Compilation of Discovery Responses
Files15
Docket No. 26-05-10 Discovery Compilations October 21 2026.pdf
PDF · 157 KB · 2 pagesText searchable
Download Docket No. 26-05-10 Discovery Compilations October 21 2026.pdfRead the text of Docket No. 26-05-10 Discovery Compilations October 21 2026.pdf
ALLCO Set 7_COMBINED.pdf
PDF · 291 KB · 24 pagesText searchable
Download ALLCO Set 7_COMBINED.pdfRead the text of ALLCO Set 7_COMBINED.pdf
CIEC Set 5_COMBINED.pdf
PDF · 112 KB · 2 pagesText searchable
Download CIEC Set 5_COMBINED.pdfRead the text of CIEC Set 5_COMBINED.pdf
CLF-AC Set 2_COMBINED.pdf
PDF · 394 KB · 18 pagesText searchable
Download CLF-AC Set 2_COMBINED.pdfRead the text of CLF-AC Set 2_COMBINED.pdf
EOE Set 7_COMBINED.pdf
PDF · 1.4 MB · 150 pagesText searchable
Download EOE Set 7_COMBINED.pdfRead the text of EOE Set 7_COMBINED.pdf
NECTA Set 4_COMBINED.pdf
PDF · 409 KB · 14 pagesText searchable
Download NECTA Set 4_COMBINED.pdfRead the text of NECTA Set 4_COMBINED.pdf
NECTA Set 5_COMBINED.pdf
PDF · 533 KB · 27 pagesText searchable
Download NECTA Set 5_COMBINED.pdfRead the text of NECTA Set 5_COMBINED.pdf
OCC Set 22_COMBINED.pdf
PDF · 627 KB · 40 pagesText searchable
Download OCC Set 22_COMBINED.pdfRead the text of OCC Set 22_COMBINED.pdf
OCC Set 23_COMBINED.pdf
PDF · 257 KB · 8 pagesText searchable
Download OCC Set 23_COMBINED.pdfRead the text of OCC Set 23_COMBINED.pdf
OCC Set 25_COMBINED.pdf
PDF · 323 KB · 33 pagesText searchable
Download OCC Set 25_COMBINED.pdfRead the text of OCC Set 25_COMBINED.pdf
OCC Set 26_COMBINED.pdf
PDF · 240 KB · 11 pagesText searchable
Download OCC Set 26_COMBINED.pdfRead the text of OCC Set 26_COMBINED.pdf
PURA Set 6_COMBINED.pdf
PDF · 1.5 MB · 82 pagesText searchable
Download PURA Set 6_COMBINED.pdfRead the text of PURA Set 6_COMBINED.pdf
PURA Set 7_COMBINED.pdf
PDF · 1.4 MB · 141 pagesText searchable
Download PURA Set 7_COMBINED.pdfRead the text of PURA Set 7_COMBINED.pdf
UCONN Set 1_COMBINED.pdf
PDF · 597 KB · 45 pagesText searchable
Download UCONN Set 1_COMBINED.pdfRead the text of UCONN Set 1_COMBINED.pdf
UCONN Set 2_COMBINED.pdf
PDF · 372 KB · 19 pagesText searchable
Download UCONN Set 2_COMBINED.pdfRead the text of UCONN Set 2_COMBINED.pdf
Text of CLF-AC Set 2_COMBINED.pdf
Extracted from the file · 18 pages · 32,497 characters
Text of EOE Set 7_COMBINED.pdf
Extracted from the file · 150 pages · 432,851 characters
Text of NECTA Set 4_COMBINED.pdf
Extracted from the file · 14 pages · 26,843 characters
Text of NECTA Set 5_COMBINED.pdf
Extracted from the file · 27 pages · 51,321 characters
Text of OCC Set 22_COMBINED.pdf
Extracted from the file · 40 pages · 63,151 characters
Text of OCC Set 23_COMBINED.pdf
Extracted from the file · 8 pages · 12,023 characters
Text of OCC Set 25_COMBINED.pdf
Extracted from the file · 33 pages · 57,780 characters
Text of OCC Set 26_COMBINED.pdf
Extracted from the file · 11 pages · 14,212 characters
Text of PURA Set 6_COMBINED.pdf
Extracted from the file · 82 pages · 163,601 characters
Page 51 of 141
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set PURA-07 Date Issued September 22, 2026 UPA-029 Page 1 of 7 Date Filed: October 06, 2026 Witness: Donald J. Scacco Jr., Digaunto Chatterjee, Douglas P. Horton, Matthew Nelson and Michael Goldman Request from: Public Utilities Regulatory Authority Question: Reference Application, Ex. CLP-IAP-1, pp. 37–45. For each case study, identify the specific factual condition or indicator that Eversource contends is also present at CL&P and cite the CL&Pspecific evidence supporting that comparison. Response: The case studies are not offered as equivalencies. The testimony presents the case studies as a documented record of how the under-investment tail has unfolded elsewhere, not as a prediction for CL&P, and it draws no causal inference from them for CL&P (Ex. CLP-IAP-1, p. 20, ll. 15– 20; p. 36, ll. 7–10 and 18–19). The case studies are relevant to CL&P because the conditions at work in those situations -- aging assets and exposure to extreme events -- are not unique to those systems. Connecticut is not insulated from major weather events, and the age and condition of distribution assets is a significant determinant of how a system performs when that stress arrives (Ex. CLP-IAP-1, p. 36, ll. 12–13 and 16–18). Where a case involves a condition that is also present on CL&P's system, the