  1. Page 31 of 101

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-06 Date Issued September 22, 2026 EOE-289 Page 2 of 2 report and will supplement this response as appropriate. However, the Company Arborist reviewed and approved the vendor timesheet as a result of their direct supervision and knowledge of the tree crews working each shift during the restoration process. The Company verifies storm-related work using additional records, including timesheets, dispatch information, and field oversight, and does not rely solely on the Eversource Connecticut Emergency Restoration Tree Contractor Work Location reports for validation purposes. d. During storm response, mini excavators may be used to remove large trunk sections and other woody debris from roadways, when necessary. Mini excavators can improve restoration efficiency. Large-diameter trunk sections that would otherwise require significant time for ground crews to cut, move, and stage manually can often be shifted in minutes, allowing roads to be reopened faster and restoration resources to be deployed to additional outage locations. The Company authorized the use of these services through its storm restoration contractor as part of the overall restoration effort. Because the work was performed to facilitate blockedroad clearing and the safe restoration of electric service, the associated costs were appropriately incurred by the Company as storm remediation expense. e. The vendor is not permitted to charge overtime during the storm working hours, from 07:00 to 16:00. Referring to Exhibit ACCT-2 (CLP-6) (MS24F), page 52, line 162, and Confidential Exhibit ACCT-2 (CLP-6A-4) (MS24F), pages 193-194, the Company reviewed the Distinctive Gardens & Tree Care LLC invoice and determined that one-hour of straight-time was billed at the overtime rate for a total incremental cost of $213.75. The Company will supplement Exhibit ACCT-2 (CLP-6A-4) (MS24F), page 52, line 162, to remove $214.
  2. Page 32 of 101

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-06 Date Issued September 22, 2026 EOE-290 Page 1 of 2 Date Filed: October 06, 2026 Witness: Christopher E. Colorio, Mark P. Baldwin, John G. Griffin and Leanne M. Landry Request from: Office of Education, Outreach, and Enforcement Question: (MS24F-VENDOR-FUEL) Refer to Exhibit ACCT-2 CLP-6 and Confidential Exhibit ACCT-2 CLP-6A-4, p. 215. The Company reported an incremental charge of $37,930 for the East River Energy vendor. Respond to the following: a. Explain why the consolidated invoice does not agree with the amount requested for recovery. Specifically, the invoice identifies a charge of $36,687 (p.215) versus the requested amount of $37,930. b. Cite the applicable contract and pricing schedule, inclusive of the billed hourly labor charge. c. Provide documentation to support the of the per gallon charge for diesel fuel, including any industry standards. Furthermore, cite to the applicable contract provision which permits the vendor to charge for diesel at that cost. If the contract has not yet been provided, please provide. d. Provide the relevant signed timesheets or other documents supporting the validity of the hours billed. If timesheets were not obtained, explain how the Company was able to validate the validity of the hours charged. e. The Invoice included a reference to “Detailed spreadsheet provided”. Please provide the referenced spreadsheet. Response: Referring to Exhibit ACCT-2 CLP-6 and Confidential Exhibit ACCT-2 CLP-6A-4, p. 215, a. The difference between the invoice amount of $36,687 and the requested amount of $37,930 is tax calculated by the Company’s Accounts Payable system. This was calculated in error and $1,243 will be removed from the filing. b. Please refer to EOE-290, Attachment 1 CONFIDENTIAL, for the contract and pricing schedule with East River Energy, inclusive of the per gallon charge for diesel fuel. The contract also includes the following provision “all Emergency Response Work shall be
  3. Page 33 of 101

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-06 Date Issued September 22, 2026 EOE-290 Page 2 of 2 performed by Contractor on a time and equipment/material price basis pursuant to the portal to portal hourly billing rates agreed to between Owner and Contractor.” c. Please refer to the pricing schedule included in EOE-290, Attachment 1 CONFIDENTIAL, for the provision permitting the vendor to charge diesel at the cost shown in the invoice. d. Please refer to EOE-290, Attachment 2 CONFIDENTIAL, for additional support for the labor hours worked. The invoice was reviewed and approved by the Company personnel overseeing the vendor and is also approved through the appropriate levels of the Company’s Delegation of Authority policy. e. Please refer to EOE-290, Attachment 2 CONFIDENTIAL.
  4. Page 34 of 101

