Text of CLF-AC Set 2_COMBINED.pdf

Extracted from the file · 18 pages · 32,497 characters

Text of EOE Set 7_COMBINED.pdf

Extracted from the file · 150 pages · 432,851 characters

Text of NECTA Set 4_COMBINED.pdf

Extracted from the file · 14 pages · 26,843 characters

Text of NECTA Set 5_COMBINED.pdf

Extracted from the file · 27 pages · 51,321 characters

Text of OCC Set 22_COMBINED.pdf

Extracted from the file · 40 pages · 63,151 characters

Text of OCC Set 23_COMBINED.pdf

Extracted from the file · 8 pages · 12,023 characters

Text of OCC Set 25_COMBINED.pdf

Extracted from the file · 33 pages · 57,780 characters

Text of OCC Set 26_COMBINED.pdf

Extracted from the file · 11 pages · 14,212 characters

Text of PURA Set 6_COMBINED.pdf

Extracted from the file · 82 pages · 163,601 characters

Text of PURA Set 7_COMBINED.pdf

Extracted from the file · 141 pages · 373,939 characters

15 pages match
  1. Page 25 of 45Match

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set UCONN-01 Date Issued September 18, 2026 UCONN-017 Page 1 of 2 Date Filed: October 02, 2026 Witness: Edward A. Davis and Kimberly R. Parsons Request from: UCONN Question: (Rate Design & Tariff Structure) Refer to Exhibit CLP-RATES-1 pp. 14-15 and Exhibit CLPRATES-2 pp. 19-22. a. The proposed distribution demand charges for Rates 55 through 58 represent increases of approximately 59% to 75% compared with distribution rate increases of 28.5% for residential customers and 45.5% for small commercial load. Please identify and quantify each factor that contributes to these proposed increases for intermediate and large commercial customers. b. Eversource states that the ROR index for "intermediate business classes" moved from an average of 2.7 under current rates to 1.2 under proposed rates, while the ROR index for Rates 1 and 7 moved from 0.3 to 0.9. Please explain why a movement of this magnitude in a single rate case—rather than a more gradual transition—is appropriate and consistent with principles of rate stability and avoidance of rate shock. c. Has Eversource evaluated the risk that distribution demand charge increases of this magnitude could incentivize large commercial and industrial customers to pursue load reduction strategies (including behind-the-meter generation, energy storage, or relocation) that would reduce Eversource’s revenue base and shift costs to remaining ratepayers? If so, please provide the results of any such analysis. If not, please explain why such an analysis was not performed. Response: a. Please refer to Exhibit CLP-ACOS-2 for the detail on the expenses allocated to Rates 55 through 58 which, compared to current distribution revenue, contribute to the distribution revenue increase proposed in this proceeding. The driver of the increases for these customer segments is the increased cost of service that is the subject to this proceeding. b. As shown in CLP-RATES-1, the current total Company ROR is 1.05%. The current ROR of Rates 1 and 7 is 0.3% (less than total) while the current ROR of the intermediate business classes is 2.9% (greater than total). To move all rate classes closer to an index of 1.0, where each rate class would be contributing equally to the total Company ROR, Rates 1 and 7 required a greater share of the total proposed increase than the intermediate business classes. Per the proposed revenue increase allocation provided in Exhibit CLP-RATES-2.1, the intermediate business classes received 93.6% of the average increase (50.6%) while Rates
  2. Page 26 of 45Match

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set UCONN-01 Date Issued September 18, 2026 UCONN-017 Page 2 of 2 1 and 7 received 102% of the average increase. If the company further decreased the allocation percentage to the intermediate business classes, other rate classes would have needed to be designed with a higher percentage increase than the Company considered reasonable to support the shortfall in increase to this class relative to their cost of service. As stated in the pre-filed testimony Exhibit CLP-RATES-1, the Company sought to recover overall costs while striking a balance between assigning an appropriate level of cost responsibility to each rate class, maintaining reasonable bounds (75% to 125% of the average increase) around changes to rates and impacts to customers. c. Eversource consistently considers the risk that distribution demand charge increases of any magnitude could incentivize large commercial and industrial customers to pursue load reduction strategies (including behind-the-meter generation, energy storage, or relocation), when presenting rate designs to PURA for rate implementation. The pricing impacts and economic incentives that utility rates create are inherent in every rate change that the Company ever presents to its regulators for review. However, providing safe and reliable electric services to customers is fundamentally an infrastructure business that requires substantial and consistent investment in that infrastructure. Therefore, the Company is called upon to balance the interests of all customers in converting those costs to rates that customers will pay. The results of that balancing are presented in the Company’s analysis and exhibits in this proceeding.
  3. Page 27 of 45