table below identifies it with reference to the CL&P-specific evidence. The Investment Calibration Framework is useful only if the ends of the range can be described as well as the middle. The case studies serve that purpose. The case studies show what the under-investment tail looks like when it materializes and what it costs customers, which a framework that were defined only in the abstract could not convey (Ex. CLP-IAP-1, pp. 31–32, 37–45). A range of outcomes is the right lens because the result of under-investment depends on many interacting factors and on events whose timing cannot be predicted, such as a severe storm or the failure of major substation equipment. The same system condition can produce very different results depending on when and how it is tested, which is why the level of investment has to be decided before those events occur rather than after (Ex. CLP-IAP-1, p. 36, l. 20 – p. 37, l. 2). The view of those tails is based on the witness’ experience with tail risk as a regulator in Massachusetts. In that experience, the cost to customers came from how a system performed under stress, and the system's condition going into that stress shaped the outcome.Page 52 of 141
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set PURA-07 Date Issued September 22, 2026 UPA-029 Page 2 of 7 Case Condition Identified in the Case Study CL&P-Specific Evidence PG&E (pp. 37– Aging assets interacting with 39) vegetation and extreme-event exposure Bare copper conductor beyond its 40-to-50year service life and vulnerable to tree contact; bulk transformers and substation assets will be past 50 years; poles below current strength standards (Ex. CLP-ELP-1, p. 42, ll. 4–20; p. 68, ll. 15–19). Connecticut experiences frequent stormactive days, which account for a large share of customer outages (Ex. CLP-ELP-1 p. 63, ll. 4–9). Connecticut has among the heaviest tree cover in the country, most outages are caused by trees or limbs, and most tree-related outages come from tree failure, often from outside the trim zone (Ex. CLP-VMP-1, p. 46, ll. 3–22; p. 47, ll. 1–2). CL&P's inspection and maintenance practices are not suggested to resemble those documented at PG&E Hawaiian Electric (pp. 39–40) Balance-sheet capacity relative to catastrophic exposure CL&P's system is exposed to severe weather, experiencing approximately 35 to 45 storm-active days annually (Ex. CLPTSP-1, p. 61, ll. 19–21). (Ex. CLP-IAP-1, p. 36, ll. 13–16). The Company's financial capacity and cost of capital are addressed by its cost of capital witness (Ex. CLPROE-1) MBTA (pp. 40–41) Maintenance crowded out over time, producing a state-ofgood-repair backlog The MBTA case illustrates how carrying costs and deferred maintenance compound over time in a capital-intensive system, and how few options remain once they do. Exhibit CLP-IAP-1 does not contend that a comparable backlog exists at CL&P; the case is included to show the direction of the risk.Page 53 of 141
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set PURA-07 Date Issued September 22, 2026 UPA-029 Page 3 of 7 Entergy New Orleans (pp. 42-43) Quantified reductions in distribution capital and maintenance followed by reliability decline The utility refrained from increasing its distribution investment in recent years (Ex. CLP-IAP-1, p. 12, ll. 13–16; p. 60, fn. 39). SAIDI increasing, with CL&P still in the top quartile at its lower edge; equipment failures account for about 35–40 percent of blue-sky outages (Ex. CLP-ELP-1, p. 48, ll. 3–9; p. 49, ll. 1–6). These indicators show the direction of the trend. Florida Power & Light (pp. 44–45) Calibrated investment run through a defined plan, reporting, cost recovery with prudence review, and scrutiny of the benefit-cost case The Company's proposal: a defined multiyear plan with reliability PIMs, annual reporting, a reliability benefit-cost model described in the Company's testimony, and capital capped at the approved forecast (Ex. CLP-IAP-1, p. 87, ll. 3–13; Ex. CLP-ELP1, p. 50, ll. 1–9; p. 67, ll. 17–19; p. 118, ll. 6–14). Resiliency work selected by predicted benefit and delivered with spacer cable at about one-third the cost of undergrounding (Ex. CLP-ELP-1, p. 63, ll. 14–18) The CL&P-specific evidence cited in the table, on asset age and condition, storm exposure and reliability trends is discussed further in the