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-06 Date Issued September 22, 2026 EOE-291 Page 1 of 2 Date Filed: October 06, 2026 Witness: Mark P. Baldwin, Clifford G. Williams, Leanne M. Landry and John G. Griffin Request from: Office of Education, Outreach, and Enforcement Question: (MS24F-VENDOR-LINE) Refer to Exhibit ACCT-2 CLP-6, and Confidential Exhibit ACCT-2 CLP-6A-4, pp. 216-233. The Company reported two incremental charges in the combined amount of $259,193 for the E-J Electric T&D LLC vendor. Respond to the following: a. Cite the location of the vendor’s contractual Pricing Schedule Exhibit (i.e., typically referred to as Exhibit A). The contract provided at OCC-044, Att. 2 (Confidential), starting at p. 1147, includes a List of Exhibits at p. 1153, which references the Pricing Schedule as Exhibit B, which EOE was unable to locate in the Company’s response. If it was not provided, please provide. b. Reference the billed rates on pp. 217, and 22,3 and the rates provided within OCC-044, Att. 2 (Confidential), p. 1277. Explain why the rates charged by the vendor exceed the rates included within the contractual rate table provided. To the extent that the vendor billed higher rates than referenced within the contract, provide an Excel spreadsheet demonstrating the amounts overbilled. c. Referring to p. 223, explain why the cost of equipment was charged during standby when the Company’s Master Service Agreement omits billing of equipment during standby. Additionally, identify the amount that was charged for equipment during standby. d. Referring to pp. 218-221, explain why the Company permitted the vendor to exclude information within boxes 24 (Event Start Time), and 25 (Event End Time). As part of the response, identify when the crews received their first assignment. Response: a. Please refer to EOE-291, Attachment 1 CONFIDENTIAL, for the Exhibit B Pricing Schedule. b. The rates billed on pp. 217, and 223, of Confidential Exhibit ACCT-2 CLP-6A-4, are governed by the agreed upon Pricing Schedule to secure ERP resources. The vendor did not bill rates more than the applicable contractual pricing and there are no associated overbilled amounts. Please refer to EOE-291, Attachment 2 CONFIDENTIAL, for the agreed upon ERP resource rate sheet that governed the invoices in question.
  5. Page 35 of 101

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-06 Date Issued September 22, 2026 EOE-291 Page 2 of 2 c. For this event, the crews began their work shift and may have characterized time during the shift as “standby,” intending to reflect the physical status of the crew at a particular point in time. For this invoice, six hours were spent working events and nine hours were spent awaiting damage assessment and other activities to identify and assign additional tickets. Thus, this characterization does not indicate that the crew or associated equipment was inactive or demobilized. During these periods, contractor resources may remain fully mobilized at the designated work or staging location, with personnel and equipment committed to Company operations and prepared to perform work immediately upon assignment. For example, resources may be awaiting the next ticket or work assignment, further direction from the Company, or otherwise be transitioning between assignments, while supporting ongoing operations. Although the field crew may characterize this time as “standby” on its timesheet, the resources remain deployed and available only to Eversource for work purposes. The total amount of $1,629 of equipment was charged during standby which is in accordance with contractual language. Please refer to the Company’s response to EOE-267, for additional detail regarding billing for Equipment during Standby. d. Although Boxes 24 (Event Start Time), and 25 (Event End Time), were not completed by the vendor, the absence of this information did not prevent the Company from validating and approving the timesheets. Part of the Company's review process is to verify the accuracy and reasonableness of contractor labor charges using the total hours worked, dates of service, event assignments, crew information, and consultation with personnel responsible for overseeing the contractor's work, as necessary. The review confirmed that sufficient information was available to validate the hours billed and their association with the applicable event or activity. In this instance, the Company was able to confirm the validity of the labor charges through its established review controls and therefore, the omission of the Event Start Time and Event End Time fields did not impact the Company's ability to verify or approve the charges. This review process serves as a key control to ensure that contractor invoices are reasonable, supported and accurately associated with the applicable event. The first assignment for the crew on pg. 218 was 5:08AM. The first assignment for the crew on page 219, was 4:41AM.
  6. Page 36 of 101

