Discovery Compilation (EOE Set 6)
Filed by Keegan Werlin LLP2 files
Part of docket 26-05-10Files2
Docket No. 26-05-10 Discovery Compilation October 15 2026.pdf
PDF · 154 KB · 1 pageText searchable
Download Docket No. 26-05-10 Discovery Compilation October 15 2026.pdfRead the text of Docket No. 26-05-10 Discovery Compilation October 15 2026.pdf
EOE Set 6_COMBINED.pdf
PDF · 866 KB · 101 pagesText searchable
Download EOE Set 6_COMBINED.pdfRead the text of EOE Set 6_COMBINED.pdf
Search terms highlighted
Eversource rate increase is on 3 pages of the text below, highlighted. Go to the first matchClear highlighting
Page 1 of 101
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-06 Date Issued September 22, 2026 EOE-268 Page 1 of 1 Date Filed: October 06, 2026 Witness: Christopher E. Colorio, Mark P. Baldwin, John G. Griffin and Leanne M. Landry Request from: Office of Education, Outreach, and Enforcement Question: (TRAFFIC TIMESHEET REQUIREMENTS) Explain the specific timesheet reporting requirements for traffic crews during both storm and blue-sky activities, and provide any internal or external policies, procedures, or other guidance. As part of the response, identify any specific requirements for identifying when the crews performed standby in lieu of actual traffic control services. Response: Traffic crews are required to complete a daily timesheet for all work activities, including both blue-sky and ERP/storm response assignments. Each timesheet must be completed and signed by the flagger, include the applicable Financial Work Order information, be signed by the Owner's representative at the end of the workday, and be submitted with the contractor's invoice. For ERP/storm response activities, labor is billable from the time crews leave their local office or reporting location until they return or report to the next assignment. The contract identifies standby time as periods when traffic crews report to the job site as directed but are waiting for Owner crews, equipment, or instructions. Such standby time is compensable at the straight-time hourly rate. The contract does not require standby time to be tracked separately on daily timesheets. The only requirement is that crews submit a complete and approved daily record of the work performed.Page 2 of 101
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-06 Date Issued September 22, 2026 EOE-269 Page 1 of 1 Date Filed: October 06, 2026 Witness: John P. DiPaola-Tromba, Sean D. Redding and Jenna Turner Request from: Office of Education, Outreach, and Enforcement Question: (VEGETATION CREW TIMESHEET REQUIREMENTS) Refer to Response to EOE-022. The Company’s response referenced that “[g]uidance on the handling of tree crew timesheets is included in all executed contracts…” Please provide or cite the specific guidance referenced in the response and identify if there are different expectations for each vendor. Response: Please refer to OCC-044, Attachment 2 CONFIDENTIAL, pages 1034-1044, for an example of Section II Special Conditions and Amendments, which includes timesheet guidelines and expectations for tree crew vendors. The expectations are the same for local vendors. Guidelines pertaining to timesheets are provided in the following parts and subparts of Section II Special Conditions and Amendments: • Part C: Performance Schedule – Working Beyond Owner’s work Period OCC-044, Attachment 2 CONFIDENTIAL, pages 1035-1036 • Part D: Scope and Pricing of Contractor Services OCC-044, Attachment 2 CONFIDENTIAL, pages 1036-1039 o Subpart 4: T&M Portion of Contractor Services (page 1038) OCC-044, Attachment 2 CONFIDENTIAL, pages 1038 o Subpart 5: Restoration Services OCC-044, Attachment 2 CONFIDENTIAL, pages 1038-1039 • Part H: Communications – Timesheet Submission / Weekly Reporting OCC-044, Attachment 2 CONFIDENTIAL, pages 1041 • Part L: Amendments to Section I, General Terms and Conditions (pages 1042-1043) OCC-044, Attachment 2 CONFIDENTIAL, pages 1042-1043 o Subpart 3 – Terms of Payment (b) OCC-044, Attachment 2 CONFIDENTIAL, pages 1042-1043Page 3 of 101
