Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Discovery Compilation (EOE Set 6)

Files2

Search terms highlighted
Eversource rate increase is on 3 pages of the text below, highlighted. Go to the first matchClear highlighting
Words on different pages
3 pages match
  1. Page 68 of 101

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-06 Date Issued September 22, 2026 EOE-311 Page 1 of 3 Date Filed: October 06, 2026 Witness: John P. DiPaola-Tromba, Sean D. Redding and Jenna Turner Request from: Office of Education, Outreach, and Enforcement Question: (MS24F-VENDOR-TREE) Refer to Exhibit ACCT-2 CLP-6 and Confidential Exhibit ACCT-2 CLP-6A-8, pp. 68-136. The Company reported three incremental charges in the combined amount of $137,422 for the Lucas Tree Experts vendor. Respond to the following: a. Referring to pp. 73, 75, 77, and 79, explain if the referenced Eversource Connecticut Emergency Restoration Tree Contractor Work Location reports were completed in accordance with the Company’s requirements. As part of the response, identify if generic responses are indicative of standby activity. b. Referring to pp. 76, 82, 88, 90, 100, 106, 108, 112, 116, 123, 127, 129, 131, 133, and 135, explain why the vendor was not required to bill at ST rates through 1630. Additionally, please provide an unlocked Excel spreadsheet detailing each timesheet referenced above and identify the total number of hours billed at OT rates through 1630, along with the corresponding incremental charges. Response: a. Lucas Tree’s electronic Eversource Connecticut Emergency Restoration Tree Contractor Work Location sheet is an electronic form developed and maintained by the contractor. The system contains required fields that must be completed before an entry can be submitted. As a result, when crews are performing storm-related work that is not associated with a specific ticket or work location, they cannot leave those fields blank. In these cases, crews may enter “Vine” as a placeholder value to satisfy the system’s dataentry requirements. “Vine” does not represent a specific work location or activity; rather, it is an administrative entry used when crews are engaged in storm-related work but are not responding to a particular ticket. The Company verifies storm-related work using additional records, including timesheets, dispatch information, and field oversight, and therefore does not rely solely on the placeholder entry for validation purposes. b. Referring to Confidential Exhibit ACCT-2 (CLP-6A-8) (MS24F), pages 76, 82, 88, 90, 100, 106, 108, 112, 116, 123, 127, 129, 131, 133, and 135, the tree crews correctly charged their ST rate between the hours of 07:00 to 16:00. These crews worked consecutive nightshifts starting at 14:00 and ending at 06:00. The two hours between 14:00 and 16:00 were billed as ST and the hours extended beyond the hours of 07:00 to 16:00 were billed as OT.
  2. Page 69 of 101

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-06 Date Issued September 22, 2026 EOE-311 Page 2 of 3 c. Please refer to the Company’s response to EOE-128 i and EOE-128, Attachment 1. The blue sky normal working hours for tree crews are 7:00 AM to 4:30 PM (or, stated differently, 07:00 to 16:30) and the tree crews are paid nine hours of straight time for time worked during these hours, up to the first 45 working hours, with a 30-minute unpaid meal break. The 30-minute unpaid meal break is in accordance with CT G.S. Chapter 557 Section 31-51ii Subsection A, which states: “No person shall be required to work for seven and one-half or more consecutive hours without a period of at least thirty consecutive minutes for a meal. Such period shall be given at some time after the first two hours of work and before the last two hours.” The period is unpaid in accordance with the Fair Labor Standards Act, which states: “Federal law does not require lunch or coffee breaks… Meal periods (typically lasting at least 30 minutes), serve a different purpose than coffee or snack breaks and, thus, are not work time and are not compensable.” d. The storm normal working hours are from 7:00 AM to 4:00 PM (or, stated differently, 07:00 to 16:00). This is due to the fact that a 30-minute, undisturbed, break cannot be guaranteed during storm response activities and duties, in accordance with CT G.S. Chapter 557 Section 31-51ii Subsection C Part 4, which states: “the continuous nature of an employer’s operations, such as chemical production or research experiments, requires that employees be available to respond to urgent or unusual conditions at all times and such employees are compensated for break and meal periods.” e. The distinction between normal working hours, 07:00 to 16:30, and storm working hours, 07:00 to 16:00, is due to the continuous nature of the Company’s storm response activities and the statutory requirement to compensate employees for their meal period when they are required to respond to urgent or unusual conditions at all times. Therefore, straight time rates during storm response are applied between 07:00 to 16:00. Prior Referenced Response: i EOE-128 Question: (VEGETATION CREW HOURS) Confirm whether each tree crew vendor’s contractual “normal working hours” remain 7 AM to 4:30 PM (i.e., 0700 to 1630) for each weekday, or a maximum of 9 hours. As part of the response, identify each tree crew vendor and cite the contract provisions that detail these hours. If the contracts do not detail the normal working hours, please provide email or other communications supporting the normal working hours that would bill at standard time (ST) rates. EOE-128 Response: The normal working hours for local tree crews are confirmed as 7 AM to 4:30 PM (or, stated differently, 07:00 to 16:30) and the tree crews are paid nine hours of straight time for time worked during these hours, up to the first 45
  3. Page 70 of 101

