  1. Page 51 of 101

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-06 Date Issued September 22, 2026 EOE-301 Page 2 of 2 activities associated with other events to ensure costs are accurately captured and charged to the appropriate work order. For example, labor related to a “car vs. pole” incident is identified and assigned to the corresponding "car vs. pole" work order rather than being allocated to an unrelated event. This process helps ensure that costs are properly charged to the correct work orders. Please refer to EOE-301, Attachment 2, for details of the start and end time of the event. Upon further review in drafting this response, the Company has identified an administrative clerical error in the amount attributed to the “car vs pole”. The Company will supplement ACCT-2 CLP-6 (MS24F) line 189 to be adjusted by $9,368.06, resulting in a revised total amount of $38,246.94.
  2. Page 52 of 101

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-06 Date Issued September 22, 2026 EOE-302 Page 1 of 2 Date Filed: October 06, 2026 Witness: Mark P. Baldwin, Clifford G. Williams, Leanne M. Landry and John G. Griffin Request from: Office of Education, Outreach, and Enforcement Question: (MS24F-VENDOR-LINE) Refer to Exhibit ACCT-2 CLP-6, and Confidential Exhibit ACCT-2 CLP-6A-6, pp. 216-227. The Company reported an incremental charge of $312,425 for the Haugland Energy Group vendor. Referring to pp. 219-221, explain how each signed Eversource Contractor Storm Mobilization & Demobilization Time Report identified the vendor’s start time of 1600 and end time of 1800 but included a total billing of nine hours for April 3, 2024. As part of the response, provide an unlocked Excel spreadsheet supporting the total amount of overbilling that resulted from the overstatement. Response: Referring to Exhibit ACCT-2 CLP-6 (MS24F), Outside Contractors- Vendor, Line 190, vendor Haugland Energy Group (“Haugland”), invoice totaling in the amount of $312,425. The Eversource Contractor Storm Mobilization & Demobilization Time Reports for April 3, 2024, reflect a start time of 1600 and an end time of 1800. However, the nine hours reported were not solely associated with the travel activity. Haugland personnel traveled from South Windsor, Connecticut, to the designated lodging location in Southbury, Connecticut, and remained on standby status while awaiting a work assignment and deployment instructions. During this period, the crews were required to remain available for storm restoration operations and were not released from assignment. The crews' original Connecticut assignment was revised, and they were reassigned to support operations in Massachusetts beginning on April 4, 2024. The reported hours reflect the contractor's mobilization and standby time associated with maintaining deployment readiness in accordance with operational direction, rather than only the two-hour travel period denoted by the 1600 to 1800 entry on the Mobilization & Demobilization Time Reports. The reported nine hours represent the total period for which the crews were maintained in an assigned, available status pending deployment. Please refer to EOE-302, Attachment 1, for an unlocked Excel spreadsheet detailing the number of standby hours for labor cost. An error was identified for April 3, 2024. Although the contractor's timesheets reflect a total of nine hours of equipment usage, the contractor invoiced only two hours. This discrepancy resulted from the contractor's invoicing practices, as the contractor elected not to bill for the remaining hours despite being entitled to do so under the
  3. Page 53 of 101

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-06 Date Issued September 22, 2026 EOE-302 Page 2 of 2 applicable contractual agreement. Accordingly, the Company was billed only for the two hours, as reflected on the submitted invoice.
  4. Page 54 of 101

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-06 Date Issued September 22, 2026 EOE-303 Page 1 of 1 Date Filed: October 06, 2026 Witness: Christopher E. Colorio, Mark P. Baldwin, John G. Griffin and Leanne M. Landry Request from: Office of Education, Outreach, and Enforcement Question: (MS24F-VENDOR-CIVIL) Refer to Exhibit ACCT-2 CLP-6, and Confidential Exhibit ACCT-2 CLP-6A-6, pp. 228-229. The Company reported an incremental charge of $5,968 for the Henkels & McCoy vendor. The charge related to repairs resulting from “truck ruts” resulting from Eversource Storm Work that appears to be at a residential address (p. 229). Explain how Eversource vehicles could have incurred damage to the referenced property requiring the $5,968 of repairs (i.e., over 1600 square feet of loam/seed). Furthermore, explain why the Eversource vehicles needed to drive on the property and identify the proximity of the damage to the public road. Response: During this event a tree came down, broke a secondary pole located in the middle of a customer’s front yard and ripped the service off the house as well as the customer’s meter. The pole is approximately 100’ from the road and 50’ from the driveway and cannot be reached from either drivable surface. Their driveway is also a very narrow unpaved driveway made for private vehicles and not for large bucket trucks. Repairs had to be made to the grass along the sides of the driveway as well as around the pole since the vehicles were too large to stay within the drivable surfaces and needed offroad access to the pole. The event number related to this outage is 5306544.
  5. Page 55 of 101

