  1. Page 38 of 101Match

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-06 Date Issued September 22, 2026 EOE-292 Page 3 of 3 various forms to invoices for work performed during 2023, that were reviewed, approved and paid during 2024, as the Company worked to get vendors to accept a change in the policy. The roll-out of the new policy resulted in significant vendor push-back. Through these interactions, it became clear that it was not possible to eliminate payments for equipment without hindering the Company’s ability to secure necessary crews -- with several vendors simply increasing the equipment charge applicable during crew work time to cover the gap. In 2025, following months of negotiations with vendors and a review of industry practices, the Company adopted a standard policy of paying vendors 50 percent of the standard Base Rate for equipment during standby. The full Base Rate for equipment still applies during travel and work time. This policy strikes a reasonable balance between fairly compensating vendors for lost opportunity costs—ensuring access to skilled, experienced vendors—and containing costs. The Company’s current Master Services Agreement reflects this updated policy.
  2. Page 39 of 101

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-06 Date Issued September 22, 2026 EOE-293 Page 1 of 1 Date Filed: October 06, 2026 Witness: Mark P. Baldwin, Clifford G. Williams, Leanne M. Landry and John G. Griffin Request from: Office of Education, Outreach, and Enforcement Question: (MS24F-VENDOR-TRAFFIC) Refer to Exhibit ACCT-2 CLP-6 and Confidential Exhibit ACCT2 CLP-6A-5, pp. 1-25. The Company reported an incremental charge of $3,825 for the Elite Flaggers LLC vendor. The invoice included several references to “Rain Day” where each of the crews billed for four hours on April 5, 2024 (p. 2). Explain if the Rain Day charges involved storm remediation or if these were the result of job cancellations. If applicable to a job cancellation, identify if the vendor’s contract permits it to bill for a minimum number of hours when services cannot be performed due to rain and provide the relevant citation. If applicable to storm remediation, provide documentation demonstrating the assignments performed on April 5, 2024. Response: Elite Flaggers LLC has a standing request to provide a certain quantity of flagging resources for both Company crews as well as contractors retained for specific projects or dock work. As these flaggers are not restricted to a singular municipality like police are, this provides enhanced flexibility, especially in storm situations. As such, the flaggers were initially planned to be utilized for scheduled work, however, when storms arise, they are still retained to provide rapid deployment of work zone setups and traffic control. In the event it is determined that the contractor crews will not be utilized, or the weather doesn’t require any Company resources beyond the normal Response Specialists, the flaggers are released and paid their minimum of four hours. In this instance, Elite remained available for deployment but was ultimately released without performing traffic control or storm remediation activities. Accordingly, the four hours billed on April 5, 2024 reflect the applicable minimum-hour payment rather than hours associated with storm remediation. Please refer to EOE-280, Attachment 1CONFIDENTIAL, for the contractual provisions related to cancellation.
  3. Page 40 of 101

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-06 Date Issued September 22, 2026 EOE-294 Page 1 of 1 Date Filed: October 06, 2026 Witness: Craig Dikeman, Matthew J. Correia, Christopher E. Colorio and Mark P. Baldwin Request from: Office of Education, Outreach, and Enforcement Question: (ECI COMPETITIVE BID ASSESSMENT) Explain the specific services performed by the Environmental Consultants Inc. vendor. Additionally, identify if the Company pursued competitive bids for the services performed by ECI prior to engagement. If pursued, provide documentation demonstrating the Request for Proposal (RFP) and the overall results. If not pursued, explain why. Response: Environmental Consultants Inc. (ECI) provides Distribution and Transmission vegetation management services for the Company. Prior to engagement, the Company conducted a competitive bidding process for these services. Following evaluation of the competitive submissions received, ECI was selected and awarded a contract. Documentation supporting the competitive bid process, including the Request for Proposal (RFP) and bid results, is provided in EOE-294, Attachment 1 CONFIDENTIAL.
  4. Page 41 of 101

