Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Discovery Compilation (EOE Set 6)

Files2

Search terms highlighted
Eversource rate increase is on 3 pages of the text below, highlighted. Go to the first matchClear highlighting
Words on different pages
3 pages match
  1. Page 21 of 101

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-06 Date Issued September 22, 2026 EOE-282 Page 1 of 1 Date Filed: October 06, 2026 Witness: Mark P. Baldwin, Clifford G. Williams, Leanne M. Landry and John G. Griffin Request from: Office of Education, Outreach, and Enforcement Question: (MS24F-VENDOR-TRAFFIC) Refer to Exhibit ACCT-2 CLP-6, and Confidential Exhibit ACCT-2 CLP-6A-3, pp. 218-230. The Company reported an incremental charge of $10,253 for the Certified Utility Services Inc vendor. Explain how the Company verified the alignment of costs to the MS24F event when most of the supporting Job assignment documents referred to different workorder numbers, including MN23AK011 (pp. 221, 224, 228, and 230) and MN23J011 (pp. 222, 223, 226, and 227). As part of the response, identify if these costs were incorrectly charged to MS24F or explain why the Company didn’t have the vendor correct the workorder number. Response: Referring to Exhibit ACCT-2 CLP-6 (MS24F), Outside Contractors- Vendors, line 135, vendor Certified Utility Services Inc, total invoice amount of $10,253. With respect to slips referencing work orders MN23AK or MN23J, the associated services were procured by contractors performing restoration work on behalf of the Company. It is common during storm restoration activities for contractors to engage subcontractors, including flagging services, to support the completion of assigned work. While the specific work order information provided to the vendor may not always reflect the final Company work order at the time services were performed, the Company’s invoice review process includes validation of the service dates, locations, and work performed to ensure the charges are appropriately associated with eventrelated restoration activities. Following this review, management verifies that the costs are reasonable, properly supported, and correctly allocated to the applicable storm event prior to approval for payment.
  2. Page 22 of 101

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-06 Date Issued September 22, 2026 EOE-283 Page 1 of 1 Date Filed: October 06, 2026 Witness: Mark P. Baldwin, Clifford G. Williams, Leanne M. Landry and John G. Griffin Request from: Office of Education, Outreach, and Enforcement Question: (MS24F-VENDOR-TRAFFIC) Refer to Exhibit ACCT-2 CLP-6 and Confidential Exhibit ACCT2 CLP-6A-4, pp. 39-49. The Company reported an incremental charge of $5,715 for the Certified Utility Services Inc vendor. The incremental cost included a Job assignment document on p. 49 that identified the activity as “Storm cancel”. Identify the nature of the services provided on April 5, 2024 (p. 49) and explain what “Storm cancel” was in relation to. As part of the response, identify if these costs were related to the cancellation of previously scheduled activity and if the hours represented a minimum number due to cancellation. Cite the contract provisions that permit the billing of hours for the cancellation. If the contract has not yet been provided, please provide. Response: Certified Utility Services has a standing request to provide a certain quantity of flagging resources for both Company crews as well as contractors retained for specific projects or dock work. As these flaggers are not restricted to a single municipality like police are, this provides enhanced flexibility, especially in storm situations. As such, the flaggers were initially planned to be utilized for scheduled work, however, when storms arise, they are still retained to provide rapid deployment of work zone setups and traffic control. In the event it is determined that the contractor crews will not be utilized, or the weather does not require any Company resources beyond the normal Response Specialists, the flaggers are released and paid their minimum of four hours. Please refer to EOE-280, Attachment 1 CONFIDENTIAL, for the contractual provisions that permit the billing of hours for the cancellation.
  3. Page 23 of 101

