Discovery Compilation (EOE Set 6)
Filed by Keegan Werlin LLP2 files
Part of docket 26-05-10Files2
Docket No. 26-05-10 Discovery Compilation October 15 2026.pdf
PDF · 154 KB · 1 pageText searchable
Download Docket No. 26-05-10 Discovery Compilation October 15 2026.pdfRead the text of Docket No. 26-05-10 Discovery Compilation October 15 2026.pdf
EOE Set 6_COMBINED.pdf
PDF · 866 KB · 101 pagesText searchable
Download EOE Set 6_COMBINED.pdfRead the text of EOE Set 6_COMBINED.pdf
Search terms highlighted
Eversource rate increase is on 3 pages of the text below, highlighted. Go to the first matchClear highlighting
Page 82 of 101
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-06 Date Issued September 22, 2026 EOE-318 Page 2 of 2 restoration readiness. The crews remained mobilized, available, and prepared to perform restoration activities at Eversource’s direction. Accordingly, these resources were compensated at the applicable working rates rather than contractual standby rates. The equipment charges were therefore associated with mobilized working crews and not equipment placed on contractual standby. As such, the Company does not consider these charges to be associated with standby costs. c. The Contractor Storm Daily Time & Work Reports substantially document the required information, including personnel, labor classifications, hours, equipment, work locations, OMS event numbers, and descriptions of restoration activities. Both reports were reviewed and signed by authorized Eversource representatives. While certain administrative fields were not completed, the information provided was sufficient to validate the resources deployed, hours reported, and restoration work performed. Accordingly, the Company signed and approved the timesheets based on the documented activities and verification by its authorized representatives. The administrative omissions did not independently indicate improper billing or result in additional charges.Page 83 of 101
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-06 Date Issued September 22, 2026 EOE-319 Page 1 of 1 Date Filed: October 07, 2026 Witness: Christopher E. Colorio, Mark P. Baldwin, John G. Griffin and Leanne M. Landry Request from: Office of Education, Outreach, and Enforcement Question: (MS24F-VENDOR-LINE) Refer to Exhibit ACCT-2 CLP-6, and Confidential Exhibit ACCT-2 CLP-6A-10, pp. 1-6. The Company reported an incremental charge of $58,786 for the South Norwalk Electric and Water vendor. Respond to the following: a. Confirm that the vendor is a mutual aid provider who is not subject to a contract or pricing schedule. Additionally, confirm that the OH&B charge refers to a grandfathered overhead charge. If not confirmed, provide details regarding the vendor, the contract, and the OH&B charge. Please note any changes in process since the Company’s response to EOE-615, in Docket No. 25-12-13. b. Identify if the Company has provided mutual aid support for the South Norwalk Electric and Water vendor since the last rate case. If support has been provided, provide a detailed listing of support provided, include the dates of such support, along with a copy of the most recent invoice. Response: a. South Norwalk Electric provided restoration assistance through the Mutual Assistance process. The OH&B charges conform to the expectations for mutual aid provider reimbursement costs established in EEI’s Governing Principles for Mutual Assistance support provided as EOE319, Attachment 1. b. The Company has not provided mutual aid support for the South Norwalk Electric and Water vendor since the last rate case.Page 84 of 101
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-06 Date Issued September 22, 2026 EOE-320 Page 1 of 1 Date Filed: October 06, 2026 Witness: Christopher E. Colorio, Mark P. Baldwin, John G. Griffin and Leanne M. Landry Request from: Office of Education, Outreach, and Enforcement Question: (MS24F-VENDOR-EQUIPMENT) Refer to Exhibit ACCT-2 CLP-6 and Confidential Exhibit ACCT-2 CLP-6A-10, pp. 21-35. The Company reported 14 incremental charges in the combined amount of $144,942 for the Sunbelt Rentals Inc. vendor. Respond to the following: a. Provide copies of any service level agreements (SLAs) between the Company and the vendor detailing the amount of time permitted for the vendor to provide a generator upon request. If SLAs do not exist, explain why. b. Provide a detailed listing of each generator rented, along with the corresponding costs (i.e., rental, labor, setup, etc.) and identify generators that were not utilized in support of storm response. For any generators not used, explain why the Company rented the generators and identify if there were any specific outages that warranted the rental of the generators that were resolved before usage. c. Referring to pp. 31-32, the two invoices detailed outages from April 6, 2024, through April 8, 2024. Provide documentation to support that the underlying outages were the result of the MS24F storm event. Response: a. Please refer to OCC-656, Attachment 2, for the contract with Sunbelt Rentals Inc. b. Please refer to ACCT-2 CLP-6A-10, pp 21-35. Each Sunbelt invoice provides the generator size requested, setup/breakdown fixed cost, additional labor hours, and associated fuel usage. All generators billed for were utilized during storm. c. Please refer to EOE-320, Attachment 1, which shows the start date of 04/06/2024 for both these events where generation was installed to restore customers during the storm which ended on 04/07/24.Page 85 of 101
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-06 Date Issued September 22, 2026 EOE-321 Page 1 of 2 Date Filed: October 06, 2026 Witness: John P. DiPaola-Tromba, Sean D. Redding and Jenna Turner Request from: Office of Education, Outreach, and Enforcement Question: (MS24F-VENDOR-TREE) Refer to Exhibit ACCT-2 CLP-6, and Confidential Exhibit ACCT-2 CLP-6A-10, through Exhibit ACCT-2 CLP-6A-11. The Company reported 17 incremental charges in the combined amount of $56,705 for the Tennett Tree Service Inc. vendor. Respond to the following: a. The Company was billed for atypical equipment including extra chainsaws, chippers, chip trucks, and cranes (refer to the 15 invoices referenced in Rows 373-378, 380-387, and 389). Provide an unlocked Excel spreadsheet listing each applicable invoice, the referenced equipment, the amounts billed for the applicable equipment, and the justification for why the equipment was necessary for storm remediation purposes. Additionally, please provide evidence of prior authorization for each charge. If prior authorization was not required, explain why. b. Explain how the Company was able to validate the accuracy of the hours billed when most of the timesheets were missing all of the hours worked (refer to the nine invoices referenced in Rows 373-377, 379-380, 382, and 389). Response: There are circumstances during storm events where damaged vegetation cannot be cleared safely with a bucket truck or climbing tree crew personnel. Specialty equipment such as a log truck or crane may be required to safely clear the tree or tree part to restore power. Tennett Tree is one of the primary providers of special tree removal equipment for Eversource Vegetation Management in Connecticut. Eversource places this equipment on standby with tree contractor personal ready to work the equipment because if the equipment was not reserved for Eversource use, Tennett Tree may choose to deploy the equipment to private resident or town jobs, rendering the equipment unavailable to Eversource. It is important to have special equipment and crews available to clear trees that require a crane or log truck grapple. The use of a crane is evaluated by the Company arborist and tree contractor and applied in situations where the tree is very large, not easily accessible by a typical lift truck or is damaged and at risk of failure during the process of removal, such as a partially uprooted tree. The use of the crane is a targeted use to maintain safe worker operations and public safety and avoid additional damage to electrical facilities or property.Page 86 of 101
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-06 Date Issued September 22, 2026 EOE-321 Page 2 of 2 It is an established practice for contractor tree crews to bill for larger chainsaws during storm restoration activities. The use of larger-bar chainsaws when removing large-diameter trees improves operational efficiency and enhances worker safety by allowing the work to be performed quicker and with less risk to the operator. The chainsaws billed on the referenced invoices are larger than the standard chainsaws provided on each bucket truck, consistent with the applicable contract provisions. Because tree crews cannot determine the size and removal requirements of a tree until they arrive at the work location, requiring a separate trip to obtain a larger chainsaw could delay restoration