Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Compilation of Discovery Responses

Files15

Search terms highlighted
Eversource rate increase is on 113 pages across 8 files of the text below, highlighted. Go to the first matchClear highlighting
Words on different pages
Words on different pages
Words on different pages

Text of CLF-AC Set 2_COMBINED.pdf

Extracted from the file · 18 pages · 32,497 characters

Text of EOE Set 7_COMBINED.pdf

Extracted from the file · 150 pages · 432,851 characters

Text of NECTA Set 4_COMBINED.pdf

Extracted from the file · 14 pages · 26,843 characters

Text of NECTA Set 5_COMBINED.pdf

Extracted from the file · 27 pages · 51,321 characters

Text of OCC Set 22_COMBINED.pdf

Extracted from the file · 40 pages · 63,151 characters

Text of OCC Set 23_COMBINED.pdf

Extracted from the file · 8 pages · 12,023 characters

Words on different pages
  1. Page 24 of 33

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-25 Date Issued October 05, 2026 OCC-927 Page 3 of 4 OCC-925 Response: Projects with a total estimated cost of less than $500,000 are typically limited in scope and are generally associated with routine replacement of failed, damaged, or end-of-life equipment. These "break/fix" projects are usually undertaken to restore or maintain the reliability and safe operation of the electric system. Because the equipment being replaced is generally required to perform a specific function and must meet established engineering and operational standards, there are often limited alternative solutions available. As a result, there are generally fewer opportunities for additional cost savings through further review and analysis. For larger capital projects with estimated costs greater than $500,000, the Company conducts a more comprehensive review in accordance with the Distribution Tri State Capital Project Approval Process (Distribution Lines) or Capital Project Approval Process (Distribution Substations). As part of this process, the Company evaluates multiple alternatives and project configurations to identify the solution that best addresses the identified system need while providing the most cost-effective outcome. This review may include evaluation of different engineering designs, equipment options, system configurations, project timing considerations, and operational impacts. The selected alternative is based on an assessment of factors such as reliability, safety, operational requirements, constructability, environmental considerations, and overall project cost. Please refer to OCC-925, Attachment 1 – Distribution Tri-State Capital Project Approval Process Please refer to OCC-925, Attachment 2 – Capital Project Approval Process See the following projects as examples of projects greater than $500,000 that underwent the alternatives analysis review process and achieved cost savings through the evaluation of multiple project options. Please note that these projects are also included in Exhibit CLP-ADDITIONS-4, as identified in the references below. Additionally, each line reference corresponds directly to the associated supporting folder in Exhibit CLP-ADDITIONS-6. - CD02190 - Middle River 28M3 Load Relief: Exhibit 4 tab “Project Specifics Post 2022”, line 286 CD02164- Norwalk 9S27 Normal overload: Exhibit 4 tab “Project Specifics Post 2022”, line 281 CD02577 - Amazon EV Chargers, Victoria Dr, Monroe: Exhibit 4 tab “Project Specifics Post 2022”, line 374 CD02153 - Stone Bridge Commons New Service: Exhibit 4 tab “Project Specifics Post 2022”, line 278 CS00577 - Rockville 14W-6X Transformer Voltage Change: Exhibit 4 tab “Project Specifics Post 2022”, line 416 OCC-924 Question: (Capital Projects) Referring to Exhibit CLP-Additions-1, page 12. Please define the term "flexibility in the budget"; explain what determines whether a project has budget flexibility or not; and identify the components (i.e. project cost categories) of a project budget which are flexible and which are inflexible. iii OCC-924 Response: The term “flexibility in the budget” is a reference to the overall capital budget, not the budget for a specific project. The term refers to the ability to defer, accelerate, or reprioritize planned capital spending within a given budget period in response to changing system conditions, emerging operational needs, or unforeseen project requirements. Budget flexibility is an important component of managing a large capital portfolio and enables the Company to efficiently allocate capital to projects that provide the greatest near-term benefit to customers and system operations. Whether a specific project has flexibility in relation to the overall budget depends primarily on the urgency of the underlying need, regulatory or compliance requirements, customer commitments, safety considerations, and the potential system impacts associated with delaying the work. Projects that address immediate safety concerns, mandated compliance requirements, emergent reliability issues, customer-driven obligations, or equipment failures
  2. Page 25 of 33

