Discovery Compilation (EOE Set 6)
Filed by Keegan Werlin LLP2 files
Part of docket 26-05-10Files2
Docket No. 26-05-10 Discovery Compilation October 15 2026.pdf
PDF · 154 KB · 1 pageText searchable
Download Docket No. 26-05-10 Discovery Compilation October 15 2026.pdfRead the text of Docket No. 26-05-10 Discovery Compilation October 15 2026.pdf
EOE Set 6_COMBINED.pdf
PDF · 866 KB · 101 pagesText searchable
Download EOE Set 6_COMBINED.pdfRead the text of EOE Set 6_COMBINED.pdf
Search terms highlighted
Eversource rate increase is on 3 pages of the text below, highlighted. Go to the first matchClear highlighting
Page 41 of 101
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-06 Date Issued September 22, 2026 EOE-295 Page 1 of 1 Date Filed: October 13, 2026 Witness: Christopher E. Colorio, Mark P. Baldwin, John G. Griffin and Leanne M. Landry Request from: Office of Education, Outreach, and Enforcement Question: (MS24F-VENDOR-ENVIRONMENTAL) Refer to Exhibit ACCT-2 CLP-6 and Confidential Exhibit ACCT-2 CLP-6A-6, pp. 1-149. The Company reported an incremental charge of $6,403 for the Environmental Consultants vendor. The invoice (pp. 1-2) appears to include approximately one month of billing for the vendor and is supported by individuals’ weekly timesheets. Explain how the Company determined the amount applicable to the MS24F event and provide supporting documentation. Additionally, cite to the vendor’s contract and corresponding pricing schedule. If the contract or corresponding pricing schedule was not provided, please provide. Response: Referring Exhibit ACCT-2 (CLP-6) (MS24F), page 52, line 172, vendor Environmental Consultants Inc. (“ECI”), in the amount of $6,403. At the time, this contractor billed the Company once per month for all work types and proper accounting was split in Maximo. The entire invoice for all work types billed in April, 2024, was included in the documentation. The invoice totals are shown on pages 2 of Confidential Exhibit ACCT-2 (CLP-6A-6) (MS24F). The invoice total is $142,278.48 and only $6,403 was allocated to MS24F011. ECI provided Arborist support for vegetation management during storm events. Support provided during storm events included tree crew dispatching, tree crew field oversight, and patrol services. While reviewing Exhibit ACCT-2 (CLP-6) (MS24F), page 52, line 172, and Confidential Exhibit ACCT-2 CLP-6A-6, pp. 1-149, the Company determined that it misallocated a portion of the ECI invoice. The Company will supplement Exhibit ACCT-2 (CLP-6) (MS24F), page 52, line 172, to add $352. Please refer to EOE-295 Attachment 1 CONFIDENTIAL, for a breakdown of the charges allocated to MS24F. Please refer to EOE-014, Attachment 2 CONFIDENTIAL (2), at paged 2478, for the ECI contract, and page 2513, for the corresponding pricing schedule. Eversource - Internal UsePage 42 of 101
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-06 Date Issued September 22, 2026 EOE-296 Page 1 of 2 Date Filed: October 06, 2026 Witness: Mark P. Baldwin, Clifford G. Williams, Leanne M. Landry and John G. Griffin Request from: Office of Education, Outreach, and Enforcement Question: (MS24F-VENDOR-TRAFFIC) Refer to Exhibit ACCT-2 CLP-6, and Confidential Exhibit ACCT-2 CLP-6A-6, pp. 150-170. The Company reported an incremental charge of $16,352 for the Extra Duty Solutions vendor. Respond to the following: a. Identify the specific charges (i.e., line items) within the invoice that were allocated to the MS24F storm event. b. Explain why the invoice includes multiple line items referenced as Storm Standby for police officers. As part of the response, explain if the Company is required to stage police officers for storm events. If required, provide or cite the applicable requirements. c. The invoice includes multiple references to “Job Cancelled.” Identify the total charges for cancellations applicable to the MS24F event, as well as the charges applicable to other activities. Explain why the Company was required to incur charges for cancellations and identify the minimum amount of time that would have prevented charges for cancellations. Response: Referring to Exhibit ACCT-2 (CLP-6) (MS24F), Outside Line Contractors, at Line 173, Extra Duty Solutions, in the amount of $16,352. a. Please refer to EOE-296, Attachment 1, for a breakdown of costs and reference pages within Confidential Exhibit ACCT-2 CLP-6A-6. Upon further review of the charges, the Company determined that a portion of the costs was not associated with the MS24F event. Accordingly, the Company will supplement Exhibit ACCT-2 (CLP-6) (MS24F) to revise line 173 and reflect the adjusted total of $14,656. b. The City of Stamford requires the Company to hire police for traffic control. As the Stamford Area Work Center (AWC) performs work in Stamford on a daily basis, they have a standing request for two police details every day. As the weather event was not forecasted to impact the area until later in the day on April 3, 2024, the police detail was retained in the event the weather held off long enough to get planned work accomplished. On the morning of April 3, 2024, however, precipitation occurred prior to the full onset of the storm event. Due to the safety hazards associated with working on energized electrical equipment during precipitation, Linemen and Cable Splicers are contractually prohibitedPage 43 of 101