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-06 Date Issued September 22, 2026 EOE-270 Page 1 of 2 Date Filed: October 06, 2026 Witness: Christopher E. Colorio, Mark P. Baldwin, John P. Dipaola-Tromba, Sean D. Redding, Jenna Turner, Leanne M. Landry and John G. Griffin Request from: Office of Education, Outreach, and Enforcement Question: (CANCELLATIONS) Explain the Company’s process for identifying and canceling scheduled activity either prior to or during a storm event. As part of the response, please provide a listing of all cancellations for each storm event and the amount associated with each cancellation. Response: The Company does not have a single, uniform process for canceling scheduled activities or services prior to or during a storm event. These types of decisions are necessarily situation-specific and storm-specific and are made based on the facts and circumstances presented by the particular storm, including the anticipated or actual impacts of the storm and the Company’s operational needs and priorities. Please refer to the Company’s response to EOE-219 i, regarding the booking and cancellation of hotel rooms, which further illustrates the situation-specific nature of such decisions. There is no centralized list or compilation of all scheduled services or activities that may have been canceled in connection with a particular storm event. The circumstances of each storm event are highly individualized and dynamic. Prior Referenced Response: i EOE-219 Question: (MS24A-VENDOR-LINE) Refer to Exhibit ACCT-2 CLP-1 and Confidential Exhibit ACCT-2 CLP-1A-10, pp. 158162. The Company reported an incremental charge of $99,735 for the HT-Exit 88 Hotel TRS LLC vendor (i.e., Marriott Mystic). The charges included 185 hotel rooms for the evening of January 11, 2024, and 185 “Breakfast & Box Lunch” meals for January 12, 2024. Identify if all of the referenced rooms and meals were utilized, and if so, by which vendor(s). If not used, identify the number of rooms and meals that were unused and explain why they were not canceled. EOE-219 Response: Please refer to Exhibit ACCT-2 CLP-1A-10 (MS24A), pp 158-162, Marriott Mystic, for lodging and meal charges of $99,735. Under the Company’s ERP for a severe weather event, resource and logistical acquisitions such as hotel rooms and food must be undertaken ahead of time based on the expected severity and complexity of an event. Expected complexity and the associated resource and logistical requirements are analyzed based on considerations of numerousPage 4 of 101
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-06 Date Issued September 22, 2026 EOE-270 Page 2 of 2 factors including, but not limited to, forecasted weather conditions; certainty of the weather forecast, size of the anticipated incident and expected impacts to personal safety and property, outage prediction modeling, anticipated extent of potential or known damage, and historical experience with other events. The Company cannot wait until a predicted weather event actually reaches its service territory to formulate its response plan and secure needed resources, as PURA has established pursuant to Conn Gen. St. §§16-32e, 16-32h and PURA’s performance standards, as well as the structure and implementation of the ERP. If the Company were to wait until a storm’s actual impact to secure mutual aid and contractor crews, hotels, food services and other logistics necessities, critical resources may not be available when needed, or, even if available, would be significantly more expensive than if procured earlier. The Company makes every effort to cancel rooms that are unused if known within the timeframe for allowed cancellation according to the hotel policy. However, based on the shifting restoration needs or priorities, crews are often relocated within regions of the service territory to work on restoration well after the cancellation period has expired and may have to be re-assigned to other hotel rooms that are closer to their physical work location (the Company focuses on locating crews as close as possible to their assigned restoration jobs to minimize the need for travel, thus freeing them up for actual restoration work). The Company must meet its contractual obligations with each hotel to pay for rooms reserved post the cancellation time frame. It is also important to note that, in times of service outages, there are other demands on hotel space from displaced residents that are experiencing service outages. As a result, the Company needs to be able to have adequate facilities to house the crews that are required to be on-site at the outset of an event, and the Company does that through contractual and logistical commitments made ahead of the event. The Company tracks rooms that are booked and assigned, not whether a crew ends up utilizing its assigned room because the Company is focused on moving