Text of CLF-AC Set 2_COMBINED.pdf

Extracted from the file · 18 pages · 32,497 characters

Text of EOE Set 7_COMBINED.pdf

Extracted from the file · 150 pages · 432,851 characters

Text of NECTA Set 4_COMBINED.pdf

Extracted from the file · 14 pages · 26,843 characters

4 pages match
  1. Page 15 of 27

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set NECTA-05 Date Issued October 02, 2026 NECTA-122 Page 2 of 2 ii NECTA-107 Question: Please provide the following: (a) discuss whether a municipal attachment can cause a pole to be in violation or noncompliant with relevant pole standards, (b) provide the number of poles replaced associated with the non-billable O&M costs in Exhibit CLP REVREQ-4 that had one or more municipal attachments before replacement. NECTA-107 Response: a. Yes. A municipal attachment, like any other attachment occupying space on a utility pole, may contribute to a pole being out of compliance with applicable clearance, loading, safety, or other pole-related standards depending on the nature, location, and condition of the attachment. Whether a particular attachment contributed to a violation or non-compliant condition is determined based on the specific facts and conditions present at the pole. b. Eversource did not track or compile information regarding the presence of municipal attachments as part of the process used to develop Exhibit CLP-REVREQ-4. Accordingly, the Company has not determined the number of poles associated with the non-billable O&M costs in Exhibit CLP-REVREQ-4 that had one or more municipal attachments prior to the replacement.
  2. Page 16 of 27

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set NECTA-05 Date Issued October 02, 2026 NECTA-123 Page 1 of 1 Date Filed: October 16, 2026 Witness: David L. Gladey and Jeffrey Richard Request from: New England Connectivity and Telecommunications Association Question: Referencing the Written Exceptions of the Connecticut Light and Power Company d/b/a Eversource Energy dated April 25, 2022, in Docket No. 19-01-52RE01, please discuss whether, under Eversource’s proposal, existing or prospective municipal attachers would be allocated a share of non-billable make ready costs when a pole replacement is required. Response: Please refer to the Company’s response to NECTA-108 i. Prior Referenced Response: i NECTA-108 Question: Reference the Written Exceptions of the Connecticut Light and Power Company d/b/a Eversource Energy dated April 25, 2022, in Docket No. 19-01-52RE01, please discuss whether, under Eversource’s proposal, existing or prospective municipal attachers would be allocated a share of non-billable make ready costs when a pole replacement is required. NECTS-108 Response: Yes, Eversource’s proposal states that “if there are no unauthorized attachers, then all entities attached to the pole plus the new attacher should equitably share in the cost to fix it.” PURA will determine whether the terms “all entities” and “new attacher” include municipal attachers, however, the Company’s language is designed to encompass all attachers. PURA may decide to determine this issue in a new docket to, among other things, investigate modifications to the current cost allocation methodologies. Please refer to Docket No. 19-01-52RE01, September 9, 2026, ruling on Motion No. 044.
  3. Page 17 of 27

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set NECTA-05 Date Issued October 02, 2026 NECTA-124 Page 1 of 2 Date Filed: October 16, 2026 Witness: Edward A. Davis and Kimberly R. Parsons Request from: New England Connectivity and Telecommunications Association Question: Please provide Eversource’s filings for all pole rate changes pursuant to the pole rate settlement approved by PURA in Docket 17-10-46. Response: Please refer to the Company’s response to NECTA-109 i. Prior Referenced Response: i NECTA-109 Question: The following is a list of the Company’s third-party pole attachment rental rate changes since the Settlement Agreement was approved by PURA on May 18, 2018: Year January 1, 2018 January 1, 2019 January 1, 2020 January 1, 2021 January 1, 2022 January 1, 2023 January 1, 2024 January 1, 2025 January 1, 2026 Date Filed 02/15/2018 02/28/2019 12/04/2019 12/27/2021 12/27/2021 12/02/2022 12/01/2023 12/11/2024 12/01/2025 PURA Filing Motion 401 Compliance Filing2 Compliance Filing3 Motion 554 Motion 545 Motion 576 Motion 587 Motion 618 Motion 629 Please refer to NECTA-109, Attachment 1, as the full calculation with source data was not filed with PURA. Please refer to NECTA-109, Attachment 2, as the full calculation with source data was not filed with PURA. 3 https://www.dpuc.state.ct.us/2nddockcurr.nsf/8e6fc37a54110e3e852576190052b64d/935b05786e1931a785258752 00798cc4 4 https://www.dpuc.state.ct.us/2nddockcurr.nsf/8e6fc37a54110e3e852576190052b64d/49f63f09f75cee10852587b90 062b75f 5 https://www.dpuc.state.ct.us/2nddockcurr.nsf/8e6fc37a54110e3e852576190052b64d/fa3b4a59b553f551852587b80 05b557a 6 https://www.dpuc.state.ct.us/2nddockcurr.nsf/8e6fc37a54110e3e852576190052b64d/7217ca3aea414e1c8525890c0 06b2bbe 1 2
  4. Page 18 of 27

