Discovery Compilation (EOE Set 6)
Filed by Keegan Werlin LLP2 files
Part of docket 26-05-10Files2
Docket No. 26-05-10 Discovery Compilation October 15 2026.pdf
PDF · 154 KB · 1 pageText searchable
Download Docket No. 26-05-10 Discovery Compilation October 15 2026.pdfRead the text of Docket No. 26-05-10 Discovery Compilation October 15 2026.pdf
EOE Set 6_COMBINED.pdf
PDF · 866 KB · 101 pagesText searchable
Download EOE Set 6_COMBINED.pdfRead the text of EOE Set 6_COMBINED.pdf
Search terms highlighted
Eversource rate increase is on 3 pages of the text below, highlighted. Go to the first matchClear highlighting
Page 72 of 101
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-06 Date Issued September 22, 2026 EOE-312 Page 2 of 2 demobilization process, the full period was recorded under the travel classification on the timesheet. Based on the actual travel and associated demobilization activities performed, the Company determined that the four hours billed reasonably reflected the time incurred and no incremental labor overcharge was identified. Additionally, the contractor did not bill the Company for equipment on the date of demobilization. Therefore, the Company incurred no additional equipment charges associated with standby, travel, or demobilization on that date. The timesheet could have included additional detail identifying the locations and demobilization activities supporting the four-hour entry. Although the Company validated the activities through Eversource personnel at the AWC and local supervision, including additional detail on the original timesheet documentation would have been preferred. b. The contractor began their shift on working rates and were awaiting ticket assignment. This was the last day of the event and, ultimately, it was determined that there were no additional tickets for this crew. They were then released and traveled back to home location. Once the crew is put to work, they are permitted to bill a working rate and continue that working rate until demobilized. Therefore, standby rates are not applicable in this case. c. The vendor stayed at a hotel that was not provided by the Company. Therefore, Company provided meals were not available at their hotel. Many times, it is more efficient for the crew to have a meal at or near their starting and ending location before they start/end work so their work time is not interrupted.Page 73 of 101
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-06 Date Issued September 22, 2026 EOE-313 Page 1 of 2 Date Filed: October 06, 2026 Witness: Mark P. Baldwin, Clifford G. Williams, Leanne M. Landry and John G. Griffin Request from: Office of Education, Outreach, and Enforcement Question: (MS24F-VENDOR-LINE) Refer to Exhibit ACCT-2 CLP-6 and Confidential Exhibit ACCT-2 CLP-6A-9, pp. 11-23. The Company reported an incremental charge of $756,614 for the Michels Power vendor. Respond to the following: a. Referring to pp. 13-14, explain why the billed equipment rates exceed the contractual rates included within OCC-044, Att.2 (Confidential), pp. 4391-4395. As part of the response, provide an unlocked Excel spreadsheet detailing the equipment billed via the invoice to equipment rates provided within the contract and identify the amount of overbill. b. Referring to pp. 17, 19, 21, and 23, explain if the Eversource Contractor Storm Daily Time & Work Report was completed in accordance with the Eversource Contractor Storm Daily Time & Work Report Procedure provided at EOE-022, Att.5. As part of the response, explain why the vendor was not required to enter information within boxes 24 (Event Start Time) and 25 (Event End Time) prior to the Company’s approval. Response: a. The equipment rates billed on the referenced invoice differ from the rates provided in OCC044, Attachment 2 CONFIDENTIAL, pp. 4391-4395 because the resources associated with this invoice were not provided under the external line crew rate schedule reflected in those pages. To provide Eversource access to a broader pool of Michels resources across Eversource’s service territory, the Company permitted Michels to submit a separate schedule of labor and equipment rates applicable to those resources. This supplemental rate schedule is associated with the same underlying contract provided in the Company’s response to OCC044 i; however, it was inadvertently omitted from the OCC-044 production. The applicable supplemental rate schedule is now provided as EOE-313, Attachment 1 CONFIDENTIAL. b. Although Boxes 24 (Event Start Time) and 25 (Event End Time) were not completed by the vendor, the absence of this information did not prevent the Company from validatingPage 74 of 101
