Compilation of Discovery Responses
Files15
Docket No. 26-05-10 Discovery Compilations October 21 2026.pdf
PDF · 157 KB · 2 pagesText searchable
Download Docket No. 26-05-10 Discovery Compilations October 21 2026.pdfRead the text of Docket No. 26-05-10 Discovery Compilations October 21 2026.pdf
ALLCO Set 7_COMBINED.pdf
PDF · 291 KB · 24 pagesText searchable
Download ALLCO Set 7_COMBINED.pdfRead the text of ALLCO Set 7_COMBINED.pdf
CIEC Set 5_COMBINED.pdf
PDF · 112 KB · 2 pagesText searchable
Download CIEC Set 5_COMBINED.pdfRead the text of CIEC Set 5_COMBINED.pdf
CLF-AC Set 2_COMBINED.pdf
PDF · 394 KB · 18 pagesText searchable
Download CLF-AC Set 2_COMBINED.pdfRead the text of CLF-AC Set 2_COMBINED.pdf
EOE Set 7_COMBINED.pdf
PDF · 1.4 MB · 150 pagesText searchable
Download EOE Set 7_COMBINED.pdfRead the text of EOE Set 7_COMBINED.pdf
NECTA Set 4_COMBINED.pdf
PDF · 409 KB · 14 pagesText searchable
Download NECTA Set 4_COMBINED.pdfRead the text of NECTA Set 4_COMBINED.pdf
NECTA Set 5_COMBINED.pdf
PDF · 533 KB · 27 pagesText searchable
Download NECTA Set 5_COMBINED.pdfRead the text of NECTA Set 5_COMBINED.pdf
OCC Set 22_COMBINED.pdf
PDF · 627 KB · 40 pagesText searchable
Download OCC Set 22_COMBINED.pdfRead the text of OCC Set 22_COMBINED.pdf
OCC Set 23_COMBINED.pdf
PDF · 257 KB · 8 pagesText searchable
Download OCC Set 23_COMBINED.pdfRead the text of OCC Set 23_COMBINED.pdf
OCC Set 25_COMBINED.pdf
PDF · 323 KB · 33 pagesText searchable
Download OCC Set 25_COMBINED.pdfRead the text of OCC Set 25_COMBINED.pdf
OCC Set 26_COMBINED.pdf
PDF · 240 KB · 11 pagesText searchable
Download OCC Set 26_COMBINED.pdfRead the text of OCC Set 26_COMBINED.pdf
PURA Set 6_COMBINED.pdf
PDF · 1.5 MB · 82 pagesText searchable
Download PURA Set 6_COMBINED.pdfRead the text of PURA Set 6_COMBINED.pdf
PURA Set 7_COMBINED.pdf
PDF · 1.4 MB · 141 pagesText searchable
Download PURA Set 7_COMBINED.pdfRead the text of PURA Set 7_COMBINED.pdf
UCONN Set 1_COMBINED.pdf
PDF · 597 KB · 45 pagesText searchable
Download UCONN Set 1_COMBINED.pdfRead the text of UCONN Set 1_COMBINED.pdf
UCONN Set 2_COMBINED.pdf
PDF · 372 KB · 19 pagesText searchable
Download UCONN Set 2_COMBINED.pdfRead the text of UCONN Set 2_COMBINED.pdf
Text of CLF-AC Set 2_COMBINED.pdf
Extracted from the file · 18 pages · 32,497 characters
Text of EOE Set 7_COMBINED.pdf
Extracted from the file · 150 pages · 432,851 characters
Text of NECTA Set 4_COMBINED.pdf
Extracted from the file · 14 pages · 26,843 characters
Text of NECTA Set 5_COMBINED.pdf
Extracted from the file · 27 pages · 51,321 characters
Text of OCC Set 22_COMBINED.pdf
Extracted from the file · 40 pages · 63,151 characters
Text of OCC Set 23_COMBINED.pdf
Extracted from the file · 8 pages · 12,023 characters
Text of OCC Set 25_COMBINED.pdf
Extracted from the file · 33 pages · 57,780 characters
Text of OCC Set 26_COMBINED.pdf
Extracted from the file · 11 pages · 14,212 characters
Text of PURA Set 6_COMBINED.pdf
Extracted from the file · 82 pages · 163,601 characters
Text of PURA Set 7_COMBINED.pdf
Extracted from the file · 141 pages · 373,939 characters
Page 3 of 45
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set UCONN-01 Date Issued September 18, 2026 UCONN-003 Page 1 of 1 Date Filed: October 02, 2026 Witness: Edward A. Davis and Kimberly R. Parsons Request from: UCONN Question: (Rate Design & Tariff Structure) Has the development of distributed solar generation in Connecticut over the last 10 years changed load profiles on Eversource’s transmission and distribution system? If yes, please explain how those changes are reflected in the on-peak hours proposed for rates 55, 56, 57, and 58 for the purposes of assessing distribution demand charges and transmission charges. Response: The question is irrelevant for these rate classes, whose Distribution rates are not time differentiated. Transmission cost allocation reflects the coincidence of these classes’ diversified demand with the Company’s corresponding monthly peaks associated with transmission service. This allocation and the associated rate design for the on-peak period established in current rates is predicated on demand allocators from the Company’s previous rate case and is planned to be updated based on demand allocators derived from the Test Year, and Rate Year billing determinants from this docket as part of the next transmission rate setting following conclusion of this case.Page 4 of 45
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set UCONN-01 Date Issued September 18, 2026 UCONN-004 Page 1 of 1 Date Filed: October 02, 2026 Witness: Lavelle A. Freeman and Juan F. Martinez Request from: UCONN Question: (Rate Design & Tariff Structure) For each distribution substation in Eversource’s Connecticut service territory please identify the peak load (measured in MW) and timestamp (date, hour ending) of the maximum 15-minute load measured at the substation in each month of 2025. Response: Please refer to UCONN-004, Attachment 1. The attachment contains 12 peak load values for each Eversource bulk substation in Connecticut listed in MW’s. The attachment also includes the associate substation’s timestamp for that peak load value for each month of 2025.Page 5 of 45