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-06 Date Issued September 22, 2026 EOE-296 Page 2 of 2 from performing non-emergency work while precipitation is occurring. Thus, at this point, the determination was made that the crews would be unable to perform routine, scheduled work and the police detail was released. c. Had the police detail been canceled the day prior and the weather subsequently held off, the Company may not have been able to secure a replacement police detail and, as a result, may have been unable to perform the planned work in Stamford. The Company is not required to pre-stage Stamford Police for traffic control, however, prior to commencing any restoration work, the Company must retain police details. This can delay restoration efforts by an hour or more. In the interest of expediting restoration and serving customers, the Company decided, based on the best information available at the time the decision was made, to retain the police detail ahead of time. Of the total cancellation costs identified, $3,648 was attributable to the MS24 event, while $1,216 related to cancellations that occurred outside the MS24 event period. The Company is required to adhere to applicable local municipal ordinances and requirements governing work within each municipality. Eversource is also committed to maintaining strong working relationships with the municipalities it serves and honoring their established policies and procedures. Accordingly, when work is cancelled or rescheduled in accordance with municipal requirements, associated cancellation charges may be unavoidable.Page 44 of 101
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-06 Date Issued September 22, 2026 EOE-297 Page 1 of 1 Date Filed: October 06, 2026 Witness: Christopher E. Colorio, Mark P. Baldwin, John G. Griffin and Leanne M. Landry Request from: Office of Education, Outreach, and Enforcement Question: (MS24F-VENDOR-FOOD/LODGING) Refer to Exhibit ACCT-2 CLP-6, and Confidential Exhibit ACCT-2 CLP-6A-6, pp. 173-175. The Company reported an incremental charge of $5,707 for the Graduate Hotels Storrs vendor. Explain why the invoice differs from the amount requested for recovery. Response: Referring to Exhibit ACCT-2 CLP-6 (MS24F), Outside Contractors-Vendor, Line 176, vendor Graduate Hotels Storrs, invoice totaling in the amount of $5,707. In reviewing this inquiry, the Company determined that there was an error in the amount of $187.12 tax expense allocated to MS24F. The Company will supplement ACCT-2 CLP-6 (MS24F), to reduce $5,707 amount on line 176, by $187.12, thereby reflecting the correct incremental charge of $5,520.05.Page 45 of 101
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-06 Date Issued September 22, 2026 EOE-298 Page 1 of 1 Date Filed: October 06, 2026 Witness: Christopher E. Colorio, Mark P. Baldwin, John G. Griffin and Leanne M. Landry Request from: Office of Education, Outreach, and Enforcement Question: (MS24F-VENDOR-CIVIL) Refer to Exhibit ACCT-2 CLP-6, and Confidential Exhibit ACCT-2 CLP-6A-6, pp. 178-179. The Company reported an incremental charge of $14,174 for the H I Stone & Son Trucking Inc. vendor. Explain what specific services were performed and how those services were necessitated by the MS24F event. Response: According to OMS event 5313523, the customer’s service and the secondary riser was damaged on April 4, 2024 during MS24F. A troubleshooter responded and determined that both energized conductors supplying the residence were damaged and the service needed to be replaced. HI Stone was hired to complete Horizontal Directional Drilling to install new conduit for the service. After completing 90’ of drilling, the contractor hit ledge and was forced to trench the remaining 160 feet and install conduit via open trench excavation. Upon review of this invoice, the Company determined that the costs to replace the conduit should be capitalized. The material for the work was provided by the contractor and therefore was not picked up in the Company’s established capitalization process. Based on this determination, the Company will supplement Exhibit ACCT-2 CLP-6 (MS24F), to modify line 179, to reflect the updated amount of $0.Page 46 of 101
