Eversource rate increase is on 113 pages across 8 files of the text below, highlighted. Go to the first matchClear highlighting
Words on different pages
Words on different pages
Words on different pages

Text of CLF-AC Set 2_COMBINED.pdf

Extracted from the file · 18 pages · 32,497 characters

60 pages match
  1. Page 45 of 150

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-07 Date Issued September 26, 2026 EOE-363 Page 2 of 2 Based on the sourcing agent’s oversight and monitoring of these purchasing activities, the sourcing agent identified an opportunity to consolidate the requirements, which then occurred. The sourcing agent therefore initiated the 2025 competitive solicitation.
  2. Page 46 of 150

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-07 Date Issued September 26, 2026 EOE-364 Page 1 of 3 Date Filed: October 09, 2026 Witness: Lavelle A. Freeman and Elli Ntakou Request from: Office of Education, Outreach, and Enforcement Question: (VEGETATION MANAGEMENT PROGRAM) Refer to Response to EOE-151. The interrogatory requested the Company to “provide the cost benefit analyses the Company performed for determining reliability projects for the 2025 Test Year”; however, no such BCA was provided. a. Provide the 2024 Reliability Budget Optimization Tool (ReBOT) referenced in the response, along with the 2023 BCA. b. Explain how the BCA was incorporated into the ReBOT and, if necessary, provide an exhibit demonstrating how the BCA inputs were used. Response: Please refer to EOE-364, Attachment 1, for details regarding the 2023 Benefit-Cost Analysis (“BCA”) and an overview of the 2024 Reliability Budget Optimization Tool (“ReBOT”) referenced in the Company’s response to EOE-151 i. The BCA was developed to evaluate the historical effectiveness of several reliability improvement strategies by analyzing the relationship between investment costs and observed reliability benefits. Specifically, the analysis examined more than $250 million of reliability investments completed between 2010 and 2020 and measured the resulting reliability impacts, including reductions in Customer Minutes Interrupted (“CMI”) and Customers Interrupted (“CI”), by work type. The study produced estimates of the average reliability improvement and cost-effectiveness associated with each mitigation strategy. The results of the BCA were subsequently incorporated into the ReBOT investment optimization model. ReBOT evaluates active outage zones, determines which mitigation strategies are applicable based on system configuration and operating characteristics, and applies the BCAderived reliability improvement factors and cost assumptions to estimate the expected reliability benefits and cost-effectiveness of potential investments. For each outage zone, ReBOT calculates the anticipated reliability benefit associated with each applicable mitigation strategy and identifies the most cost-effective alternative. Recommended investments are then ranked across all programs based on estimated reliability benefit relative to cost and may be selected subject to budgetary constraints and reliability performance objectives.
  3. Page 47 of 150

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-07 Date Issued September 26, 2026 EOE-364 Page 2 of 3 Slides 16 through 23 illustrate how the BCA outputs are incorporated into ReBOT. As shown, historical outage and work management data were used in the BCA to develop cost and performance relationships by work type. These relationships, including estimated percentage reliability improvements and unit cost assumptions, serve as inputs to ReBOT and are applied to current outage zone performance data to estimate expected CMI reductions, project costs, and costeffectiveness metrics. ReBOT then uses these calculations to prioritize investments and develop an optimized portfolio of reliability projects. ReBOT is not a standalone application but rather a collection of SQL Server database tables, business rules, analytical calculations, and ETL (Extract, Transform, and Load) processes used to integrate and analyze outage, asset, and work management data. As such, the tool itself cannot reasonably be produced in response to this interrogatory. EOE-364, Attachment 2, provides a representative example of the most recent ReBOT output generated using the latest available system data. The history of the BCA/ReBOT development Process is as follows: • • • • • December 2023: Completion of the Benefit-Cost Analysis evaluating the historical effectiveness and cost-effectiveness of various reliability mitigation strategies. January 2024 - October 2024: Development of the ReBOT framework, including creation of database structures, analytical methodologies, and ETL processes necessary to address data quality, integration, and modeling challenges. October 2024: Preliminary recommendations were provided to Engineering for review and feasibility assessment, including evaluation of the top twenty device-level recommendations. Engineering feedback was subsequently incorporated into the model and prioritization logic. 2025 - June 2026: Calibration and refinement period. Engineering feedback was continually incorporated to improve recommendation quality, increase the percentage of actionable recommendations, and enhance model performance. Additional analysis of the original BCA results was performed to normalize observed reliability impacts relative to overall Company reliability performance. ReBOT recommendations generated for the 2025 TripSaver program were used to support investment prioritization decisions. June 2026: First production-ready ReBOT output was used to develop proposed 2027 reliability work plans, including reconductoring projects, TripSaver installations, backbone sectionalizing projects, and radial recloser installations. The Company has not included ReBOT outputs generated during 2024 because those results were produced during the initial development and testing phase of the tool and do not reflect subsequent model enhancements, calibration efforts, data quality improvements, and engineering feedback that were incorporated between 2025 and June 2026. During this period, the Company refined the underlying benefit assumptions, improved data integration processes, normalized historical
  4. Page 48 of 150