crews to where the work location as the first priority and information as to whether the room was used is not probative, since it must be paid for. In preparation for the storm event, the Company had booked rooms at the Marriott Mystic for Wednesday, January 10, 2024 and Thursday, January 11, 2024 nights and ordered all meals. Due to changes in food and lodging needs for the storm event, the Company did not require rooms and meals. The cancellation notification was sent via email on Wednesday, January 10, 2024, at 2:19pm. Due to a guarantee on the rooms and the ordered food, the Company incurred charges for the cancelled rooms and the cost of the ordered food.Page 5 of 101
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-06 Date Issued September 22, 2026 EOE-271 Page 1 of 1 Date Filed: October 06, 2026 Witness: Craig Dikeman, Matthew J. Correia, Christopher E. Colorio and Mark P. Baldwin Request from: Office of Education, Outreach, and Enforcement Question: (FUEL PROVIDERS) Identify if the Company pursued competitive bids in support of its engagement of Fuel providers. If pursued, provide documentation demonstrating the Request for Proposal (RFP) and the overall results. If not pursued, explain why. Response: For the purposes of this response, the Company has assumed that “fuel providers” refers to providers of scheduled onsite diesel fueling for the Company’s fleet vehicles and emergency fueling services at Eversource locations. These services support the continued operation of fleet vehicles, including during storm events and other emergencies. The Company pursued a competitive bid for these services, and the details of that bid are provided in EOE-271, Attachment 1, CONFIDENTIAL.Page 6 of 101
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-06 Date Issued September 22, 2026 EOE-272 Page 1 of 1 Date Filed: October 13, 2026 Witness: Christopher E. Colorio, Mark P. Baldwin, John G. Griffin and Leanne M. Landry Request from: Office of Education, Outreach, and Enforcement Question: (MS24F-TIMING) Refer to Exhibit CLP-STORM-IMT-3 (Event 6), and Response to EOE-019, Att. 1. Explain how the information provided within Ex. CLP-STORM-IMT-3 supports an initial arrival time of 6am within EOE-019, Att. 1. As part of the response, explain why the Company defined an initial arrival time that is 12 hours prior to the declaration of the ERP (i.e., Ex. CLPSTORM-IMT-3, p. 65) and 24 hours before the Emergency Operations Centers (EOCs) were activated (i.e., Ex. CLP-STORM-IMT-3, p. 65). Response: Eversource established a 6:00 a.m. activation time for the Emergency Operations Centers (EOCs) on April 4, 2024. Based on the forecast and timing of the events, it was necessary to have crews arrive ahead of any potential travel issues due to the expected weather impacts. This would allow crews to support the expected storm response and restoration effort following the overnight impacts of the April 3-4, 2024 nor'easter. Eversource had already declared an ERP Level 5 event, secured external resources, and developed staffing plans ahead of the storm. Activating the EOCs at 6:00 a.m. ensured the necessary personnel and resources were in place to coordinate activities, as damage assessment and restoration work got underway.Page 7 of 101
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-06 Date Issued September 22, 2026 EOE-273 Page 1 of 2 Date Filed: October 06, 2026 Witness: Mark P. Baldwin, Clifford G. Williams, Leanne M. Landry and John G. Griffin Request from: Office of Education, Outreach, and Enforcement Question: (MS24F-VENDOR-LINE) Refer to Exhibit ACCT-2 CLP-6 and Confidential Exhibit ACCT-2 CLP-6A-1, pp. 23-62. The Company reported an incremental charge of $377,813 for the Asplundh Construction Corp. Respond to the following: a. Referring to pp. 40, 44, 47, 49, 51, 53, 55-56, and 59, explain why each of the crews were permitted to commence billing on April 3, 2024, at either 0600 or 0630 and solely bill for standby when the ERP declaration did not occur until 1800. As part of the response, please identify the incremental cost for the standby billing on April 3, 2024, for the hours prior to the 1800 ERP declaration. b. Referring to p. 43, explain why two individuals were permitted to bill for four hours (each) of travel for demobilization on April 5, 2024, without any details regarding the commute or the documentation to demonstrate that there was a commute (i.e., there was no corresponding mobilization). As part