Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Discovery Compilation (EOE Set 6)

Files2

Search terms highlighted
Eversource rate increase is on 3 pages of the text below, highlighted. Go to the first matchClear highlighting
Words on different pages
3 pages match
  1. Page 61 of 101

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-06 Date Issued September 22, 2026 EOE-306 Page 1 of 2 Date Filed: October 06, 2026 Witness: John P. DiPaola-Tromba, Sean D. Redding and Jenna Turner Request from: Office of Education, Outreach, and Enforcement Question: (MS24F-VENDOR-TREE) Refer to Exhibit ACCT-2 CLP-6 (Outside Contractors tab) and Confidential Exhibit ACCT-2 CLP-6A-6 through CLP-6A-8. The Company reported 126 incremental charges (Excel Rows 198-323) for the combined amount of $495,799 for the Lewis Tree Service Inc. vendor. Explain why every Weekly Operations Summary report (e.g., pp. 283, 287, 291, etc.) included a ‘Time Start’ and a ‘Time Finish’ of 7:00AM and 4:00PM, respectively, which does not agree with the hours billed. As part of the response, explain how the Company was able to validate the accuracy of the hours billed and provide supporting documentation available to the reviewer at the time verifying that the hours were correctly billed for each invoice (i.e., crew). Additionally, provide an unlocked Excel spreadsheet listing each invoice, detailing the crew’s start and end times, identifying the billable amounts, and identifying if supporting documentation (i.e., available to the arborist at the time of the review) is being provided. Response: In reference to Exhibit ACCT-2 CLP-6 and Confidential Exhibit ACCT-2 CLP-6A-6 through CLP-6A-8, the Weekly Operations Summary is a Lewis Tree Service Inc. supplied digital timesheet. The “TIME START” and “TIME FINISH” fields of the timesheet are pre-filled, which is a limitation of the system, and could not be edited by the tree crew performing restoration services during MS24F. Please refer EOE-306, Attachment 1, for the Company’s response to EOE-542 in Docket 25-1213, which describes the process for assigning tree crew vendors sixteen-hour storm shifts, verifying that the tree crew vendor worked through the shift, and releasing tree crew vendors from their shifts. The Company Arborist approved the timesheet as a result of their direct supervision and knowledge of the tree crews working each shift of restoration support. The Eversource Arborist reviewing the contractor timesheet had specific knowledge of each crew’s start and stop times and when they were released if they did not work a full storm shift. The billable hours were approved by the Arborist to the extent the hours matched what was worked during storm restoration under their direct supervision and/or knowledge. The Company does not possess the requested detailed breakdown of all invoices and associated timesheets filed in this proceeding for tree-contractor work. All of the requested data is available to EOE in the invoices and associated timesheets that pertain to Tree Crew vendors for the MS24F event. The Company’s regulatory requirement is to utilize the timesheets to document the hours
  2. Page 62 of 101

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-06 Date Issued September 22, 2026 EOE-306 Page 2 of 2 worked by each crew, for each vendor, in order to support payment to that vendor. Accordingly, the Company’s processes are constructed to obtain and use those records for validating payment, subject to review and sign off by Eversource Arborist, who has contemporaneous knowledge of the work performed. The Company’s financial systems do not record invoiced amounts by data field, for each data point included on the invoices or the associated timesheets. Therefore, extracting and compiling this information from the timesheets in the manner sought by EOE would require extensive manual efforts that can be performed by EOE or EOE’s consultant, if information in that format assists EOE in putting forth its case.
  3. Page 63 of 101