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-06 Date Issued September 22, 2026 EOE-311 Page 3 of 3 working hours, with a 30-minute unpaid meal break. This language is not included in contract provisions, rather it is a department practice. Please refer to EOE-128, Attachment 1, for the Eversource Contractor Tree Crew Work Schedule.
  4. Page 71 of 101

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-06 Date Issued September 22, 2026 EOE-312 Page 1 of 2 Date Filed: October 07, 2026 Witness: Mark P. Baldwin, Clifford G. Williams, Leanne M. Landry and John G. Griffin Request from: Office of Education, Outreach, and Enforcement Question: (MS24F-VENDOR-LINE) Refer to Exhibit ACCT-2 CLP-6, and Confidential Exhibit ACCT-2 CLP-6A-8, pp. 194-229. The Company reported an incremental charge of $271,950 for the McPhee Electric LTD vendor. Respond to the following: a. Referring to p. 205, explain why each of the crews were permitted to bill for four hours of demobilization travel time without any documentation to support applicable travel. As part of the response, identify the beginning and ending locations, distance between the two locations, original estimated travel time, modified estimated travel time applying 1.3 factor, and the difference. Additionally, identify the incremental cost associated with the derived difference. b. Referring to p. 205, explain why the vendor billed equipment during standby on April 5, 2024. As part of the response, identify the cost of equipment billed during the standby hours. c. Referring to pp. 195, identify if the vendor had access to Company provided meals for any period during their assignment. If the vendor had access, explain why they were paid for meals for the entire duration of their support. Response: a. The crews traveled from their hotel in Marlborough, Connecticut, to the Tolland Area Work Center (AWC) and, following release, from the Tolland AWC to their home location in Farmington, Connecticut. Applying the 1.3 travel factor, the respective travel times were approximately 51 minutes and 65 minutes, for a combined point-to-point travel time of approximately two hours. However, the four-hour period properly encompassed the crews overall return and demobilization process and was not limited solely to driving time. In addition to travel, the period included hotel checkout, return and disposal of materials, safety debriefing, confirmation with supervision that no additional work remained outstanding, securing equipment and materials for return, a meal, and other required closeout activities before the crews were fully released. Because these activities occurred as part of the crews’ return and
  5. Page 72 of 101

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-06 Date Issued September 22, 2026 EOE-312 Page 2 of 2 demobilization process, the full period was recorded under the travel classification on the timesheet. Based on the actual travel and associated demobilization activities performed, the Company determined that the four hours billed reasonably reflected the time incurred and no incremental labor overcharge was identified. Additionally, the contractor did not bill the Company for equipment on the date of demobilization. Therefore, the Company incurred no additional equipment charges associated with standby, travel, or demobilization on that date. The timesheet could have included additional detail identifying the locations and demobilization activities supporting the four-hour entry. Although the Company validated the activities through Eversource personnel at the AWC and local supervision, including additional detail on the original timesheet documentation would have been preferred. b. The contractor began their shift on working rates and were awaiting ticket assignment. This was the last day of the event and, ultimately, it was determined that there were no additional tickets for this crew. They were then released and traveled back to home location. Once the crew is put to work, they are permitted to bill a working rate and continue that working rate until demobilized. Therefore, standby rates are not applicable in this case. c. The vendor stayed at a hotel that was not provided by the Company. Therefore, Company provided meals were not available at their hotel. Many times, it is more efficient for the crew to have a meal at or near their starting and ending location before they start/end work so their work time is not interrupted.
  6. Page 73 of 101