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-06 Date Issued September 22, 2026 EOE-299 Page 1 of 1 Date Filed: October 06, 2026 Witness: Christopher E. Colorio, Mark P. Baldwin, John G. Griffin and Leanne M. Landry Request from: Office of Education, Outreach, and Enforcement Question: (MS24F-VENDOR-CIVIL) Refer to Exhibit ACCT-2 CLP-6, and Confidential Exhibit ACCT-2 CLP-6A-6, pp. 186-191. The Company reported three incremental charges in the combined amount of $16,459 for the H I Stone & Son Trucking Inc. vendor. Explain what specific services were performed and how those services were necessitated by the MS24F event. Additionally, explain why the Scope of Work (pp. 187, 189, 191) references different work order numbers. Response: The customer’s service to house # 84 Lazy Brook Rd, Monroe failed during MS24F on 4/3/24. The troubleshooter tested the service cable and determined that replacement was required. HI Stone used Horizontal Directional drilling to install 270’ of new 3” conduit. The cost included test pits that were needed to locate other utilities, working with the mark out technician to identify utilities within the range of digging, running the final sections of conduit into a handhole as well as all restoration to the customers property. The WOs referenced on the Scope of Work serve as HI Stone’s internal means of tracking the work assigned to them. Upon review of this invoice, the Company determined that the costs to replace the conduit should be capitalized. The material for the work was provided by the contractor and therefore was not picked up in the Company’s established capitalization process. Based on this determination, the Company will supplement Exhibit ACCT-2 CLP-6 (MS24F), to modify lines 183-185, to reflect the updated amount of $0.Page 47 of 101
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-06 Date Issued September 22, 2026 EOE-300 Page 1 of 3 Date Filed: October 06, 2026 Witness: Mark P. Baldwin, Clifford G. Williams, Leanne M. Landry and John G. Griffin Request from: Office of Education, Outreach, and Enforcement Question: (MS24F-VENDOR-LINE) Refer to Exhibit ACCT-2 CLP-6, and Confidential Exhibit ACCT-2 CLP-6A-6, pp. 202-211. The Company reported an incremental charge of $100,209 for the Harlan Electric Construction vendor. Respond to the following: a. Provide a brief description of the timing of events for this vendor and reconcile those activities with the documentation provided. As part of the description, explain how the vendor would have incurred four hours of billing from 6AM to 10AM on April 3, 2024 (to “Pick up Eversource Buckets” as referenced on pp. 204-207) and then resumed billing on April 4, 2024, at 6AM with no Travel or hotel costs. Additionally, explain why the vendor finished its last assignment at 3:30PM on April 4, 2024, but was permitted to continue billing until 10:00PM. b. Referring to pp. 204-207, explain why the vendor was permitted to bill each employee for four hours on April 3, 2024, to “Pick up Eversource Buckets.” As part of the response, identify where the vendor was mobilized from. c. Cite the location of the vendor’s contractual Pricing Schedule Exhibit (i.e., typically referred to as Exhibit A). The contract provided at OCC-044, Att. 2 (Confidential), starting at p. 2286, includes a List of Exhibits at p. 2292, which references the Pricing Schedule as Exhibit B, which EOE was unable to locate in the Company’s response. If it was not provided, please provide. d. Referring to pp. 208-211, explain why the equipment was charged during standby when the Company’s Master Service Agreement omits billing of equipment during standby. Additionally, identify the amount that was charged for equipment during standby. Response: a. These crews were Transmission to Distribution conversions. The time is accounted for to transition by dropping and securing Transmission equipment and transitioning into Distribution crews. The time allotted to pick up buckets is to complete the Transmission to Distribution transition and the logistics to arrive at the yard. The vendor completed their last assignment at 3:30PM on April 4th and during that time, they were contractually considered “Working” for the remainder of the day. The crews completed their last ticket at 3:30PM and awaited further tickets until they were ultimately released at 10PM.Page 48 of 101