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-06 Date Issued September 22, 2026 EOE-307 Page 1 of 2 Date Filed: October 06, 2026 Witness: John P. DiPaola-Tromba, Sean D. Redding and Jenna Turner Request from: Office of Education, Outreach, and Enforcement Question: (MS24F-VENDOR-TREE-EQUIPMENT) Refer to Exhibit ACCT-2 CLP-6 (Outside Contractors tab), and Confidential Exhibit ACCT-2 CLP-6A-6, through CLP-6A-8. The Company reported 126 incremental charges (Excel Rows 198-323) for the combined amount of $495,799 for the Lewis Tree Service Inc. vendor. The Company was billed for atypical equipment including extra chainsaws, chipper disks, chip trucks, log trucks, and a backyard lift. Provide an unlocked Excel spreadsheet listing each applicable invoice, the referenced equipment, the amounts billed for the applicable equipment, and the justification for why the equipment was necessary for storm remediation purposes. Additionally, please provide documentation of prior authorization for each charge. Response: It is an established practice for contractor tree crews to bill for larger chainsaws during storm restoration activities. The use of larger-bar chainsaws when removing large-diameter trees improves operational efficiency and enhances worker safety by allowing the work to be performed quicker and with less risk to the operator. The chainsaws billed on the referenced invoices are larger than the standard chainsaws provided on each bucket truck, consistent with the applicable contract provisions. Because tree crews cannot determine the size and removal requirements of a tree until they arrive at the work location, requiring a separate trip to obtain a larger chainsaw could delay restoration efforts and result in additional travel costs. Accordingly, billing for a larger chainsaw is permitted for the entire shift when utilized, as that equipment resource is dedicated to the assigned crew and is therefore unavailable for use on other work during that period. The Company Arborist may approve the use of a Disk Chipper and Chip Truck for several reasons. There may not be anywhere to place damaged vegetation except in a roadway which would cause a public safety hazard. The Company Arborist may approve the use of chipper due to the location of the issue to proactively prevent customer complaints. Use of a chipper is an exception that is only allowed at the direction of the Company Arborist. The Company will request backyard lifts and associated equipment for storm response. If the Company does not secure the equipment, tree contractors could use the equipment for municipal or private residential jobs and it could be unavailable when needed. There are vegetation related event tickets requiring climbing crews or backyard lifts nearly every storm event. A backyard lift
  4. Page 64 of 101

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-06 Date Issued September 22, 2026 EOE-307 Page 2 of 2 can support increased safety and efficiency in areas where typically a tree contractor would need to send climbing tree crew personnel up into the trees. During storm response, log trucks may be used to remove large trunk sections and, when necessary, safely support unstable tree sections with their grapples where no safe drop zone exists. Log trucks also substantially improve restoration efficiency. Large-diameter trunk sections that would otherwise require significant time for ground crews to cut, move, and stage manually can often be removed in minutes, allowing roads to be reopened faster and restoration resources to be deployed to additional outage locations. The Company authorized the use of these services through its storm restoration contractor as part of the overall restoration effort. Because the work was performed to facilitate blocked-road clearing and the safe restoration of electric service, the associated costs were appropriately incurred by the Company as storm remediation expense. The associated equipment charges were reviewed and approved by the Company Arborist through the timesheet approval process, confirming that use of the equipment was appropriate for the work performed. The Company does not possess the requested detailed breakdown of all invoices and associated timesheets filed in this proceeding for tree-contractor work. All of the requested data is available to EOE, in the invoices and associated timesheets that pertain to Tree Crew vendors for the MS24F event. The Company’s regulatory requirement is to utilize the timesheets to document the hours worked by each crew, for each vendor, in order to support payment to that vendor. Accordingly, the Company’s processes are constructed to obtain and use those records for validating payment, subject to review and sign off by the Company Arborist, who has contemporaneous knowledge of the work performed. The Company’s financial systems do not record invoiced amounts by data field, for each data point included on the invoices or the associated timesheets. Therefore, extracting and compiling this information from the timesheets in the manner sought by EOE would require extensive manual efforts that can be performed by EOE, or EOE’s consultant, if information in that format assists EOE in putting forth its case.
  5. Page 65 of 101

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-06 Date Issued September 22, 2026 EOE-308 Page 1 of 1 Date Filed: October 06, 2026 Witness: John P. DiPaola-Tromba, Sean D. Redding and Jenna Turner Request from: Office of Education, Outreach, and Enforcement Question: (MS24F-VENDOR-TREE-EXPENSE) Refer to Exhibit ACCT-2 CLP-6 (Outside Contractors tab) and Confidential Exhibit ACCT-2 CLP-6A-6 through CLP-6A-8. The Company reported 126 incremental charges (Excel Rows 198-323) for the combined amount of $495,799 for the Lewis Tree Service Inc. vendor. Referring to Excel Row 290, explain how the “Billable Expense” referenced in the invoice is applicable to the MS24F event when each of the supporting invoices (i.e., CLP-6A-7. pp. 181-186) were dated as of March 2024, prior to the event. Response: Referring to the invoice in Exhibit ACCT-2 (CLP-6A-7) (MS24F), on pages 178-187, upon review the Company determined that the wood disposal charges dated March 8, 2024, through March 26, 2024, were misallocated to the MS24F event in error during the cost distribution process in Maximo. These charges should have been allocated to the Company’s vegetation management tree removal program. The Company will supplement Exhibit ACCT-2 (CLP-6) (MS24F), page 53, line 290, to remove $2,268.
  6. Page 66 of 101