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-06 Date Issued September 22, 2026 EOE-295 Page 1 of 1 Date Filed: October 13, 2026 Witness: Christopher E. Colorio, Mark P. Baldwin, John G. Griffin and Leanne M. Landry Request from: Office of Education, Outreach, and Enforcement Question: (MS24F-VENDOR-ENVIRONMENTAL) Refer to Exhibit ACCT-2 CLP-6 and Confidential Exhibit ACCT-2 CLP-6A-6, pp. 1-149. The Company reported an incremental charge of $6,403 for the Environmental Consultants vendor. The invoice (pp. 1-2) appears to include approximately one month of billing for the vendor and is supported by individuals’ weekly timesheets. Explain how the Company determined the amount applicable to the MS24F event and provide supporting documentation. Additionally, cite to the vendor’s contract and corresponding pricing schedule. If the contract or corresponding pricing schedule was not provided, please provide. Response: Referring Exhibit ACCT-2 (CLP-6) (MS24F), page 52, line 172, vendor Environmental Consultants Inc. (“ECI”), in the amount of $6,403. At the time, this contractor billed the Company once per month for all work types and proper accounting was split in Maximo. The entire invoice for all work types billed in April, 2024, was included in the documentation. The invoice totals are shown on pages 2 of Confidential Exhibit ACCT-2 (CLP-6A-6) (MS24F). The invoice total is $142,278.48 and only $6,403 was allocated to MS24F011. ECI provided Arborist support for vegetation management during storm events. Support provided during storm events included tree crew dispatching, tree crew field oversight, and patrol services. While reviewing Exhibit ACCT-2 (CLP-6) (MS24F), page 52, line 172, and Confidential Exhibit ACCT-2 CLP-6A-6, pp. 1-149, the Company determined that it misallocated a portion of the ECI invoice. The Company will supplement Exhibit ACCT-2 (CLP-6) (MS24F), page 52, line 172, to add $352. Please refer to EOE-295 Attachment 1 CONFIDENTIAL, for a breakdown of the charges allocated to MS24F. Please refer to EOE-014, Attachment 2 CONFIDENTIAL (2), at paged 2478, for the ECI contract, and page 2513, for the corresponding pricing schedule. Eversource - Internal Use
  5. Page 42 of 101

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-06 Date Issued September 22, 2026 EOE-296 Page 1 of 2 Date Filed: October 06, 2026 Witness: Mark P. Baldwin, Clifford G. Williams, Leanne M. Landry and John G. Griffin Request from: Office of Education, Outreach, and Enforcement Question: (MS24F-VENDOR-TRAFFIC) Refer to Exhibit ACCT-2 CLP-6, and Confidential Exhibit ACCT-2 CLP-6A-6, pp. 150-170. The Company reported an incremental charge of $16,352 for the Extra Duty Solutions vendor. Respond to the following: a. Identify the specific charges (i.e., line items) within the invoice that were allocated to the MS24F storm event. b. Explain why the invoice includes multiple line items referenced as Storm Standby for police officers. As part of the response, explain if the Company is required to stage police officers for storm events. If required, provide or cite the applicable requirements. c. The invoice includes multiple references to “Job Cancelled.” Identify the total charges for cancellations applicable to the MS24F event, as well as the charges applicable to other activities. Explain why the Company was required to incur charges for cancellations and identify the minimum amount of time that would have prevented charges for cancellations. Response: Referring to Exhibit ACCT-2 (CLP-6) (MS24F), Outside Line Contractors, at Line 173, Extra Duty Solutions, in the amount of $16,352. a. Please refer to EOE-296, Attachment 1, for a breakdown of costs and reference pages within Confidential Exhibit ACCT-2 CLP-6A-6. Upon further review of the charges, the Company determined that a portion of the costs was not associated with the MS24F event. Accordingly, the Company will supplement Exhibit ACCT-2 (CLP-6) (MS24F) to revise line 173 and reflect the adjusted total of $14,656. b. The City of Stamford requires the Company to hire police for traffic control. As the Stamford Area Work Center (AWC) performs work in Stamford on a daily basis, they have a standing request for two police details every day. As the weather event was not forecasted to impact the area until later in the day on April 3, 2024, the police detail was retained in the event the weather held off long enough to get planned work accomplished. On the morning of April 3, 2024, however, precipitation occurred prior to the full onset of the storm event. Due to the safety hazards associated with working on energized electrical equipment during precipitation, Linemen and Cable Splicers are contractually prohibited
  6. Page 43 of 101

