the CT-bar as initially outlined in the Revised Straw Proposal and provided a baseline model (UPA-076 in that proceeding) that captured CT-bar concepts and served as the foundation for discussion during subsequent technical sessions. In the discussion below, “Steps 1-6” refer to the CT-bar methodology as outlined in the PFD. Step 1 also encompasses the broader discussion of the “Capital Plan” and “Non-Capital Plan” distinction described in the PFD. Step 1 Step 1 of CT-bar is a historical review of actual investment placed in service, separated into two categories: “Capital Plan” and “Non-Capital Plan.” The purpose of this step is to establish an average level of plant additions that were not anticipated in the Capital Plan for possible inclusion in subsequent revenue-requirement calculations. The example provided in the RE01-PFD for “Non-Capital Plan” additions is “unplanned storm.” Because the “Capital Plan” contemplated by CT-bar is a project-by-project listing of anticipated capital investment, “Non-Capital Plan” additions necessarily relate to investments not identified by project. The Company’s F-Factor proposal does not make this distinction. As the Company explained in Docket No. 21-05-15RE01, some projects cannot be planned with precision. For example, it would be impossible for the Company to perfectly predict Emergent Failures. The Company cannot predict which specific pole or cross-arm will fail. The Company can, however, reasonably forecast a volume and severity of such failures based on system conditions and recent experience. The Company views the distinction between “Capital Plan” and “Non-Capital Plan” as unnecessary for two reasons. → All capital investments, whether planned, unplanned, “Capital Plan,” or “NonCapital Plan,” ultimately must pass a prudence review. This critical gate -successfully demonstrating prudence -- is and should remain the ultimate determinant of recovery regardless of whether a particular investment was forecast in advance. → The Company is proposing a hard cap on core capital investment eligible for the FFactor based on the capital forecast presented in this proceeding. By doing so, the Company can provide up front, during this proceeding, indicative revenue-support levels necessary to conduct the capital plan, while committing to cap the resultingPage 89 of 98
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-20 Date Issued September 22, 2026 OCC-859 Page 3 of 6 revenue increases during the PBMRP, even if actual capital investment exceeds the forecast. This approach reflects the reality that system needs are dynamic. Rather than distinguishing between “Capital Plan” and “Non-Capital Plan,” the Company’s F-Factor considers capital investment in the aggregate, allowing the Company to deploy resources as efficiently as possible and to respond to emergent system conditions that are inevitable for any utility operation, while balancing affordability and other considerations for customers. Step 2 Step 2 of CT-bar is to determine the amount of capital investment expected to be placed in service during a given period. The Company’s model filed in response to EOE-156 utilizes the capital investment forecast presented in this proceeding. For purposes of this response, the Company refers to its discussion of the TSP for details regarding those investments. Here, the Company is addressing the mechanics of the capital forecast rather than the forecast itself. Specifically, in EOE-156, Attachment 1, worksheet “COS-2 Capital,” the sum of Lines 19 and 26 for a given calendar year equals the total capital investment shown in Exhibit CLP-ELP-1, Figure 7. Whether or not these steps are similar to CT-bar, three points are important. → The capital investment forecast used for the F-Factor is the same forecast discussed elsewhere in this proceeding as necessary to achieve the objectives described in the TSP. → Each annual F-Factor filing includes a reconciliation of cumulative capital investment placed in service through the calendar year-end preceding the filing, including a prudence review. Thus, regardless of any differences in methodology, customers ultimately pay only for investment found prudent through that review. → Because the F-Factor includes a hard cap based on the current capital investment forecast, the annual reconciliation is necessarily downward-only. Accordingly, if the Company places more plant in service than currently forecast, the reconciliation will not adjust revenues upward even if those additional investments are ultimately found prudent. Mechanically, the flow of eligible capital investment through the F-Factor is shown in EOE-156, Attachment 1, worksheet “PBR-4 F-Factor,” as the sum of Lines 28 and 36.Page 90 of 98