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-07 Date Issued September 26, 2026 EOE-364 Page 3 of 3 reliability results relative to overall Company performance, and incorporated engineering review of recommended investments to improve the quality and applicability of model outputs. Accordingly, the Company believes that the most recent 2026 ReBOT output, provided as EOE364, Attachment 2, is the most representative and informative example of the tool’s current functionality and investment prioritization methodology. Providing earlier developmental outputs could be misleading because they do not reflect the current model logic and capabilities used to support reliability investment planning. Prior Referenced Response: i EOE-151 Question: (VEGETATION MANAGEMENT PROGRAM) Refer to Exhibit CLP-ELP-1, p. 67. Please provide the cost benefit analyses the Company performed for determining reliability projects for the 2025 Test Year. EOE-151 Response: As part of compliance with Docket No. 17-12-03RE08, the Company performed the referenced Benefit-Cost Analysis (“BCA”) in 2023 using historical reliability projects, their associated costs, and their observed impact on SAIDI and SAIFI. In 2024, the BCA results were incorporated into the Reliability Budget Optimization Tool (“ReBOT”). ReBOT uses the BCA results as a baseline to determine the cost-optimal reliability mitigation measure for each zone. It first creates a list of zones eligible for reliability mitigation by evaluating historical outage performance at the individual-zone level. The tool then estimates the potential reduction in customer interruptions and customer minutes of interruption associated with various eligible remediation alternatives. The estimated reliability benefit of each alternative is then evaluated relative to its estimated project cost using $/SAIDI or SAIFI per unit reduction as the metric to determine the most cost-effective mitigation measure. This process identifies and prioritizes potential device deployments and other remediation alternatives that are expected to provide the greatest reliability improvement in a cost-effective manner. The initial ReBOT recommendations were produced in late 2024. Due to the timing of the Company’s project-planning cycle, the recommendations were used to support project selection for the 2025 and 2026 TripSaver Program. ReBOT’s use was subsequently expanded to support both the TripSaver, Smart Switch and reconductoring Programs in 2027. ReBOT is an evolving analytical tool, and the Company continues to refine its methodology and expand its application as additional experience and data become available. The BCA and ReBOT are used as project-screening and prioritization tools and are not intended to predict the precise impact of future projects or programs. Final project selection also considers engineering judgment, constructability, local system conditions, operational requirements, and other project-specific factors. As such, benefits and costs of each project may differ from the tool’s results for a multitude of reasons.
  5. Page 49 of 150

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-07 Date Issued September 26, 2026 EOE-365 Page 1 of 1 Date Filed: October 09, 2026 Witness: John P. DiPaola-Tromba, Sean D. Redding and Jenna Turner Request from: Office of Education, Outreach, and Enforcement Question: (VEGETATION MANAGEMENT PROGRAM) Refer to Response EOE-140.The Company’s response identified that “operating under the current approved budget has more recently resulted in a reduction of local tree crews needed to complete the annual VMP workplan, which impacts the availability of local tree crews for storm response activities and the need to secure non local tree crews for Level 5 events.” Explain what specific actions the Company has performed to secure local tree crews in advance of storm activity. For example, has the Company attempted to solicit services from local tree crews who are not contracted for the Company’s blue-sky Vegetation Management Program. As part of the response, identify when the Company has performed any specific actions. Response: The Company secures Line Clearance Qualified (“LCQ”) tree contractor crews per OSHA 29 CFR 1910.269 that are available and can travel in time to assist with storm restoration. The Company most recently secured LCQ tree crews on September 24-25, 2026, for storm MS26AD. The locally available LCQ tree crews that were secured already work for the Company in Connecticut primarily performing tree removals. The other LCQ tree crews secured for this restoration event came from outside the state, including Pennsylvania, Maine, Maryland, and New York.
  6. Page 50 of 150