efforts and result in additional travel costs. Accordingly, billing for a larger chainsaw is permitted for the entire shift when utilized, as that equipment resource is dedicated to the assigned crew and is therefore unavailable for use on other work during that period. The Company Arborist may approve the use of a Disk Chipper and Chip Truck for several reasons. There may not be anywhere to place damaged vegetation except in a roadway which would cause a public safety hazard. The Company Arborist may approve the use of chipper due to the location of the issue to proactively prevent customer complaints. Use of a chipper is an exception that is only allowed at the direction of the Company Arborist. Please refer to EOE-321, Attachment 1 CONFIDENTIAL, for the requested unlocked spreadsheet detailing equipment charges. To be clear, all requested equipment charges are previously documented and readily available on the corresponding invoices in Confidential Exhibit ACCT-2 (CLP-6A-10) (MS24F), through Exhibit ACCT-2 (CLP-6A-11) (MS24F). Please refer EOE-306, Attachment 1, for Company’s response to EOE-542, in PURA Docket 2512-13, which describes the process for assigning tree crew vendors sixteen-hour storm shifts, verifying that the tree crew vendor worked through the shift, and releasing tree crew vendors from their shifts. The Company Arborist approved the timesheet as a result of their direct supervision and knowledge of the tree crews working each shift of restoration support. The Eversource Arborist reviewing the contractor timesheet had specific knowledge of each crew’s start and stop times and when they were released if they did not work a full storm shift. The billable hours were approved by the Arborist to the extent the hours matched what was worked during storm restoration under their direct supervision and/or knowledge.Page 87 of 101
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-06 Date Issued September 22, 2026 EOE-322 Page 1 of 2 Date Filed: October 07, 2026 Witness: Mark P. Baldwin, Clifford G. Williams, Leanne M. Landry and John G. Griffin Request from: Office of Education, Outreach, and Enforcement Question: (MS24F-VENDOR-TRAFFIC) Refer to Exhibit ACCT-2 CLP-6, and Confidential Exhibit ACCT-2 CLP-6A-11, pp. 83-95. The Company reported an incremental charge of $7,027 for the Town of Greenwich for activity on April 3, 2024 (prior to the storm onset). The incremental cost was supported by an invoice (p. 83) and job forms that identified unrelated work order numbers (i.e., WO# 81849159), several charges for standby, and multiple cancellations. Explain how each of the charges were applicable to the MS24F event. As part of the response, identify if the cancellation charges were related to the cancellation of previously scheduled activity and if the hours represented a minimum number due to cancellation. If applicable, cite the contract provisions that permit the billing of hours for the cancellations. Response: Referring to ACCT-2 CLP-6 (MS24F), Outside Contractors – Vendors, Line 395, vendor Town of Greenwich, total invoice in the amount of $7,027. The cancellation of work was the result of the inclement weather conditions associated with this event. While the Company makes every reasonable effort to cancel services that are no longer required, operational and safety considerations may limit its ability to do so in all circumstances. Police officers were initially retained in anticipation that their services could be needed throughout the day. As conditions evolved and it became apparent that certain officers would not be required, those officers were promptly released. Other officers remained on site due to the potential need for their services as work activities and weather conditions continued to be assessed. Pursuant to the ordinances of the Town of Greenwich, police officer presence is required whenever traffic control is necessary in connection with work activities. Accordingly, officers remained assigned where such requirements could reasonably be anticipated. In addition, invoices are subject to a rigorous review and approval process designed to ensure that all charges are accurately assigned to the appropriate event. As part of that process, the applicable work orders were reviewed and verified to confirm that the associated work was performed during the dates of this event. This verification included confirmation from internal personnel that the services reflected on the invoices were performed on the specific dates for which recovery is sought.Page 88 of 101
