Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Compilation of Discovery Responses

Files15

Search terms highlighted
Eversource rate increase is on 113 pages across 8 files of the text below, highlighted. Go to the first matchClear highlighting
Words on different pages
Words on different pages
Words on different pages

Text of CLF-AC Set 2_COMBINED.pdf

Extracted from the file · 18 pages · 32,497 characters

Text of EOE Set 7_COMBINED.pdf

Extracted from the file · 150 pages · 432,851 characters

Text of NECTA Set 4_COMBINED.pdf

Extracted from the file · 14 pages · 26,843 characters

4 pages match
  1. Page 8 of 27

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set NECTA-05 Date Issued October 02, 2026 NECTA-119 Page 1 of 2 Date Filed: October 16, 2026 Witness: Leanne M. Landry, Jeffrey D. Turano and Marisa B. Paruta Request from: New England Connectivity and Telecommunications Association Question: Refer to NECTA-059 Attachment 1, which reports $63,608,379 in Account 106010, “Completed Construction Not Classified,” as of December 31, 2025. Please provide: a. A work-order-level schedule reconciling to the $63,608,379 balance. For each work order, identify its number, description, balance, work type, expected FERC utility account and retirement-unit category upon unitization, and the dates it was placed in service and posted to Account 106010. b. Identify each work order involving the installation or replacement of a pole, and state whether the pole was physically installed and in service as of December 31, 2025. c. Identify each work order subsequently unitized, including the unitization date, final FERC utility account, retirement-unit category, number of poles posted to the continuing property records, and any change from its December 31, 2025 balance. Reconcile these subsequent postings to the work orders provided in subpart (a). Response: a. Please refer to NECTA-119, Attachment 1, for the list of work orders associated with the $63,608,379 ‘non-unitized’ balance in Account 364310, including work order number, description, work order type, in-service date and balances in each estimated utility account at 12-31-2025. Retirement unit category is not determined until unitization. As discussed in the Company’s response to NECTA-075 i, balances in account 106 remain in the ‘nonunitized’ category while the work order activities are finalized. After all invoices are received, drawings are finalized, the pre-requisites/tasks in the work management system are completed, and final costs appropriately flow through the FERC Split, the work order is closed/posted to the CPR (Continuing Property Records). Once closed, the final costs of the assets in FERC account 106 are moved to FERC account 101010 (Plant in Service) and unitized/posted to the CPR with their specific retirement units in each appropriate Utility Account. b. Because retirement unit category is not determined until the work order is unitized and Posted to the CPR, work orders in 106010 involving the installation or replacement of poles cannot be specifically identified.
  2. Page 9 of 27

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set NECTA-05 Date Issued October 02, 2026 NECTA-119 Page 2 of 2 c. Please refer to NECTA-119, Attachment 2, for a list of work orders from the ‘nonunitized’ balance of $63,608,379 that were unitized and Posted to the CPR after 12/31/2025, including the retirement units, quantity, FERC utility accounts, work order close date, General Ledger post date, and amounts posted to account 101010. Differences between work order 106 balances at one point in time and subsequent postings to 101 at a later date are due to normal work order lifecycle activities including additional work order charges, customer contributions, adjusting journal entries, final estimate updates and FERC split reallocations. Prior Referenced Response: i NECTA-075 Question: (FERC Accounts) Select a 2025 Work Order and provide a discussion and timeline for the assignment of costs to the different FERC accounts beginning with the opening of the Work Order and the initial incurrence of costs to the closing of the Work Order. As part of this response, please indicate whether all costs are held in Account 365 until the Work Order is closed, or are costs assigned based on when proper account designation is determined. NECTA-0175 Response: For example, Work Order 80364832 was initiated in July 2025, for the replacement of a recloser and recloser control. The Operations department generated this new work order in the Company’s work management system, ensuring the correct work order type was established based on the type of work being performed. The estimates were then entered for the work order by selecting the Compatible Units (assets) planned to be installed and removed, which created the FERC Split. The combination of the Work Order Type and FERC Split chosen for Work Order 80364832 ensured that the correct Utility Accounts were utilized, as well as determining the appropriate allocation of charges between FERC accounts 107010 (Construction Work in Progress) and 108030 (Cost of Removal). The work order was set to “open” status in July 2025; work commenced and capital expenditures were charged to FERC accounts 107010, and 108030. While in FERC Account 107, the capital expenditures are not disseminated at the Utility Account (365 Overhead Conductors and Devices) level in the Company’s plant asset records. When the installed assets were deemed “used and useful” later in July 2025, the Operations department moved the work order to “in-service” status and the capital expenditures in FERC Account 107 were moved to FERC Account 106 (Completed Construction not Classified), while the charges in FERC Account 108030, remained unchanged. At that time, the assets placed in service began to depreciate in their assigned Utility Account (365), while the Operations department continued to work on finalizing all costs to the work order. In December 2025, after all invoices were received, drawings were finalized, the pre-requisites/tasks in the work management system were completed, final costs appropriately flow through the FERC Split, the work order was closed/posted to the CPR (Continuing Property Records). Once this work order was closed, the final costs of the plant additions in FERC Account 106 were moved to FERC Account 101010 (Plant in Service) and unitized/posted to the CPR with the specific retirement units in Utility Account 365 based on final costs. The final cost of removal in FERC Account 108030, was then moved to FERC Account 108010 (Accumulated Provision for Depreciation).
  3. Page 10 of 27