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-20 Date Issued September 22, 2026 OCC-859 Page 4 of 6 Step 3 Step 3 of CT-bar reduces the level of capital investment eligible for revenue support by depreciation expense reflected in base rates. CT-bar incorporates this effect as a reduction to gross plant, which is the amount of new depreciable plant. The net effect of this treatment is understated incremental depreciation expense. The Company’s F-Factor incorporates the effect of depreciation on capital-driven revenue requirements consistent with standard accounting treatment, as shown in EOE-156, Attachment 1, worksheet “PBR-4 F-Factor,” Lines 33 and 34. Line 33 specifically reflects the amount of depreciation accumulating in rate base and is responsive to subpart (b) of this interrogatory. This is where ongoing depreciation expense appropriately influences the cost of service, consistent with subpart (a) of this interrogatory. By contrast, the CT-bar approach effectively reduces incremental gross plant additions (i.e., the amounts shown on Line 28), which understates the resulting depreciation expense. Stated differently, the Company’s F-Factor proposal does not mirror CT-bar’s application of depreciation expense because CT-bar applies depreciation as a reduction to gross plant, which is an improper order of computation. However, the Company’s F-Factor proposal remains consistent with the intent underlying CT-bar Step 3, namely the incorporation of depreciation into capitalrelated revenue requirements. Although different from the CT-bar, the F-Factor is more accurate and results in lower rate base and return than what was contemplated in the CT-bar. Step 4 As described above, the Company makes no distinction between “Capital Plan” and “Non-Capital Plan” investments and already incorporates a downward-only annual reconciliation of plant placed in service. Accordingly, CT-bar Step 4 is not applicable to the F-Factor. Step 5 Step 5 of CT-bar contains certain reconciliation concepts that also exist within the Company’s FFactor proposal, including downward-only adjustments. However, the F-Factor is conceptually simpler because it does not distinguish between “Capital Plan” and “Non-Capital Plan” investments. Under the F-Factor, the downward-only reconciliation is based on a prudence review (or the reality that the Company were to spend less than forecasted, such that actual plant additions are lower than the amount initially included in setting the F Factor) and consists of a straightforward comparison between: (1) cumulative capital investment determined to have been prudently incurred; and (2) cumulative capital investment reflected in this proceeding. Accordingly, the reconciliation reaches two straightforward conclusions, which are: (1) whether the capitalPage 91 of 98
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-20 Date Issued September 22, 2026 OCC-859 Page 5 of 6 investment was prudently incurred; and (2) whether that prudent investment exceeds, in aggregate, the investment forecast presented in this docket. If prudent investment exceeds the forecast, the F-Factor remains capped at the forecast level even though the investment was determined to be prudent. By contrast, CT-bar Step 5 requires comparison of “Capital Plan” and “Non-Capital Plan” investments, a distinction that does not fully reflect the dynamic nature of distribution system needs. Moreover, Step 5 includes vague references to downward-only adjustments for capital investment PURA may deem “non-essential” (as opposed to imprudent) or capital additions that “can be delayed.” The Company’s F-Factor proposal includes no comparable adjustments. Instead, it relies on the prudence review process and the hard cap discussed above. See also the Company’s response to OCC-423 for additional discussion of the relationship between CT-bar and the F-Factor. Step 6 Step 6 of CT-bar is the calculation of the resulting revenue requirement. Under the Company’s proposal, these calculations are performed in EOE-156, Attachment 1, worksheet “PBR-4 FFactor,” Lines 48-53, and worksheet “PBR-5 F-Factor Property Tax,” Line 42. The summarized results are presented in worksheet “PBR-3 F-Factor Summary,” Lines 17-23. With respect to subpart (c), as demonstrated in the model filed in EOE-156, the Company’s FFactor proposal provides a truer calculation of the revenue requirements associated with capital investment, that is, one more closely aligned with actual capital-driven costs of service. Unlike CT-bar, the F-Factor explicitly incorporates the effects of plant retirements, cost of removal, and accumulated deferred income taxes (“ADIT”). CT-Bar F-Factor Treatment Step Step 1 The F-Factor makes no distinction between Capital Plan and Non-Capital Plan investments. Step 2 The CT-bar and F-Factor use a comparable forecast of capital additions. Step 3 For the F-Factor, depreciation is not applied as a reduction to plant additions; instead, depreciation is correctly captured by deducting accumulated depreciation from rate base Step 4 N/A (the F-Factor does not distinguish between Capital Plan and Non-Capital Plan additions).Page 92 of 98
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-20 Date Issued September 22, 2026 OCC-859 Page 6 of 6 Step 5 Modified. F-Factor reconciliation is based on a prudence review and hard cap rather than Capital Plan/Non-Capital Plan comparisons and "non-essential" investment determinations. Step 6 The CT-bar and F-Factor have a comparable revenue requirement calculation, although the F-Factor properly incorporates plant retirements, cost of removal and ADIT.Page 93 of 98