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-06 Date Issued September 22, 2026 EOE-300 Page 2 of 3 b. Please refer to the Company’s response to subpart (a). Southington, CT. The crews mobilized from c. The applicable contractual Pricing Schedule was not included in the Company’s response to OCC-044, Attachment 2 CONFIDENTIAL. The Pricing Schedule has now been provided as EOE-300, Attachment 1 CONFIDENTIAL. d. The contractor appropriately charged for equipment on this invoice. The use of the term “standby” on a timesheet does not, by itself, indicate that the contractor is entitled to bill that time at the contractual standby rate. In many such circumstances, the contractor’s resources have already mobilized to an assigned on-set or staging location, are fully prepared and available to perform work, and are awaiting further direction or assignment from Eversource. Such time may therefore be compensable at the applicable working rate depending on the circumstances, notwithstanding the contractor’s use of “standby” as a descriptive notation on its timesheet. Please see the Company’s response to EOE-267 i, for additional detail regarding billing for Equipment during Standby. Prior Referenced Response: i EOE-267 Question (LINE CREWS) For each storm in the Company’s recovery request, identify the total amount of equipment that was billed by line crew vendors during standby activities. Please provide the information in an unlocked excel spreadsheet allocating each cost to a specific vendor by storm event. EOE-267 Response: There is no contractual, operational or other prohibition that bars the payment of equipment rates during standby time and these costs are not tracked separately from a vendor’s crew time for invoicing purposes. Information regarding equipment charges is contained within the underlying vendor invoices and supporting documentation submitted as part of the Company’s filing. The Company has consistently explained that, in the years 2018 through 2023, the Company’s contractual terms provided that standby rates were charged only to labor rates, not to equipment. This policy followed from the fact that, when vendor crews commit to perform work for the Company, their equipment is dedicated for the duration of the engagement, preventing the use of that equipment somewhere else. This commitment of vendor equipment extends beyond working hours, as vendors must remain ready and available so long as they are committed to the Company’s restoration effort. This policy also reflects the fact that labor rates vary depending on the demands and associated risk placed on the field crews for their performance (i.e., standby rates are lower than work rates), where vendor equipment is tied up regardless of the work status of the vendor’s crews.Page 49 of 101
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-06 Date Issued September 22, 2026 EOE-300 Page 3 of 3 Specifically, the contract language “Standby Rates apply to labor resources only” was applied so that there was no separate standby rate for equipment and equipment was, instead, billed at the same rate regardless of the crew’s work status (e.g. travel, standby, or work time). The Company’s policy acknowledged that it was paying for exclusive access to the vendor’s equipment throughout the event, compensating vendors for their lost opportunity cost. Not paying for equipment during standby would discourage vendors from committing their resources to the Company in storms with competitive procurement of crews among regional utilities. In January 2022, Eversource Energy received the final report of an independent assessment of the “Eversource ERP Capability,” prepared by Accenture LLC. This assessment was undertaken by Eversource Energy as part of a regulatory compliance initiative beginning in September 2021. In this assessment, Accenture made several recommendations regarding the Eversource Energy ERP organization, including a recommendation to expand the emergency-management organization and capabilities by creating an executive role to oversee the enterprise emergency-management program with greater visibility and decision-making authority within the overall organization. Specifically, Accenture recommended establishing regionally based directors to oversee the implementation of program initiatives and manage state-specific relationships; expanded oversight and governance coordination of risk mitigation and resiliency initiatives; and additional training and exercise design personnel. Over the next two years, Eversource Energy implemented the Accenture recommendations, expanding and formalizing the emergency-management organization with a new vice president role and several new director roles to improve overall emergency-response preparedness and associated business