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set NECTA-05 Date Issued October 02, 2026 NECTA-120 Page 1 of 3 Date Filed: October 19, 2026 Witness: Edward A. Davis, Kimberly R. Parsons, Leanne M. Landry and Jeffrey D. Turano Request from: New England Connectivity and Telecommunications Association Question: For each year nonbillable make ready costs were deferred, and for each FERC expense account and subaccount initially charged with costs included in the nonbillable make-ready regulatory asset: a. Identify the gross amount charged, the amount credited to the expense account when the cost was deferred, and the net amount remaining, if any, in the FERC Form 1 expense balance. Identify the regulatory-asset account debited and provide the supporting journal entries. b. Identify any amount of those costs included in an input to the pole attachment rate calculation after deferral. Reconcile the 2025 nonbillable make-ready charges and deferral credits in Account 593, and its subaccounts to the $163,740,608 Account 593 input in Exhibit CLP-RATES-2.14. Response: a. Please refer to NECTA-120, Attachment 1, for the gross amount charged, the amount credited to expense when deferred, and the net amount remaining. The expense deferral is recorded to amortization FERC account 407000. Therefore, the gross amounts remain in their respective O&M FERC accounts. The regulatory asset account debited is FERC account 186MRC. Please refer to NECTA-120, Attachment 2, for the supporting journal entries as noted in the table below.
  4. Page 11 of 27

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set NECTA-05 Date Issued October 02, 2026 NECTA-120 Page 2 of 3 Entity FERC Account Month Number Journal ID Amount 11 186MRC 202206 452954 $25,922 11 186MRC 202207 455838 ($21,137) 11 186MRC 202305 487104 $1,109,194 11 186MRC 202305 488193 $582,059 11 186MRC 202306 491734 $485,508 11 186MRC 202307 494829 $572,589 11 186MRC 202308 497582 ($36,701) 11 186MRC 202309 501074 $595,951 11 186MRC 202310 504470 $917 11 186MRC 202311 507737 $223,926 11 186MRC 202312 511324 $2,275,976 11 186MRC 202403 520451 $46,288 11 186MRC 202404 523785 $641,915 11 186MRC 202405 527560 $971,722 11 186MRC 202406 530904 $344,989 11 186MRC 202407 534224 $278,399 11 186MRC 202408 537630 $215,438 11 186MRC 202409 540675 $611,944 11 186MRC 202410 544438 $520,422 11 186MRC 202411 547604 ($660,980) 11 186MRC 202412 551442 $652,437 11 186MRC 202502 557376 $380,824 11 186MRC 202503 560842 $1,098,738 11 186MRC 202504 564286 $944,656 11 186MRC 202505 567461 $407,804 11 186MRC 202506 570704 $615,282 11 186MRC 202507 573823 $1,104,707 11 186MRC 202508 577260 $783,761 11 186MRC 202509 580820 $182,860 11 186MRC 202510 584222 $411,278 11 186MRC 202511 587157 ($227,627) 11 186MRC 202512 590759 $345,207 $15,484,268 b. Please refer to NECTA-112, Attachment 1, for non-billable third-party make-ready costs from 2018 through 2025 by FERC Account. The amount related to non-billable third-party pole make ready found in Account 593 in 2025 was $4,551,307. This amount is 2.8% of
  5. Page 12 of 27