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set UCONN-01 Date Issued September 18, 2026 UCONN-018 Page 1 of 2 Date Filed: October 02, 2026 Witness: Edward A. Davis and Kimberly R. Parsons Request from: UCONN Question: (Rate Design & Tariff Structure) Explain how the proposed rate design provides University of Connecticut and UConn Health with economically efficient price signals while recognizing their continuous, research-related, healthcare, and mission-critical operations. a. Identify any optional rates or programs available for flexible load, demand response, energy storage, or system-peak reductions. b. Identify any alternative rate designs considered for such customers and explain why each was accepted or rejected. Response: a. Eversource is wholly aware that the service it is providing to customers is an essential service that must be delivered with a high degree of reliability at an affordable price for all customers. In that context, there are two fundamental realities that apply: (1) the business of delivering safe and reliable power to customers is an infrastructure-centric endeavor; and (2) the costs of building, maintaining, reinforcing and upgrading that infrastructure are borne across a wide range of customer classes that make differing use of the system and that have differing methods and capabilities to pay for that use. In that context, the rates that the Company has proposed in this proceeding were developed using the Company’s actual costs incurred and established methods to allocate those costs across the customer base in accordance with the use of the system. Eversource deeply respects the mission of both UCONN as an educational institution and UCONN Health as a research-related and healthcare institution, and the integrity of those institutions in meeting that mission. However, utility rates are, by definition, designed to be collectively applied across a broad disparity of customers, including residential customers. This means that, attempting to craft “optional rates or programs available for flexible load, demand response, energy storage, or system-peak reductions,” will typically create costs for some other customer segment, most notably, residential customers. Consequently, these types of initiatives are ones that make more sense when undertaken by the specific customer viewing those types of initiatives as beneficial to their economic interests.
  4. Page 28 of 45

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set UCONN-01 Date Issued September 18, 2026 UCONN-018 Page 2 of 2 b. The Company did not consider creating a special rate or rate structure for educational institutions or healthcare institutions. However, UCONN is the beneficiary of numerous program benefits that Eversource offers to large commercial customers. For example, Eversource is a longstanding partner in advancing UCONN’s research-related, healthcare, and mission-critical operations through energy efficiency and demand management. In fact, UCONN is one of Eversource’s largest commercial and industrial participants in the Conservation & Load Management (C&LM) programs offered through the Energize Connecticut initiative. As a key strategic customer, UConn works closely and participates in monthly meetings with dedicated Eversource Energy Efficiency Account Executives and consultants to identify opportunities, develop projects, and maximize participation in available energy efficiency programs. In addition, across UCONN’s Storrs campus, regional campuses, hospitals, and health centers, Eversource provides technical assistance, engineering support, project development expertise, and C&LM incentive funding. Over the past 3+ years alone, Eversource has supported approximately 295 energy efficiency projects for UCONN, delivering more than $2.1 million in C&LM incentives funded by Eversource’s customers. These projects span a broad range of Energize Connecticut offerings, including custom energy efficiency projects, lighting and equipment rebates, building system optimization initiatives, and incentives for new and replacement high-efficiency equipment. UConn also participates in Eversource-supported Active Demand Response programs, helping reduce peak demand, enhance grid reliability, and lower system costs at five sites. Beyond C&LM program delivery, Eversource supports workforce development and energy innovation through its involvement with UCONN’s Southern New England Industrial Training and Assessment Center (ITAC). As a funding partner and advisory board member, Eversource provides strategic guidance and collaborates with faculty to help develop the next generation of energy efficiency professionals. Eversource employees also mentor graduate students and support senior engineering capstone projects through technical consultation and project review.
  5. Page 29 of 45Match

