Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Compilation of Discovery Responses

Files15

Search terms highlighted
Eversource rate increase is on 113 pages across 8 files of the text below, highlighted. Go to the first matchClear highlighting
Words on different pages
Words on different pages
Words on different pages
2 pages match
  1. Page 1 of 18

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set CLF-AC-02 Date Issued October 01, 2026 CLF-AC-013 Page 1 of 1 Date Filed: October 15, 2026 Witness: Julia Frayer Request from: CLF and Acadia Center Question: (Productivity Factor) Refer to Exhibit CLP-PBR-2, Section 2.2. a) Confirm whether the Company’s proposed productivity factor is derived using an indexing (historical peer performance) methodology rather than an efficiency frontier analysis. b) Please identify every methodology considered in deriving the Company’s proposed productivity factor and state the criteria used to select the indexing methodology over the alternatives. c) If an indexing methodology was used as confirmed in (a) above, produce all workpapers, memoranda, and analyses used that compared the index method to efficiency frontier analysis for purposes of this proceeding, including any cost-benefit or sensitivity analysis of the two approaches. Response: a) Yes, the Company’s proposed productivity factor is derived using an index-based methodology (see Section 2.2 on page 19-21 of Exhibit CLP-PBR-2). b) LEI’s Industry TFP Study described the index-based methodology, as well as data envelopment analysis, and Stochastic Frontier Analysis. The reasons for choosing the indexbased numerical method are discussed in Section 2.2 on page 19-21 of Exhibit CLP-PBR-2. c) There are no such materials that compared the results in Exhibit CLP-PBR-2 versus alternative methods. See refer to the Company’s response to subpart (b) above.
  2. Page 2 of 18

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set CLF-AC-02 Date Issued October 01, 2026 CLF-AC-014 Page 1 of 1 Date Filed: October 15, 2026 Witness: Julia Frayer Request from: CLF and Acadia Center Question: (Productivity Factor) Refer to the Company’s and/or LEI’s prior positions on productivity factor methodology in other jurisdictions. a) Identify any prior PURA (or other state commission) docket in which the Company or LEI have advocated for or applied an efficiency frontier methodology, and explain any difference in position taken in this proceeding. b) State whether the Company agrees that an efficiency frontier approach would better isolate achievable productivity gains by benchmarking against best-practice utilities rather than the Company’s own historical peer group. If the Company disagrees, please explain why, with supporting data. c) Quantify what the productivity factor would be under an efficiency frontier methodology using the same or comparable underlying data, or explain why such a calculation was not performed. Response: a) Based on LEI’s review of its prior regulatory work and the Company’s rate applications over the last 20 years, LEI has not identified a prior PURA or other U.S. state commission docket in which the Company or LEI advocated for or applied an efficiency frontier methodology to derive a productivity factor. b) As explained in Section 2.2 of Exhibit CLP-PBR-2, “there are a number of methods that can be used to estimate a TFP trend for an industry,” each of which has its own advantages and limitations. Sections 2.2 and 2.3, together with Figure 6 of Exhibit CLP-PBR-2, discuss these alternative approaches and LEI’s rationale for selecting an index-based methodology. Specifically, LEI wrote: “Index methods are more transparent when dealing with outliers, unlike DEA [Data Envelopment Analysis] and SFA [Stochastic Frontier Analysis] methods, and require significantly fewer data points/observations to reach a robust conclusion. For these reasons, index methods are often used for informing regulators in ratemaking proceedings.” c) LEI did not undertake such an analysis, for the reasons laid out in response to CLF-AC-14 (b).
  3. Page 3 of 18

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set CLF-AC-02 Date Issued October 01, 2026 CLF-AC-015 Page 1 of 3 Date Filed: October 15, 2026 Witness: Julia Frayer Request from: CLF and Acadia Center Question: (Productivity Factor) Refer to Exhibit CLP-PBR-2. a) Identify all datasets used in LEI’s productivity factor study (hereinafter the “Study”), and for each dataset state whether it is publicly available. b) For each dataset that is not publicly available, please describe its source, how the Company compiled the dataset, and why a non-public dataset was used instead of a publicly available standardized dataset. c) Please state whether LEI compared results derived from its proprietary/non-public dataset against results derived from publicly available data and, if so, produce all data, workpapers, and calculations showing how that comparison was performed. Response: a) As outlined in “Appendix F: List of Sources,” LEI relied on publicly available sources for all datasets used in the productivity factor study. Data Series Source Customers Publicly available via EIA 861 Distribution Plant (Balance at Beginning of Year); Distribution Plant (Additions); Distribution Plant (Retirements); Distribution Plant (Balance at End of Year); Total Electric Plant (Balance at End of Year); Electric Operation and Maintenance Expenses (Total Distribution Expenses) Electric Operation and Maintenance Expenses (Total Customer Accounts Expenses) Electric Operation and Maintenance Expenses (Total Customer Service and Informational Expenses) Electric Operation and Maintenance Expenses (Total Sales Expenses) Publicly available via FERC Form 1
  4. Page 4 of 18