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-25 Date Issued October 05, 2026 OCC-927 Page 4 of 4 generally have limited or no budget flexibility because delays could result in unacceptable operational, safety, or customer impacts. In contrast, projects addressing aging infrastructure that remain in serviceable condition may have greater flexibility because the assets can continue to operate safely and reliably for a period beyond the originally planned replacement date. For aging infrastructure replacement projects, budget flexibility typically exists when asset condition, engineering assessments, operational history and system performance indicate that the asset can remain in service without creating an immediate reliability, safety, or compliance concern. In these situations, The Company may defer a planned replacement project by one or more years with limited near-term impact on customer reliability while continuing to monitor the asset through its normal maintenance and inspection programs. Budget categories that are generally considered more flexible include planned construction expenditures associated with asset replacement programs, such as labor, materials, equipment, and contractor costs for projects that have not yet commenced construction or where construction can be paused without creating risk to the distribution system and can be rescheduled based on emergent priorities. The ability to defer certain aging infrastructure replacement projects provides an important mechanism for managing capital expenditures within the overall portfolio. When unforeseen conditions arise, such as unexpected equipment failures, storm-related damage, deteriorated assets identified through inspections, or other emergent reliability needs, funding associated with projects that can be safely deferred may be reallocated to address those higher-priority needs. This approach allows the Company to respond promptly to emergent system conditions while continuing to maintain safe and reliable service. Deferred replacement projects remain within the long-term capital plan and are reevaluated in subsequent planning cycles to ensure that asset condition and system risk remain acceptable before replacement is further postponed. Accordingly, budget flexibility does not reflect the elimination of planned infrastructure investments, but rather the Company's ability to optimize the timing of certain replacement projects whose deferral is not expected to have an immediate impact on system reliability, while ensuring sufficient funding is available to address unforeseen conditions that require immediate corrective action.
  3. Page 26 of 33

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-25 Date Issued October 05, 2026 OCC-928 Page 1 of 2 Date Filed: October 20, 2026 Witness: Lavelle A. Freeman, Edward A. Davis, Juan F. Martinez, Gerhard Walker and Kimberly R. Parsons Request from: Office of Consumer Counsel Question: (ECONOMIC DEVELOPMENT RATE) Refer to Exh. CLP-RATES-1, at 31, which states that the proposed EDR “produces system-wide benefits by improving utilization, enhancing fixed cost recover, and placing downward pressure on rates.” a. Please explain whether and how the rate schedules applicable to EDR customers (Rate 57 and Rate 58) provide incentives for customers to shift load away from system or local peak hours. If not, why not? b. Please provide the capacity headroom on the Company’s system and identify the date and hour of the system peak for the last 3 years. c. Please provide the capacity headroom for each of the Company’s substation, along with the date and hour of peak at each substation for the last 3 years. Response: a. The structures and design of rates for each component of service under these schedules reflect the type of cost and charge associated with the service provided. Distribution demand charges are designed to meet these customers’ system demand requirements and to be more efficient by recovering fixed local and system costs through customer charges, which are further set on a tiered basis depending on customer’s level of demand and local capacity requirements. Charges for transmission and NBFMCC components of service are designed to recover the cost of providing these services on a peak period demand basis, which provides a price signal to efficiently manage load during peak hours and potentially reduce or shift load away from peak hours. Generation service for these customers is provided through Last Resort Service, which is priced on a time-of-day basis which provides volumetric-based (i.e., per kWh) pricing which may also encourage efficient use of power and provide an incentive to shift load away from peak hours. b. Please refer to OCC-928, Attachment 1, for headroom capacity of all bulk substations. The last 3 years available are 2023, 2024, and 2025. The last row in the excel worksheet of Attachment 1 calculates the total non-coincident headroom capacity. These values can be used to identify capacity headroom on the Company’s system but they cannot be simply added up to identify a total system headroom capacity but rather need to be understood as available headroom at a specific asset. It must also be understood that assets upstream, or
  4. Page 27 of 33