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set UCONN-01 Date Issued September 18, 2026 UCONN-019 Page 1 of 15 Date Filed: October 02, 2026 Witness: Douglas P. Horton, Edward A. Davis and Kimberly R. Parsons Request from: UCONN Question: (Performance Based Rates) Refer to Exhibit CLP-RATES-3 at p. 192 indicating that the Performance-Based Multi-Year Rate Plan (“PBMRP”) Rider is authorized for a four-year term starting July 1, 2027. a. For each of Rates 55-58, please provide the annual projected billing impact of the PBMRP Rider for each year of the proposed four-year PBMRP term. If no such projected annual rate impact analysis was conducted, please explain why. b. provide the projected annual and cumulative percentage change in total delivery rates for each of Rates 55, 56, 57, and 58 for each year of the PBMRP term, attributable to the combined PBMRP adjustments (I-X, F-Factor, Consumer Dividend, earnings sharing mechanism, and any other anticipated adjustments). c. State all assumptions used in preparing the projections. Response: Please refer to AMTRAK-012, Attachment 1. Each tab provides illustrative incremental distribution increases for the rate-year specified, based on the Company’s proposed PBMRP. Lines 42, 44, 46, and 48 provide Rate 55, 56, 57, and 58, respectively. Column L provides the incremental distribution revenues, while column AU provides the annual percentage increase presented on a total bill basis. For ease of reference, the Company has summarized the requested amounts in UCONN-19, Attachment 1. a. Per UCONN-19, Attachment 1, Lines 5-8 provides incremental revenues and annual percentage changes for each of the requested rates. Column F provides the incremental distribution revenue for Rate Year 2, while Column G provides the corresponding annual percentage total change. Column I and Column J provide the incremental distribution revenue increase and percentage increase in total, respectively, for Rate Year 3. Column L and Column M provide the incremental distribution revenue increase and percentage total increase, respectively, for Rate Year 4. b. Lines 15-18 provide the corresponding cumulative amounts for each of the rate years. Finally, Column O provides the annual average percentage increase, which is approximately 1.2% for each of Rate 55 and Rate 56, and 1.0% per year for each of Rate 57 and Rate 58.
  6. Page 30 of 45Match

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set UCONN-01 Date Issued September 18, 2026 UCONN-019 Page 2 of 15 c. Please refer to the Company’s response to data request EOE-156 i, which provides the model and discussion related to the increases referenced in parts a and b above. Prior Referenced Response: i EOE-156 Question: (PBMRP CAPITAL SUPPORT MECHANISM) Refer to Exhibit CLP-ELP-1, pp. 101-103. Provide a working, unlocked Excel spreadsheet that would serve as a representative tool used to calculate the Company’s incremental revenue requirements resulting from the proposed capital support mechanism (F-Factor) for each year of the MRP. As part of the submission, discuss the calculations and separately identify and explain all critical assumptions, using cited information from the Company’s rate case submission where relevant (e.g., depreciation rate from the Company’s depreciation study). In support of the request, please use the Company’s proposed 5-Year Targeted System Performance (TSP) Plan within the spreadsheet’s initial inputs and apply an initial assumption that the Company incurred actual plant-in-service additions of 5% more than the proposed annual TSP funding. Additionally, please configure the spreadsheet to allow for the weighted average carrying costs (WACC) to be individually adjusted for both ROE and Cost of Debt. EOE-156 Response: The Company appreciates the opportunity to respond to EOE’s thoughtful question regarding the operation of the PBMRP proposed in this proceeding, which the Company views as key to reaching a long-term reliability and resiliency plan for Connecticut, while meeting affordability needs for customers. The Company’s response to this request is organized as follows: A. Overview and Results B. F-Factor Discussion C. Impact of 5% Additional Capital Investment D. Model overview Attachments referenced in this response: EOE-156, Attachment 1, provides the Company’s working model, with projected capital investment as filed in this proceeding. See, e.g., Exhibit CLP-ELP-1, Figure 7. EOE-156, Attachment 2, provides a second model that is identical in every respect to Attachment 1 except that capital investments are 5% greater than the forecast submitted to this proceeding in Exhibit CLP-ELP-1, Figure 7, as stipulated by EOE’s data request. A. Overview and Results Ultimately, the Company’s goal in this proceeding is to establish a sustainable, cohesive ratemaking framework that supports electric utility service in the State of Connecticut in an affordable manner for
  7. Page 31 of 45Match

