Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Compilation of Discovery Responses

Files15

Search terms highlighted
Eversource rate increase is on 113 pages across 8 files of the text below, highlighted. Go to the first matchClear highlighting
Words on different pages
Words on different pages
Words on different pages

Text of CLF-AC Set 2_COMBINED.pdf

Extracted from the file · 18 pages · 32,497 characters

60 pages match
  1. Page 132 of 150Match

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-07 Date Issued September 26, 2026 EOE-372 Page 5 of 6 With respect to the capital-support mechanism or “F” factor in the formula, the Company proposes a mechanism based on a fixed annual capital investment level for each year of the PBMRP, with reconciliation through PURA’s annual RAM proceedings. The fixed annual investment level would initially be set at the Company’s capital forecast, as approved in this proceeding, and would be subject to downward-only reconciliation1 in the event that either i) the Company’s actual plant in service is lower than projected and utilized in establishing the initial F-Factor for that Rate Year or ii) PURA ultimately denies as imprudent a level of investment that was initially included in the F Factor allowance. In this way, customers are assured that rates ultimately reflect the costs of system investments that are actually in service, and have been found prudently incurred by PURA. As described in its Exhibit CLP-ELP-1 testimony, the Company has presented different investment trajectories in the Company’s 5-Year targeted system performance (TSP) and is proposing to establish the capital support mechanism of the PBR adjustment consistent with the annual capital funding requirements presented in Figure 7 of the Exhibit CLPELP-1 testimony. As part of the Company’s annual RAM compliance filing, actual plant additions placed in service during the applicable plan year would be reconciled against the approved forecast that would have been utilized in the prior PBMRP filing to establish the FFactor initially. Following PURA’s determination that the Company’s actual plant additions are prudent, used and useful, the Company’s allowed rate base and associated revenue requirement for that year will be limited to the lesser of (1) the total revenue requirement for the forecasted capital approved in this proceeding; or (2) the total revenue requirement for the actual plant in service. As described previously, if the Company’s actual capital additions exceeds the forecasted amount approved in this proceeding, the Company would not be permitted to seek recovery of the incremental investment during the initial four-year PBMRP Term. Any such investment would instead remain subject to review and consideration in a subsequent base rate proceeding or successor PBMRP Term. The Company’s proposed capital funding mechanism sets a defined cap on capital recovery during the plan term, providing customers with greater rate certainty and placing the risk (and cost) of increased capital spending on the Company during the course of the PBMRP. The annual reconciliation further protects customers by blocking recovery of investments that are delayed, deferred, canceled, or not placed in service, since those costs would not be reflected in the “F” factor upon reconciliation, which is based on plant in service. For these reasons, the proposal aligns cost recovery with prudent investment and incentivizes efficient execution of the capital program, all while minimizing customer over-collection. Based on the above framework, an exhibit that demonstrates a revenue requirement consisting of: (1) a reconciliation of actual plant additions placed in service during the previous calendar year against the approved forecast (also referred to as the F-factor allowance) for that calendar year, and (2) the F-factor allowance for the new Rate Year beginning July 1st, would be filed on or about March 1st of each year consistent with the timing of all other RAM component reconciliations. Concurrent with that timing, all plant additions documentation for the previous calendar year included in the above reconciliation will also be filed on or about March 1st as part of the same filing. The Company notes that the revenue decoupling mechanism (RDM) will continue to operate and reconcile actual revenues to the target revenues, as adjusted by the PBMRP. The Company’s reference to a ‘downward only’ reconciliation is meant to reflect that the revenue target utilized in the RDM will not be adjusted upward in the event actual plant additions exceed the level originally reflected in the F-Factor allowance. In that circumstance, the F-Factor allowance is capped at the fixed level projected in this proceeding. Capital that is placed in service above the cap would not be included in rates until a future rate case proceeding, and only then on a prospective basis. 1
  2. Page 133 of 150Match