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-06 Date Issued September 22, 2026 EOE-313 Page 1 of 2 Date Filed: October 06, 2026 Witness: Mark P. Baldwin, Clifford G. Williams, Leanne M. Landry and John G. Griffin Request from: Office of Education, Outreach, and Enforcement Question: (MS24F-VENDOR-LINE) Refer to Exhibit ACCT-2 CLP-6 and Confidential Exhibit ACCT-2 CLP-6A-9, pp. 11-23. The Company reported an incremental charge of $756,614 for the Michels Power vendor. Respond to the following: a. Referring to pp. 13-14, explain why the billed equipment rates exceed the contractual rates included within OCC-044, Att.2 (Confidential), pp. 4391-4395. As part of the response, provide an unlocked Excel spreadsheet detailing the equipment billed via the invoice to equipment rates provided within the contract and identify the amount of overbill. b. Referring to pp. 17, 19, 21, and 23, explain if the Eversource Contractor Storm Daily Time & Work Report was completed in accordance with the Eversource Contractor Storm Daily Time & Work Report Procedure provided at EOE-022, Att.5. As part of the response, explain why the vendor was not required to enter information within boxes 24 (Event Start Time) and 25 (Event End Time) prior to the Company’s approval. Response: a. The equipment rates billed on the referenced invoice differ from the rates provided in OCC044, Attachment 2 CONFIDENTIAL, pp. 4391-4395 because the resources associated with this invoice were not provided under the external line crew rate schedule reflected in those pages. To provide Eversource access to a broader pool of Michels resources across Eversource’s service territory, the Company permitted Michels to submit a separate schedule of labor and equipment rates applicable to those resources. This supplemental rate schedule is associated with the same underlying contract provided in the Company’s response to OCC044 i; however, it was inadvertently omitted from the OCC-044 production. The applicable supplemental rate schedule is now provided as EOE-313, Attachment 1 CONFIDENTIAL. b. Although Boxes 24 (Event Start Time) and 25 (Event End Time) were not completed by the vendor, the absence of this information did not prevent the Company from validating
  7. Page 74 of 101

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-06 Date Issued September 22, 2026 EOE-313 Page 2 of 2 and approving the timesheets. Part of the Company's review process is to verify the accuracy and reasonableness of contractor labor charges using the total hours worked, dates of service, event assignments, crew information, and consultation with personnel responsible for overseeing the contractor's work, as necessary. The review confirmed that sufficient information was available to validate the hours billed and their association with the applicable event or activity. In this instance, the Company confirmed the validity of the labor charges through its established review controls and therefore, the omission of the Event Start Time and Event End Time fields did not impact the Company's ability to verify or approve the charges. This review process serves as a key control to ensure that contractor invoices are reasonable, supported, and accurately associated with the applicable event. Prior Referenced Response: i OCC-044 Question: (Contracts) For all external line crews and vegetation contractors whose costs are reflected in the storms in this docket and for all current external line crews, please provide all contracts and addendums thereto in effect from January 1, 2024, to the present. OCC-044 Response: Please refer to OCC-044, Attachment 1, for a listing of external line crew and vegetation contractors whose services were utilized in the storms under review in this docket and all current external line crews. Attachment 1 includes page number references to the associated contracts, which are provided as OCC-044, Attachment 2 CONFIDENTIAL.
  8. Page 75 of 101

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-06 Date Issued September 22, 2026 EOE-314 Page 1 of 1 Date Filed: October 06, 2026 Witness: Mark P. Baldwin, Clifford G. Williams, Leanne M. Landry and John G. Griffin Request from: Office of Education, Outreach, and Enforcement Question: (MS24F-VENDOR-LINE) Refer to Exhibit ACCT-2 CLP-6 and Confidential Exhibit ACCT-2 CLP-6A-9, pp. 24-38. The Company reported two incremental charges in the combined amount of $142,456 for the MTV Solutions Inc. vendor. Respond to the following: a. Referring to pp. 25-26, 29, 32, and 35, explain why the vendor was permitted a higher rate for the Digger Derrick than permitted within the pricing schedule provided at OCC044, Att.2 (Confidential). As part of the response, identify the incremental impact of the higher rate. b. Referring to pp. 24-38, confirm that the vendor was used in a Dock crew capacity and explain why the vendor was utilized to perform services on April 8, 2024 (several days after demobilization) in lieu of Company personnel. Response: a. Upon further review of the contract attachments, the Company identified a revised pricing schedule submitted by MTV to correct what the vendor identified as a clerical error in its original pricing sheet. The Digger Derrick rate reflected on pp. 25–26, 29, 32, and 35 is consistent with the corrected rate included in that revised pricing schedule. The revised pricing schedule was inadvertently omitted from the Company’s response to OCC-044, Attachment 2 CONFIDENTIAL. The applicable revised pricing schedule has now been provided as EOE-314, Attachment 1 CONFIDENTIAL. b. The MTV crew referenced was a Dock crew at that time. The Stamford work center that the contractor was working for covers the towns of Greenwich, Stamford, and Darien. These towns are very busy with customer work, which often exceeds that which the Company’s internal resources have the capacity to complete on their own without incurring significant drive time to arrive in the area from other work centers. As such, the Company supplements their workforce as needed with contractors to handle additional work.
  9. Page 76 of 101