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set UCONN-01 Date Issued September 18, 2026 UCONN-019 Page 3 of 15 customers, over a long term. This is the Company’s goal because the CL&P system needs investment for reliability, resiliency and modernization. For this infrastructure investment to be affordable for customers, a coherent ratemaking plan needs to be instituted that will consider the interests of customers over a longer term than just the next rate case. That framework needs to balance: (1) the reliability and performance requirements of the Company’s customers and the broader State of Connecticut; (2) customer rate stability and affordability; (3) incentives for cost efficiency in utility operations; and (4) implementation of a revenue support mechanism sufficient to cover the cost of delivering these objectives to customers, including the cost of capital. The Company’s PBMRP is designed to address these objectives in a holistic, balanced way. To do this, the Company started with the ratemaking framework under discussion in PURA’s PBR docket (Docket No. 21-05-15RE01), while also introducing certain new elements to remediate the flaws that would ultimately hinder PURA’s (draft) PBR model from supporting the necessary stay-out terms. As discussed below, the stayout term is the critical element of the PBMRP that creates the cost-efficiency incentive inherent in a performance based ratemaking plan. This context is vital to understand both the design and mechanics of the Company’s proposed PBMRP, including both the F-Factor and “I-X” components. To augment understanding of how the plan would work over the stay-out period, the Company has incorporated the projected costs of service set forth in EOE-156, Attachment 1, Worksheet, entitled “COS-1 Total,” which is the Company’s cost of service, as filed. The Company does not intend to imply that these dollar amounts are certain for the future and there will undoubtedly be changes in a litigated result. However, these figures serve as a reasonable basis for presenting this analysis to reflect the Company’s PBMRP proposal. Moreover, assuming that there will be changes to the underlying cost of service that serves as the “going in revenue requirement,” all of the projections made herein become highly optimistic, as discussed below. Increasing capital investment on the Connecticut distribution system is a given for the reasons described in the testimony of the Company’s Leadership Panel and Targeted System Plan (“TSP”) Panel – the Connecticut distribution system needs additional investment to maintain service reliability to customers and even more investment to achieve a level of modernization. The Company will need to make this investment to meet the interests of customers, with or without a multi-year plan. However, without a multi-year rate plan, whether in the form of the Company’s proposed PBMRP or another reasonable model, the Company’s only viable course of action to support this level of needed investment will be to file traditional cost-ofservice rate cases, as closely to annually as possible. Effectively, these sequential cases will “roll in” unrecovered capital investment into base rates to maintain a nexus between what the Company needs to invest in the system and what rates are reflecting for recovery of costs. In a world in which system investment needs are relatively flat, economy-wide inflation is modest and predictable at 2% annually, and rates are fully coupled with growing sales revenues (and no revenue decoupling mechanism), it is conceivable that a utility could offset the cost increases it incurs with organic sales growth, as electric utilities could do in past decades. However, that is not the reality of today’s operating environment. The distribution system investment needs are extensive and growing and the financial consequences of these circumstances are factors that need to be considered in determining a reasonable and workable regulatory plan. Establishment of a reasonable multi-year, performance-based ratemaking plan is the mechanism that can support the system needs in a manner that is wholly transparent and stable for customers, allowing for a smoother trajectory of rate changes than would otherwise occur. Results of F-Factor Implementation Assuming Capped Forecast Investment
  8. Page 32 of 45Match