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-07 Date Issued September 26, 2026 EOE-372 Page 6 of 6 Further, under the Company’s proposed timeline, the revenue requirement resulting from the reconciliation of the prior year’s F-factor allowance and the new Rate Year’s F-factor allowance will go into effect on July 1, following the March 1st filing. As part of the RAM process, PURA performed prudence reviews of capital documentation filed for the ESI, including discovery, between March 1st and September 1st, the date on which additional RAM rate changes were made. Even though PBMRP rates would go into effect on July 1st, the Company proposes that this timeline continues to be used for capital prudence reviews under the PBMRP. To the extent PURA’s prudence review warrants any adjustment to the revenue requirement that went into effect on July 1, the Company will calculate the excess revenue collected from customers over the period of July 1 through August 31 and include this amount, plus carrying costs for those 2 months, in the RDM’s allowed revenue target for the July 1 through June 30th Rate Year. b. Please refer to subpart (d) of this question. c. Please refer to subpart (d) of this question. d. Please refer to the example shown in EOE-156, Attachment 1, pages 4 through 12, showing how the annual capital recovery process, including reconciliation, would function, including detailed calculations in the form to be used in the annual adjustment filings. Please note that pages 4, through 12, show an illustrative example for all four Rate Years contemplated for the duration of the PBMRP; however, the annual filing would only be for a single year of the PBMRP. As part of this example, please refer to the differences between realized annual plant addition costs and the associated rate base, and the return, taxes, and depreciation on rate base that are included in the going-in revenues found in EOE-156, Attachment 1, worksheet “PBR-7 Going-In Capital RR”, Lines 13-16. Additionally, the detailed calculations shown in EOE-156, Attachment 1, pages 4 through 12, demonstrate that the annual PBR reconciliations will be an assessment of the Company’s total accumulated depreciation included in base distribution rates (i.e., customers will be receiving credit for the increase in the Company’s accumulated depreciation for all capital included in base distribution rates), as opposed to the Company’s entire rate base (the Company considers its entire rate base to include other rate base items such as deferred assets and liabilities, etc.). e. The revenue requirement for capital recovery will include appropriate recovery of net plant in service, accumulated deferred income taxes (“ADIT”) and accumulated depreciation for the cumulative additional plant additions and will include a pre-tax return on investment (i.e. return on rate base including income taxes), return of investment (i.e. depreciation), property taxes, gross earnings tax and uncollectible expense.
  3. Page 134 of 150

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-07 Date Issued September 26, 2026 EOE-373 Page 1 of 2 Date Filed: October 15, 2026 Witness: Douglas P. Horton, Brendan J. O’ Brien and Garrett J. Murray Request from: Office of Education, Outreach, and Enforcement Question: (F-FACTOR; COST OF REMOVAL/RETIREMENTS) Respond to the following: a. Compare and contrast the Company’s incorporation of cost of removal and retirements to the approach used in RAM filings for the Electric System Improvements (ESI) mechanism. b. Discuss whether cost of removal is included within the Company’s Targeted System Performance (TSP) plan, including the corresponding projections. If included, discuss how the projections were derived and cite relevant references to this topic. c. If response to subsection (b) is negative, explain how the Company derived the projected cost of removal amounts within its Financial Forecast and provide supporting workpapers for the proposed amounts referenced in the F-Factor Excel spreadsheet within the PBR-4 F-Factor tab. Response: a. The Company’s treatment of cost of removal and retirements under the F-Factor is fundamentally different from, and not comparable to, the treatment reflected in Electric System Improvements (“ESI”) Revenue Adjustment Mechanism (“RAM”) filings. The ESI mechanism is a narrowly tailored recovery mechanism that is limited to the revenue requirement impacts associated with incremental ESI plant additions. ESI considers only qualifying plant additions and the corresponding depreciation expense and accumulated deferred income taxes (“ADIT”) associated with those additions. ESI does not incorporate plant retirements, cost of removal, depreciation expense, or ADIT related to all existing system investment. The F-Factor, by contrast, is not limited to a discrete subset of capital additions. Rather, it reflects plant-related activity affecting the entire distribution system. As a result, the F-Factor considers the effects of the full range of plant-related rate base activity, including plant additions, plant retirements, cost of removal, depreciation expense, and ADIT related to all investment, thereby resulting in a level of rate base truly representative of the capital deployed in the provision of utility service during a given Rate Year. Accordingly, the two mechanisms serve different regulatory purposes, rely on different inputs, and measure different categories of utility activity.
  4. Page 135 of 150