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-06 Date Issued September 22, 2026 EOE-284 Page 1 of 2 Date Filed: October 06, 2026 Witness: Christopher E. Colorio, Mark P. Baldwin, John G. Griffin and Leanne M. Landry Request from: Office of Education, Outreach, and Enforcement Question: (MS24F-VENDOR-OTHER) Refer to Exhibit ACCT-2 CLP-6, and Confidential Exhibit ACCT2 CLP-6A-4, pp. 56-59. The Company reported four incremental charges in the combined amount of $1,263 for the Charter Oak Building Maintenance Inc. vendor. The invoices provided descriptions of “storm related extra work” (p. 56), “coverage for building mechanic” (p. 57), and “storm related work” (pp. 58-59). Identify the specific services performed and explain how the services were both necessary and incremental for storm remediation purposes. Response: Referring to Exhibit ACCT-2 CLP-6 (MS24F), Outside Contractors – Vendors, line 143-146, vendor Clean Harbors Env Service Inc, invoices totaling in the amount of $1,263. Charter Oak Building Maintenance invoices 300744 (p. 56), 300745 (p. 58), and 300746 (p. 59), are custodial services that were incremental and directly related to storm restoration activities, extending beyond the employees’ contracted daily responsibilities. Under normal operations, custodial personnel perform standard cleaning duties during a scheduled four-hour shift at each assigned location. Due to the increased occupancy of Company facilities by employees working extended and after-hours shifts in support of the storm event, custodial staff were required to remain on duty beyond their regularly scheduled shifts. These additional services included meal area cleanup, restocking restroom supplies and paper goods, cleaning and maintaining common area flooring, and the collection and removal of increased volumes of waste generated as a result of the storm response effort. In addition, invoice 300747 (p. 57) the vendor provided supplemental facility support services at the Cheshire location during the absence of the assigned Building Mechanic. The contracted personnel did not perform the technical functions ordinarily performed by a Building Mechanic. Rather, they performed lower-skilled operational and logistical tasks that would typically be assigned to the Building Mechanic in support of storm response activities. These duties included the setup of catering service areas; arrangement of tables and chairs within lunchroom and auditorium spaces; escorting and assisting catering personnel with meal setup and distribution for storm response personnel; and monitoring facility grounds to ensure exterior walkways were properly treated and maintained in a safe condition in anticipation of freezing rain and ice conditions forecasted for the day. These services were necessary to support storm restoration
  4. Page 24 of 101

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-06 Date Issued September 22, 2026 EOE-284 Page 2 of 2 operations and maintain a safe and functional work environment for employees responding to the event.
  5. Page 25 of 101

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-06 Date Issued September 22, 2026 EOE-285 Page 1 of 1 Date Filed: October 06, 2026 Witness: Mark P. Baldwin, Clifford G. Williams, Leanne M. Landry and John G. Griffin Request from: Office of Education, Outreach, and Enforcement Question: (MS24F-VENDOR-CIVIL) Refer to Exhibit ACCT-2 CLP-6 and Confidential Exhibit ACCT-2 CLP-6A-4, pp. 86-87. The Company reported two incremental charges in the combined amount of $14,535 for the Coleman Drilling & Blasting Inc vendor. Both of the invoices were billed for hourly activity without signed timesheets or equivalent documents. Provide the relevant signed timesheets supporting the individuals and hours worked. If timesheets were not obtained, explain how the Company was able to validate the accuracy and applicability of the charges. Response: Referring to Exhibit ACCT-2 (CLP-6)(MS24F), Outside Line Contractors, at Line 152, Coleman Drilling & Blasting, in the amount of $14,535. When Coleman Drilling & Blasting provide services, generally they will provide an operator and the necessary rigging equipment. The labor and equipment hours are listed on the invoice. With these details, the Operations Manager responsible for the area where the work was performed and supervised the resources, verified the accuracy of the reported information, and approved the invoice.
  6. Page 26 of 101