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set UCONN-01 Date Issued September 18, 2026 UCONN-005 Page 1 of 1 Date Filed: October 02, 2026 Witness: Lavelle A. Freeman, Gerhard Walker, Juan F. Martinez, Justin M. Pelkowski and Jingyuan Dong Request from: UCONN Question: (Rate Design & Tariff Structure) For each month in calendar year 2023, calendar year 2024, and calendar year 2025, please identify the actual and projected peak load hour measured on Eversource’s transmission system (as reported to ISO New England for Regional Network Service load purposes), including date, hour ending, and Eversource’s average 60-minute MW load measured during the Company’s monthly peak load hour. Response: Please refer to UCONN-5, Attachment 1, for the actual, historical peak load data.Page 6 of 45
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set UCONN-01 Date Issued September 18, 2026 UCONN-006 Page 1 of 1 Date Filed: October 02, 2026 Witness: Lavelle A. Freeman, Gerhard Walker, Juan F. Martinez, Justin M. Pelkowski, Edward A. Davis and Kimberly R. Parsons Request from: UCONN Question: (Rate Design & Tariff Structure) For each monthly peak load hour identified in questions UCONN-8 and UCONN-9, please provide Eversource’s estimate of the contribution of intermediate and large commercial customers (Rates 55, 56, 57, and 58) to the total load during that hour. Response: Please refer to CIEC-020, Attachment 1, for the requested information.Page 7 of 45
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set UCONN-01 Date Issued September 18, 2026 UCONN-007 Page 1 of 1 Date Filed: October 05, 2026 Witness: Warren R. Boutin and Andrew C. Belden Request from: UCONN Question: (Rate Design & Tariff Structure) What was the total installed capacity (measured in alternating current megawatts) of behind-the-meter solar photovoltaic generation in Eversource’s Connecticut service territory as of year-end 2010, as of year-end 2015, as of year-end 2020, and as of year-end 2025? a. For each period, what percentage of behind-the-meter solar capacity was installed by intermediate commercial customers (Rates 55 and 56)? b. For each period, what percentage was installed by large commercial customers (Rates 57 and 58)? Response: Power Clerk tracks the installed capacity for the behind the meter solar generation. The customer billing rate needed to determine the percentages installed by medium to large commercial customer is not available in Power Clerk. Thus, questions a. and b. cannot be answered. Please refer to the table below which represents a running total of behind-the-meter solar generation. Year Running Total PV Generation MW) 2010 21.31 2015 144.29 2020 451.73 2025 979.14Page 8 of 45
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set UCONN-01 Date Issued September 18, 2026 UCONN-008 Page 1 of 2 Date Filed: October 02, 2026 Witness: Edward A. Davis and Kimberly R. Parsons Request from: UCONN Question: (Rate Design & Tariff Structure) Refer to Exhibit CLP-RATES-1 at p. 10. The MHD-EV class is a new and separate rate class that started in 2025 and is constructed very similarly to Eversource’s EV-Large rate class. a. Please explain how Eversource constructed the distribution component of Rate EV-MHD and Rate EV-Large. b. Please explain how Eversource constructed the transmission component of Rate EV-MHD and Rate EV-Large. c. Please explain why the distribution demand charge included in Rate EV-MHD and in Rate EVLarge varies based on a customer’s load factor. d. Please explain why the transmission demand charge included in Rate EV-MHD and in Rate EV-Large varies based on a customer’s load factor. Response: a. The distribution component of Rate EV-Large is based on Rate 56. First, an average distribution rate per kWh is calculated by dividing the Rate 56 Distribution Demand Charge revenue by Rate 56 billed sales. Once this average distribution rate is established, it is converted into an on and off-peak rate using an on-peak differential derived from the Marginal Cost Study (MCOS) and on and off-peak sales splits for Rate 56. This calculation provides the on and off-peak Distribution per kWh rate for Tier 1 of Rate EV-Large. Tier 1 has no Distribution Demand Charge. To determine the Distribution Demand Charge of Tier 2 through Tier 8, the Rate 56 Distribution Demand Charge is divided into seven (7) equal shares, with each Tier accumulating one share as it moves towards Tier 8 (full Rate 56 pricing). The reverse process is used for the on and off-peak Distribution per kWh charges. Rate EV-MHD uses the same distribution rates as Rate EV-Large for both demand and per kWh. The only difference is the load factor ranges for each of the eight (8) tiers. Please refer to UCONN-8, Attachment 1, for the calculations supporting this explanation. b. The transmission component of Rate EV-Large is based on Rate 56. First, an average transmission rate per kWh is calculated by dividing the Rate 56 Transmission Demand Charge revenue by Rate 56 billed sales. Once this average transmission rate is established, it is converted into an on and off-peak rate using an on-peak differential derived from the Marginal Cost Study (MCOS) and on and off-peak sales splits for Rate 56. This calculation providesPage 9 of 45