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-07 Date Issued September 26, 2026 EOE-366 Page 1 of 26 Date Filed: October 15, 2026 Witness: Douglas P. Horton Request from: Office of Education, Outreach, and Enforcement Question: (PBMRP CAPITAL SUPPORT MECHANISM-CALCULATIONS) Refer to Response to EOE156, Att.1-Att.2. Respond to the following: a. Please identify the specific tabs that were responsive to the F-Factor calculation request versus those that provided additional analysis. b. Confirm that the PBR-7 Going-In Capital RR tab was used to derive the weighted cost of capital (WACC) and that adjustments to this tab (i.e., notably cell G81) would dynamically change the F-Factor allowance within the PBR-3 F-Factor Summary tab. If not confirmed, explain how to input adjustments to account for changes to the WACC to allow for analysis of the results. c. Please modify the F-Factor Excel spreadsheet to calculate the F-Factor as of Day 1 of Rate Year 1 where capital additions within the revenue requirements are cut-off as of an estimated end of the evidentiary record date and the corresponding F-Factor capital additions commence as of the next month. Response: a. The Company’s model filed in response to interrogatory EOE-156 provided the worksheets necessary to understand both the operation of the F-Factor and its relationship to the broader PBMRP framework. The worksheets titled “PBR-3 F-Factor Summary” (PDF Page 4), “PBR4 F-Factor” (PDF Pages 5-8), “PBR-5 F-Factor Property Tax” (PDF Page 9), “PBR-6 Capital Forecast” (PDF Page 10), and “PBR-7 Going-In Capital RR” (PDF Pages 11-12) contain the calculations and supporting inputs associated with the F-Factor mechanism itself. The application of those calculations within the overall revenue requirement framework is reflected in “PBR-1 Total PBRA” (PDF Page 2). These worksheets contain the specific calculations necessary to determine the F-Factor and to provide context and information regarding the development of inputs, forecast investment levels, rate base impacts, property tax effects, and the interaction between the F-Factor and the broader revenue requirement structure. In particular, “PBR-1 Total PBRA” serves as a summary of the annual revenue requirement adjustments that directly affect the decoupled revenue target, including the F-Factor, and demonstrates how the F-Factor functions alongside the proposal’s other ratemaking elements.
  7. Page 51 of 150

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-07 Date Issued September 26, 2026 EOE-366 Page 2 of 26 Importantly, intended to resemble the form and function of the annual PBR adjustment filings submitted by the Company’s affiliate utilities under their established performance-based regulatory plans and, as such, the worksheet reflects how the various components of the PBMRP would be consolidated and applied in practice to determine annual revenue requirement adjustments under the proposed framework. b. Correct. Specifically, adjustments to Excel cells C70 (equity ratio), E70 (return on equity), C72 (debt ratio), and E72 (cost of debt) flow through to cell G81, which calculates the pretax cost of capital utilized in the F-Factor calculations. As noted, the WACC calculated at the referenced tab is based on the currently-authorized capital structure of 53 percent equity ratio and return on equity of 9.25 percent. The Company notes that the model was developed to illustrate the operation of the proposed PBMRP framework, including the F-Factor and I-X mechanisms, and to facilitate evaluation of assumptions within those mechanisms. The model was not designed to automatically reestablish or restate Going-In Revenue Requirements in response to hypothetical modifications to authorized capital structure or cost of capital parameters. Therefore, while changes to the referenced inputs appropriately flow through the F-Factor calculation, any corresponding adjustment to Going-In Revenue Requirements would need to be separately evaluated and calculated. The Company’s responses to EOE-156 i and OCC-423 ii further demonstrate that the sufficiency of the Going-In Revenue Requirement is a critical prerequisite to the operation of the overall framework. The F-Factor is not intended to independently address all capital-related cost pressures, nor is it designed to function as a substitute for appropriate base rates. Instead, it operates as one component of a comprehensive ratemaking structure intended to support continued system investment while preserving the broader customer protections and performance incentives incorporated throughout the PBMRP. Consequently, modifications to cost of capital assumptions within the illustrative model may appropriately inform sensitivity analyses of the F-Factor itself, but they should not be interpreted as re-establishing the overall revenue requirement or evaluating the reasonableness of the PBMRP outside the context of the complete proposal. c. Please refer to EOE-366, Attachment 1. As presently configured, the model reflects the Company’s currently authorized equity capitalization (53%) and return on equity (9.25%), as well as investment through a period near the anticipated close of the evidentiary record. For simplicity of discussion and analysis, the Company assumed that investment through December 31, 2026, would be reflected in base distribution rates effective July 1, 2027. Accordingly, the model’s F-Factor calculations of plant-related activity begin January 1, 2027. For purposes of this response, the Company estimated the impacts to rate base and associated revenue requirement components using a simplified methodology designed to reasonably
  8. Page 52 of 150