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set CLF-AC-02 Date Issued October 01, 2026 CLF-AC-015 Page 2 of 3 Data Series Electric Operation and Maintenance Expense (Total Administrative and General Expenses) Distribution of Salaries and Wages (Distribution) Distribution of Salaries and Wages (Customer Accounts) Distribution of Salaries and Wages (Customer Service and Informational) Distribution of Salaries and Wages (Sales) Distribution of Salaries and Wages (Administrative and General) GDP Implicit Price Deflator for Final Sales to Domestic Purchasers Normalized Producer Price Index by Commodity: Special Indexes: Construction Materials (WPUSI012011) Employment Cost Index: Total compensation, private industry workers, by occupation and industry group, not seasonally adjusted - Electric, gas, and sanitary services (ECU12542I) Employment Cost Index: Total compensation, private industry workers, by occupation and industry group, not seasonally adjusted, current dollar index - Utilities (CIU2014400000000I (B)) Moody’s Seasoned AAA Corporate Bond Yield Market Yield on US Treasury Securities at 10-Year Constant Maturity, Quoted on an Investment Basis, Inflation-Indexed, Percent, Annual, Not Seasonally Adjusted Historical State Tax Rate Data Daily Treasury Par Yield Curve Rates Source Publicly available via US Bureau of Economic Analysis Publicly available via US Bureau of Labor Statistics Publicly available via Federal Reserve Economic Data Publicly available via Federal Reserve Economic Data Publicly available via Institute on Taxation and Economic Policy Publicly available from the US Department of the Treasury
  5. Page 5 of 18

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set CLF-AC-02 Date Issued October 01, 2026 CLF-AC-015 Page 3 of 3 Data Series Source Depreciation Life for Tax Purposes Publicly available from the Internal Revenue Service b) As stated in subpart (a), above, LEI relied on publicly available sources for all datasets used in the productivity factor study. c) As stated in subpart (a), above, LEI relied on publicly available sources for all datasets used in the productivity factor study.
  6. Page 6 of 18

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set CLF-AC-02 Date Issued October 01, 2026 CLF-AC-016 Page 1 of 4 Date Filed: October 15, 2026 Witness: Julia Frayer Request from: CLF and Acadia Center Question: (Productivity Factor) Refer to the U.S. Bureau of Labor Statistics’ (BLS) Total Factor Productivity (“TFP”) data for the utilities industry (available at https://www.bls.gov/productivity/tables/, “Total factor productivity by major industries”), and Exhibit CLP-PBR-2, Section 2.5 (productivity factor formula). a) Please explain why the Study did not rely on the BLS TFP data for utilities as its primary data source or as a verification or validation source for the Study’s results. b) Applying the Section 2.5 formula to the BLS TFP data for utilities, confirm or refute that average productivity growth over the 2005-2024 period is approximately 0.457%. If the Company’s calculation differs, please demonstrate how the calculation was completed and explain the discrepancy. c) Discuss every difference between the “output” metric selected for the TFP analysis used in Exhibit CLP-PBR-2, (e.g., “number of customers”), and the output metric used by BLS. d) State whether the Company has a fully replicable model (data plus formulas) underlying the Study’s recommended productivity factor, sufficient for intervenors’ experts to independently verify and stress-test the result. If yes, please include a copy of said model as part of the Company’s response to this question. If such a model will not be produced and shared for analysis by other stakeholders, please explain why not. Response: a) The Study did not rely on the BLS (“U.S. Bureau of Labor Statistics”) total factor productivity (“TFP”) series for Utilities as its primary data source because the scope of the BLS measure is materially broader than the electric distribution industry examined in LEI’s Study. BLS identifies the Utilities industry in its major-industry TFP statistics as NAICS 22. 1 The BLS definition of NAICS 22 includes establishments providing electric power, natural gas, steam supply, water supply, and sewage removal, and the electric-power component itself includes generation, transmission, and distribution. 2 1 2 BLS. Total Factor Productivity for Major Industries Release Technical Notes. 2026. BLS. Utilities: NAICS 22. 2026.
  7. Page 7 of 18