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-06 Date Issued September 22, 2026 EOE-296 Page 2 of 2 from performing non-emergency work while precipitation is occurring. Thus, at this point, the determination was made that the crews would be unable to perform routine, scheduled work and the police detail was released. c. Had the police detail been canceled the day prior and the weather subsequently held off, the Company may not have been able to secure a replacement police detail and, as a result, may have been unable to perform the planned work in Stamford. The Company is not required to pre-stage Stamford Police for traffic control, however, prior to commencing any restoration work, the Company must retain police details. This can delay restoration efforts by an hour or more. In the interest of expediting restoration and serving customers, the Company decided, based on the best information available at the time the decision was made, to retain the police detail ahead of time. Of the total cancellation costs identified, $3,648 was attributable to the MS24 event, while $1,216 related to cancellations that occurred outside the MS24 event period. The Company is required to adhere to applicable local municipal ordinances and requirements governing work within each municipality. Eversource is also committed to maintaining strong working relationships with the municipalities it serves and honoring their established policies and procedures. Accordingly, when work is cancelled or rescheduled in accordance with municipal requirements, associated cancellation charges may be unavoidable.
  7. Page 44 of 101

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-06 Date Issued September 22, 2026 EOE-297 Page 1 of 1 Date Filed: October 06, 2026 Witness: Christopher E. Colorio, Mark P. Baldwin, John G. Griffin and Leanne M. Landry Request from: Office of Education, Outreach, and Enforcement Question: (MS24F-VENDOR-FOOD/LODGING) Refer to Exhibit ACCT-2 CLP-6, and Confidential Exhibit ACCT-2 CLP-6A-6, pp. 173-175. The Company reported an incremental charge of $5,707 for the Graduate Hotels Storrs vendor. Explain why the invoice differs from the amount requested for recovery. Response: Referring to Exhibit ACCT-2 CLP-6 (MS24F), Outside Contractors-Vendor, Line 176, vendor Graduate Hotels Storrs, invoice totaling in the amount of $5,707. In reviewing this inquiry, the Company determined that there was an error in the amount of $187.12 tax expense allocated to MS24F. The Company will supplement ACCT-2 CLP-6 (MS24F), to reduce $5,707 amount on line 176, by $187.12, thereby reflecting the correct incremental charge of $5,520.05.
  8. Page 45 of 101

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-06 Date Issued September 22, 2026 EOE-298 Page 1 of 1 Date Filed: October 06, 2026 Witness: Christopher E. Colorio, Mark P. Baldwin, John G. Griffin and Leanne M. Landry Request from: Office of Education, Outreach, and Enforcement Question: (MS24F-VENDOR-CIVIL) Refer to Exhibit ACCT-2 CLP-6, and Confidential Exhibit ACCT-2 CLP-6A-6, pp. 178-179. The Company reported an incremental charge of $14,174 for the H I Stone & Son Trucking Inc. vendor. Explain what specific services were performed and how those services were necessitated by the MS24F event. Response: According to OMS event 5313523, the customer’s service and the secondary riser was damaged on April 4, 2024 during MS24F. A troubleshooter responded and determined that both energized conductors supplying the residence were damaged and the service needed to be replaced. HI Stone was hired to complete Horizontal Directional Drilling to install new conduit for the service. After completing 90’ of drilling, the contractor hit ledge and was forced to trench the remaining 160 feet and install conduit via open trench excavation. Upon review of this invoice, the Company determined that the costs to replace the conduit should be capitalized. The material for the work was provided by the contractor and therefore was not picked up in the Company’s established capitalization process. Based on this determination, the Company will supplement Exhibit ACCT-2 CLP-6 (MS24F), to modify line 179, to reflect the updated amount of $0.
  9. Page 46 of 101