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-06 Date Issued September 22, 2026 EOE-304 Page 1 of 4 Date Filed: October 06, 2026 Witness: Mark P. Baldwin, Clifford G. Williams, Leanne M. Landry and John G. Griffin Request from: Office of Education, Outreach, and Enforcement Question: (MS24F-VENDOR-LINE) Refer to Exhibit ACCT-2 CLP-6 and Confidential Exhibit ACCT-2 CLP-6A-6, pp. 246-259. The Company reported an incremental charge of $231,039 for the IB Abel Inc. vendor. Respond to the following: a. Referring to p. 250, confirm that the Company included a charge applicable to “car vs pole”. If confirmed, identify the total impact of this activity and explain why this amount was not eliminated from the storm recovery request. As part of the response, please provide an unlocked Excel spreadsheet supporting applicable calculations. b. Referring to OCC-044, Att.2 (Confidential), pp. 2725-2752, confirm that the vendor’s Exhibit A Pricing Schedule contains the Company’s standard provisions, including “Standby Rates apply to labor resources only” (i.e., p. 2732). If not confirmed, cite the revised Exhibit A Pricing Schedule that was executed (signed) for 2024 and 2025 that revised the standard provisions. c. Referring to pp. 249-251, 253, provide an unlocked Excel spreadsheet calculating the billed equipment costs applicable to the reported standby activity. d. Referring to p. 254, explain why the vendor identified approximately four hours of standby (i.e., boxes 23-25: 1635-2030) but billed that time as Work (box 12). As part of the response, provide an unlocked Excel spreadsheet detailing the difference in pricing (i.e., labor and equipment) had these hours been reported as standby. e. Referring to p. 254, explain why the vendor was permitted to bill for two hours to “Eat and bed down” (i.e., boxes 23-25). As part of the response, provide an unlocked Excel spreadsheet detailing the incremental amount incurred for the vendor for the two hours (i.e., labor and equipment). Response: Referring to Exhibit ACCT-2 CLP-6 (MS24F), Outside Contractors- Vendor, Line 195, vendor I B Abel Inc, invoice total amount is $231,039. a. Please refer to EOE-304, Attachment 1 CONFIDENTIAL, for an unlocked excel spreadsheet for the calculations of “car vs Pole” identifying the total impact in the amount of $12,927.50. Upon further review during the preparation of this response, the Company determined that the referenced cost should be excluded from the recovery request. The
  6. Page 56 of 101