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-07 Date Issued September 26, 2026 EOE-373 Page 2 of 2 b. Cost of removal is inherently reflected in the Company’s capital planning process, including investments within the Targeted System Performance (“TSP”) plan. The Company’s longrange capital planning process is intended to identify and forecast the overall level of system investment necessary to maintain, modernize, and improve the electric system. As a result, cost of removal is not a distinct TSP cost driver, rather a consequence of forecasted asset replacement activity. Cost of removal projections are informed by recent experience, circumstance, and trends relative to overall levels of investment and applied to the Company’s expectations of future system needs. For example, the Company’s capital expenditure forecast includes $86.1 million for emergent line failures in 2028, per the Company’s response to OCC-858 (see OCC-858, Attachment 1). Of that $86.1 million, cost of removal can be expected, based on recent experience, to account for roughly 20%, or $17.2 million. In this way, cost of removal is assumed to be reflected within the overall system investment activity that underlies the Company’s capital planning process and associated rate base projections. Accordingly, although the TSP plan does not identify or quantify cost of removal separately from installation costs, cost of removal is inherently contemplated as part of the overall system investment assumptions reflected in the Company’s capital planning process. c. Please refer to the Company’s response to subpart (b) above.
  5. Page 136 of 150Match

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-07 Date Issued September 26, 2026 EOE-374 Page 1 of 2 Date Filed: October 15, 2026 Witness: Douglas P. Horton, David L. Gladey, Leanne M. Landry and Jeffrey D. Turano Request from: Office of Education, Outreach, and Enforcement Question: (F-FACTOR; CAPITAL ADDITIONS) Refer to Response to EOE-156, Att.1-Att.2. Explain how the F-Factor calculation and the Company’s Targeted System Performance (TSP) plan accounts for unplanned capital additions. Response: The Company’s F-Factor proposal does not make the distinction between “Capital Plan” and “Non-Capital Plan.” As the Company explained in Docket No. 21-05-15RE01, some projects cannot be planned with precision. For example, it would be impossible for the Company to perfectly predict Emergent Failures. The Company cannot predict which specific pole or cross-arm will fail. The Company can, however, reasonably forecast a volume and severity of such failures based on system conditions and recent experience, which is the type of information that the Company uses to develop its forecasted capital plan. The Company is proposing to (1) set a hard cap on the annual plant additions that may be recovered through the F-Factor; and (2) set that cap on the basis of the Company’s forecast annual capital expenditures, as presented in this case. If Emergent Failures were to develop in year beyond what is budgeted, it would not change the cap. The cap would operate to allow a quantity of plant additions into rates, while the rest would have to wait until the next rate case, similar to how the ESI works now with the $300 million annual allowance. With this perspective in mind, there is no distinction between “Capital Plan” and “Non-Capital Plan” that is necessary for two reasons: First, the hard cap on core capital investment eligible for the F-Factor is based on the capital forecast presented in this proceeding, but in the end, it will be the actual plant additions that are entered into rates – whether planned or unplanned. This approach results in the circumstances where the Company is providing upfront, during this proceeding, indicative revenue increases necessary to support those investments while committing to cap resulting revenue increases during the PBMRP even if actual capital investment exceeds the forecast. Additionally, the downwardonly reconciliation of the Company’s proposed F-Factor protects customers from the bill impacts
  6. Page 137 of 150

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-07 Date Issued September 26, 2026 EOE-374 Page 2 of 2 associated with plant additions over the threshold, including necessary emergent, or unplanned investments unforeseen today. Second, all capital plant additions, whether planned, unplanned, “Capital Plan” or “Non-Capital Plan,” ultimately must pass PURA’s prudence review before actual rate recovery of those specific projects costs may commence. This critical gate, successfully demonstrating prudence, is and should remain the ultimate determinant of recovery regardless of whether a particular investment was forecast in advance. Applying this test renders the distinction between Capital Plan and NonCapital Plan items irrelevant.
  7. Page 138 of 150Match