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set NECTA-05 Date Issued October 02, 2026 NECTA-120 Page 3 of 3 the total Account 593 that was used in the calculation of the 2027 third-party pole attachment rental rates shown in Exhibit CLP-RATES-2.14.
  6. Page 13 of 27

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set NECTA-05 Date Issued October 02, 2026 NECTA-121 Page 1 of 1 Date Filed: October 16, 2026 Witness: Brendan J. O’Brien, Garrett J. Murray, Leanne M. Landry and Jeffrey D. Turano Request from: New England Connectivity and Telecommunications Association Question: Refer to NECTA-054(h). The Company deducted $802,869 per year from nonbillable make-ready costs for 2023 through 2025 to account for recovery in base distribution rates, but made no deduction for 2022. a. Please explain why no deduction was made for 2022. b. Explain whether the Company recovered any nonbillable make-ready costs through base distribution rates during that year. If it did, quantify the amount applicable to the period for which 2022 costs were deferred and provide a revised calculation of the proposed regulatory asset reflecting that amount. Response: a. The Final Decision for Docket No. 19-01-52RE01 was approved by PURA on May 11, 2022 permitting the Company to commence deferring the make-ready O&M costs. The unbillable make-ready costs in base distribution rates of $802,869 for calendar year 2022 had already been exceeded for the first four months of the year. In other words, the O&M costs incurred on make-ready work up to the date of the Final Decision was in excess of the base rate recovery. b. The Company had incurred more than $1 million of make-ready O&M from January 2022 through April 2022. That amount was more than the amount being recovered in base distribution rates. No revision in the calculation is required.
  7. Page 14 of 27

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set NECTA-05 Date Issued October 02, 2026 NECTA-122 Page 1 of 2 Date Filed: October 16, 2026 Witness: David L. Gladey and Jeffrey Richard Request from: New England Connectivity and Telecommunications Association Question: For all poles replaced for which Eversource is seeking amortization of non-billable O&M costs in Exhibit CLP REVREQ-4, please a. confirm that third-party attachers transferred their attachments to the replacement pole at their cost; b. discuss whether a municipal attachment can be the cause of a pole being non-compliant; and c. provide the number of poles replaced associated with the non-billable O&M costs in Exhibit CLP REVREQ-4 that had municipal attachments. Response: a. Please refer to the Company’s response to NECTA-106 i. b. Please refer to the Company’s response to NECTA-107 ii subpart (a). c. Please refer to the Company’s response to NECTA-107 subpart (b). Prior Referenced Response: i NECTA-106 Question: For all poles replaced for which Eversource is seeking amortization of non-billable O&M costs in Exhibit CLP REVREQ-4, please confirm that third-party attachers transferred their attachments to the replacement pole at their cost. If not. Identify the exceptions and state who bore the transfer costs, the amounts involved, and whether any such amounts are included in the proposed amortization. NECTA-106 Response: Eversource does not perform, direct, schedule, or fund the transfer of third-party attachments to replacement poles and does not maintain records regarding costs incurred by third party attachers for such transfers. The costs reflected in Exhibit CLP-REVREQ-r are costs incurred by Eversource and do not include costs incurred by third party attachers to transfer their facilities.
  8. Page 15 of 27

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set NECTA-05 Date Issued October 02, 2026 NECTA-122 Page 2 of 2 ii NECTA-107 Question: Please provide the following: (a) discuss whether a municipal attachment can cause a pole to be in violation or noncompliant with relevant pole standards, (b) provide the number of poles replaced associated with the non-billable O&M costs in Exhibit CLP REVREQ-4 that had one or more municipal attachments before replacement. NECTA-107 Response: a. Yes. A municipal attachment, like any other attachment occupying space on a utility pole, may contribute to a pole being out of compliance with applicable clearance, loading, safety, or other pole-related standards depending on the nature, location, and condition of the attachment. Whether a particular attachment contributed to a violation or non-compliant condition is determined based on the specific facts and conditions present at the pole. b. Eversource did not track or compile information regarding the presence of municipal attachments as part of the process used to develop Exhibit CLP-REVREQ-4. Accordingly, the Company has not determined the number of poles associated with the non-billable O&M costs in Exhibit CLP-REVREQ-4 that had one or more municipal attachments prior to the replacement.
  9. Page 16 of 27