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-06 Date Issued September 22, 2026 EOE-304 Page 2 of 4 Company maintains established review and approval processes designed to ensure that costs are accurately recorded, appropriately supported, and charged to the correct work orders. In this instance, the invoice in question was a revised invoice and an administrative error occurred during the allocation of the revised charges. The Company will supplement ACCT-2 CLP-6 (MS24F), to adjust lines 195 to reflect the total amount of $218,111.50. b. The vendor’s Exhibit A Pricing Schedule was provided in OCC-044, Attachment 2 CONFIDENTIAL, beginning on p. 2732. The Pricing Schedule contains the Company’s standard provisions, including the provision that “Standby Rates apply to labor resources only.” Please refer to the Company’s response to EOE-267 i for additional detail regarding billing for Equipment during Standby. The provision that "Standby Rates apply to labor resources only" should not be interpreted to mean that equipment cannot be billed during periods when crews are awaiting assignment or direction. Rather, the provision establishes that a contractual Standby Rate applies only to labor resources and does not create a separate standby rate for equipment. Those equipment rates are charged during all hours that the equipment resources are made available to or are utilized to support the company. Please see the Company’s response to EOE-267 for more context and detail regarding the billing of equipment. c. Please refer to EOE-304, Attachment 2 CONFIDENTIAL, for an unlocked Excel spreadsheet calculating the specific amount of equipment cost applicable to the reported standby activity which was billed to the Company according to contractual provisions. d. Once the Contractor’s started their storm shift it was at the Working Rate. All time during that shift is paid at the working rate according to contractual provisions. Please refer to EOE-304, Attachment 3 CONFIDENTIAL, for an unlocked Excel spreadsheet calculating the specific amount of labor and equipment variance if the contractor would have reported these hours as standby. e. The contractor began the working shift. As part of the continuation and completion of a shift a contractor is expected to hold safety debriefs, remove equipment and excess material from trucks, drive back to their hotel, eat and bed down to signify the completion of a storm shift. Please refer to EOE-304, Attachment 4 CONFIDENTIAL, for an unlocked Excel spreadsheet detailing the costs associated with the final two hours, which were attributed to employees' travel time back to their hotel accommodation and time for crews to obtain dinner following their assigned work activities that were billed to the Company according to contractual provisions.
  7. Page 57 of 101

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-06 Date Issued September 22, 2026 EOE-304 Page 3 of 4 Prior Referenced Response: i EOE-267 Question: (LINE CREWS) For each storm in the Company’s recovery request, identify the total amount of equipment that was billed by line crew vendors during standby activities. Please provide the information in an unlocked excel spreadsheet allocating each cost to a specific vendor by storm event. EOE-267 Response: There is no contractual, operational or other prohibition that bars the payment of equipment rates during standby time and these costs are not tracked separately from a vendor’s crew time for invoicing purposes. Information regarding equipment charges is contained within the underlying vendor invoices and supporting documentation submitted as part of the Company’s filing. The Company has consistently explained that, in the years 2018 through 2023, the Company’s contractual terms provided that standby rates were charged only to labor rates, not to equipment. This policy followed from the fact that, when vendor crews commit to perform work for the Company, their equipment is dedicated for the duration of the engagement, preventing the use of that equipment somewhere else. This commitment of vendor equipment extends beyond working hours, as vendors must remain ready and available so long as they are committed to the Company’s restoration effort. This policy also reflects the fact that labor rates vary depending on the demands and associated risk placed on the field crews for their performance (i.e., standby rates are lower than work rates), where vendor equipment is tied up regardless of the work status of the vendor’s crews. Specifically, the contract language “Standby Rates apply to labor resources only” was applied so that there was no separate standby rate for equipment and equipment was, instead, billed at the same rate regardless of the crew’s work status (e.g. travel, standby, or work time). The Company’s policy acknowledged that it was paying for exclusive access to the vendor’s equipment throughout the event, compensating vendors for their lost opportunity cost. Not paying for equipment during standby would discourage vendors from committing their resources to the Company in storms with competitive procurement of crews among regional utilities. In January 2022, Eversource Energy received the final report of an independent assessment of the “Eversource ERP Capability,” prepared by Accenture LLC. This assessment was undertaken by Eversource Energy as part of a regulatory compliance initiative beginning in September 2021. In this assessment, Accenture made several recommendations regarding the Eversource Energy ERP organization, including a recommendation to expand the emergency-management organization and capabilities by creating an executive role to oversee the enterprise emergency-management program with greater visibility and decision-making authority within the overall organization. Specifically, Accenture recommended establishing regionally based directors to oversee the implementation of program initiatives and manage state-specific relationships; expanded oversight and governance coordination of risk mitigation and resiliency initiatives; and additional training and exercise design personnel. Over the next two years, Eversource Energy implemented the Accenture recommendations, expanding and formalizing the emergency-management organization with a new vice president role and several new director roles to improve overall emergency-response preparedness and associated business processes. As part of this organizational initiative, Eversource Energy formalized the role of Director of Emergency Preparedness Logistics and Resource Acquisition in late 2023, vesting this role with responsibility for contract services relating to emergency management. This change placed control of vendor contracts in the hands of the team directly responsible for resource acquisition in emergency events. Following this organizational change, the emergency-management team launched a supplier cost-optimization review to identify opportunities for greater cost control in the tough environment of competitive procurement of contract resources. Working together, the Company’s contracts and procurement teams identified the discounting or elimination of equipment charges during standby time as one of several strategies that could help to contain storm restoration costs. The Company began to shift its policy on standby rates for equipment starting in late 2023, working
  8. Page 58 of 101Match