of the response, please provide documentation that was available at the time of the review. c. Cite the location of the vendor’s contractual Pricing Schedule Exhibit (i.e., typically referred to as Exhibit A). The contract provided at OCC-044, Att.2 (Confidential), starting at p. 180 includes a List of Exhibits at p. 188 which references the Pricing Schedule as Exhibit B but was unable to locate the document. Additionally, EOE observed similar documentation within EOE-024, Att.2 (Confidential). with a similar omission. d. Referring to pp. 24-34, explain why the vendor billed for equipment during standby. As part of the response, identify the total incremental charge for the equipment billed during standby and separately identify the incremental equipment charge for the hours referenced in subsection b. Response: Referring to Exhibit ACCT-2 (CLP-6)(MS24F), Outside Line Contractors, at Line 37, Asplundh Construction Corp, in the amount of $377,813. a. Asplundh was permitted to be on standby starting 0600-0630 because these crews were on a 4-10 schedule. Not paying these crews standby time would have likely resulted in losing the crews for the storm event, which the Company could not afford to do given the pending conditions. The Company also needed the crews on standby to assist in any weather-Page 8 of 101
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-06 Date Issued September 22, 2026 EOE-273 Page 2 of 2 related events that may occur prior to 1800. Without tree crews, the Company cannot restore power or address emergencies and the Company retained the crews for that purpose. The incremental cost for the standby billing on April 3, 2024 for the hours prior to the 1800 ERP declaration is $94,674.27. b. These two individuals remained on system in CT. The individuals remained in Western region to support any potential need for final support that may have been required. It was determined they could be demobilized and they completed that process on April 5th which included any required safety debriefs, equipment and material securement and travel activities. The balance of their contingent traveled to another state to continue support. The incremental cost for the standby billing for the timeframe requested on April 3 is $96,850. c. The vendor’s contractual Pricing Schedule, identified as Exhibit B, was inadvertently omitted from the Company’s responses to both OCC-044 and EOE-024. The Pricing Schedule is now provided as EOE-273, Attachment 1 CONFIDENTIAL. The contractual provisions addressing standby rates begin on page 3 of the Pricing Schedule. d. The contractor is a Contractor of Choice (“COC”) and per the contract they are permitted to charge for equipment. The total incremental charge for the equipment billed during standby is $8,152. The total incremental charge for the equipment billed for the employees mentioned in subsection b is $108.Page 9 of 101
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-06 Date Issued September 22, 2026 EOE-274 Page 1 of 5 Date Filed: October 06, 2026 Witness: John P. DiPaola-Tromba, Sean D. Redding and Jenna Turner Request from: Office of Education, Outreach, and Enforcement Question: (MS24F-VENDOR-TREE) Refer to Exhibit ACCT-2 CLP-6, and Confidential Exhibits ACCT-2 CLP-6A-1, through CLP-6A-2. The Company reported 79 incremental charges in the combined amount of $315,461 for the Asplundh Tree Expert Co vendor. Respond to the following: a. Referring to rows 102-106, explain why the vendor incurred storm related charges for activity that occurred between April 8, 2024, and April 12, 2024, when the storm was demobilized on April 4, 2024. As part of the response, clarify if any of the charges should have been charged to the MN24J minor storm event (i.e., referenced in EOE-013, Att.1) and, if still applicable, provide documentation to support both the necessity and applicability of the remediation to the MS24F event. Finally, explain why some of the activity was performed at OT rates (e.g., pp. 98-100) and why the activity could not be performed by Eversource employees. b. Referring to rows 79, 80, 103, 105, and 106, the Company included charges for Disc Chippers. Explain why the Disc Chippers were necessary for storm remediation purposes. As part of the response, provide documentation to support the Company’s preauthorization of the additional charges and identify the total amount charged for Disc Chippers. c. Referring to rows 52-58, 69-77, 92-93, and 95-96, explain