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-06 Date Issued September 22, 2026 EOE-322 Page 2 of 2 There are no contracts established with the Town of Greenwich for this service. Pursuant to the Eversource Procurement Manual, purchases issued to or pursuant to federal, state, or municipal government entities or other regulated utilities are not subject to competitive bid requirements. In this instance, Eversource is procuring services directly from a municipal entity acting under its governmental authority and established fee structure, rather than through a negotiated commercial relationship. As a result, a standalone supplier contract is neither required nor customary, and the transaction is processed under the applicable procurement exemption for governmental entities. Upon further review in drafting this response, the Company identified a clerical error with the cost associated with WO# 81849159, in the amount of $1,360. The Company will supplement ACCT2 CLP-6 (MS24F), line 395, to reflect the total amount of $5,667.Page 89 of 101
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-06 Date Issued September 22, 2026 EOE-323 Page 1 of 1 Date Filed: October 06, 2026 Witness: Mark P. Baldwin, Clifford G. Williams, Leanne M. Landry and John G. Griffin Request from: Office of Education, Outreach, and Enforcement Question: (MS24F-VENDOR-TRAFFIC) Refer to Exhibit ACCT-2 CLP-6 and Confidential Exhibit ACCT2 CLP-6A-11, pp. 105-111. The Company reported an incremental charge of $2,827 for the Town of Lebanon for activity that spanned April 5, 2024, through April 12, 2024, with several charges applying to cancellations and no references to the MS24F011 work order number. Explain how each of the charges were applicable to the MS24F event, provide contemporaneous supporting documentation, and explain why each of the cancellations were referenced as “w/o 24 hr notice”. Response: Referring to Exhibit ACCT-2 CLP-6 (MS24F), Outside Contractors-Vendors, Line 397, vendor Town of Lebanon, invoice total amount of $2,827. Upon further review in drafting this response, the Company determined that these costs are not associated with the event. The Company will supplement ACCT-2 CLP-6 (MS24F), to remove lines 397 in the amount of $2,827.Page 90 of 101
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-06 Date Issued September 22, 2026 EOE-324 Page 1 of 1 Date Filed: October 06, 2026 Witness: Mark P. Baldwin, Clifford G. Williams, Leanne M. Landry and John G. Griffin Request from: Office of Education, Outreach, and Enforcement Question: (MS24F-VENDOR-TRAFFIC) Refer to Exhibit ACCT-2 CLP-6 and Confidential Exhibit ACCT2 CLP-6A-11, p. 113. The Company reported an incremental charge of $1,520 for the Town of Portland for cancellation activity on April 11, 2024, approximately one week after the MS24F event. Explain how the cancellation charges were applicable to the MS24F event and provide supporting documentation. Response: Referring to Exhibit ACCT-2 CLP-6 (MS24F), Outside Contractor- Vendors, Line 399, vendor Town of Portland, invoice total amount of $1,520. Upon further review in drafting this response, the Company determined that these costs are not associated with the event. The Company will supplement ACCT-2 CLP-6 (MS24F), to remove lines 399 in the amount of $1,520.Page 91 of 101
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-06 Date Issued September 22, 2026 EOE-325 Page 1 of 1 Date Filed: October 06, 2026 Witness: John P. DiPaola-Tromba, Sean D. Redding and Jenna Turner Request from: Office of Education, Outreach, and Enforcement Question: (MS24F-VENDOR-ACCRUAL) Refer to Exhibit ACCT-2 CLP-6. The Company reported an incremental charge of $13,914 for a Tree Accrual (Row 408). Explain why the Company is reporting an accrual for Tree costs that occurred over two years ago and provide documentation supporting the amount. Response: Referring to Exhibit ACCT-2 (CLP-6) (MS24F), on page 55, at line 408, Tree Accrual in the amount of $13,914. The Company had Vegetation Management unvouchered liabilities (“UVL”) for the MS24F storm costs. These charges have been reconciled and will not be invoiced against MS24F. The Company will supplement Exhibit ACCT-2 (CLP-6) (MS24F) to remove the $13,914 Tree Accrual.
As listed on the current system
Corres. 10/15/2026 [26-05-10] (Keegan Werlin LLP) - Discovery Compilation (EOE Set 6)