responses to UPA-025 i and UPA-026 ii. The underlying data on CL&P's assets and reliability are presented by the Leadership Panel (Ex. CLP-ELP-1) and the System Engineering Panel (Ex. CLP-TSP-1). Prior Referenced Response: i UPA-025 Question: Reference Application, Ex. CLP-IAP-1, pp. 31–32 and 54. Identify each quantitative threshold, benchmark, or other criterion used to distinguish underinvestment, calibrated investment, and overinvestment under the Investment Calibration Framework. If Eversource establishes no such thresholds or criteria, state so. Explain how the results presented on page 54 of Ex. CLP-IAP-1 to determine where CL&P’s proposed capital investment falls within the framework. UPA-025 Response:Page 54 of 141
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set PURA-07 Date Issued September 22, 2026 UPA-029 Page 4 of 7 The Investment Calibration Framework does not establish a numeric threshold, such as a dollar amount per customer or a percentage of rate base, separating underinvestment, calibrated investment and overinvestment. The framework is a way of organizing PURA’s review of the level of investment; it is not a formula that produces a number. That is deliberate. The appropriate level of investment depends on each system’s age, condition, load, weather exposure and policy requirements, so a single threshold would not be sound, and it would carry its own unintended consequences. Spending just under a fixed line could be treated as sufficient regardless of the system’s condition and spending just over it as excessive regardless of need. Setting investment levels is a judgment made within parameters, much as PURA sets other multi-year program budgets, i.e., the budget is built from historical experience and from the work needed going forward, and decisions are then made within that range. The framework’s focus was to create a methodology of quantifying and prioritizing the investments costs and benefits so that effective and efficient investments can be identified and prioritized, understanding all of the moving parts that change these estimates and potentially whether a project is cost effective. The focus was not meant to provide a single number. The Company’s proposed budgets target impacts in relation to what is deemed by analytical evaluation to be effective and efficient. The level of investment that is effective and efficient also depends on the objective it is measured against. The Company’s benefit-cost model identifies the most cost-effective work for a stated reliability objective, such as a given improvement in SAIDI or SAIFI, and it can be run against different objectives (Ex. CLP-TSP-1, p. 34, ll. 12–18; p. 60, ll. 3–5). What is cost-effective therefore depends on the selected objective. The Company’s planning presents the choice as a range, which is how the framework expects the question to be approached. The Company identified three investment levels: (1) Sustained Performance, the baseline needed to sustain the system, which carries lower near-term spending but higher emergent-failure and capital risk; (2) the proposed level, which adds Enhanced Reliability and Resiliency to constituted the Targeted System Performance plan; and (3) a higher Advancing the Grid level that the Company does not propose in this proceeding. The framework does not determine the specific dollar amounts at any of those levels. The support for the amounts proposed, including how the capital forecast was developed, is presented by the Leadership Panel and the System Engineering Panel (Exs. CLP-ELP-1; CLP-TSP-1 through TSP-3; see also the response to UPA-033i). The framework is neutral as to the answer. The crux of the analysis is the identification of a planning and investment approach and a vision on the “end state” that is envisioned as the proper regulatory outcome for customers. Therefore, in place of a fixed threshold, the framework identifies criteria that the Company recommends PURA apply collectively, several of which are quantitative: Criterion Indicates Insufficient Investment Indicates Calibration Indicates OverInvestment Project BenefitCost Results High-value projects repeatedly deferred Portfolio funded in order of value; funded projects above 1.0 Projects funded below 1.0 or lower-cost alternatives passed over Reliability and Asset Condition Deteriorating SAIDI/SAIFI, rising equipment-caused and fair-weather outages, growing replacement backlog Performance stable or improving against commitments Gains well beyond commitments at a relatively high costPage 55 of 141