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-07 Date Issued September 26, 2026 EOE-375 Page 1 of 12 Date Filed: October 14, 2026 Witness: Douglas P. Horton Request from: Office of Education, Outreach, and Enforcement Question: (F-FACTOR; CT-BAR DIFFERENCES) Refer to Response to OCC-09, p.10. The response identified three major impairments of the CT-Bar that were addressed within the proposed FFactor. Specific to the 3rd item (i.e., “the mechanical deduction of depreciation expense from plant additions instead of rate base”), explain why the Company believed this to be an impairment given that the Authority’s PFD had applied the revenue cap formula to the going in rates, not the O&M expense as proposed by the Company. As part of the response, confirm that the Authority’s proposed treatment (i.e., within the PFD) would prevent increased revenue from property taxes and the corresponding impact from GET and uncollectibles, which are otherwise included in the revenue cap formula on O&M. If not confirmed, explain how the F-Factor calculation eliminates the increases resulting within the revenue cap formula. Response: Please refer to the Company’s response to interrogatory EOE-368 i, which explains not only why the Company’s F-Factor revenues associated with property taxes do not overlap with the application of I-X-CD, but also why the Company’s understanding of the framework outlined in the 2021-05-15RE01 Proposed Final Decision (“PFD”) would, in fact, create such overlap. The Company acknowledges that the PFD applied the revenue cap mechanism to going-in revenues rather than limiting the application of I-X to O&M expense. However, that distinction does not address the impairment identified in the Company’s response to OCC-423 ii. The impairment is not simply the amount of revenue produced by the formula; rather, it is the PFD’s reliance on a mechanical deduction of depreciation expense from plant additions as a proxy for changes in utility investment requirements. While applying I-X to total revenue requirement may produce a greater revenue adjustment than applying the same factor solely to O&M, the resulting revenue change does not necessarily track with the utility’s real cost of service. Such an outcome would require highly restrictive assumptions, including that inflation is the primary driver of changes in capital investment requirements over time and that annual depreciation approximately offsets inflation. For example, if inflation were 2%, average asset lives would need to be 50 years such that annual depreciation equals 1/50, or 2%. There is no economic, operational, or regulatory basis to assume such a relationship. Asset lives are determined by the physical characteristics and service lives of utility assets, while inflation reflects broader economic conditions. The two are fundamentally unrelated.
  8. Page 139 of 150Match

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-07 Date Issued September 26, 2026 EOE-375 Page 2 of 12 As a result, the PFD’s approach using depreciation as the offset to investment requirements does not reliably approximate changes in capital-related revenue requirements and therefore necessarily weakens the relationship between actual system investment requirements and the revenues intended to support those investments. With respect to property taxes, the Company does not agree that the PFD’s approach would prevent increased revenues associated with property taxes, including the related impacts from gross earnings taxes (“GET”) and uncollectibles. As described in Response to EOE-368, applying I-X to all variables of the revenue requirement (i.e. the total revenue requirement), is necessarily inclusive of property taxes reflected in Going-In revenue requirements (PFD, Appendix Page vi). At the same time, Step 6 of CT-bar explicitly identified property taxes as one of the cost components in the revenue requirement calculations (PFD, Appendix Page x). Therefore, at a minimum, there are property taxes in multiple components of the framework outlined in the PFD that need to be negated to avoid duplicative revenue. The application of depreciation expense outlined in the PFD does not accomplish this for the same reason as described above with respect to depreciation – inflation is not the primary driver of changes in system investment requirements. In contrast, the Company’s proposal is intended to address this because under the Company’s proposal, incremental revenue adjustments after the establishment of initial Going-In revenues distinctly address capital-driven costs, such as property taxes, depreciation, return, and income taxes, separately and differently from O&M, such that the same costs are not adjusted in two different components of the PBMRP. Capital-related costs are supported exclusively by the FFactor, while I-X-CD is applied to O&M only, which excludes costs driven by capital investment, thereby avoiding any possible duplicative recovery. Prior Referenced Responses: i EOE-368 Question: (F-FACTOR; PROPERTY TAXES O&M) Confirm that both the Company’s proposed F-Factor calculation and the proposed revenue cap formula calculation increase the revenue requirements for property taxes. If confirmed, provide an analysis detailing the estimated property tax increase that would result within the revenue cap formula for each of the four Rate Years. As part of the increase, please account for the impact of the gross earnings tax (GET) and allowance for uncollectible amounts (i.e., the 7.63% and .63% included within the PBR-3 F-Factor Summary tab). If not confirmed, explain how the property tax expense would be excluded from the revenue cap formula to include the corresponding reduction in the property tax basis used after accounting for depreciation. EOE-368 Response: The premise of this interrogatory is incorrect. The Company’s proposal does not increase revenue requirements for normal property taxes through both the F-Factor as well as another component of its PBMRP proposal, such as I-X. Unlike the framework outlined in the 2021-05-15RE01 Proposed Final Decision (“PFD”), which would have resulted
  9. Page 140 of 150Match