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-06 Date Issued September 22, 2026 EOE-309 Page 1 of 1 Date Filed: October 06, 2026 Witness: John P. DiPaola-Tromba, Sean D. Redding and Jenna Turner Request from: Office of Education, Outreach, and Enforcement Question: (MS24F-VENDOR-TREE) Refer to Exhibit ACCT-2 CLP-6 (Outside Contractors tab) and Confidential Exhibit ACCT-2 CLP-6A-6 through CLP-6A-8. The Company reported 126 incremental charges (Excel Rows 198-323) for the combined amount of $495,799 for the Lewis Tree Service Inc. vendor. Referring to Excel Row 307, explain how the referenced activity, which occurred on April 9, 2024 (several days after demobilization), related to the MS24F event. As part of the response, explain why a 2023 Tree Removals report was provided in lieu of the Emergency Restoration Tree Contractor Work Location report and explain why that report listed activity that appears to be routine vegetation removals. If applicable, please provide additional documentation demonstrating the applicability of the activity to the MS24F event. Response: Referring to Exhibit ACCT-2 (CLP-6) (MS24F), page 53, at line 307, and Exhibit ACCT-2 (CLP6A-8) (MS24F), page 4, the referenced “2023 Tree Removal” document refers to non-storm tree work that was performed on behalf of Operations week ending March 13, 2024, and does not apply to the corresponding invoice in Exhibit ACCT-2 (CLP-6A-8) (MS24F), pages 1-3. This document may have been scanned in error by the vendor during the final invoice submission process. Please refer to Exhibit ACCT-2 (CLP-6A-7) (MS24F), page 251, for the Emergency Restoration Tree Contractor Work Location report that supports the invoice in Exhibit ACCT-2 (CLP-6A-8) (MS24F), pages 1-3.
  7. Page 67 of 101

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-06 Date Issued September 22, 2026 EOE-310 Page 1 of 1 Date Filed: October 06, 2026 Witness: John P. DiPaola-Tromba, Sean D. Redding and Jenna Turner Request from: Office of Education, Outreach, and Enforcement Question: (MS24F-VENDOR-TREE-DELAYED REMEDIATION) Refer to Exhibit ACCT-2 CLP-6 (Outside Contractors tab) and Confidential Exhibit ACCT-2 CLP-6A-6 through CLP-6A-8. The Company reported 126 incremental charges (Excel Rows 198-323) for the combined amount of $495,799 for the Lewis Tree Service Inc. vendor. The Company was billed for remediation between the dates of April 10, 2024, and August 13, 2024, when the storm event was demobilized on April 4, 2024. Provide an unlocked Excel spreadsheet listing each applicable invoice, the referenced dates, the amounts billed for each date, and, as applicable, provide documentation demonstrating that the remediation was both necessary and directly applicable to the MS24F event. To the extent that errors are identified, please reference each error in the Excel spreadsheet. Response: Please refer to OCC-842, Attachment 1.
  8. Page 68 of 101