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set NECTA-05 Date Issued October 02, 2026 NECTA-124 Page 2 of 2 https://www.dpuc.state.ct.us/2nddockcurr.nsf/8e6fc37a54110e3e852576190052b64d/9eefc7010b52b13785258a780 067bef6 8 https://www.dpuc.state.ct.us/2nddockcurr.nsf/8e6fc37a54110e3e852576190052b64d/9a4b512d19856a8285258bf00 05c4137 9 https://www.dpuc.state.ct.us/2nddockcurr.nsf/8e6fc37a54110e3e852576190052b64d/44b3d5b8aa4c47e085258d53 006ec478 7
  5. Page 19 of 27

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set NECTA-05 Date Issued October 02, 2026 NECTA-125 Page 1 of 2 Date Filed: October 16, 2026 Witness: David L. Gladey, Jeffrey Richard and Marisa B. Paruta Request from: New England Connectivity and Telecommunications Association Question: For each pole that was replaced for which non-billable O&M costs have been recorded to the deferred asset for Third Party Pole Make Ready Work, please: a. indicate the age of the pole and whether it was fully depreciated; b. for the subset of poles that were overloaded, discuss whether Eversource reviewed the loading for specific communications strands and, if it did, identify the overloaded strands and the associated pole. Response: Please refer to the Company’s response to NECTA-110 i. Prior Referenced Response: i NECTA-110 Question: For each pole that was replaced for which non-billable O&M costs have been recorded to the deferred asset for Third Party Pole Make Ready Work, please (a) indicate the age of the pole and whether it was fully depreciated, (b) for the subset of poles that were overloaded, discuss whether Eversource reviewed the loading for specific communications strands and, if it did, identify the overloaded strands and the associated pole. NECTA-125 Response: a. Please refer to Table 1, below, for the number of poles retired annually for which non-billable O&M costs have been recorded to the deferred asset for Third Party Pole Make Ready Work.
  6. Page 20 of 27

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set NECTA-05 Date Issued October 02, 2026 NECTA-125 Page 2 of 2 CL&P utilizes the Broad Group Procedure to depreciate poles. Under the Broad Group Procedure, homogenous assets are grouped together and depreciated under a single average service life. The Company does not track the age of each individual pole retired under the Third Party Pole Make Ready program in the fixed asset module; therefore, the Company does not have information that would provide the vintage year of a pole retired in Table 1 or whether that pole was fully depreciated. b. For poles identified as overloaded, The Company's loading analysis evaluated the aggregate loading contributed by including communications attachments on the pole. The Company does not own, operate, engineer or maintain the communications facilities and does not perform loading analysis for individual communications strands or attribute loading impacts to individual strands. Accordingly, The Company did not identify or track overloaded conditions at the individual communications strand level and is unable to identify specific overloaded communications strands associated with particular poles.
  7. Page 21 of 27

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set NECTA-05 Date Issued October 02, 2026 NECTA-126 Page 1 of 6 Date Filed: October 19, 2026 Witness: Brendan J. O’Brien, Garrett J. Murray, Leanne M. Landry and Jeffrey D. Turano Request from: New England Connectivity and Telecommunications Association Question: The Joint Testimony of the Revenue Requirements Panel, at p. 66, states that the costs recorded to the deferred asset for Third Party Pole Make Ready are associated with the cost of performing nonbillable pole make ready work not recovered in base distribution rates. Please: a. Discuss whether this statement means that the costs recorded to the deferred asset are the costs for years in which the non-billable third party pole make ready costs exceeded the costs for such work in the basic distribution rates set in Docket 17-10-46; b. Provide the amount of non-billable third party pole make ready costs “embedded” in basic distribution rates in Docket 17-10-46, or another PURA decision thereafter; c. Discuss whether the non-billable third-party pole make ready costs recorded in the deferred asset were included as costs in the calculation of pole attachment rates, and provide the amount of the non-billable costs, broken down by FERC account included in the calculation of pole rates for each calendar year since the last rate case in 17-10-46, in which there has been a difference in treatment of such non-billable costs between basic distribution rates and pole rates; d. Discuss whether Eversource has reduced the amount recorded in the deferred asset for third party make ready costs for any revenues received or that will be received through pole rent that includes the non-billable cost in the setting of the pole rate. Response: a. Yes, as outlined in the Company’s response to subpart (e) and (h) in NECTA-054 i, the Company deferred all non-billable third-party pole make ready costs net of the amount recovered in base distribution rates. b. Please refer to the Company’s response to NECTA-048 ii. c. Please refer to the Company’s response to NECTA-120 iii. d. Please refer to the Company’s response to NECTA-112 iv.
  8. Page 22 of 27

