Discovery Compilation (EOE Set 6)
Filed by Keegan Werlin LLP2 files
Part of docket 26-05-10Files2
Docket No. 26-05-10 Discovery Compilation October 15 2026.pdf
PDF · 154 KB · 1 pageText searchable
Download Docket No. 26-05-10 Discovery Compilation October 15 2026.pdfRead the text of Docket No. 26-05-10 Discovery Compilation October 15 2026.pdf
EOE Set 6_COMBINED.pdf
PDF · 866 KB · 101 pagesText searchable
Download EOE Set 6_COMBINED.pdfRead the text of EOE Set 6_COMBINED.pdf
Search terms highlighted
Eversource rate increase is on 3 pages of the text below, highlighted. Go to the first matchClear highlighting
Page 18 of 101
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-06 Date Issued September 22, 2026 EOE-279 Page 1 of 1 Date Filed: October 06, 2026 Witness: Mark P. Baldwin, Clifford G. Williams, Leanne M. Landry and John G. Griffin Request from: Office of Education, Outreach, and Enforcement Question: (MS24F-VENDOR-TRAFFIC) Refer to Exhibit ACCT-2 CLP-6, and Confidential Exhibit ACCT-2 CLP-6A-3, pp. 110-131. The Company reported an incremental charge of $4,658 for the Certified Utility Services Inc vendor. The invoice details activity that spanned both before and after the storm event, with no activity on April 4, 2024 (i.e., the primary day of storm recovery). Additionally, none of the Job assignment documents identified the MS24F011 workorder number as being relevant. Please identify the specific assignments that applied to the MS24F event and provide supporting documentation. Identify the amount of charges included which are unrelated to the MS24F event. Response: Referring to Exhibit ACCT-2 CLP-6 (MS24F), Outside Contractors-Vendors, line 128, vendor Certified Utility Services Inc, invoice totaling the amount of $4,658. In reviewing the charges associated with this event, the Company confirmed that the charges incurred on April 4, 2024, were appropriately assigned to work order MS24F, despite the fact that certain supporting slips did not reflect the correct work order number. The Company recognizes that, in some instances, vendors may inadvertently record an incorrect work order number or may not have the appropriate work order information available at the time the work is documented. Upon further review in drafting this response, the Company determined that there is a clerical error in the total amount of $2,619.50. The Company will supplement ACCT-2 CLP-6 (MS24F), to adjust line 128 to reflect the total amount of $2,038.50.Page 19 of 101
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-06 Date Issued September 22, 2026 EOE-280 Page 1 of 1 Date Filed: October 06, 2026 Witness: Mark P. Baldwin, Clifford G. Williams, Leanne M. Landry and John G. Griffin Request from: Office of Education, Outreach, and Enforcement Question: (MS24F-VENDOR-TRAFFIC) Refer to Exhibit ACCT-2 CLP-6 and Confidential Exhibit ACCT2 CLP-6A-3, pp. 132-135. The Company reported two incremental charges in the combined amount of $1,080 for the Certified Utility Services Inc vendor. Explain why both invoices referenced that they only performed standby but were permitted to bill for work zone setup, in addition to the hourly labor rate. Furthermore, cite the contract provisions that permit this billing treatment. If the contract has not yet been provided, please provide. To the extent that the vendor should not have billed for work zone setup during standby, please identify the total impact of this activity throughout all invoices included within Excel Rows 126-142. Response: Certified Utility Services was secured to support Central Connecticut Cable Company on the date of the storm event. Because Eversource required Central Connecticut Cable Company to remain available for potential storm restoration activities, Central Connecticut Cable Company likewise retained the flagging resources that had been scheduled to support its work. Although the invoices identify the activity as “standby,” the flagging crews were not cancelled and remained available for potential deployment. Accordingly, Certified Utility Services was paid the applicable four-hour work zone setup minimum. The work zone setup charge reflects the contractual minimum associated with retaining the traffic control resources and does not indicate that an active work zone was physically established during the standby period. The applicable contract provision is contained in the Special Terms and Conditions provided as EOE-280, Attachment 1 CONFIDENTIAL, Section 12, pp. 12-13.Page 20 of 101