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-06 Date Issued September 22, 2026 EOE-313 Page 2 of 2 and approving the timesheets. Part of the Company's review process is to verify the accuracy and reasonableness of contractor labor charges using the total hours worked, dates of service, event assignments, crew information, and consultation with personnel responsible for overseeing the contractor's work, as necessary. The review confirmed that sufficient information was available to validate the hours billed and their association with the applicable event or activity. In this instance, the Company confirmed the validity of the labor charges through its established review controls and therefore, the omission of the Event Start Time and Event End Time fields did not impact the Company's ability to verify or approve the charges. This review process serves as a key control to ensure that contractor invoices are reasonable, supported, and accurately associated with the applicable event. Prior Referenced Response: i OCC-044 Question: (Contracts) For all external line crews and vegetation contractors whose costs are reflected in the storms in this docket and for all current external line crews, please provide all contracts and addendums thereto in effect from January 1, 2024, to the present. OCC-044 Response: Please refer to OCC-044, Attachment 1, for a listing of external line crew and vegetation contractors whose services were utilized in the storms under review in this docket and all current external line crews. Attachment 1 includes page number references to the associated contracts, which are provided as OCC-044, Attachment 2 CONFIDENTIAL.Page 75 of 101
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-06 Date Issued September 22, 2026 EOE-314 Page 1 of 1 Date Filed: October 06, 2026 Witness: Mark P. Baldwin, Clifford G. Williams, Leanne M. Landry and John G. Griffin Request from: Office of Education, Outreach, and Enforcement Question: (MS24F-VENDOR-LINE) Refer to Exhibit ACCT-2 CLP-6 and Confidential Exhibit ACCT-2 CLP-6A-9, pp. 24-38. The Company reported two incremental charges in the combined amount of $142,456 for the MTV Solutions Inc. vendor. Respond to the following: a. Referring to pp. 25-26, 29, 32, and 35, explain why the vendor was permitted a higher rate for the Digger Derrick than permitted within the pricing schedule provided at OCC044, Att.2 (Confidential). As part of the response, identify the incremental impact of the higher rate. b. Referring to pp. 24-38, confirm that the vendor was used in a Dock crew capacity and explain why the vendor was utilized to perform services on April 8, 2024 (several days after demobilization) in lieu of Company personnel. Response: a. Upon further review of the contract attachments, the Company identified a revised pricing schedule submitted by MTV to correct what the vendor identified as a clerical error in its original pricing sheet. The Digger Derrick rate reflected on pp. 25–26, 29, 32, and 35 is consistent with the corrected rate included in that revised pricing schedule. The revised pricing schedule was inadvertently omitted from the Company’s response to OCC-044, Attachment 2 CONFIDENTIAL. The applicable revised pricing schedule has now been provided as EOE-314, Attachment 1 CONFIDENTIAL. b. The MTV crew referenced was a Dock crew at that time. The Stamford work center that the contractor was working for covers the towns of Greenwich, Stamford, and Darien. These towns are very busy with customer work, which often exceeds that which the Company’s internal resources have the capacity to complete on their own without incurring significant drive time to arrive in the area from other work centers. As such, the Company supplements their workforce as needed with contractors to handle additional work.Page 76 of 101
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-06 Date Issued September 22, 2026 EOE-315 Page 1 of 1 Date Filed: October 07, 2026 Witness: Mark P. Baldwin, Clifford G. Williams, Leanne M. Landry and John G. Griffin Request from: Office of Education, Outreach, and Enforcement Question: (MS24F-VENDOR-TRAFFIC) Refer to Exhibit ACCT-2 CLP-6, and Confidential Exhibit ACCT-2 CLP-6A-9, pp. 39-44. The Company reported an incremental charge of $3,413 for the New England Flagger Services vendor. Certain supporting documents (i.e., pp. 41, 43) referenced “Rain Day”. Explain if any of the charges related to cancellations of previously scheduled assignments in lieu of actual flagging services. If applicable to cancellations, identify the specific activity and total incremental amount. Response: The flaggers should have recorded “storm” rather than “Rain Day” on their timesheets. During the periods reflected on these timesheets (ranging from April 3, 2024 to April 5, 2024), the flaggers were working alongside the Company’s line crews in response to the storm event.Page 77 of 101