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-06 Date Issued September 22, 2026 EOE-292 Page 1 of 3 Date Filed: October 06, 2026 Witness: Mark P. Baldwin, Clifford G. Williams, Leanne M. Landry and John G. Griffin Request from: Office of Education, Outreach, and Enforcement Question: (MS24F-VENDOR-LINE) Refer to Exhibit ACCT-2 CLP-6, and Confidential Exhibit ACCT-2 CLP-6A-4, pp. 234-247. The Company reported an incremental charge of $205,216 for the Elecnor Hawkeye LLC vendor. Respond to the following: a. Cite the location of the vendor’s contractual Pricing Schedule Exhibit (i.e., typically referred to as Exhibit A). The contract provided at OCC-044, Att. 2 (Confidential), starting at p. 1492, includes a List of Exhibits at p. 1498 which references the Pricing Schedule as Exhibit B, which EOE was unable to locate in the Company’s response. If it was not provided, please provide. b. Referring to pp. 238, 240, 242, 244-245, explain why the equipment was charged during standby (i.e., at the “1/2 rate” referenced) when the Company’s Master Service Agreement omits billing of equipment during standby. Additionally, identify the amount that was charged for equipment during standby. Response: a. The applicable contractual Pricing Schedule was not included in the Company’s response to OCC-044, Attachment 2 CONFIDENTIAL. The Pricing Schedule has now been provided as EOE-292, Attachment 1 CONFIDENTIAL. b. The contractor charged 50% of equipment on standby in line with EOE-292, Attachment 1 (PS-6), which allows for this charge. The equipment charged during standby is the total amount of $4,291.27 -- paid in accordance with applicable contract provisions. Please refer to the Company’s response to EOE-267 i, for additional detail regarding billing for Equipment during Standby. Prior Referenced Response: i EOE-267 Question (LINE CREWS) For each storm in the Company’s recovery request, identify the total amount of equipment that was billed by line crew vendors during standby activities. Please provide the information in an unlocked excel spreadsheet allocating each cost to a specific vendor by storm event.
  7. Page 37 of 101

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-06 Date Issued September 22, 2026 EOE-292 Page 2 of 3 EOE-267 Response: There is no contractual, operational or other prohibition that bars the payment of equipment rates during standby time and these costs are not tracked separately from a vendor’s crew time for invoicing purposes. Information regarding equipment charges is contained within the underlying vendor invoices and supporting documentation submitted as part of the Company’s filing. The Company has consistently explained that, in the years 2018 through 2023, the Company’s contractual terms provided that standby rates were charged only to labor rates, not to equipment. This policy followed from the fact that, when vendor crews commit to perform work for the Company, their equipment is dedicated for the duration of the engagement, preventing the use of that equipment somewhere else. This commitment of vendor equipment extends beyond working hours, as vendors must remain ready and available so long as they are committed to the Company’s restoration effort. This policy also reflects the fact that labor rates vary depending on the demands and associated risk placed on the field crews for their performance (i.e., standby rates are lower than work rates), where vendor equipment is tied up regardless of the work status of the vendor’s crews. Specifically, the contract language “Standby Rates apply to labor resources only” was applied so that there was no separate standby rate for equipment and equipment was, instead, billed at the same rate regardless of the crew’s work status (e.g. travel, standby, or work time). The Company’s policy acknowledged that it was paying for exclusive access to the vendor’s equipment throughout the event, compensating vendors for their lost opportunity cost. Not paying for equipment during standby would discourage vendors from committing their resources to the Company in storms with competitive procurement of crews among regional utilities. In January 2022, Eversource Energy received the final report of an independent assessment of the “Eversource ERP Capability,” prepared by Accenture LLC. This assessment was undertaken by Eversource Energy as part of a regulatory compliance initiative beginning in September 2021. In this assessment, Accenture made several recommendations regarding the Eversource Energy ERP organization, including a recommendation to expand the emergency-management organization and capabilities by creating an executive role to oversee the enterprise emergency-management program with greater visibility and decision-making authority within the overall organization. Specifically, Accenture recommended establishing regionally based directors to oversee the implementation of program initiatives and manage state-specific relationships; expanded oversight and governance coordination of risk mitigation and resiliency initiatives; and additional training and exercise design personnel. Over the next two years, Eversource Energy implemented the Accenture recommendations, expanding and formalizing the emergency-management organization with a new vice president role and several new director roles to improve overall emergency-response preparedness and associated business processes. As part of this organizational initiative, Eversource Energy formalized the role of Director of Emergency Preparedness Logistics and Resource Acquisition in late 2023, vesting this role with responsibility for contract services relating to emergency management. This change placed control of vendor contracts in the hands of the team directly responsible for resource acquisition in emergency events. Following this organizational change, the emergency-management team launched a supplier cost-optimization review to identify opportunities for greater cost control in the tough environment of competitive procurement of contract resources. Working together, the Company’s contracts and procurement teams identified the discounting or elimination of equipment charges during standby time as one of several strategies that could help to contain storm restoration costs. The Company began to shift its policy on standby rates for equipment starting in late 2023, working with vendors throughout 2024 to negotiate changes to the former payment policy. This shift in policy applied in
  8. Page 38 of 101Match