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set NECTA-05 Date Issued October 02, 2026 NECTA-123 Page 1 of 1 Date Filed: October 16, 2026 Witness: David L. Gladey and Jeffrey Richard Request from: New England Connectivity and Telecommunications Association Question: Referencing the Written Exceptions of the Connecticut Light and Power Company d/b/a Eversource Energy dated April 25, 2022, in Docket No. 19-01-52RE01, please discuss whether, under Eversource’s proposal, existing or prospective municipal attachers would be allocated a share of non-billable make ready costs when a pole replacement is required. Response: Please refer to the Company’s response to NECTA-108 i. Prior Referenced Response: i NECTA-108 Question: Reference the Written Exceptions of the Connecticut Light and Power Company d/b/a Eversource Energy dated April 25, 2022, in Docket No. 19-01-52RE01, please discuss whether, under Eversource’s proposal, existing or prospective municipal attachers would be allocated a share of non-billable make ready costs when a pole replacement is required. NECTS-108 Response: Yes, Eversource’s proposal states that “if there are no unauthorized attachers, then all entities attached to the pole plus the new attacher should equitably share in the cost to fix it.” PURA will determine whether the terms “all entities” and “new attacher” include municipal attachers, however, the Company’s language is designed to encompass all attachers. PURA may decide to determine this issue in a new docket to, among other things, investigate modifications to the current cost allocation methodologies. Please refer to Docket No. 19-01-52RE01, September 9, 2026, ruling on Motion No. 044.
  10. Page 17 of 27

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set NECTA-05 Date Issued October 02, 2026 NECTA-124 Page 1 of 2 Date Filed: October 16, 2026 Witness: Edward A. Davis and Kimberly R. Parsons Request from: New England Connectivity and Telecommunications Association Question: Please provide Eversource’s filings for all pole rate changes pursuant to the pole rate settlement approved by PURA in Docket 17-10-46. Response: Please refer to the Company’s response to NECTA-109 i. Prior Referenced Response: i NECTA-109 Question: The following is a list of the Company’s third-party pole attachment rental rate changes since the Settlement Agreement was approved by PURA on May 18, 2018: Year January 1, 2018 January 1, 2019 January 1, 2020 January 1, 2021 January 1, 2022 January 1, 2023 January 1, 2024 January 1, 2025 January 1, 2026 Date Filed 02/15/2018 02/28/2019 12/04/2019 12/27/2021 12/27/2021 12/02/2022 12/01/2023 12/11/2024 12/01/2025 PURA Filing Motion 401 Compliance Filing2 Compliance Filing3 Motion 554 Motion 545 Motion 576 Motion 587 Motion 618 Motion 629 Please refer to NECTA-109, Attachment 1, as the full calculation with source data was not filed with PURA. Please refer to NECTA-109, Attachment 2, as the full calculation with source data was not filed with PURA. 3 https://www.dpuc.state.ct.us/2nddockcurr.nsf/8e6fc37a54110e3e852576190052b64d/935b05786e1931a785258752 00798cc4 4 https://www.dpuc.state.ct.us/2nddockcurr.nsf/8e6fc37a54110e3e852576190052b64d/49f63f09f75cee10852587b90 062b75f 5 https://www.dpuc.state.ct.us/2nddockcurr.nsf/8e6fc37a54110e3e852576190052b64d/fa3b4a59b553f551852587b80 05b557a 6 https://www.dpuc.state.ct.us/2nddockcurr.nsf/8e6fc37a54110e3e852576190052b64d/7217ca3aea414e1c8525890c0 06b2bbe 1 2

Text of OCC Set 22_COMBINED.pdf

Extracted from the file · 40 pages · 63,151 characters

Text of OCC Set 23_COMBINED.pdf

Extracted from the file · 8 pages · 12,023 characters

Text of OCC Set 25_COMBINED.pdf

Extracted from the file · 33 pages · 57,780 characters

Text of OCC Set 26_COMBINED.pdf

Extracted from the file · 11 pages · 14,212 characters

Text of PURA Set 6_COMBINED.pdf

Extracted from the file · 82 pages · 163,601 characters

Text of PURA Set 7_COMBINED.pdf

Extracted from the file · 141 pages · 373,939 characters

Text of UCONN Set 1_COMBINED.pdf

Extracted from the file · 45 pages · 105,510 characters

Text of UCONN Set 2_COMBINED.pdf

Extracted from the file · 19 pages · 40,074 characters

As listed on the current system

Corres. 10/21/2026 [26-05-10] (Keegan Werlin LLP) - Compilation of Discovery Responses

This filing on the current system (opens in a new tab)