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set UCONN-01 Date Issued September 18, 2026 UCONN-008 Page 2 of 2 the on and off-peak Transmission per kWh rate for Tier 1 of Rate EV-Large. Tier 1 has no Transmission Demand Charge. To determine the Transmission Demand Charge of Tier 2 through Tier 8, the Rate 56 Transmission Demand Charge is divided into seven (7) equal shares, with each Tier accumulating one share as it moves towards Tier 8 (full Rate 56 pricing). The reverse process is used for the on and off-peak Transmission per kWh charges. Rate EVMHD uses the same transmission rates as Rate EV-Large for both demand and per kWh. The only difference is the load factor ranges for each of the eight (8) tiers. The Transmission rates will be updated using approved rate case determinants during the subsequent RAM cycle following the Final Decision of this proceeding. Please refer to UCONN-8, Attachment 1, for the calculations supporting this explanation. c. The distribution demand charge included in Rate EV-MHD and in Rate EV-Large varies based on a customer’s load factor due to the requirements of subpart (c) in the referenced Order No. 12, whereby the Company shall file, no later than August 1, 2022, for PURA review and approval, proposed design documents that include a proposed tariff specifically for separately metered DCFCs and networked Level 2 EVSEs serving light-duty fleets, as directed in Section V.C.2.c., which states: The Authority finds that a more robust and permanent demand charge mitigation solution that reflects an appropriate allocation of distribution system costs is necessary to support the sustained growth of the EVSE industry in the State. The Authority will further consider a more sustainable solution during the 2022 Annual Review. Accordingly, the Authority will require the EDCs to propose a tariff specifically for separately metered DCFCs and networked Level 2 EVSEs serving light-duty fleets, to be submitted to the Authority no later than August 1, 2022. The tariff shall include a fixed monthly charge, on-peak and off-peak kWh distribution charges that are higher when a charging station’s load factor is low (e.g., utilization of <5%) and decrease at established increments as charging station utilization increases, and kW distribution and transmission demand charges that are lower when a charging station’s load factor is low and increase at established increments as charging station utilization increases. To minimize program costs, any revenues from billed sales that exceed the established revenue requirements used to design the tariff over the useful life of the EVSE shall be tracked by the EDCs and credited back to ratepayers through a rider or other rate reconciliation mechanism. The tariff shall be offered to all electric utility customers with separately metered DCFCs and light-duty fleets with installations of four or more networked Level 2 chargers that are enrolled in a managed charging program. d. The transmission demand charge included in Rate EV-MHD and in Rate EV-Large varies based on a customer’s load factor due to the same requirements as mentioned in subpart (c) above.Page 10 of 45
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set UCONN-01 Date Issued September 18, 2026 UCONN-009 Page 1 of 2 Date Filed: October 02, 2026 Witness: Edward A. Davis and Kimberly R. Parsons Request from: UCONN Question: (Rate Design & Tariff Structure) Refer to Exhibit CLP-RATES-3. Eversource assesses distribution demand charges and transmission demand charges to intermediate and large commercial customers using billing units based on kilovolt-amperes (“kVA”). a. Please explain why Eversource believes it is appropriate to continue assessing such charges in kVA rather than using kilowatts (“kW”). b. Please explain the bill impact of converting from kVA to kW billing units on Rates 55, 56, 57, and 58 customers. Please provide detailed analysis. Response: a. The use of kVA is designed to capture and present total delivery power requirements and incentivize efficient utilization of delivery facilities, as measured by power factor at their point of service. From the inception of kVA metering and billing customers have responded to this structure and the price signals afforded by kVA demand billing and achieved numerous benefits as a result of lowering demand charges, particularly through installing and maintaining power factor management and correction equipment at their facilities often with a relatively short payback. This kVA structure continues to provide an accurate and transparent means of informing each customer of their demand while achieving efficient utilization of the grid for power delivered to their facilities. The continued utilization of kVA demand ensures customers retain an accurate measure of their total power delivery requirements. The kVA demand directly translates to the current (amperes) flowing through the power system unlike kW. This current is