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-06 Date Issued September 22, 2026 EOE-281 Page 1 of 1 Date Filed: October 06, 2026 Witness: Mark P. Baldwin, Clifford G. Williams, Leanne M. Landry and John G. Griffin Request from: Office of Education, Outreach, and Enforcement Question: (MS24F-VENDOR-TRAFFIC) Refer to Exhibit ACCT-2 CLP-6, and Confidential Exhibit ACCT-2 CLP-6A-3, pp. 136-161. The Company reported an incremental charge of $16,693 for the Certified Utility Services Inc vendor. The invoice details activity from April 2, 2024 (i.e., prior to the mobilization at 6 p.m. on April 3, 2024) to April 5, 2024, and references several unrelated workorder numbers. For each Job assignment document that details a different workorder number (i.e., pp. 139-141), please provide documentation to support the applicability of the charges to the MS24F event. Identify the amount of charges included which are unrelated to the MS24F event. Response: Referring to Exhibit ACCT-2 (CLP-6) (MS24F), Outside Line Contractors, at Line 131, Certified Utility Services Inc, in the amount of $16,693. Upon further review of the charges in support of this response, the Company determined that a portion of the costs recorded under the MS24F event are attributable to post-storm work associated with MS24E. Specifically, the charges associated with the job slip referenced on page 139 will be reallocated from MS24F to MS24E. Accordingly, the Company will supplement Exhibit ACCT2 (CLP-6) (MS24F), to revise line 131, to an adjusted total of $16,261. Additionally, the Company will supplement Exhibit ACCT-2 (CLP-5) (MS24E), to include the reallocated charge of $432. The remaining job slips are all related to the MS24E storm. The supporting job slips either identify the work as storm-related or reference a storm work order. While there may be instances where a vendor records an incorrect work order number or does not have the appropriate work order available when documenting the work performed, the Company's invoice review process includes additional validation procedures to verify the appropriateness of charges. These procedures may include review of supporting documentation and consultation with field personnel. Based on the storm designation noted on the job slips and the results of the validation review, the invoice reviewer determined that the charges were appropriately associated with storm-related work and approved the invoice.Page 21 of 101
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-06 Date Issued September 22, 2026 EOE-282 Page 1 of 1 Date Filed: October 06, 2026 Witness: Mark P. Baldwin, Clifford G. Williams, Leanne M. Landry and John G. Griffin Request from: Office of Education, Outreach, and Enforcement Question: (MS24F-VENDOR-TRAFFIC) Refer to Exhibit ACCT-2 CLP-6, and Confidential Exhibit ACCT-2 CLP-6A-3, pp. 218-230. The Company reported an incremental charge of $10,253 for the Certified Utility Services Inc vendor. Explain how the Company verified the alignment of costs to the MS24F event when most of the supporting Job assignment documents referred to different workorder numbers, including MN23AK011 (pp. 221, 224, 228, and 230) and MN23J011 (pp. 222, 223, 226, and 227). As part of the response, identify if these costs were incorrectly charged to MS24F or explain why the Company didn’t have the vendor correct the workorder number. Response: Referring to Exhibit ACCT-2 CLP-6 (MS24F), Outside Contractors- Vendors, line 135, vendor Certified Utility Services Inc, total invoice amount of $10,253. With respect to slips referencing work orders MN23AK or MN23J, the associated services were procured by contractors performing restoration work on behalf of the Company. It is common during storm restoration activities for contractors to engage subcontractors, including flagging services, to support the completion of assigned work. While the specific work order information provided to the vendor may not always reflect the final Company work order at the time services were performed, the Company’s invoice review process includes validation of the service dates, locations, and work performed to ensure the charges are appropriately associated with eventrelated restoration activities. Following this review, management verifies that the costs are reasonable, properly supported, and correctly allocated to the applicable storm event prior to approval for payment.Page 22 of 101
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-06 Date Issued September 22, 2026 EOE-283 Page 1 of 1 Date Filed: October 06, 2026 Witness: Mark P. Baldwin, Clifford G. Williams, Leanne M. Landry and John G. Griffin Request from: Office of Education, Outreach, and Enforcement Question: (MS24F-VENDOR-TRAFFIC) Refer to Exhibit ACCT-2 CLP-6 and Confidential Exhibit ACCT2 CLP-6A-4, pp. 39-49. The Company reported an incremental charge of $5,715 for the Certified Utility Services Inc vendor. The incremental cost included a Job assignment document on p. 49 that identified the activity as “Storm cancel”. Identify the nature of the services provided on April 5, 2024 (p. 49) and explain what “Storm cancel” was in relation to. As part of the response, identify if these costs were related to the cancellation of previously scheduled activity and if the hours represented a minimum number due to cancellation. Cite the contract provisions that permit the billing of hours for the cancellation. If the contract has not yet been provided, please provide. Response: Certified Utility Services has