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-06 Date Issued September 22, 2026 EOE-316 Page 1 of 2 Date Filed: October 07, 2026 Witness: Mark P. Baldwin, Clifford G. Williams, Leanne M. Landry and John G. Griffin Request from: Office of Education, Outreach, and Enforcement Question: (MS24F-VENDOR-SERVICE) Refer to Exhibit ACCT-2 CLP-6, and Confidential Exhibit ACCT-2 CLP-6A-9, pp. 132-169. The Company reported an incremental charge of $96,464 for the Pasquariello Electric Corp vendor. Respond to the following: a. Comparing p. 132, with pp. 133-142, explain why the vendor billed all activity at DT rates when each of the Eversource Contractor Storm Daily Time & Work Reports reported both standby and travel time. As part of the response, provide an unlocked Excel spreadsheet calculating the excess amount billed using the Travel/Standby response rate included in the pricing schedule provided at Confidential EOE-014, Att. 2, p. 2094. b. Comparing p. 132, with pp. 133-142, explain why the vendor billed for equipment during standby. As part of the response, provide an unlocked Excel spreadsheet calculating the total incremental charge for the equipment billed during standby. c. Referring to pp. 133-142, explain if the Eversource Contractor Storm Daily Time & Work Reports were completed in accordance with the Eversource Contractor Storm Daily Time & Work Report Procedure provided at EOE-022, Att. 5. As part of the response, explain why the vendor was not required to enter the required information prior to the Company’s approval. Response: Referring to Exhibit ACCT-2 CLP-6 (MS24F), Outside Contractors, line 345, vendor Pasquariello Electric Corp, total invoice amount of $96,464. a. The vendor’s use of the Double Time (“DT”) rate reflects the applicable emergencyresponse compensation classification associated with the crews’ storm deployment and their underlying union requirements. The references to “travel” and “standby” on the Eversource Contractor Storm Daily Time & Work Reports identify the activity being performed by the crews during portions of the deployment; they do not, in this instance, indicate that the crews were released from storm assignment or otherwise no longer committed to Eversource. Please refer to EOE-316, Attachment 1, for an unlocked excel spreadsheet which provides the total incremental charge for labor hours which were billed to the Company according to contractual provisions.Page 78 of 101
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-06 Date Issued September 22, 2026 EOE-316 Page 2 of 2 b. For purposes of contractor timekeeping, a “standby” designation may reflect the operational status of the crew at a particular point in time and does not necessarily indicate that the crew or associated equipment was inactive or demobilized. During these periods, contractor resources may remain fully mobilized at the designated work or staging location, with personnel and equipment committed to Company operations and prepared to immediately perform assigned work. For example, resources may be awaiting the next ticket or work assignment, awaiting further direction from the Company, or transitioning between assignments while remaining available to support ongoing operations. Although the contractor may categorize this time as “standby” on its timesheet, the resources remain deployed and unavailable for other work. In this case, the crews had already been activated and deployed for storm restoration and, throughout the periods identified, remained committed to Eversource and unavailable for other work. For the same reason, the associated equipment remained committed to the deployed crews and available for Eversource restoration activities. Accordingly, the Company does not consider the equipment charges associated with those periods to constitute equipment billed during contractual standby. c. The Eversource Contractor Storm Daily Time & Work Reports were not completed in all respects in accordance with the Eversource Contractor Storm Daily Time & Work Report Procedure provided at EOE-022, Attachment 5, because certain required information was not entered prior to Company approval. The vendor was not exempt from the requirement to complete the applicable fields. Rather, the omission was an administrative oversight during the storm invoicing and approval process. The Company’s approval of the reports should not be interpreted as a waiver or modification of the reporting requirements. The reports were reviewed in the context of the overall storm deployment and the supporting information available to the Company at the time. The time reports and invoices were reviewed and determined that the charges were accurate. Therefore, the Company representative approved the invoice. The required information could have been more fully documented on the reports prior to approval. The Company has addressed the response based on the underlying activity reflected in the other, available supporting records.Page 79 of 101