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-25 Date Issued October 05, 2026 OCC-928 Page 2 of 2 downstream may be more limiting than the station headroom itself. The total headroom capacity is not used to plan system needs but may be used as a trend to identify the overall capacity available from year to year. Headroom capacity for a specific location can be seen on the Company’s hosting capacity map (Eversource CT Grid Connection Navigator). It is assumed that the question is asking for distribution loads, not including transmission loads. If so the dates and hours with the highest coincident distribution loads across the substations for the last 3 years have been: i. 9/17/2023: 5 pm ii. 7/16/2024: 6 pm iii. 7/29/2025: 6 pm c. Please refer to OCC-928, Attachment 1, for headroom capacity of all bulk substations. The last 3 years available are 2023, 2024, and 2025. Peak load data for 2026 has not been finalized to calculate headroom capacity.
  5. Page 28 of 33

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-25 Date Issued October 05, 2026 OCC-929 Page 1 of 1 Date Filed: October 19, 2026 Witness: Edward A. Davis and Kimberly R. Parsons Request from: Office of Consumer Counsel Question: (ECONOMIC DEVELOPMENT RATE) Refer to Exh. CLP-RATES-1, at 26. Please explain the standards the Company will use to determine that a customer’s project provides sufficient economic value, including job creation and capital investment, to qualify for the EDR. Response: The Company anticipates a written commitment and demonstrated achievement of added jobs and capital investment within the Company’s service area, commensurate with the level of service and nature of the new or expanded facilities that would receive service under the EDR. The Company is also reviewing the requirements and documentation set forth as part of UI’s current EDR program, pursuant to UI’s rate case in Docket No. 28-08-08. Details of these and other standards are yet to be developed.
  6. Page 29 of 33

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-25 Date Issued October 05, 2026 OCC-930 Page 1 of 1 Date Filed: October 19, 2026 Witness: Edward A. Davis and Kimberly R. Parsons Request from: Office of Consumer Counsel Question: (ECONOMIC DEVELOPMENT RATE) Refer to Exh. CLP-RATES-1, at 26. Please explain the standards the Company would use to determine that a customer’s project sufficiently supports regulatory objectives to qualify for the EDR. Please also identify the relevant “regulatory objectives.” Response: In addition to customer-side standards such as those highlighted in response to OCC-929 i, the regulatory objectives under the EDR would include meeting the minimum new or incremental demand thresholds and setting discounted rates at levels that exceed marginal cost of providing service while providing a contribution to fixed costs of providing service and without shifting costs to other customers. The requirements set forth as part of the decision and EDR implemented pursuant to UI’s rate case in PURA Docket No. 28-08-08 provide another basis for regulatory objective standards applicable to the Eversource EDR. Prior Referenced Response: i OCC-929 Question: (ECONOMIC DEVELOPMENT RATE) Refer to Exh. CLP-RATES-1, at 26. Please explain the standards the Company will use to determine that a customer’s project provides sufficient economic value, including job creation and capital investment, to qualify for the EDR. OCC-929 Response: The Company anticipates a written commitment and demonstrated achievement of added jobs and capital investment within the Company’s service area, commensurate with the level of service and nature of the new or expanded facilities that would receive service under the EDR. The Company is also reviewing the requirements and documentation set forth as part of UI’s current EDR program, pursuant to UI’s rate case in Docket No. 28-08-08. Details of these and other standards are yet to be developed.
  7. Page 30 of 33

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-25 Date Issued October 05, 2026 OCC-931 Page 1 of 1 Date Filed: October 19, 2026 Witness: Edward A. Davis and Kimberly R. Parsons Request from: Office of Consumer Counsel Question: (ECONOMIC DEVELOPMENT RATE) Refer to Exh. CLP-RATES-1, at 26-27. Please explain what information a customer will be required to submit to demonstrate that “new load or expanded operations would not occur, or would be materially altered, absent the availability of the EDR.” Will applicants be required to provide pricing offers from other utilities/jurisdictions? If not, why not? Response: An applicant will be required to attest and demonstrate that receiving a discount under the EDR is a decisive factor in their decision to add new or incremental load during the term of service under the EDR. An explanation of the reason and characteristics of such new or incremental load, and of why an EDR discount is needed as a prerequisite for siting or expansion of load in the Company’s service area is also required.
  8. Page 31 of 33