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set PURA-07 Date Issued September 22, 2026 UPA-029 Page 5 of 7 Composition of Spending Existing system work is consistently deferred Spending mainly on maintaining and strengthening the existing system Building for load that is not there or not expected (p. 47, ll. 3–6) Cost Benchmarking Capital investment levels well below peers, alongside rising maintenance needs on an aging system (p. 56, ll. 7– 10) Costs near or below benchmark with adequate performance Capital investment well above peers without commensurate performance The Company applies these criteria through two planning approaches. For reliability improvement, it selects projects using the benefit-cost model described in the response to UPA-024, ranked by metrics such as dollars per customerminute of interruption saved (Ex. CLP-TSP-3, slides 34–35). The ranking sets the order in which work is funded toward the stated objective; it is not a rule that every project above a fixed benefit-cost ratio is built. For asset health, it runs programmatic replacement of asset classes with known degradation patterns, including bare copper overhead conductor, paper-insulated lead cable, right-of-way poles, direct-buried cable, pad-mounted switchgear and substation transformers. The pace of each program reflects historical spending patterns, with reasonable escalations for age and condition (p. 67, ll. 3–5; p. 69, ll. 11–13) (Ex. CLP-TSP-3, 37, 57–62, 71). The asset programs, their pacing and the associated failure data are presented by the System Engineering Panel (Ex. CLP-TSP-1; Ex. CLP-TSP-3, slides 57–62, 71). Exhibit CLP-IAP-1 offers no opinion on the specific program lengths or budgets. It identifies the age and condition of assets pacing, weighed against cost, as the kind of consideration the Balance step relies on. Applied to CL&P, the benchmarking results describe the Company’s historical position. LEI’s unit cost benchmarking ranks CL&P 32nd of 88 utilities nationally and 8th of 22 in the Northeast on capital cost per customer, and 47th of 88 and 8th of 22 on total cost per customer. After controlling for labor prices, network density, scale and other drivers, CL&P’s capital costs averaged approximately 14 percent below the model-predicted benchmark and its total costs approximately 2 percent below it over 2015–2024 (Ex. CLP-PBR-3, pp. 9, 16-17)i. Together with the condition of an aging system, those results place CL&P historically within the calibrated range, toward the under-investment side. The benchmarking results do not by themselves locate the proposed plan. The testimony’s conclusion that the proposed investment is calibrated rests on the combination of criteria above: the proposed reliability budget satisfies the RE08 affordability test and the investments carry benefit-to-cost ratios above 1.0 (Ex. CLP-IAP-7), the spending is directed at the existing system (Ex. CLP-IAP-1, p. 46, l. 10 – p. 47, l. 11), and the need is documented in Exhibits CLP-TSP-1 through TSP-3, including an aging asset base and rising SAIDI (Ex. CLP-ELP-1, p. 42, l. 4 – p. 43, l. 2; p. 48, ll. 3–9). ii UPA-026 Question: Reference Application, Ex. CLP-IAP-1, p. 54. Explain the analytical basis for concluding that CL&P’s below-average capital spending reflects a “drift toward under-investment.” Identify the specific reliability, asset-condition, performance, or investment-need used to distinguish efficient below-average spending from underinvestment. Provide all supporting calculations and workpapers. UPA-026 Response:Page 56 of 141