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-07 Date Issued September 26, 2026 EOE-375 Page 3 of 12 in overlapping treatment of property-tax-related revenue requirements, the Company’s proposal was specifically designed to avoid that outcome by separating capital cost recovery from O&M cost recovery. As described in the Company’s response to EOE-156i, the I-X-CD adjustment is applied only to O&M expense. This is demonstrated in EOE-156, Attachment 1, Worksheet “PBR-1 Total PBRA,” Line 21, which identifies its source as “Exhibit CLP-REVREQ-2, Schedule C-3.0, Column F, Line 51.” Property taxes, by contrast, are reflected on Line 61 of that same schedule and are not included in the O&M expense amount to which I-X-CD is applied. Accordingly, the Company’s proposal does not apply I-X-CD to a revenue requirement that includes property taxes. Under the Company’s proposal, any incremental revenue requirement associated with property taxes arises solely through operation of the F-Factor. The PFD, however, not only does not offer that separation, it clearly results in overlap. Specifically, Step 6 of the CT-Bar mechanism expressly incorporated property taxes into the capital-related revenue requirement calculation: Step 6: The Authority will calculate the amount of revenue the EDC may recover through the CT-Bar for CTBar Projects by taking the CT-Bar Projects identified in Step 5 and allocating the costs associated with those projects equally to each month of Rate Year 1. The Authority will then multiply each month’s CT-Bar Project costs by the depreciation, property tax, and GET rates approved in the EDC’s rate amendment decision and add those costs together to determine an aggregated monthly amount. The Authority will then use the aggregated monthly amount to determine the annual revenue requirement impact. A similar approach will be taken for each respective Rate Year of the MRP, i.e., Rate Years 2 through 4. (PFD, Appendix Page x, emphasis added). Thus, under the PFD, property taxes were expressly embedded within CT-Bar revenue requirements. At the same time, the PFD further discusses application of the I-Factor to all variables of the revenue cap formula: "The Authority will apply the I-Factor to all variables within the Revenue Cap Formula, capital funding mechanisms, (i.e., CT-Bar and any potential Capital Cost Trackers), PIMs, SSMs, and regulatory assets and liabilities." (PFD, Appendix Page vi, emphasis added). Accordingly, the PFD not only included property taxes within CT-Bar revenue requirements, but also subjected those CT-Bar amounts to the application of the I-Factor through the broader revenue cap framework. As a result, the PFD’s approach would have increased revenues related to property taxes through multiple mechanisms, which, at a minimum, obscures the degree to which property taxes are reasonably accounted for in its framework. The Company’s proposal intentionally avoids that result. Rather than embedding property-tax recovery within a capital mechanism as well as the revenue base to which inflation is applied, the Company separates revenues supporting O&M from those driven by system investment. O&M expense alone is subject to the I-X-CD adjustment, while capital-related revenue requirements, including associated property taxes, are recovered exclusively through the F-Factor. This structure ensures a clear delineation between O&M and capital cost recovery and prevents the overlapping result outlined in the PFD. ii OCC-423 Question: Exhibit CLP-ELP-1 Please explain in detail why the Company believes its proposed treatment of capital expenditures under the PBMRP, including the use of forecasted capital expenditures and the F-Factor, is preferable to including capital expenditures within the Revenue Cap Formula framework as proposed in the Docket No. 21-05-15RE01 Proposed Final Decision. In your response,
  10. Page 141 of 150