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-25 Date Issued October 05, 2026 OCC-932 Page 1 of 1 Date Filed: October 19, 2026 Witness: Edward A. Davis, Steven Lamontagne and Kimberly R. Parsons Request from: Office of Consumer Counsel Question: (ECONOMIC DEVELOPMENT RATE) Refer to Exh. CLP-RATES-1, at 29. a. Please explain what equipment is included in the “interconnection, system upgrade, or make-ready costs” for which EDR customers would be responsible (e.g., substations, transformers, conductors, etc.). b. If upgrades to shared infrastructure, such as substations, are required, explain how the costs of the upgrades are recovered. Response: a. Customers would be responsible for all costs associated with the installation of a new service pursuant to the Company’s new business policies. These costs are determined when such applications are made to the Company and would vary depending on the site conditions and work required for each location. Discounted revenues contemplated under the term of an EDR would be considered in the context of any CIAC or similar evaluation for a prospective EDR applicant. b. Such upgrades and the recovery of costs would be considered pursuant to the Company’s new business policy guidelines and any other considerations at the time of application for service.
  9. Page 32 of 33

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-25 Date Issued October 05, 2026 OCC-933 Page 1 of 2 Date Filed: October 19, 2026 Witness: Edward A. Davis and Kimberly R. Parsons Request from: Office of Consumer Counsel Question: (ECONOMIC DEVELOPMENT RATE) Refer to the Company’s response to OCC-458. Explain the factors that will be considered in negotiations with each EDR customer (e.g., potential system benefits, economic development benefits) and the relative weight of each factor for determining the customer’s discount level. a. Did the Company consider providing the same discount level for all EDR customers? If so, why did the Company rule out this option? If not, why not? Response: The Company considered a set of fixed, declining factors, but did not elect to propose this pathway without additional data from specific use cases. As a general framework for any negotiation, the Company considers discounts to distribution rates equating to 25% in year 1 with 5% decrements in each of the 4 subsequent, sequential years, terminating upon completion of the 5-year period, to be a reasonable initial schedule. Relative to this schedule, both the discounts (higher or lower) and the term (5 years is the maximum) could potentially be adjusted, with consideration of both the aforementioned regulatory objectives and the need to achieve revenue sufficiency pursuant to factors discussed in the Company’s response to OCC-932 i, assuring no shifting of costs to other customers. In turn, further discount levels may be considered commensurate with a demonstrated positive system benefit (e.g., contribution to fixed costs while remaining above marginal costs). Prior Referenced Response i OCC-932 Question: (ECONOMIC DEVELOPMENT RATE) Refer to Exh. CLP-RATES-1, at 29. a. Please explain what equipment is included in the “interconnection, system upgrade, or make-ready costs” for which EDR customers would be responsible (e.g., substations, transformers, conductors, etc.). b. If upgrades to shared infrastructure, such as substations, are required, explain how the costs of the upgrades are recovered.
  10. Page 33 of 33

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-25 Date Issued October 05, 2026 OCC-933 Page 2 of 2 OCC-932 Response: a. Customers would be responsible for all costs associated with the installation of a new service pursuant to The Company’s new business policies. These costs are determined when such applications are made to The Company and would vary depending on the site conditions and work required for each location. Discounted revenues contemplated under the term of an EDR would be considered in the context of any CIAC or similar evaluation for a prospective EDR applicant. b. Such upgrades and the recovery of costs would be considered pursuant to The Company’s new business policy guidelines and any other considerations at the time of application for service.

Text of OCC Set 26_COMBINED.pdf

Extracted from the file · 11 pages · 14,212 characters

Text of PURA Set 6_COMBINED.pdf

Extracted from the file · 82 pages · 163,601 characters

Text of PURA Set 7_COMBINED.pdf

Extracted from the file · 141 pages · 373,939 characters

Text of UCONN Set 1_COMBINED.pdf

Extracted from the file · 45 pages · 105,510 characters

Text of UCONN Set 2_COMBINED.pdf

Extracted from the file · 19 pages · 40,074 characters

As listed on the current system

Corres. 10/21/2026 [26-05-10] (Keegan Werlin LLP) - Compilation of Discovery Responses

This filing on the current system (opens in a new tab)