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set PURA-07 Date Issued September 22, 2026 UPA-029 Page 6 of 7 Underinvestment and efficiency are separate questions. Underinvestment means investing less than the system needs, given its age, condition, load, weather exposure and the reliability objectives set for it (see the response to UPA-025ii). Efficiency relates to whether each dollar spent buys a commensurate benefit (Ex. CLP-IAP-1, p. 85, ll. 5–7). A comparison of spending to an average, whether of peers or of the Company’s own history, does not by itself establish either one. In the near term, under-investment can also constitute cost discipline (Ex. CLP-IAP-1, p. 35, ll. 1–6). What indicates whether lower spending is meeting system need is how the system is performing, i.e., whether reliability is stable or improving, or declining. As explained in the response to UPA-025, this is a judgment based on several signals, not a single threshold: Reliability Stable or Improving Reliability Declining Spending below peer average Lower spending is meeting system need. Most likely where input prices are stable, the utility can lock in long-term procurement, load is changing slowly, and assets are not yet at end of life. Under-investment signal. Deferred work is showing up as reduced performance. Spending above peer average Investment catching up or improving performance. The test is whether each dollar buys a commensurate benefit. Over-investment signal. Spending is not producing results. CL&P is not operating in the stable environment described by the “spending below peer average” and “reliability stable or improving” quadrant above (the upper left quadrant). Rather, it is moving toward the “spending below peer average” and “reliability declining” quadrant. Distribution equipment prices have risen well above general inflation, are changing, and much of the asset base is at or near end of life (Ex. CLP-IAP-1, p. 45, l. 18 – p. 46, l. 9; Ex. CLPELP-1, p. 42, ll. 4–20). Blue-sky SAIDI was 77.5 minutes in 2025, against a 2021–2025 average of 71.1 minutes, which indicates that SAIDI may be showing signals of decline (Ex. CLP-TSP-1, p. 76, Table 1), while SAIFI remained flat (Ex. CLP-ELP-1, p. 48, 11ll. 3-9). It is important to note, however, that external factors also affect SAIDI/SAIFI performance and this must be factored into the analysis. Below-average capital spending together with reliability showing initial signs of decline indicates that there is a need for elevated levels of investment in the future. The specific signs Exhibit CLP-IAP-1 relies upon are (page citations are to Ex. CLP-IAP-1 unless noted): 1. Constrained investment period. The Company refrained from increasing its distribution investment in recent years (Ex. CLP-IAP-1, p. 12, ll. 13–16). 2. Equipment cost inflation. Because of the equipment price increases noted above, a similar nominal budget supports less work over time (p. 45, l. 18 – p. 46, l. 9). 3. O&M pattern. Higher O&M relative to peers, alongside modest capital spending, can be consistent with an aging system that needs more maintenance to stay in service (p. 56, ll. 7–10), although cross-utility O&M comparisons also reflect differences in service territory characteristics, regulatory requirements, company capitalization policy, labor costs and policy-program accounting (pp. 54–56). Increasing emergent failures also take resources away from proactive replacement (Ex. CLP-TSP-1, p. 22, ll. 14–16). 4. Asset condition and reliability. The Company’s planning testimony documents an aging distribution system, with major asset classes at or beyond their expected service lives, rising equipment failures, and reliabilityPage 57 of 141
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set PURA-07 Date Issued September 22, 2026 UPA-029 Page 7 of 7 that remains in the top quartile but has begun to slip, (Ex. CLP-ELP-1, pp. 42, 48–49; Ex. CLP-TSP-1, p. 35; Ex. CLP-TSP-3, slide 58). The asset-level detail is presented by the Leadership Panel and the System Engineering Panel. The point for the framework is the direction of those indicators. The data show a pattern associated with the underinvestment side of the calibrated range rather than one of stability or overinvestment. Taken together, these signs place CL&P within the calibrated range but moving toward its underinvestment side. Exhibit CLP-IAP-1’s opinion is directed at the framework and at whether the proposed plan sits within the calibrated range; it is not centered on the amount of investment the Company has identified (p. 16, ll. 10–15). The support for the specific amounts proposed is presented in the Company’s planning testimony (Exs. CLP-ELP-1; CLP-TSP-1 through TSP-3) Exhibit CLP-IAP-1 did not rely on separate calculations for this conclusion; it relies on the record evidence cited above, including the LEI benchmarking results and workpapers (Ex. CLP-PBR-3) and the reliability data in Ex. CLP-TSP-1, Table 1.Page 58 of 141