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set UCONN-01 Date Issued September 18, 2026 UCONN-019 Page 4 of 15 EOE-156, Chart 1, below, provides illustrative rate increases comparing circumstances where the Company is pursuing a traditional rate-case cycle with filings as close to annually as possible under Connecticut law, as compared to the proposed PBMRP. These amounts assume the Company’s revenue requirement proposed in this docket is authorized without modification, except that the Company has used its existing weighted average cost of capital to perform the analysis, in order to isolate the functioning of the F-Factor operation - apart from changes in the cost of capital (i.e., the analysis uses a 9.25% return on equity and 47%/53% debt to equity capital structure). As noted above, the cost-of-service projections are shown in EOE-156, Attachment 1, Worksheet “COS-1 Total,” Line 35. In the absence of a multi-year rate plan, the Company anticipates filing rate cases on a rolling basis, with base rate changes effective January 1, 2029, July 1, 2030, and January 1, 2032. Chart 1, below, also spans the time period covering one year beyond the Company’s proposed four-year plan. 2032 is shown for illustrative purposes EOE-156, Chart 1 Annual Incremental Revenue Increase, $ Millions Note: Chart 1 assumes base-rate amendments effective 1/1/2029, 7/1/2030 and 1/1/2032. In Chart 1, a rolling rate-case cycle is depicted as the orange series, with the Company estimating new rates effective January 1, 2029 (18 months after the present docket concludes), with additional revenues of $129 million; followed by another $183 million rate change effective July 1, 2030, and a further $147 million effective January 1, 2032. These rate adjustments arise primarily as a result of capital investment rather than O&M changes, which means that the associated rate changes are reasonably foreseeable and ultimately predictable. In contrast, the Company’s proposed PBMRP would yield revenue increases of $77.6 million for rates effect July 1, 2028, $81.1 million July 1, 2029, and $83 million July 1, 2030 (EOE-156, Attachment 1, worksheet “PBR-1 Total PBRA”, Line 41). For purposes of discussion, the Company estimates that the subsequent rate case taking effect after the proposed PBMRP would be $119 million in 2031, followed by $89 million in 2032 assuming continuation of the proposed framework. Uncertainty grows as the timeframe of projections extends, as the Company will inevitably experience cost increases in relation to both operating expenses and capital investment, as time passes. Therefore, the later years (particularly 2031 and 2032)
  9. Page 33 of 45Match

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set UCONN-01 Date Issued September 18, 2026 UCONN-019 Page 5 of 15 should be interpreted as illustrative for purposes of discussing the principles and conceptual impacts of the PBMRP and traditional rate case frameworks. As Chart 1 illustrates, whether through a multi-year rate plan or sequential rate cases, ongoing revenue support is essential to the electric system. Revenue increases for the Company are rate increases for customers, so that a smoother and more predictable customer impact occurs through the Company’s PBMRP, which is the fundamental purpose of the PBMRP. The Company’s proposal results in rate increases amounting to approximately 1.5-2.1% on a total bill basis, annually (Line 3). In contrast, a rolling rate-case cycle yields rate increases nearly double at 3.4% (Line 4). Essential to this discussion is that both frameworks are designed to roughly track with the cost of service, although the stay-out feature of the PBMRP forces the Company to absorb the risk of deviation from the cost of service given the likelihood that operating and investment costs will increase over the period. The difference is the gradualism of the Company’s PBMRP, which results in smoother, more predictable bill changes for customers. EOE-156, Table 1 Line Description 2028 2029 2030 2031 2032 Incremental Revenues ($ Millions) 1 Company Proposal 77.6 81.1 83.0 118.6 89.0 2 Rate Case Cycle 0.0 129.0 183.0 0.0 147.0 Annual Increase, % Total Bill 3 4 Company Proposal Rate Case Cycle 1.5% 0.0% 1.5% 2.4% 1.5% 3.4% 2.1% 0.0% 1.6% 2.6% The rolling rate-case cycle is characterized by larger changes that are more disruptive to customers, in addition to being administratively burdensome for all Connecticut stakeholders. Importantly, the Company’s PBMRP does not undermine the applicability or efficacy of prudence reviews in terms of establishing a strong incentive for cost control. Under the Company’s proposal, prudence reviews can occur annually, preserving accountability and cost-control incentives with increased transparency, as well. B. F-Factor Operation At its core, the Company’s proposed F-Factor mechanism is designed to provide a revenue allowance sufficient to support the level of capital investment needed by the system, including the cost of capital. Several essential characteristics of the F-Factor mechanism mutually contribute to its viability and potential longevity: 1. Like the CT-Bar the Company’s F-Factor would take effect the first day of the first Rate Year coming out of the rate case, which eliminates the need for Rate Year capital to be embedded in base rates, subject to later downward-only reconciliation. To the extent capital investment currently factored into the Company’s proposed revenue requirement for Rate Year 1 is “rolled back” to an earlier date (for example, to a capital investment cutoff date of February 28, 2027 for inclusion in base rates), the F-Factor revenue-requirement calculation would inherently adjust to reflect capital investment as of that cutoff date. 2. Like the CT-Bar, the Company’s F-Factor does not pre-emptively or categorically exclude any type of capital investment. The Company regularly makes capital investments that do not directly affect the performance of the electric grid the way utility poles, transformers, lines,
  10. Page 34 of 45