a standing request to provide a certain quantity of flagging resources for both Company crews as well as contractors retained for specific projects or dock work. As these flaggers are not restricted to a single municipality like police are, this provides enhanced flexibility, especially in storm situations. As such, the flaggers were initially planned to be utilized for scheduled work, however, when storms arise, they are still retained to provide rapid deployment of work zone setups and traffic control. In the event it is determined that the contractor crews will not be utilized, or the weather does not require any Company resources beyond the normal Response Specialists, the flaggers are released and paid their minimum of four hours. Please refer to EOE-280, Attachment 1 CONFIDENTIAL, for the contractual provisions that permit the billing of hours for the cancellation.Page 23 of 101
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-06 Date Issued September 22, 2026 EOE-284 Page 1 of 2 Date Filed: October 06, 2026 Witness: Christopher E. Colorio, Mark P. Baldwin, John G. Griffin and Leanne M. Landry Request from: Office of Education, Outreach, and Enforcement Question: (MS24F-VENDOR-OTHER) Refer to Exhibit ACCT-2 CLP-6, and Confidential Exhibit ACCT2 CLP-6A-4, pp. 56-59. The Company reported four incremental charges in the combined amount of $1,263 for the Charter Oak Building Maintenance Inc. vendor. The invoices provided descriptions of “storm related extra work” (p. 56), “coverage for building mechanic” (p. 57), and “storm related work” (pp. 58-59). Identify the specific services performed and explain how the services were both necessary and incremental for storm remediation purposes. Response: Referring to Exhibit ACCT-2 CLP-6 (MS24F), Outside Contractors – Vendors, line 143-146, vendor Clean Harbors Env Service Inc, invoices totaling in the amount of $1,263. Charter Oak Building Maintenance invoices 300744 (p. 56), 300745 (p. 58), and 300746 (p. 59), are custodial services that were incremental and directly related to storm restoration activities, extending beyond the employees’ contracted daily responsibilities. Under normal operations, custodial personnel perform standard cleaning duties during a scheduled four-hour shift at each assigned location. Due to the increased occupancy of Company facilities by employees working extended and after-hours shifts in support of the storm event, custodial staff were required to remain on duty beyond their regularly scheduled shifts. These additional services included meal area cleanup, restocking restroom supplies and paper goods, cleaning and maintaining common area flooring, and the collection and removal of increased volumes of waste generated as a result of the storm response effort. In addition, invoice 300747 (p. 57) the vendor provided supplemental facility support services at the Cheshire location during the absence of the assigned Building Mechanic. The contracted personnel did not perform the technical functions ordinarily performed by a Building Mechanic. Rather, they performed lower-skilled operational and logistical tasks that would typically be assigned to the Building Mechanic in support of storm response activities. These duties included the setup of catering service areas; arrangement of tables and chairs within lunchroom and auditorium spaces; escorting and assisting catering personnel with meal setup and distribution for storm response personnel; and monitoring facility grounds to ensure exterior walkways were properly treated and maintained in a safe condition in anticipation of freezing rain and ice conditions forecasted for the day. These services were necessary to support storm restorationPage 24 of 101
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-06 Date Issued September 22, 2026 EOE-284 Page 2 of 2 operations and maintain a safe and functional work environment for employees responding to the event.Page 25 of 101
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-06 Date Issued September 22, 2026 EOE-285 Page 1 of 1 Date Filed: October 06, 2026 Witness: Mark P. Baldwin, Clifford G. Williams, Leanne M. Landry and John G. Griffin Request from: Office of Education, Outreach, and Enforcement Question: (MS24F-VENDOR-CIVIL) Refer to Exhibit ACCT-2 CLP-6 and Confidential Exhibit ACCT-2 CLP-6A-4, pp. 86-87. The Company reported two incremental charges in the combined amount of $14,535 for the Coleman Drilling & Blasting Inc vendor. Both of the invoices were billed for hourly activity without signed timesheets or equivalent documents. Provide the relevant signed timesheets supporting the individuals and hours worked. If timesheets were not obtained, explain how the Company was able to validate the accuracy and applicability of the charges. Response: Referring to Exhibit ACCT-2 (CLP-6)(MS24F), Outside Line Contractors, at Line 152, Coleman Drilling & Blasting, in the amount of $14,535. When Coleman Drilling & Blasting provide services, generally they will provide an operator and the necessary rigging equipment. The labor and equipment hours are listed on the invoice. With these details, the Operations Manager responsible for the area where the work was performed and supervised the resources, verified the accuracy of the reported information, and approved the invoice.Page 26 of 101