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-06 Date Issued September 22, 2026 EOE-286 Page 1 of 2 Date Filed: October 14, 2026 Witness: Mark P. Baldwin, Clifford G. Williams, Leanne M. Landry and John G. Griffin Request from: Office of Education, Outreach, and Enforcement Question: (MS24F-VENDOR-LINE) Refer to Exhibit ACCT-2 CLP-6, and Confidential Exhibit ACCT-2 CLP-6A-4, pp. 88-107. The Company reported six incremental charges in the combined amount of $1,121,268 for the Conexus Energy Group LLC vendor. The Company provided invoices for five of the six charges but failed to provide signed Eversource Contractor Storm Daily Time & Work Reports or Eversource Contractor Storm Mobilization & Demobilization Time reports (collectively timesheets). Respond to the following: a. Provide the omitted signed timesheets for the charges included in Rows 154-158. If the documents cannot be provided, explain how the Company validated the accuracy of the billed activity. b. Referring to pp. 98-99 (i.e., supporting Row 159), explain why the vendor was permitted to bill for lodging when they were mobilized out of Beacon Falls, CT. As part of the response, identify if the lodging expense was due to contractual obligations and specify if the vendor was lodged at a hotel. If lodged at a hotel, identify the location. c. Referring to pp. 100-102, explain why the vendor was permitted to bill for 2 hours of travel time between Beacon Falls, CT and Milford, CT, a distance of approximately 20 miles. d. Referring to pp. 103-107, the timesheets provided identify the first assignment dispatch time of 8:34, approximately 2.5 hours after the vendor’s start time (i.e., box 6). Explain why the vendor did not record activity as standby until the initial assignment. As part of response, please identify the incremental impact of the vendor’s billing of equipment for 2.5 hours. Response: Referring to Exhibit ACCT-2 CLP-6, Outside Contractors- Vendors, Lines 154-159, vendor Conexus Energy Group LLC, invoices totaling the amount of $1,121,268. a. Please refer to the following attachments for timesheets supporting charges for lines 154158: • EOE-286, Attachment 1, for timesheets for invoice 24153, line 154. • EOE-286, Attachment 2, for timesheets for invoice 24153, line 155.
  7. Page 27 of 101

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-06 Date Issued September 22, 2026 EOE-286 Page 2 of 2 • • • EOE-286, Attachment 3, for timesheets for invoice 240155, line 156. EOE-286, Attachment 4, for timesheets for invoice 240152, line 157. EOE-286, Attachment 5, for timesheets for invoice 240151, line 158. b. As documented in EOE-286, Attachment 6, crews were mobilized from Connecticut, New Jersey, and Massachusetts and directed by Eversource to arrive by 2200 hours on April 3 and self-lodge in preparation for a 06:00 start time. Beacon Falls, CT is the contractor’s laydown yard, not the crews’ originating locations. The contractor self-lodged in Milford, CT, as reflected on the timesheet (box 16, Ending Location). Lodging was necessary to ensure resources were positioned and available for restoration activities and billed at the agreed-upon $85 per-person per diem rate. c. The two hours of reported travel should not be interpreted solely as travel between Beacon Falls and Milford, CT. As documented in Confidential EOE-286, Attachment 6, crews were mobilized from locations throughout Connecticut, New Jersey, and Massachusetts. Although initially secured to support Massachusetts, Eversource redirected these resources to Connecticut prior to mobilization due to greater storm impacts. The reported travel time reflects mobilization related travel associated with positioning these resources, while Milford, CT represents the lodging location recorded at the conclusion of the workday. d. The contractor’s 06:00 start time reflects when crews were activated and required to be prepared and available for restoration activities. Although the initial field assignment was dispatched at 08:34, the crews were not on standby as defined under the applicable contract. During this period, crews were actively engaged in restoration preparation, including equipment and material readiness, safety coordination, and deployment related activities. The absence of an immediate field assignment does not constitute standby when crews are performing compensable restoration related activities. Accordingly, the working rate was applicable to both labor and equipment, and there was no incremental equipment overbilling associated with the approximately 2.5-hour period.
  8. Page 28 of 101

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-06 Date Issued September 22, 2026 EOE-287 Page 1 of 1 Date Filed: October 06, 2026 Witness: Mark P. Baldwin, Clifford G. Williams, Leanne M. Landry and John G. Griffin Request from: Office of Education, Outreach, and Enforcement Question: (MS24F-VENDOR-LINE) Refer to Exhibit ACCT-2 CLP-6, and Confidential Exhibit ACCT-2 CLP-6A-4, pp. 108-126. The Company reported an incremental charge of $1,475 for the D&D Power LLC vendor. The supporting timesheet provided at p. 121, reported 2 hours for MS24F for several crew members and 2 hours for WO 81725834, for other crew members. Respond to the following: a. Explain what specific services were provided in support of MS24A and provide the referenced “Storm Sheet”. b. Explain what specific services were performed in support of WO 81725834. Include in the response an explanation of what the timesheet’s reference to “Rain Day” represents. If applicable, identify if the vendor’s contract permits it to bill for a minimum number of hours when services cannot be performed due to rain. If applicable, cite the contract provisions. Response: a. The invoices at issue in this question do not pertain to MS24A. The storm cost recovery request to which these invoices relate is MS24F. b. The information relating to WO 81725834, were not included in the storm recovery costs for which the Company seeks recovery. It was part of the same timesheet, however it was unrelated to the storm.
  9. Page 29 of 101