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-07 Date Issued September 26, 2026 EOE-375 Page 4 of 12 a. b. c. Please explain why the Company believes O&M expenses are appropriately subject to an externally indexed revenue cap, while capital expenditures require separate recovery through an F-Factor based on a fixed annual capital investment forecast. Please explain how the Company’s proposed treatment of capital expenditures is expected to produce customer cost savings or otherwise improve customer affordability relative to including capital expenditures within a revenue cap formula. Please explain how the proposed F-Factor mitigates or avoids any incentive to favor capital expenditures over O&M solutions, including in circumstances where either a capital or O&M solution could be used to address the same system need. OCC-423 Response: The Company appreciates OCC’s thoughtful and analytical questions on the Company’s proposed performance based multi-year rate plan (“PBMRP”) and looks forward to further discussion on the development of a workable PBR framework for the Company’s customers. To cover the issues raised in the question, the Company’s response is organized as follows: 1. Review of relevant aspects of the Company’s PBMRP. 2. Considerations on the design of capital-driven revenue support. 3. Specific responses to parts (a), (b) and (c), above. 1. Review of the Relevant Aspects of the Company’s PBMRP Ultimately, the Company’s goal in this proceeding is to establish a sustainable, cohesive ratemaking framework that advances electric utility service in the State of Connecticut in an affordable manner for customers, over a long term. This is the Company’s goal because the CL&P system needs investment for reliability, resiliency and modernization. For this investment to be affordable for customers, a coherent ratemaking plan needs to be instituted that will consider the interests of customers over a longer term than just the next rate case. That framework needs to balance: (1) the reliability and performance requirements of the Company’s customers and the broader State of Connecticut; (2) customer rate stability and affordability; (3) incentives for cost efficiency in utility operations; and (4) implementation of a revenue support mechanism sufficient to cover the cost of delivering these objectives to customers. The Company’s PBMRP is designed to address these objectives in a holistic, balanced way. To do this, the Company started with the ratemaking framework under discussion in PURA’s PBR docket (Docket No. 21-05-15RE01), while also introducing certain new elements to remediate the flaws that would ultimately hinder PURA’s (draft) PBR model from supporting the necessary stayout terms. For any multi-year rate plan to be successful, it needs to be grounded in the reality of the utility’s costs, while also incorporating features that innately push the utility to be more efficient. That is not to say every dollar of the utility’s costs will be (or should be) recovered. Rather, the allowed revenues need to be sufficient to afford the utility a reasonable opportunity to cover its cost of service to customers, including a reasonable rate of return on equity (“ROE”) where the utility is operating prudently and efficiently, as required by state law. A framework in which the utility has no reasonable opportunity to earn its ROE, regardless of how hard it strives for efficiency, simply becomes self-defeating because the utility will exercise its statutory rights to a distribution rate proceeding, thereby muting the most powerful efficiency feature of a multi-year rate plan, which is the stay-out term. A framework that underestimates the actual cost to run the system and/or affords the utility no reasonable chance to earn its allowed ROE, year after year, also results in under-investment and a system that not only lacks innovation,

Text of NECTA Set 4_COMBINED.pdf

Extracted from the file · 14 pages · 26,843 characters

Text of NECTA Set 5_COMBINED.pdf

Extracted from the file · 27 pages · 51,321 characters

Text of OCC Set 22_COMBINED.pdf

Extracted from the file · 40 pages · 63,151 characters

Text of OCC Set 23_COMBINED.pdf

Extracted from the file · 8 pages · 12,023 characters

Text of OCC Set 25_COMBINED.pdf

Extracted from the file · 33 pages · 57,780 characters

Text of OCC Set 26_COMBINED.pdf

Extracted from the file · 11 pages · 14,212 characters

Text of PURA Set 6_COMBINED.pdf

Extracted from the file · 82 pages · 163,601 characters

Text of PURA Set 7_COMBINED.pdf

Extracted from the file · 141 pages · 373,939 characters

Text of UCONN Set 1_COMBINED.pdf

Extracted from the file · 45 pages · 105,510 characters

Text of UCONN Set 2_COMBINED.pdf

Extracted from the file · 19 pages · 40,074 characters

As listed on the current system

Corres. 10/21/2026 [26-05-10] (Keegan Werlin LLP) - Compilation of Discovery Responses

This filing on the current system (opens in a new tab)