what drives utilization of the system and impacts ratings of every piece of equipment which are always in amperes or kVA, not kW as it does not correlate directly to amperes flowing. Its use is an integral and valuable part of the demand-based rate structures that customers can rely and act on when making decisions about their electric service. b. From a rate design and policy perspective, converting to kW from kVA billing runs counter to the intent and the benefits achieved through the establishment of kVA metering and billing. The factors in the Company’s tariff for converting rates from a per kVA to a per kW basis is reserved and applies only to those customers for whom, at the time the kVA rate was established, kVA metering was not available. These factors are class average values that only apply on this limited basis. The application of kVA metering and billing was phased in over time, first for rates 57 and 58 customers and later for Rate 55 and 56Page 11 of 45
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set UCONN-01 Date Issued September 18, 2026 UCONN-009 Page 2 of 2 customers. Since its inception, customers have responded to kVA rates and invested in equipment that improved efficiency and lowered their total power delivery requirements and charges for electric service. These benefits have been realized in both distribution and time-varying transmission rates and charges. Reverting to a kW rate would remove this price signal and be regressive. A conversion using class average power factors would produce inaccurate and inappropriate kW values, particularly when compared with the actual power factors and resulting kW demand. For illustrative purposes, the company has provided a calculation of kW demand values associated derived from billed kVA and assumed class average power factors. Please see these calculations, by rate class and demand charge type, in UCONN-09 Attachment 1. To reiterate, these calculations are strictly for illustrative purposes and are not a proposal for rate design for any of these rate classes. A conversion of this type will produce a higher unit rate and lower, theoretical kW billing units. While the higher rate would be retained, the actual bill impact compared with this illustration will vary, depending upon customers’ actual power factors and thereby actual kW demand.Page 12 of 45
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set UCONN-01 Date Issued September 18, 2026 UCONN-010 Page 1 of 2 Date Filed: October 02, 2026 Witness: Edward A. Davis and Kimberly R. Parsons Request from: UCONN Question: (Rate Design & Tariff Structure) Refer to Exhibit CLP-RATES-1 at p. 34 which states that by providing a reduced rate for incremental usage related to heat pumps, the Company believes it can help drive adoption of heat pump technology and achieve better system utilization during winter months. Eversource goes on to state that this will help drive better system utilization as the Company is currently a summer peak system. a. Does Eversource believe that this outcome can also be achieved if intermediate and large commercial customers consume additional electricity in the winter months? b. Does Eversource believe that DER adoption and operation by intermediate and large commercial customers can improve system utilization if a DER is operated to reduce a customer’s grid demand during hours of peak demand on Eversource’s transmission and distribution system? c. Please explain why Eversource has not proposed seasonal differentiation in its distribution rates for intermediate and large commercial customers on Rates 55, 56, 57, or 58. Response: a. The referenced outcome is attributable to incremental monthly kWh usage from heat pump adoption for space heating during winter months. The incremental usage characteristics were derived from the difference between the residential non-space heating class, as a baseline, and residential electric space heating. The Company did not conduct a comparison assuming greater usage in the winter season by intermediate or large commercial customers. b. From a distribution system operator perspective, DER adoption and operation by an intermediate or large commercial customer that reduces the respective customer’s grid demand during hours of peak demand does not help the system, unless the system is relieved of any capacity requirements for that respective customer during the peak – meaning that the customer would have no back-up source of power on peak. The distribution system is constructed to meet the requirements of localized peak demands and if one or more customers is able to take their load off-line, it benefits that customer. It benefits other customers, only if the Company is actually able to avoid the need for capacity on the system, which can only occur if the customer benefitting from DER is willing to relieve the system of an obligation to provide firm service upon demand for the single
Text of UCONN Set 2_COMBINED.pdf
Extracted from the file · 19 pages · 40,074 characters
As listed on the current system
Corres. 10/21/2026 [26-05-10] (Keegan Werlin LLP) - Compilation of Discovery Responses