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-07 Date Issued September 26, 2026 EOE-366 Page 3 of 26 approximate the results that would be produced by updating the Company’s filed cost of service model (Exhibit CLP-REVREQ-2) to reflect investment through December 31, 2026. This approach was intended to isolate and evaluate the timing assumption specified in the interrogatory without undertaking a comprehensive reforecast or re-establishment of Going-In Revenue Requirements. Most importantly, the results demonstrate that changing the investment cut-off date does not change the overall level of revenue support contemplated under the Company’s proposal. Rather, it changes whether the revenue requirement associated with a given investment period is reflected through Going-In Revenue Requirements or through the F-Factor. Investment included in Going-In Revenue Requirements is excluded from the F-Factor, and investment excluded from Going-In Revenue Requirements is reflected through the F-Factor. As a result, the full revenue requirement associated with a given investment period resides in one mechanism or the other, but not both. Crucially, the results of this analysis should be considered in the context of the overall cost of service underlying the PBMRP. The Company has taken care to propose a comprehensive regulatory framework, leveraging and incorporating elements from the Proposed decision in PURA’s PBR proceedings as applicable that works cohesively regarding the establishment of Going-In Revenue Requirements, the F-Factor, the I-X mechanism, and each other component of the PBMRP. Prior Referenced Responses: i EOE-156 Question: (PBMRP CAPITAL SUPPORT MECHANISM) Refer to Exhibit CLP-ELP-1, pp. 101-103. Provide a working, unlocked Excel spreadsheet that would serve as a representative tool used to calculate the Company’s incremental revenue requirements resulting from the proposed capital support mechanism (F-Factor) for each year of the MRP. As part of the submission, discuss the calculations and separately identify and explain all critical assumptions, using cited information from the Company’s rate case submission where relevant (e.g., depreciation rate from the Company’s depreciation study). In support of the request, please use the Company’s proposed 5-Year Targeted System Performance (TSP) Plan within the spreadsheet’s initial inputs and apply an initial assumption that the Company incurred actual plant-in-service additions of 5% more than the proposed annual TSP funding. Additionally, please configure the spreadsheet to allow for the weighted average carrying costs (WACC) to be individually adjusted for both ROE and Cost of Debt. EOE-156 Response: The Company appreciates the opportunity to respond to EOE’s thoughtful question regarding the operation of the PBMRP proposed in this proceeding, which the Company views as key to reaching a long-term reliability and resiliency plan for Connecticut, while meeting affordability needs for customers. The Company’s response to this request is organized as follows:
  9. Page 53 of 150Match

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-07 Date Issued September 26, 2026 EOE-366 Page 4 of 26 A. B. C. D. Overview and Results F-Factor Discussion Impact of 5% Additional Capital Investment Model overview Attachments referenced in this response: EOE-156, Attachment 1, provides the Company’s working model, with projected capital investment as filed in this proceeding. See, e.g., Exhibit CLP-ELP-1, Figure 7. EOE-156, Attachment 2, provides a second model that is identical in every respect to Attachment 1 except that capital investments are 5% greater than the forecast submitted to this proceeding in Exhibit CLP-ELP-1, Figure 7, as stipulated by EOE’s data request. A. Overview and Results Ultimately, the Company’s goal in this proceeding is to establish a sustainable, cohesive ratemaking framework that supports electric utility service in the State of Connecticut in an affordable manner for customers, over a long term. This is the Company’s goal because the CL&P system needs investment for reliability, resiliency and modernization. For this infrastructure investment to be affordable for customers, a coherent ratemaking plan needs to be instituted that will consider the interests of customers over a longer term than just the next rate case. That framework needs to balance: (1) the reliability and performance requirements of the Company’s customers and the broader State of Connecticut; (2) customer rate stability and affordability; (3) incentives for cost efficiency in utility operations; and (4) implementation of a revenue support mechanism sufficient to cover the cost of delivering these objectives to customers, including the cost of capital. The Company’s PBMRP is designed to address these objectives in a holistic, balanced way. To do this, the Company started with the ratemaking framework under discussion in PURA’s PBR docket (Docket No. 21-05-15RE01), while also introducing certain new elements to remediate the flaws that would ultimately hinder PURA’s (draft) PBR model from supporting the necessary stay-out terms. As discussed below, the stay-out term is the critical element of the PBMRP that creates the cost-efficiency incentive inherent in a performance based ratemaking plan. This context is vital to understand both the design and mechanics of the Company’s proposed PBMRP, including both the F-Factor and “I-X” components. To augment understanding of how the plan would work over the stay-out period, the Company has incorporated the projected costs of service set forth in EOE-156, Attachment 1, Worksheet, entitled “COS-1 Total,” which is the Company’s cost of service, as filed. The Company does not intend to imply that these dollar amounts are certain for the future and there will undoubtedly be changes in a litigated result. However, these figures serve as a reasonable basis for presenting this analysis to reflect the Company’s PBMRP proposal. Moreover, assuming that there will be changes to the underlying cost of service that serves as the “going in revenue requirement,” all of the projections made herein become highly optimistic, as discussed below. Increasing capital investment on the Connecticut distribution system is a given for the reasons described in the testimony of the Company’s Leadership Panel and Targeted System Plan (“TSP”) Panel – the Connecticut distribution system needs additional investment to maintain service reliability to customers and even more investment to achieve a level of modernization. The Company will need to make this investment to meet the interests of customers, with or without a multi-year plan. However, without a multi-year rate plan, whether in the form of the Company’s proposed PBMRP or another reasonable model, the Company’s only viable course of action to support this level of needed investment will be to file traditional cost-of-service rate cases, as closely to annually as possible. Effectively, these
  10. Page 54 of 150Match