processes. As part of this organizational initiative, Eversource Energy formalized the role of Director of Emergency Preparedness Logistics and Resource Acquisition in late 2023, vesting this role with responsibility for contract services relating to emergency management. This change placed control of vendor contracts in the hands of the team directly responsible for resource acquisition in emergency events. Following this organizational change, the emergency-management team launched a supplier cost-optimization review to identify opportunities for greater cost control in the tough environment of competitive procurement of contract resources. Working together, the Company’s contracts and procurement teams identified the discounting or elimination of equipment charges during standby time as one of several strategies that could help to contain storm restoration costs. The Company began to shift its policy on standby rates for equipment starting in late 2023, working with vendors throughout 2024 to negotiate changes to the former payment policy. This shift in policy applied in various forms to invoices for work performed during 2023, that were reviewed, approved and paid during 2024, as the Company worked to get vendors to accept a change in the policy. The roll-out of the new policy resulted in significant vendor push-back. Through these interactions, it became clear that it was not possible to eliminate payments for equipment without hindering the Company’s ability to secure necessary crews -- with several vendors simply increasing the equipment charge applicable during crew work time to cover the gap. In 2025, following months of negotiations with vendors and a review of industry practices, the Company adopted a standard policy of paying vendors 50 percent of the standard Base Rate for equipment during standby. The full Base Rate for equipment still applies during travel and work time. This policy strikes a reasonable balance between fairly compensating vendors for lost opportunity costs—ensuring access to skilled, experienced vendors—and containing costs. The Company’s current Master Services Agreement reflects this updated policy.Page 50 of 101
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-06 Date Issued September 22, 2026 EOE-301 Page 1 of 2 Date Filed: October 06, 2026 Witness: Mark P. Baldwin, Clifford G. Williams, Leanne M. Landry and John G. Griffin Request from: Office of Education, Outreach, and Enforcement Question: (MS24F-VENDOR-LINE) Refer to Exhibit ACCT-2 CLP-6 and Confidential Exhibit ACCT-2 CLP-6A-6, pp. 212-215. The Company reported an incremental charge of $47,615 for the Haugland Energy Group vendor. Respond to the following: a. Confirm that the difference between the reported recovery amount ($47,615) and the invoice amount ($48,408) is attributed to the “car vs. pole” activity referenced on p. 215. If not confirmed, explain the difference. b. Referring to p. 215, explain if the Eversource Contractor Storm Daily Time & Work Report was fully completed as required by the Eversource Contractor Storm Daily Time & Work Report Procedure provided at EOE-022, Att.5. If not fully completed, explain why the Eversource reviewer did not require the information to be completed prior to approval. c. Provide an unlocked Excel spreadsheet supporting the calculation of the “car vs. pole” and explain how the Company was able to derive the amount based on the missing information (i.e., boxes 24 and 25) contained within the Eversource Contractor Storm Daily Time & Work Report on p. 215. Response: Referring to Exhibit ACCT-2 CLP-6 (MS24F), Outside Contractor-Vendor, line 189, vendor Haugland Energy Group LLC, total invoice amount $47,615. a. The difference amount between the reported recovery amount ($47,615) and the invoice amount ($48,408) is attributed to the “car vs pole” in the total amount of $793. b. The Eversource Contractor Storm Daily Time & Work Report is complete as required. c. Please refer to EOE-301, Attachment 1 CONFIDENTIAL, detailing the “car vs pole” calculations. Invoices are subject to a rigorous review and approval process to ensure that all charges are accurately captured to the appropriate work order. As part of this process, the Company reviews the related event information within the Oracle Utilities Analytics system, including applicable field comments, to confirm that the costs are directly attributable to the event. Each event is assigned a defined start and end date/time within the system. Labor hours are reviewed against these event parameters and separated from
As listed on the current system
Corres. 10/15/2026 [26-05-10] (Keegan Werlin LLP) - Discovery Compilation (EOE Set 6)