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-06 Date Issued September 22, 2026 EOE-299 Page 1 of 1 Date Filed: October 06, 2026 Witness: Christopher E. Colorio, Mark P. Baldwin, John G. Griffin and Leanne M. Landry Request from: Office of Education, Outreach, and Enforcement Question: (MS24F-VENDOR-CIVIL) Refer to Exhibit ACCT-2 CLP-6, and Confidential Exhibit ACCT-2 CLP-6A-6, pp. 186-191. The Company reported three incremental charges in the combined amount of $16,459 for the H I Stone & Son Trucking Inc. vendor. Explain what specific services were performed and how those services were necessitated by the MS24F event. Additionally, explain why the Scope of Work (pp. 187, 189, 191) references different work order numbers. Response: The customer’s service to house # 84 Lazy Brook Rd, Monroe failed during MS24F on 4/3/24. The troubleshooter tested the service cable and determined that replacement was required. HI Stone used Horizontal Directional drilling to install 270’ of new 3” conduit. The cost included test pits that were needed to locate other utilities, working with the mark out technician to identify utilities within the range of digging, running the final sections of conduit into a handhole as well as all restoration to the customers property. The WOs referenced on the Scope of Work serve as HI Stone’s internal means of tracking the work assigned to them. Upon review of this invoice, the Company determined that the costs to replace the conduit should be capitalized. The material for the work was provided by the contractor and therefore was not picked up in the Company’s established capitalization process. Based on this determination, the Company will supplement Exhibit ACCT-2 CLP-6 (MS24F), to modify lines 183-185, to reflect the updated amount of $0.
  10. Page 47 of 101

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-06 Date Issued September 22, 2026 EOE-300 Page 1 of 3 Date Filed: October 06, 2026 Witness: Mark P. Baldwin, Clifford G. Williams, Leanne M. Landry and John G. Griffin Request from: Office of Education, Outreach, and Enforcement Question: (MS24F-VENDOR-LINE) Refer to Exhibit ACCT-2 CLP-6, and Confidential Exhibit ACCT-2 CLP-6A-6, pp. 202-211. The Company reported an incremental charge of $100,209 for the Harlan Electric Construction vendor. Respond to the following: a. Provide a brief description of the timing of events for this vendor and reconcile those activities with the documentation provided. As part of the description, explain how the vendor would have incurred four hours of billing from 6AM to 10AM on April 3, 2024 (to “Pick up Eversource Buckets” as referenced on pp. 204-207) and then resumed billing on April 4, 2024, at 6AM with no Travel or hotel costs. Additionally, explain why the vendor finished its last assignment at 3:30PM on April 4, 2024, but was permitted to continue billing until 10:00PM. b. Referring to pp. 204-207, explain why the vendor was permitted to bill each employee for four hours on April 3, 2024, to “Pick up Eversource Buckets.” As part of the response, identify where the vendor was mobilized from. c. Cite the location of the vendor’s contractual Pricing Schedule Exhibit (i.e., typically referred to as Exhibit A). The contract provided at OCC-044, Att. 2 (Confidential), starting at p. 2286, includes a List of Exhibits at p. 2292, which references the Pricing Schedule as Exhibit B, which EOE was unable to locate in the Company’s response. If it was not provided, please provide. d. Referring to pp. 208-211, explain why the equipment was charged during standby when the Company’s Master Service Agreement omits billing of equipment during standby. Additionally, identify the amount that was charged for equipment during standby. Response: a. These crews were Transmission to Distribution conversions. The time is accounted for to transition by dropping and securing Transmission equipment and transitioning into Distribution crews. The time allotted to pick up buckets is to complete the Transmission to Distribution transition and the logistics to arrive at the yard. The vendor completed their last assignment at 3:30PM on April 4th and during that time, they were contractually considered “Working” for the remainder of the day. The crews completed their last ticket at 3:30PM and awaited further tickets until they were ultimately released at 10PM.

As listed on the current system

Corres. 10/15/2026 [26-05-10] (Keegan Werlin LLP) - Discovery Compilation (EOE Set 6)

This filing on the current system (opens in a new tab)