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-07 Date Issued September 26, 2026 EOE-366 Page 5 of 26 sequential cases will “roll in” unrecovered capital investment into base rates to maintain a nexus between what the Company needs to invest in the system and what rates are reflecting for recovery of costs. In a world in which system investment needs are relatively flat, economy-wide inflation is modest and predictable at 2% annually, and rates are fully coupled with growing sales revenues (and no revenue decoupling mechanism), it is conceivable that a utility could offset the cost increases it incurs with organic sales growth, as electric utilities could do in past decades. However, that is not the reality of today’s operating environment. The distribution system investment needs are extensive and growing and the financial consequences of these circumstances are factors that need to be considered in determining a reasonable and workable regulatory plan. Establishment of a reasonable multiyear, performance-based ratemaking plan is the mechanism that can support the system needs in a manner that is wholly transparent and stable for customers, allowing for a smoother trajectory of rate changes than would otherwise occur. Results of F-Factor Implementation Assuming Capped Forecast Investment EOE-156, Chart 1, below, provides illustrative rate increases comparing circumstances where the Company is pursuing a traditional rate-case cycle with filings as close to annually as possible under Connecticut law, as compared to the proposed PBMRP. These amounts assume the Company’s revenue requirement proposed in this docket is authorized without modification, except that the Company has used its existing weighted average cost of capital to perform the analysis, in order to isolate the functioning of the F-Factor operation - apart from changes in the cost of capital (i.e., the analysis uses a 9.25% return on equity and 47%/53% debt to equity capital structure). As noted above, the cost-of-service projections are shown in EOE-156, Attachment 1, Worksheet “COS-1 Total,” Line 35. In the absence of a multi-year rate plan, the Company anticipates filing rate cases on a rolling basis, with base rate changes effective January 1, 2029, July 1, 2030, and January 1, 2032. Chart 1, below, also spans the time period covering one year beyond the Company’s proposed four-year plan. 2032 is shown for illustrative purposes.

Text of NECTA Set 4_COMBINED.pdf

Extracted from the file · 14 pages · 26,843 characters

Text of NECTA Set 5_COMBINED.pdf

Extracted from the file · 27 pages · 51,321 characters

Text of OCC Set 22_COMBINED.pdf

Extracted from the file · 40 pages · 63,151 characters

Text of OCC Set 23_COMBINED.pdf

Extracted from the file · 8 pages · 12,023 characters

Text of OCC Set 25_COMBINED.pdf

Extracted from the file · 33 pages · 57,780 characters

Text of OCC Set 26_COMBINED.pdf

Extracted from the file · 11 pages · 14,212 characters

Text of PURA Set 6_COMBINED.pdf

Extracted from the file · 82 pages · 163,601 characters

Text of PURA Set 7_COMBINED.pdf

Extracted from the file · 141 pages · 373,939 characters

Text of UCONN Set 1_COMBINED.pdf

Extracted from the file · 45 pages · 105,510 characters

Text of UCONN Set 2_COMBINED.pdf

Extracted from the file · 19 pages · 40,074 characters

As listed on the current system

Corres. 10/21/2026 [26-05-10] (Keegan Werlin LLP) - Compilation of Discovery Responses

This filing on the current system (opens in a new tab)