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set NECTA-05 Date Issued October 02, 2026 NECTA-126 Page 2 of 6 Prior Referenced Responses: i NECTA-054 Question: (Make Ready Work & Related Costs) Reference Exhibit CLP REVREQ-4 (Third Party Pole Make Ready Costs). Provide the following: a. b. c. d. e. f. g. h. i. Line 7552, Notes, indicates that Eversource began maintaining detailed records of both billable and nonbillable make costs consistent with Order No. 15, in the Final Decision in 19-01-52 RE01. Please confirm that the figure of $16,580,868 includes only non-billable costs. Discuss whether (i) the non-compliance issues that led to the costs incurred by the company as shown in this exhibit were discovered by the company as a result of a new attacher requesting to attach, (ii) for each pole in the exhibit, the company has a record of when the last attacher attached to the pole and when the pole was last inspected. Confirm that the headings for columns F through Y are the FERC accounts to which the third party pole make ready costs were assigned; Provide a description of the subaccounts for Accounts 593, and 594. Discuss why all the costs are in O&M accounts and there are no costs in capital accounts at page 41 of Exhibit CLP REVREQ-1. For entries indicating “Pole replacement – Pole defective”, explain why if the pole is already defective, it would not be the company’s or the joint pole owner’s responsibility to replace the pole. With reference to line 7030 which explains that Frontier will set a new 40-foot class 2 pole and remove the 35-foot class 4 pole, explain *D&D*Conv and discuss how the capital costs associated with the pole replacement were treated in the FERC Form 1. Provide an allocation of the amount of $16,580,868 into calendars years, meaning the portion allocable to each year starting with 2017 and ending with 2025 and indicate where the allocations appear in the FERC Form 1 for those years. Explain line 7548, the removal of 2023-2025 Amounts in Distribution Rates of $2,408,607. Explain how that amount was added to distribution rates since the last rate case in Docket 17-10-46. NECTA-054 Response: a. Confirmed. The amount of $16,580,868 shown on line 7552, includes only non-billable third party make ready costs. As noted in Exhibit CLP-REVREQ-4, Eversource began maintaining detailed records of both billable and non-billable make ready costs consistent with the Docket 10-01-52RE01, Decision. The amount reflected in this exhibit represents costs that were classified as non-billable and therefore were not invoiced to attaching entities. b. (i) The non-compliance conditions reflected in Exhibit CLP-REVREQ-4, were identified during the engineering phase associated with attachment requests. (ii) Eversource maintains records related to pole inspections and attachment activity. The availability of records identifying the most recent attachment date and inspection date varies based on the specific pole and historical record availability. c. Yes, columns F through Y are the FERC accounts to which the third party pole make ready costs were assigned. d. Below is a description of the subaccounts for FERC 593, and 594.
  9. Page 23 of 27