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-06 Date Issued September 22, 2026 EOE-315 Page 1 of 1 Date Filed: October 07, 2026 Witness: Mark P. Baldwin, Clifford G. Williams, Leanne M. Landry and John G. Griffin Request from: Office of Education, Outreach, and Enforcement Question: (MS24F-VENDOR-TRAFFIC) Refer to Exhibit ACCT-2 CLP-6, and Confidential Exhibit ACCT-2 CLP-6A-9, pp. 39-44. The Company reported an incremental charge of $3,413 for the New England Flagger Services vendor. Certain supporting documents (i.e., pp. 41, 43) referenced “Rain Day”. Explain if any of the charges related to cancellations of previously scheduled assignments in lieu of actual flagging services. If applicable to cancellations, identify the specific activity and total incremental amount. Response: The flaggers should have recorded “storm” rather than “Rain Day” on their timesheets. During the periods reflected on these timesheets (ranging from April 3, 2024 to April 5, 2024), the flaggers were working alongside the Company’s line crews in response to the storm event.
  10. Page 77 of 101

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-06 Date Issued September 22, 2026 EOE-316 Page 1 of 2 Date Filed: October 07, 2026 Witness: Mark P. Baldwin, Clifford G. Williams, Leanne M. Landry and John G. Griffin Request from: Office of Education, Outreach, and Enforcement Question: (MS24F-VENDOR-SERVICE) Refer to Exhibit ACCT-2 CLP-6, and Confidential Exhibit ACCT-2 CLP-6A-9, pp. 132-169. The Company reported an incremental charge of $96,464 for the Pasquariello Electric Corp vendor. Respond to the following: a. Comparing p. 132, with pp. 133-142, explain why the vendor billed all activity at DT rates when each of the Eversource Contractor Storm Daily Time & Work Reports reported both standby and travel time. As part of the response, provide an unlocked Excel spreadsheet calculating the excess amount billed using the Travel/Standby response rate included in the pricing schedule provided at Confidential EOE-014, Att. 2, p. 2094. b. Comparing p. 132, with pp. 133-142, explain why the vendor billed for equipment during standby. As part of the response, provide an unlocked Excel spreadsheet calculating the total incremental charge for the equipment billed during standby. c. Referring to pp. 133-142, explain if the Eversource Contractor Storm Daily Time & Work Reports were completed in accordance with the Eversource Contractor Storm Daily Time & Work Report Procedure provided at EOE-022, Att. 5. As part of the response, explain why the vendor was not required to enter the required information prior to the Company’s approval. Response: Referring to Exhibit ACCT-2 CLP-6 (MS24F), Outside Contractors, line 345, vendor Pasquariello Electric Corp, total invoice amount of $96,464. a. The vendor’s use of the Double Time (“DT”) rate reflects the applicable emergencyresponse compensation classification associated with the crews’ storm deployment and their underlying union requirements. The references to “travel” and “standby” on the Eversource Contractor Storm Daily Time & Work Reports identify the activity being performed by the crews during portions of the deployment; they do not, in this instance, indicate that the crews were released from storm assignment or otherwise no longer committed to Eversource. Please refer to EOE-316, Attachment 1, for an unlocked excel spreadsheet which provides the total incremental charge for labor hours which were billed to the Company according to contractual provisions.

As listed on the current system

Corres. 10/15/2026 [26-05-10] (Keegan Werlin LLP) - Discovery Compilation (EOE Set 6)

This filing on the current system (opens in a new tab)