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-06 Date Issued September 22, 2026 EOE-317 Page 1 of 2 Date Filed: October 06, 2026 Witness: John P. Dipaola-Tromba, John G. Griffin and Leanne M. Landry Request from: Office of Education, Outreach, and Enforcement Question: (MS24F-VENDOR-FOOD) Refer to Exhibit ACCT-2 CLP-6 and Confidential Exhibit ACCT-2 CLP-6A-9, pp. 170-174. The Company reported three incremental charges in the combined amount of $43,802 for the Paul Gregorys LLC and Perk on Main LLC vendors. Provide an unlocked Excel spreadsheet detailing the total all-in costs for each meal (i.e., breakfast, lunch, and dinner) and provide a comparison of the cost to the maximum meal caps outlined within Eversource’s restaurant meal policy. Response: Referring to Exhibit ACCT-2 CLP-6 (MS24F), Outside Contractors- Vendors, line 346-348, vendor Paul Gregorys LLC, invoices totaling the amount of $31,160 and Perk on Main LLC, invoice totaling the amount of $12,642. The Company makes reasonable efforts to manage meal costs during emergency restoration events. However, standard meal policies cannot always be adhered to due to the unique circumstances of emergency response operations. Vendors capable of providing emergency meal services on short notice must maintain specialized capabilities, including rapid procurement, preparation, and delivery of large quantities of meals, often within 12 to 24 hours and under adverse conditions. These services frequently require after-hours staffing, expedited logistics, and operational flexibility beyond that of traditional catering services, resulting in increased costs. Additionally, restaurants and catering vendors often incur higher operating expenses when supporting emergency response efforts due to the volume, urgency, and timing of orders. Unlike normal restaurant operations, where customer demand is managed throughout the day, emergency response meal requests require vendors to prepare and deliver large quantities of food on short notice, creating additional labor, inventory, and transportation costs. Providing adequate meals for employees working extended shifts, often ranging from 12 to 16 hours in challenging weather and field conditions, is a necessary component of emergency restoration operations. Access to sufficient meals supports employee health, safety, endurance, and productivity, enabling personnel to safely and effectively perform restoration activities underPage 80 of 101
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-06 Date Issued September 22, 2026 EOE-317 Page 2 of 2 demanding circumstances. Please refer to EOE-317, Attachment 1 CONFIDENTIAL, for the total all-in costs for each meal. Lastly, upon further review of this response the Company identified an error in the tax amount within line 346, in the amount of $168.98; line 347, in the amount of $177.00; and line 348, in the amount of $113.36. The Company will supplement ACCT-2 CLP-6 (MS24F), to reflect the following for each line: • • • Line 346, the total amount of $15,014.60 Line 347, the total amount of $15,800.00 Line 348, the total amount of $12,528.64Page 81 of 101
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-06 Date Issued September 22, 2026 EOE-318 Page 1 of 2 Date Filed: October 13, 2026 Witness: Mark P. Baldwin, Clifford G. Williams, Leanne M. Landry and John G. Griffin Request from: Office of Education, Outreach, and Enforcement Question: (MS24F-VENDOR-LINE) Refer to Exhibit ACCT-2 CLP-6, and Confidential Exhibit ACCT-2 CLP-6A-9, pp. 187-201. The Company reported two incremental charges in the combined amount of $45,869 for the Riggs Distler & Company Inc vendor. Respond to the following: a. Referring to p. 189, confirm that the vendor was used in a Dock crew capacity and explain why the vendor was utilized to perform services on May 29, 2024, in lieu of Company personnel. Additionally, provide contemporaneous documentation supporting that the crossarm on pole 2264 was damaged by the MS24F event. b. Comparing p. 199 with p. 200, explain why the vendor billed for equipment during standby. As part of the response, provide an unlocked Excel spreadsheet calculating the total incremental charge for the equipment billed during standby. c. Referring to pp. 200-201, explain if the Eversource Contractor Storm Daily Time & Work Reports were completed in accordance with the Eversource Contractor Storm Daily Time & Work Report Procedure provided at EOE-022, Att. 5. As part of the response, explain why the vendor was not required to enter the required information prior to the Company’s approval. Response: Referring to Exhibit ACCT-2 (CLP-6) (MS24F), Outside Line Contractors, at Lines 350-351, Riggs Distler & Company Inc, in the amount of $45,869. a. The contractor was used as a Dock crew by the company during this time period. Dock crews are assigned their work in the same manner that internal line crews are assigned work, through local area supervision. Other than the discretion of management, there is no specific reason to assign work to dock crews in lieu of internal line crews. The post-storm patrols on April 5, 2024 identified pole 2264 as having “Broken middle pin. Floating primary causing cutout and bracket for transformer to bend. Crossarm burned also.” b. The contractor was performing regularly scheduled blue-sky work for Eversource when the storm event began. As the crews had already mobilized and commenced their workday, Eversource proactively transitioned them from their scheduled assignments to storm
As listed on the current system
Corres. 10/15/2026 [26-05-10] (Keegan Werlin LLP) - Discovery Compilation (EOE Set 6)