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set NECTA-05 Date Issued October 02, 2026 NECTA-126 Page 3 of 6 • • • • • • • • • • • 593000 – Distribution Maintenance of Overhead Lines 593010 – Poles and Fixtures 593020 – Overhead Construction Transfer 593040 – Overhead Corrective Maintenance Repairs 593050 – Overhead Service Maintenance Repairs 593100 – Tree Trimming Vegetation Control 594000 – Distribution Maintenance of Underground Lines 594010 – Underground Conduit Maintenance 594020 – Manhole Regulating 594030 – Underground Corrective and Emergent Maintenance 594260 – Maintenance of Manholes e. In Docket No. 19-01-52RE01, PURA directed the Company to defer incremental non-billable make-ready costs (see Docket No. 19-01-52RE01 Final Decision dated May 11, 2022 at page 45). Consistent with this directive, the Company deferred incremental non-billable O&M make-ready costs to a regulatory asset which is being sought for recovery in this rate amendment application as supported by Exhibit CLPREVREQ-4. The capital costs for non-billable third party market ready pole work is included for recovery in the Company’s rate amendment application consistent with all other in-service capital and is supported in Exhibit CLP-ADDITIONS-9. f. For entries indicating “Pole replacement – Pole defective”, if the pole was found during survey to already be defective, it would be the Company’s or the joint pole owner’s responsibility to replace the pole. g. With reference to Exhibit CLP REVREQ-4 (Third Party Make Ready Costs), line 7030, “D&D Conv” is part of the Field Work Order description. The entire Field Work Order description for this line is “*D&D*Conv. 1635692 - Make Ready Non” which is used internally to communicate the contractor assigned to the work order, the Alden One conversation number, the type of work and billing classification. Therefore, “D&D” refers to D&D Contractors, “Conv. 1635692” is the Alden One conversation number, “Make Ready Non” indicates this is for make ready work and is ‘non’ billable. The capital costs associated with the additions and retirements related to the pole replacement were included on lines 64, 65, and 67, of pages 204-207, in the Company’s 2025 FERC Form 1 filing. h. The table below shows the $16,580,868 by year. The amounts are included in the FERC Form 1 under Electric Operation and Maintenance Expenses under their respective FERC account number (583, 584, 587, 590, 593, 594, 595, 596, and 598) by year.
  10. Page 24 of 27

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set NECTA-05 Date Issued October 02, 2026 NECTA-126 Page 4 of 6 i. ii Refer to the Company’s response to NECTA-048i, for the 2023-2025 amounts in distribution rates. NECTA-048 Question: (Make Ready Work & Related Costs) Reference Exhibit CLP-REVREQ-1, pp. 44-46. Reconcile the statement that “the Company has not included any pole make-ready costs within base distribution rates in this proceeding…” (p. 46) with PURA’s statement in Docket No. 19-01-52RE01, that “EDCs received some level of recovery in base distribution rates to perform non-billable make-ready work…” A complete response will explain the steps taken by the Company to ensure that there is no double-recovery of non-billable make-ready costs in base rates versus in the deferred regulatory asset for non-billable make-ready costs. NECTA-048 Response: As noted in Exhibit CLP-REVREQ-1 at 44, lines 12 through 15, the Company states “The costs recorded to this deferred asset are associated with the costs of performing non-billable make-ready pole work not recovered in base distribution rates [emphasis added] to meet established standards, as approved in Docket No. 19-01-52RE01…” Further, in Late File Exhibit-01 in Docket No. 19-01-52RE01, the Company notes there is $803 thousand recovered in base distribution rates, annually, that are netted against cumulative non-billable make-ready costs. Therefore, providing assurance that the Company is not double-recovering non-billable make-ready costs in base distribution rates. Refer to Exhibit CLP-REVREQ-4 (Make Ready Pole Work), line 7548 in tab “Non-Billable Reason” for the Removal of 2023-2025 Amounts in Distribution Rates totaling $2.4 million. iii NECTA-120 Question: For each year nonbillable make ready costs were deferred, and for each FERC expense account and subaccount initially charged with costs included in the nonbillable make-ready regulatory asset:

Text of OCC Set 22_COMBINED.pdf

Extracted from the file · 40 pages · 63,151 characters

Text of OCC Set 23_COMBINED.pdf

Extracted from the file · 8 pages · 12,023 characters

Text of OCC Set 25_COMBINED.pdf

Extracted from the file · 33 pages · 57,780 characters

Text of OCC Set 26_COMBINED.pdf

Extracted from the file · 11 pages · 14,212 characters

Text of PURA Set 6_COMBINED.pdf

Extracted from the file · 82 pages · 163,601 characters

Text of PURA Set 7_COMBINED.pdf

Extracted from the file · 141 pages · 373,939 characters

Text of UCONN Set 1_COMBINED.pdf

Extracted from the file · 45 pages · 105,510 characters

Text of UCONN Set 2_COMBINED.pdf

Extracted from the file · 19 pages · 40,074 characters

As listed on the current system

Corres. 10/21/2026 [26-05-10] (Keegan Werlin LLP) - Compilation of Discovery Responses