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set PURA-07 Date Issued September 22, 2026 UPA-030 Page 1 of 6 Date Filed: October 06, 2026 Witness: Donald J. Scacco Jr., Digaunto Chatterjee, Douglas P. Horton, Edward A. Davis, Kimberly R. Parsons, Matthew Nelson and Michael Goldman Request from: Public Utilities Regulatory Authority Question: Reference Application, Ex. CLP-IAP-1, pp. 57–58. For each of the four affirmative affordability measures Eversource identifies (the performance-based multi-year rate plan, economic development rate, optional residential space-heating rate, and Consumer Dividend), state the specific action Eversource recommends that the Authority take in this proceeding. Also, state whether conclusion is that CL&P’s proposal is affordable depends on implementation of each measure and, if not, identify which measures Eversource considers necessary to support that conclusion. Response: The Company recommends that PURA take the following actions with respect to each affordability measure: Measure Recommended action Supporting testimony PBMRP Approve the PBMRP as proposed, including the I − X − S adjustment to base-rate O&M and the Capital Funding Mechanism capped at the approved forecast with annual, downward-only reconciliation Ex. CLP-ELP-1; Exs. CLP-PBR-1 to PBR-3; Ex. CLP-IAP-1, pp. 59–62 Economic Development Rate Approve the EDR rider for qualifying Rate 57 and 58 customers adding incremental load, with a declining five-year discount, a marginal-cost floor, and a repayment provision UI 22-08-08 Ex. CLP-RATES-1; Ex. CLP-IAP-1, pp. 62–67 Optional residential space heating rate (Rate 6) Approve optional Rate 6 for eligible residential customers converting from delivered fuels to air-source heat pumps Exs. CLP-RATES-1, RATES-6; Ex. CLPIAP-1, pp. 67–70 Consumer Dividend Adopt the Consumer Dividend as the SFactor, with an unconditional 0.30 percent Ex. CLP-IAP-1, pp. 70–84; Ex. CLP-PBR-Page 59 of 141
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set PURA-07 Date Issued September 22, 2026 UPA-030 Page 2 of 6 floor, an asymmetric annual ratchet that can raise the applied level to 0.60 percent over the plan term, and a trigger based on Core Operating Expense per customer against the escalated benchmark 1 Ex. CLP-ELP-1, pp. 92–96 While each measure is designed to provide value to customers, the affordability of the Company’s proposal is not dependent on the implementation of each measure. The conclusion that CL&P's proposed investment is affordable rests primarily on the calibration evidence: benefit-cost results (Ex. CLP-IAP-7), the historical bill and cost benchmarking record, and the documented system need (Ex. CLP-IAP-1, p. 85, l. 13 – p. 86, l. 7). The measures are complementary. The Economic Development Rate and Rate 6 can each be evaluated on its own merits; the Consumer Dividend operates, and therefore is dependent on the PBMRP. Please also see the response to UPA-022 i. Of the four, the PBMRP, meaning the O&M formula together with the Capital Funding Mechanism, is the measure the Company considers necessary to sustain that conclusion over the plan term. It is the structure that makes calibrated investment achievable over time: the annual change in revenue adjustments supporting capital is capped at the approved forecast, reconciled only downward during the course of the PBMRP, and recovered at a measured pace (p. 30, l. 13 – p. 31, l. 3; p. 87, ll. 3–13). See Exhibit See Exhibits CLP-ELP-1 (pp. 73–119) and CLP-PBR-1 for support of the PBMRP proposal. The next three measures were designed to benefit consumers without shifting costs to other customers. The Consumer Dividend is an affordability enhancement for the PBMRP and operates within it as the S-Factor through which customers share in efficiency gains. The Economic Development Rate addresses the sales base over which fixed costs are spread and can have a meaningful effect depending on customer participation (p. 58, ll. 7–20). The optional residential space heating rate (Rate 6) is a targeted measure that lowers the electric cost of operating a heat pump, relative to the standard residential rate, for eligible customers, with no cost redistribution to non-adopting customers, and adds sales over which embedded costs are spread (p. 69, ll. 3–12). As described