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-20 Date Issued September 22, 2026 OCC-860 Page 1 of 6 Date Filed: October 14, 2026 Witness: Douglas P. Horton, Leanne M. Landry, John G. Griffin and Danielle Munson Request from: Office of Consumer Counsel Question: Does the Company have clear protocols for allocating Company labor and labor overheads to capitalized projects? a. Are these protocols in written form? If so, please provide. If not please explain protocols and methods in detail. b. Are these protocols implemented as part of monthly or regular periodic accounting, or are these determinations only made in preparation for determination of revenue requirements as in the context of a general rate case? c. How would capitalization of labor and labor overheads be determined and documented within the annual reconciliation proceeding? d. Please provide an example of the calculation of expensing versus capitalization of laborrelated costs that would be filed in an annual reconciliation filing. e. How did the protocols apply to how the Company quantified Test Year expenditures in this proceeding? f. Have the Company’s standards or protocols changed over time? For example, is the Company’s approach in this rate case different to any other rate case? If yes, explain when, why, and how the protocols or standards have changed. Response: a. Yes, the Company has clear protocols for allocating Company labor and labor overheads to capitalized projects. These fundamental protocols for labor capitalization are based on Generally Accepted Accounting Principles (GAAP) requirements and the Federal Energy Regulatory Commission (FERC)’s Uniform System of Accounts. All employees are required to abide by and follow the corporate “Time Reporting Policy,” which informs how base pay is divided among the Eversource Energy operating companies and to ensure the accounting is appropriate, including charging time to capitalized projects. As noted in the policy, “Each subsidiary or business segment should be charged directly, when possible, for employees’ time benefiting that subsidiary or business segment.” This avoids cross-subsidization between the Operating Companies, including CL&P, and between capitalized projects. This policy also requires that the person authorized to approve the transaction is responsible for ensuring the appropriate work order and rate codePage 94 of 98
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-20 Date Issued September 22, 2026 OCC-860 Page 2 of 6 are used to cause the cost to be charged to the correct FERC account (i.e. FERC account 107 in the case of capitalized projects) and to the proper affiliate(s) depending on the subsidiaries or business segments benefitting from the services provided. Please refer to OCC-199 Attachment 1, for this policy. The Company also adheres to Accounting Policy Statement (APS) 8, which provides guidelines surrounding the decision to capitalize or expense expenditures for plant. Under this policy, once a capital project has been approved by management, a work order is established by the project management team. Generally, all expenditures directly related to the project incurred after this point are capitalized. Please refer to EOE-060 Attachment 3, for this policy. Certain employees may also charge Engineering & Supervision (“E&S”) work orders. The E&S work orders are selected by employees who actively support construction activities directly related to capital projects, but are not readily identified to a specific capital project work order. Having these employees direct charge specific capital project work orders on a daily basis becomes impracticable to decipher for timesheet reporting purposes because of the extensive number of capital projects they support. Therefore, the E&S work order allows for a more practical, effective, and expedient timesheet reporting mechanism for certain employees to capture their time appropriately. E&S is not ascribed to individual capital projects on a discrete, quantifiable basis for individual projects or programs. The labor and labor-related costs associated with the E&S function are ascribable to all eligible capital projects and are pooled into closing accounts that are then applied on an aggregated basis to active work orders on a month-to-month basis as a “clearing rate.” The E&S overhead “pool” captures costs incurred in support of the Company’s construction activities that are not readily identified to a specific capital project work order. The nature of these costs includes labor costs/payroll and associated overheads. Such classification is required under the FERC Uniform System of Accounts (“USoA”), which states: “Engineering and supervision includes the portion of the pay and expenses of engineers, surveyors, draftsmen, inspectors, superintendents and their assistants applicable to construction work.” Thus, the types of charges included in FERC Account 107ES0 (Construction Work in Progress) are employee labor and external vendor labor costs that support capital project construction activities through engineering and supervisory functions. Once a capital project is placed in service in FERC Account 101 (Electric Plant in Service), the E&S costs are classified to property units in the same manner as all other capital charges on the project work orders. With the assistance of project managers and engineers, Plant Accounting determines what percentage of the total project each property unit represents. All capital charges to the project work orders, including E&S charges, are ascribed to the