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-06 Date Issued September 22, 2026 EOE-304 Page 4 of 4 with vendors throughout 2024 to negotiate changes to the former payment policy. This shift in policy applied in various forms to invoices for work performed during 2023, that were reviewed, approved and paid during 2024, as the Company worked to get vendors to accept a change in the policy. The roll-out of the new policy resulted in significant vendor push-back. Through these interactions, it became clear that it was not possible to eliminate payments for equipment without hindering the Company’s ability to secure necessary crews -- with several vendors simply increasing the equipment charge applicable during crew work time to cover the gap. In 2025, following months of negotiations with vendors and a review of industry practices, the Company adopted a standard policy of paying vendors 50 percent of the standard Base Rate for equipment during standby. The full Base Rate for equipment still applies during travel and work time. This policy strikes a reasonable balance between fairly compensating vendors for lost opportunity costs—ensuring access to skilled, experienced vendors—and containing costs. The Company’s current Master Services Agreement reflects this updated policy.
  9. Page 59 of 101

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-06 Date Issued September 22, 2026 EOE-305 Page 1 of 2 Date Filed: October 06, 2026 Witness: Mark P. Baldwin, Clifford G. Williams, Leanne M. Landry and John G. Griffin Request from: Office of Education, Outreach, and Enforcement Question: (MS24F-VENDOR-CIVIL) Refer to Exhibit ACCT-2 CLP-6, and Confidential Exhibit ACCT-2 CLP-6A-6, pp. 280-281. The Company reported an incremental charge of $35,967 for the KTI Utility Construction & Maintenance LLC vendor. Respond to the following: a. Identify the total amount of charges applicable to standby activity. b. Explain the process for when the vendor would be mobilized to perform pole replacements or repairs. As part of the response, explain why the vendor would be mobilized prior to the worksite being properly secured. c. For each standby charge, explain the circumstances for which the vendor was engaged prior to worksite being secured. d. Referring to the applicable Event Level Matrix (ELM) within EOE-010, Att. 5, pp. 17-19, identify where the civil crews are identified for staging purposes. If not included in referenced pages, cite the applicable pages. Response: Referring to Exhibit ACCT-2 CLP-6 (MS24F), Outside Contractors-Vendors, line 197, vendor KTI Utility Construction & Maintenance LLC, total invoice amount of $35,967. a. The total amount of charges applicable to standby activities is $14,848.50. b. During storm events, the Company may direct KTI to set poles to support and expedite restoration efforts by line crews. The Company may mobilize KTI prior to the worksite being properly secured because the Company may be notified of a broken pole while all other resources are engaged on other events. To maintain the pace of restoration efforts, the Company may dispatch KTI to begin replacing the pole. If a traffic detail is required or a tree crew is required, then KTI would notify the Company immediately and KTI would wait until the job site is ready to go to work. c. Please refer to subpart (b) on why the job site would not be secured prior to KTI getting on site.
  10. Page 60 of 101

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-06 Date Issued September 22, 2026 EOE-305 Page 2 of 2 d. KTI is staged for each storm event to assist with pole setting. Given that setting poles is a time-intensive process, KTI is a key resource during storm events, providing pole-setting support so that line crews can focus on restoration activities and restore service as quickly as possible. The ELM does not explicitly include provisions for the staging of pole-setting crews. However, the Company stages pole setting/rock drilling crews similar to line crews. This ensures that the necessary resources are available when needed, allowing line crews to remain focused on restoration activities and helping to accelerate service restoration. If crews are not secured in advance, they may be committed or deployed out of state when needed, potentially leaving them unavailable to support the Company’s restoration efforts.

As listed on the current system