in the Company’s response to UPA-033 ii, the Company acknowledges that its proposals in this proceeding do not reflect the singular framework in existence that could support affordable investment in the state of Connecticut. The Company has proposed a comprehensive framework in this proceeding, leveraging its experience and that of its expert consultants work in other jurisdictions, and conforming as closely as possible to the PFDs in PURA’s PBR proceedings, in order to propose a framework that could support the level of going-forward system investment needs while operating in a multi-year rate case stay out, which is a fundamental component of PBR frameworks adopted elsewhere. If PURA adopts a framework that materially differs from the Company’s proposals, or is not calibrated to support the level of investment neededPage 60 of 141
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set PURA-07 Date Issued September 22, 2026 UPA-030 Page 3 of 6 in the system on a going forward basis, the Company will not be in a position to commit to a rate case stay-out period of, which will result in more frequent rate cases, in which all components of the Company’s costs will be updated to then-current levels. Prior Referenced Responses: UPA-022 Question: Reference Application, Ex. CLP-IAP-1, p. 25. Identify the evidence Eversource relies upon to conclude that the proposed capital plan is affordable from the customer perspective and quantify the bill or energy-burden impact attributable to the proposed capital investment. Provide all supporting calculations and workpapers. i UPA-022 Response: To conclude that the proposed capital plan is affordable, the Company followed the Three B’s discussed in response to UPA-021,i and relied on the following evidence: (1) the cost benchmarking performed by LEI (Exhibit CLP-PBR3); (2) the Company's benefit-cost modeling of reliability investment (Exhibit CLP-TSP-1 & CLP-TSP-3); (3) application of the RE08 affordability test (notwithstanding the Company’s stated concerns with the methodological basis for this alleged threshold); (4) alignment with RE011; and (5) data showing that the distribution costs are not significantly impacting the volatility of customer bills (Exhibit CLP-IAP-1,atpage. 21–22; 48-49; Figures 2 and 4). Using the proposed “Three B’s Framework”, Eversource has provided the following evidence that the proposed capital plan is affordable: 1. 2. “Burden” or impact on customers: a. The distribution portion of a typical residential bill has grown modestly in real terms -- about 9 percent from January 2015 to 2026 (about 0.8 percent per year), and about 0.2 percent in real terms from 2019 to 2026 (page 22, line. 11–17; page 48, line. 5–16; Figure 4). b. The bill volatility customers have experienced since 2021 came from supply and public-benefits charges, not distribution (page 21, line 3; page 22, line 7; Figure 2). c. Under the current multi-year plan, the ESI limited the bill impact of $2.7 billion of capital investment to less than $2 per month each year, on average, over 2018–2025 (page 60, line 12–16) d. The most direct quantitative measure of customer affordability available to PURA is energy burden under the RE011 framework. The Company's five-tier low-income discount is designed to hold participating customers' energy burden to roughly six percent (Exhibit CLP-IAP-1, at page 86, ll. 8–12; Exhibit CLP-CUSTOMER-1). “Budget” a. Structural protections in the proposal -- the Capital Funding Mechanism caps the level of capital revenue support during the PBMRP at the approved forecast in this proceeding and reconciles annually, but only downward, so customers pay the lesser of forecast or actual plant in service (page 61, line 14–18; page 87, line 3– 13; Exhibit CLP-ELP-1, at page 101–102). Amounts expended above the cap would be allowed in rates only prospectively from the date of a future prudence review and forward (in the context of a future rate case), imposing an element of regulatory lag on capital investments above the cap, and above forecasted levels.
Text of UCONN Set 1_COMBINED.pdf
Extracted from the file · 45 pages · 105,510 characters
Text of UCONN Set 2_COMBINED.pdf
Extracted from the file · 19 pages · 40,074 characters
As listed on the current system
Corres. 10/21/2026 [26-05-10] (Keegan Werlin LLP) - Compilation of Discovery Responses