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set CLF-AC-02 Date Issued October 01, 2026 CLF-AC-016 Page 2 of 4 By comparison, electric power distribution is a narrow activity separately classified as NAICS 221122, covering establishments primarily engaged in operating electric distribution systems or arranging the sale of electricity over distribution systems. 3 To LEI’s knowledge, BLS does not publish an RFP series for NAICS 221122. Accordingly, the BLS Utilities TFP measure reflects productivity changes across activities outside the scope of the Study, including electric generation and transmission, natural gas distribution, and water and sewage services, which may have materially different technologies, cost structures, and productivity drivers. Although the BLS series and LEI’s Industry TFP Study both apply the general TFP concept of comparing output growth with growth in combined inputs, the measures are not directly comparable. LEI’s Industry TFP Study uses number of customers as its primary output measure and capital and OM&A as its inputs, whereas BLS measures Utilities output using real sectoral output derived from the inflation-adjusted value of industry sales ($) and other output rather than a single physical measure such as MWh sold, and combines inputs of capital, labor, energy, materials, and services. 4 In summary, the difference in the coverage of utility businesses and these differences in the definitions of output and inputs limit the usefulness of the BLS series as a validation benchmark of the results of LEI’s Industry TFP Study. b) Applying the formula shown in Figure 8 of Section 2.5 of LEI’s Industry TFP report to the BLS TFP data, results in 0.457% average growth rate. However, for reasons discussed in subpart (a) above, this is not a comparable statistic that can be used to validate the TFP trends for the electric distribution sector. The BLS TFP index is for all types of utilities in the U.S. and is not specific to the electric distribution sector. c) LEI’s Industry TFP Study uses customer numbers as its output measure, which is a physical measure of the number of customers served by electric distribution companies. Each customer is therefore treated as a unit of output, irrespective of electricity consumption, revenues, or customer type. By contrast, BLS uses real sectoral output, which measures the goods and services produced by an industry for delivery outside that industry; sectoral output is based on gross output (including sales, receipts and other operating income in dollars), less transactions within the same industry. 5 BLS therefore measures changes in the quantity and mix of goods and services produced, rather than changes in the number of customers served. Where multiple outputs are combined, BLS 3 4 5 United States Census Bureau. NORTH AMERICAN INDUSTRY CLASSIFICATION SYSTEM. 2022. P. 117. BLS. Total Factor Productivity for Major Industries Release Technical Notes. 2026. BLS. Total Factor Productivity for Major Industries Release Technical Notes. 2026.
  8. Page 8 of 18

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set CLF-AC-02 Date Issued October 01, 2026 CLF-AC-016 Page 3 of 4 uses a chained Törnqvist index that weights the component outputs according to their economic value shares. 6 BLS also notes that physical-quantity output measures are used for some industries within the utilities sector. 7 Thus, customer growth and BLS real output can move differently, for example, output per customer or the mix of utility services can change even when customer numbers remain unchanged. d) Yes. The recommended productivity factor in LEI’s Industry TFP Study was developed using a fully functional model utilizing underlying data, formulas and calculations necessary to reproduce the reported result. LEI will produce the confidential and proprietary model to CLF, subject to the execution of an appropriate confidentiality agreement with commercial terms. 6 7 BLS. Industry Productivity Measures: Estimation. 2026. BLS. Office of Productivity and Technology: Calculation. 2026.
  9. Page 9 of 18

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set CLF-AC-02 Date Issued October 01, 2026 CLF-AC-016 Page 4 of 4
  10. Page 10 of 18

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set CLF-AC-02 Date Issued October 01, 2026 CLF-AC-017 Page 1 of 3 Date Filed: October 16, 2026 Witness: Douglas P. Horton and Julia Frayer Request from: CLF and Acadia Center Question: (Productivity Factor) Refer to the productivity factor(s) recommended in the Study, including any component factor for capital expense, and the Company’s proposed revenue cap formula. a) State whether the recommended productivity factor, or any factor, is negative for any year(s) in the Study period, and if so, identify each such year and the value. b) Provide all analyses showing the revenue or rate base impact to ratepayers in each year of the study period that would result from applying a negative productivity factor, as compared to a factor floored at zero. Response: a) The table below is Figure 2 of CLP-PBR-2, which provides years with negative OM&A PFP growth rate. There are nine (9) annual periods where the PFP trend was negative. Below is a table listing the years with a negative TFP growth rate. This table is from Figure 2 of CLP-PBR-2. There are 15 annual periods where the TFP trend was negative.

Text of EOE Set 7_COMBINED.pdf

Extracted from the file · 150 pages · 432,851 characters

Text of NECTA Set 4_COMBINED.pdf

Extracted from the file · 14 pages · 26,843 characters

Text of NECTA Set 5_COMBINED.pdf

Extracted from the file · 27 pages · 51,321 characters

Text of OCC Set 22_COMBINED.pdf

Extracted from the file · 40 pages · 63,151 characters

Text of OCC Set 23_COMBINED.pdf

Extracted from the file · 8 pages · 12,023 characters

Text of OCC Set 25_COMBINED.pdf

Extracted from the file · 33 pages · 57,780 characters

Text of OCC Set 26_COMBINED.pdf

Extracted from the file · 11 pages · 14,212 characters

Text of PURA Set 6_COMBINED.pdf

Extracted from the file · 82 pages · 163,601 characters

Text of PURA Set 7_COMBINED.pdf

Extracted from the file · 141 pages · 373,939 characters

Text of UCONN Set 1_COMBINED.pdf

Extracted from the file · 45 pages · 105,510 characters

Text of UCONN Set 2_COMBINED.pdf

Extracted from the file · 19 pages · 40,074 characters

As listed on the current system

Corres. 10/21/2026 [26-05-10] (Keegan Werlin LLP) - Compilation of Discovery Responses

This filing on the current system (opens in a new tab)