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-06 Date Issued September 22, 2026 EOE-286 Page 1 of 2 Date Filed: October 14, 2026 Witness: Mark P. Baldwin, Clifford G. Williams, Leanne M. Landry and John G. Griffin Request from: Office of Education, Outreach, and Enforcement Question: (MS24F-VENDOR-LINE) Refer to Exhibit ACCT-2 CLP-6, and Confidential Exhibit ACCT-2 CLP-6A-4, pp. 88-107. The Company reported six incremental charges in the combined amount of $1,121,268 for the Conexus Energy Group LLC vendor. The Company provided invoices for five of the six charges but failed to provide signed Eversource Contractor Storm Daily Time & Work Reports or Eversource Contractor Storm Mobilization & Demobilization Time reports (collectively timesheets). Respond to the following: a. Provide the omitted signed timesheets for the charges included in Rows 154-158. If the documents cannot be provided, explain how the Company validated the accuracy of the billed activity. b. Referring to pp. 98-99 (i.e., supporting Row 159), explain why the vendor was permitted to bill for lodging when they were mobilized out of Beacon Falls, CT. As part of the response, identify if the lodging expense was due to contractual obligations and specify if the vendor was lodged at a hotel. If lodged at a hotel, identify the location. c. Referring to pp. 100-102, explain why the vendor was permitted to bill for 2 hours of travel time between Beacon Falls, CT and Milford, CT, a distance of approximately 20 miles. d. Referring to pp. 103-107, the timesheets provided identify the first assignment dispatch time of 8:34, approximately 2.5 hours after the vendor’s start time (i.e., box 6). Explain why the vendor did not record activity as standby until the initial assignment. As part of response, please identify the incremental impact of the vendor’s billing of equipment for 2.5 hours. Response: Referring to Exhibit ACCT-2 CLP-6, Outside Contractors- Vendors, Lines 154-159, vendor Conexus Energy Group LLC, invoices totaling the amount of $1,121,268. a. Please refer to the following attachments for timesheets supporting charges for lines 154158: • EOE-286, Attachment 1, for timesheets for invoice 24153, line 154. • EOE-286, Attachment 2, for timesheets for invoice 24153, line 155.Page 27 of 101
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-06 Date Issued September 22, 2026 EOE-286 Page 2 of 2 • • • EOE-286, Attachment 3, for timesheets for invoice 240155, line 156. EOE-286, Attachment 4, for timesheets for invoice 240152, line 157. EOE-286, Attachment 5, for timesheets for invoice 240151, line 158. b. As documented in EOE-286, Attachment 6, crews were mobilized from Connecticut, New Jersey, and Massachusetts and directed by Eversource to arrive by 2200 hours on April 3 and self-lodge in preparation for a 06:00 start time. Beacon Falls, CT is the contractor’s laydown yard, not the crews’ originating locations. The contractor self-lodged in Milford, CT, as reflected on the timesheet (box 16, Ending Location). Lodging was necessary to ensure resources were positioned and available for restoration activities and billed at the agreed-upon $85 per-person per diem rate. c. The two hours of reported travel should not be interpreted solely as travel between Beacon Falls and Milford, CT. As documented in Confidential EOE-286, Attachment 6, crews were mobilized from locations throughout Connecticut, New Jersey, and Massachusetts. Although initially secured to support Massachusetts, Eversource redirected these resources to Connecticut prior to mobilization due to greater storm impacts. The reported travel time reflects mobilization related travel associated with positioning these resources, while Milford, CT represents the lodging location recorded at the conclusion of the workday. d. The contractor’s 06:00 start time reflects when crews were activated and required to be prepared and available for restoration activities. Although the initial field assignment was dispatched at 08:34, the crews were not on standby as defined under the applicable contract. During this period, crews were actively engaged in restoration preparation, including equipment and material readiness, safety coordination, and deployment related activities. The absence of an immediate field assignment does not constitute standby when crews are performing compensable restoration related activities. Accordingly, the working rate was applicable to both labor and equipment, and there was no incremental equipment overbilling associated with the approximately 2.5-hour period.
As listed on the current system
Corres. 10/15/2026 [26-05-10] (Keegan Werlin LLP) - Discovery Compilation (EOE Set 6)