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-06 Date Issued September 22, 2026 EOE-288 Page 1 of 1 Date Filed: October 06, 2026 Witness: Mark P. Baldwin, Clifford G. Williams, Leanne M. Landry and John G. Griffin Request from: Office of Education, Outreach, and Enforcement Question: (MS24F-VENDOR-LINE) Refer to Exhibit ACCT-2 CLP-6, and Confidential Exhibit ACCT-2 CLP-6A-4, pp. 127-192. The Company reported an incremental charge of $493,876 for the D&D Power LLC vendor. Referring to p. 147, explain what “Cleanup Work” and “Storm Duty” represents within the referenced Eversource Contractor Storm Daily Time & Work Report (timesheet) and explain why these resources were not released at 3:00pm in lieu of billing for an additional six hours. Additionally, discuss if the information contained within the timesheet identifies the individual crew members responsible for each work assignment. Response: Cleanup work is referring to cleaning up the job sites when the events are complete. Once the crew restores a customer’s power, there is usually still an extensive amount of cleanup work needed to make the job site clean and safe before leaving. Storm duty refers to being ready to be dispatched to tickets during a storm event. Torrington AWC continued restoration activities late into the night on 4/4/24 which is why D&D was held later that day.
  10. Page 30 of 101

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-06 Date Issued September 22, 2026 EOE-289 Page 1 of 2 Date Filed: October 06, 2026 Witness: John P. DiPaola-Tromba, Sean D. Redding and Jenna Turner Request from: Office of Education, Outreach, and Enforcement Question: (MS24F-VENDOR-TREE) Refer to Exhibit ACCT-2 CLP-6, and Confidential Exhibit ACCT-2 CLP-6A-4, pp. 193-194. The Company reported an incremental charge of $11,903 for the Distinctive Gardens & Tree Care LLC vendor. Respond to the following: a. Cite the applicable contract and pricing schedule, inclusive of the provision that permits the Per Diem charge. b. Identify if the vendor had access to Company provided meals on April 4, 2024, at the Torrington AWC. If the vendor had access to meals, explain why they were permitted to bill a Per Diem charge. c. Provide the omitted Eversource Connecticut Emergency Restoration Tree Contractor Work Location report and explain if the crew performed remediation activities or were held on standby. d. Explain why the vendor was permitted to bill for two mini excavators. As part of the response, provide documentation demonstrating the Company’s prior approval of this equipment. e. Referring to p. 194, explain why the vendor was permitted to only bill for 6 hours at an ST rate when they commenced billing at 9AM, resulting in 7.5 hours at an ST rate. (i.e., response to EOE-128) As part of the response, please identify the incremental impact of vendor’s billing for 6 hours at an ST rate versus 7.5 hours at an ST rate. Response: a. Please refer to OCC-044, Attachment 2 CONFIDENTIAL, page 1039, for the contract language that permits the per diem charge. b. The vendor was staged at the area work center (“AWC”) and would have appropriately had access to available food. However, meals at the AWC do not always cover all personnel present at the location. Tree crews may be actively working on event restoration activities when meals are provided at the AWC. The time required to break down the tree crew’s worksite and return to the AWC for a meal would not benefit customers or decrease restoration time when utilizing a meal per diem would be more efficient. c. The Eversource Connecticut Emergency Restoration Tree Contractor Work Location reports may have been missed during the scanning process. The Company is working on locating the

As listed on the current system

Corres. 10/15/2026 [26-05-10] (Keegan Werlin LLP) - Discovery Compilation (EOE Set 6)

This filing on the current system (opens in a new tab)