why the vendor was not required to bill at ST rates for the hours billed through 1630. Specifically, the Company permitted 20 invoices to be billed at ST rates through 1600, typically for two consecutive days and failed to bill at the ST rate through 1630. Provide an unlocked Excel spreadsheet detailing each invoice referenced above (i.e., the referenced Rows) and identify the total number of hours billed at OT rates through 1630, along with the corresponding incremental charge. Specifically, include the differential between the OT rate and ST rate multiplied by the hours billed at OT rates through 1630. Response: a. While reviewing Exhibit ACCT-2 (CLP-6) (MS24F), page 51, line 104, and Confidential Exhibit (CLP-6A-2)(MS24F), pages 98-100, the Company determined that the referenced tree crew invoice should have been allocated to the MN24J storm event. The tree crew responded to Event # 5329897 on Luchon Road in Willington, CT, at the onset of the MN24J event. The Company will supplement Exhibit ACCT-2 (CLP-6) (MS24F), page 51, line 104, to remove $1,922 from MS24A.Page 10 of 101
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-06 Date Issued September 22, 2026 EOE-274 Page 2 of 5 The individual and tree crews referenced in Exhibit ACCT-2 (CLP-6) (MS24F), page 51, lines 102-103, and 105-106, and Confidential Exhibit (CLP-6A-2) (MS24F), pages 92-97 and 101-106, were performing MS24F customer request assessment and post-storm tree work on MS24F storm-damaged trees. These invoices do not pertain to MN24J and were correctly billed to MS24F. During storm events, especially those that include high winds, rain, snow, or ice, trees may fail entirely, or parts of a tree may be damaged. When an entire tree fails or a part of a tree is damaged and impacts electrical infrastructure, the tree or tree part is cleared as part of storm restoration. However, trees that are damaged by then storm but have not fallen often remain following an event. Damage to the trunk or a large leader or branches in the canopy may result in a standing tree that is compromised structurally. Storms may cause trees to develop cracks or seams that will cause the tree to fail in the short term. Some trees that are uprooted during a storm event may fall over slowly or may be held up in other trees that will temporarily hold their weight but fail in the near term. Branches in trees may be broken but remain hanging in the tree’s canopy, dangling above electrical infrastructure, and waiting for a future wind to finalize the break or dislodge a broken limb from the tree. These future potential threats to the system are often not resolved in real time during the restoration portion of the event because the Company’s priority is to clear vegetation that poses an immediate safety or reliability risk (including blocked roads) and restore customers. Therefore, the Company returns after an event to address storm damaged trees and limbs that the Company finds to be a threat to reliability and public safety. Patrolling for and removing storm damaged vegetation is a standard part of utility vegetation management storm response and is not included in the Company’s normal vegetation management cycle. The Company has described post vegetation storms in previous storm cost recovery testimony. These storm damaged tree conditions are identified through follow up items noted on restoration events, non-outage events identified during the restoration post restoration patrols by operations, engineering or vegetation management or inquiries from customers or towns. There may be a delay in providing the assessment and mitigation to storm damage locations as the information from the patrols by other Company departments or locations provided by customers or towns may be received at different time periods after the completion of restoration. Mitigation of a storm damaged tree depends on the condition and location of the tree, access to tree and requirements to mitigate the damage as there is variable effort and time needed to complete the work. This can vary from cutting a single broken limb to requiring a crane or scheduling an outage to mitigate the risk to the system, workers and the public. Following an event, tree contractors may be instructed to complete storm damage patrols and perform mitigation trimming or tree removals by the Company Arborists.
As listed on the current system
Corres. 10/15/2026 [26-05-10] (Keegan Werlin LLP) - Discovery Compilation (EOE Set 6)