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-06 Date Issued September 22, 2026 EOE-311 Page 1 of 3 Date Filed: October 06, 2026 Witness: John P. DiPaola-Tromba, Sean D. Redding and Jenna Turner Request from: Office of Education, Outreach, and Enforcement Question: (MS24F-VENDOR-TREE) Refer to Exhibit ACCT-2 CLP-6 and Confidential Exhibit ACCT-2 CLP-6A-8, pp. 68-136. The Company reported three incremental charges in the combined amount of $137,422 for the Lucas Tree Experts vendor. Respond to the following: a. Referring to pp. 73, 75, 77, and 79, explain if the referenced Eversource Connecticut Emergency Restoration Tree Contractor Work Location reports were completed in accordance with the Company’s requirements. As part of the response, identify if generic responses are indicative of standby activity. b. Referring to pp. 76, 82, 88, 90, 100, 106, 108, 112, 116, 123, 127, 129, 131, 133, and 135, explain why the vendor was not required to bill at ST rates through 1630. Additionally, please provide an unlocked Excel spreadsheet detailing each timesheet referenced above and identify the total number of hours billed at OT rates through 1630, along with the corresponding incremental charges. Response: a. Lucas Tree’s electronic Eversource Connecticut Emergency Restoration Tree Contractor Work Location sheet is an electronic form developed and maintained by the contractor. The system contains required fields that must be completed before an entry can be submitted. As a result, when crews are performing storm-related work that is not associated with a specific ticket or work location, they cannot leave those fields blank. In these cases, crews may enter “Vine” as a placeholder value to satisfy the system’s dataentry requirements. “Vine” does not represent a specific work location or activity; rather, it is an administrative entry used when crews are engaged in storm-related work but are not responding to a particular ticket. The Company verifies storm-related work using additional records, including timesheets, dispatch information, and field oversight, and therefore does not rely solely on the placeholder entry for validation purposes. b. Referring to Confidential Exhibit ACCT-2 (CLP-6A-8) (MS24F), pages 76, 82, 88, 90, 100, 106, 108, 112, 116, 123, 127, 129, 131, 133, and 135, the tree crews correctly charged their ST rate between the hours of 07:00 to 16:00. These crews worked consecutive nightshifts starting at 14:00 and ending at 06:00. The two hours between 14:00 and 16:00 were billed as ST and the hours extended beyond the hours of 07:00 to 16:00 were billed as OT.
  9. Page 69 of 101

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-06 Date Issued September 22, 2026 EOE-311 Page 2 of 3 c. Please refer to the Company’s response to EOE-128 i and EOE-128, Attachment 1. The blue sky normal working hours for tree crews are 7:00 AM to 4:30 PM (or, stated differently, 07:00 to 16:30) and the tree crews are paid nine hours of straight time for time worked during these hours, up to the first 45 working hours, with a 30-minute unpaid meal break. The 30-minute unpaid meal break is in accordance with CT G.S. Chapter 557 Section 31-51ii Subsection A, which states: “No person shall be required to work for seven and one-half or more consecutive hours without a period of at least thirty consecutive minutes for a meal. Such period shall be given at some time after the first two hours of work and before the last two hours.” The period is unpaid in accordance with the Fair Labor Standards Act, which states: “Federal law does not require lunch or coffee breaks… Meal periods (typically lasting at least 30 minutes), serve a different purpose than coffee or snack breaks and, thus, are not work time and are not compensable.” d. The storm normal working hours are from 7:00 AM to 4:00 PM (or, stated differently, 07:00 to 16:00). This is due to the fact that a 30-minute, undisturbed, break cannot be guaranteed during storm response activities and duties, in accordance with CT G.S. Chapter 557 Section 31-51ii Subsection C Part 4, which states: “the continuous nature of an employer’s operations, such as chemical production or research experiments, requires that employees be available to respond to urgent or unusual conditions at all times and such employees are compensated for break and meal periods.” e. The distinction between normal working hours, 07:00 to 16:30, and storm working hours, 07:00 to 16:00, is due to the continuous nature of the Company’s storm response activities and the statutory requirement to compensate employees for their meal period when they are required to respond to urgent or unusual conditions at all times. Therefore, straight time rates during storm response are applied between 07:00 to 16:00. Prior Referenced Response: i EOE-128 Question: (VEGETATION CREW HOURS) Confirm whether each tree crew vendor’s contractual “normal working hours” remain 7 AM to 4:30 PM (i.e., 0700 to 1630) for each weekday, or a maximum of 9 hours. As part of the response, identify each tree crew vendor and cite the contract provisions that detail these hours. If the contracts do not detail the normal working hours, please provide email or other communications supporting the normal working hours that would bill at standard time (ST) rates. EOE-128 Response: The normal working hours for local tree crews are confirmed as 7 AM to 4:30 PM (or, stated differently, 07:00 to 16:30) and the tree crews are paid nine hours of straight time for time worked during these hours, up to the first 45
  10. Page 70 of 101

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-06 Date Issued September 22, 2026 EOE-311 Page 3 of 3 working hours, with a 30-minute unpaid meal break. This language is not included in contract provisions, rather it is a department practice. Please refer to EOE-128, Attachment 1, for the Eversource Contractor Tree Crew Work Schedule.

As listed on the current system

Corres. 10/15/2026 [26-05-10] (Keegan Werlin LLP) - Discovery Compilation (EOE Set 6)

This filing on the current system (opens in a new tab)