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-06 Date Issued September 22, 2026 EOE-292 Page 3 of 3 various forms to invoices for work performed during 2023, that were reviewed, approved and paid during 2024, as the Company worked to get vendors to accept a change in the policy. The roll-out of the new policy resulted in significant vendor push-back. Through these interactions, it became clear that it was not possible to eliminate payments for equipment without hindering the Company’s ability to secure necessary crews -- with several vendors simply increasing the equipment charge applicable during crew work time to cover the gap. In 2025, following months of negotiations with vendors and a review of industry practices, the Company adopted a standard policy of paying vendors 50 percent of the standard Base Rate for equipment during standby. The full Base Rate for equipment still applies during travel and work time. This policy strikes a reasonable balance between fairly compensating vendors for lost opportunity costs—ensuring access to skilled, experienced vendors—and containing costs. The Company’s current Master Services Agreement reflects this updated policy.
  9. Page 39 of 101

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-06 Date Issued September 22, 2026 EOE-293 Page 1 of 1 Date Filed: October 06, 2026 Witness: Mark P. Baldwin, Clifford G. Williams, Leanne M. Landry and John G. Griffin Request from: Office of Education, Outreach, and Enforcement Question: (MS24F-VENDOR-TRAFFIC) Refer to Exhibit ACCT-2 CLP-6 and Confidential Exhibit ACCT2 CLP-6A-5, pp. 1-25. The Company reported an incremental charge of $3,825 for the Elite Flaggers LLC vendor. The invoice included several references to “Rain Day” where each of the crews billed for four hours on April 5, 2024 (p. 2). Explain if the Rain Day charges involved storm remediation or if these were the result of job cancellations. If applicable to a job cancellation, identify if the vendor’s contract permits it to bill for a minimum number of hours when services cannot be performed due to rain and provide the relevant citation. If applicable to storm remediation, provide documentation demonstrating the assignments performed on April 5, 2024. Response: Elite Flaggers LLC has a standing request to provide a certain quantity of flagging resources for both Company crews as well as contractors retained for specific projects or dock work. As these flaggers are not restricted to a singular municipality like police are, this provides enhanced flexibility, especially in storm situations. As such, the flaggers were initially planned to be utilized for scheduled work, however, when storms arise, they are still retained to provide rapid deployment of work zone setups and traffic control. In the event it is determined that the contractor crews will not be utilized, or the weather doesn’t require any Company resources beyond the normal Response Specialists, the flaggers are released and paid their minimum of four hours. In this instance, Elite remained available for deployment but was ultimately released without performing traffic control or storm remediation activities. Accordingly, the four hours billed on April 5, 2024 reflect the applicable minimum-hour payment rather than hours associated with storm remediation. Please refer to EOE-280, Attachment 1CONFIDENTIAL, for the contractual provisions related to cancellation.
  10. Page 40 of 101

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-06 Date Issued September 22, 2026 EOE-294 Page 1 of 1 Date Filed: October 06, 2026 Witness: Craig Dikeman, Matthew J. Correia, Christopher E. Colorio and Mark P. Baldwin Request from: Office of Education, Outreach, and Enforcement Question: (ECI COMPETITIVE BID ASSESSMENT) Explain the specific services performed by the Environmental Consultants Inc. vendor. Additionally, identify if the Company pursued competitive bids for the services performed by ECI prior to engagement. If pursued, provide documentation demonstrating the Request for Proposal (RFP) and the overall results. If not pursued, explain why. Response: Environmental Consultants Inc. (ECI) provides Distribution and Transmission vegetation management services for the Company. Prior to engagement, the Company conducted a competitive bidding process for these services. Following evaluation of the competitive submissions received, ECI was selected and awarded a contract. Documentation supporting the competitive bid process, including the Request for Proposal (RFP) and bid results, is provided in EOE-294, Attachment 1 CONFIDENTIAL.

As listed on the current system

Corres. 10/15/2026 [26-05-10] (Keegan Werlin LLP) - Discovery Compilation (EOE Set 6)