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set UCONN-01 Date Issued September 18, 2026 UCONN-019 Page 6 of 15 substations, etc. clearly do, but are nonetheless essential capital investments in the provision of service to customers. Capital investments for facilities safeguarding equipment, information technology enabling self-service customer portals, and vehicles needed for transporting materials to work sites are but a few examples of core capital investments that are necessary and, therefore, inform the F-Factor allowance. 3. Like the CT-Bar, the Company’s F-Factor aligns the capital investment necessary for the target performance of the electric grid outlined in the Company’s Targeted System Plan, with the revenues required to support those investments. In developing the F-Factor the Company sought to establish a means of tying the F-Factor revenue allowances to the capital investment forecast that would be discussed extensively in this docket. This allows the focus of the TSP to remain on the system needs and plan objectives while simultaneously acknowledging that those needs and objectives, whatever they may be, require some measure of revenue support. The F-Factor serves as a necessary link between the system needs evaluated in this docket and necessary revenues. 4. The Company’s F-Factor properly includes the cost of capital. If CT-bar is evaluated separately from going-in revenue requirements, no single design factor would guarantee its failure more so than the absence of the cost of capital from its revenue requirement calculations. Though the cost of capital is not visible the way other costs of service are, such as the maintenance cost that keeps an older piece of equipment online or the cost of gasoline in a line truck, it is just as real a cost of service. The Company regularly operates with a cash deficit. That is, the cash necessary to support ongoing operations exceeds the cash received from customers through bills. The direct result is the Company must secure funds through some other means. Those other means are debt and equity investors: the individuals, banks, corporations and other institutions supplying funds to capital markets. Those entities have choice in terms of the entities to whom they provide their funds, choices that weigh other utility companies, industries, countries and continents, type of security, duration, expected return, the presence (or absence) of dividends, environmental, social, and governance characteristics, and countless other variables against the investor’s tolerance for risk. Not surprisingly, the Company cannot expect that investors, facing the choice between the Company and essentially all other investment opportunities, would or should accept zero return in exchange for their funds. Thus, the cost to acquire the funds necessary to perform the ongoing capital investments required of the system is real, fundamentally non-zero, and more specifically the Company’s cost of capital filed in this proceeding. 5. The Company’s F-Factor captures all elements of the Company’s capital investment base, including plant additions, plant retirements, accumulated depreciation, cost of removal, and accumulated deferred income taxes. The Company’s F-Factor calculation fundamentally captures the impact of ongoing depreciation accumulating in rate base, which has the effect of reducing overall revenue requirements. Additionally, the Company’s F-Factor calculation inherently captures the reduced revenue requirement resulting from plant retirements and accumulated deferred income taxes, while also incorporating the effect of cost of removal on rate base. 6. Like the CT-Bar, annual reconciliation of the revenue requirement ensures customers ultimately pay only for prudent capital investment while balancing the utility’s need to cover the ongoing costs of providing ongoing service. Critically, the Company’s F-Factor

Text of UCONN Set 2_COMBINED.pdf

Extracted from the file · 19 pages · 40,074 characters

As listed on the current system

Corres. 10/21/2026 [26-05-10] (Keegan Werlin LLP) - Compilation of Discovery Responses

This filing on the current system (opens in a new tab)