Discovery Compilations (ALLCO Set 11, CLF-SC Set 3, OCC Set 24).
Files4
Docket No. 26-05-10 Discovery Compilations October 22 2026.pdf
PDF · 155 KB · 1 pageText searchable
Download Docket No. 26-05-10 Discovery Compilations October 22 2026.pdfRead the text of Docket No. 26-05-10 Discovery Compilations October 22 2026.pdf
ALLCO Set 11_COMBINED.pdf
PDF · 1.2 MB · 99 pagesText searchable
Download ALLCO Set 11_COMBINED.pdfRead the text of ALLCO Set 11_COMBINED.pdf
CLF-SC Set 3_COMBINED.pdf
PDF · 390 KB · 16 pagesText searchable
Download CLF-SC Set 3_COMBINED.pdfRead the text of CLF-SC Set 3_COMBINED.pdf
OCC Set 24_COMBINED.pdf
PDF · 503 KB · 41 pagesText searchable
Download OCC Set 24_COMBINED.pdfRead the text of OCC Set 24_COMBINED.pdf
Page 1 of 99
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set ALLCO-11 Date Issued September 24, 2026 ALLCO-119 Page 1 of 3 Date Filed: October 08, 2026 Witness: Warren R. Boutin and Andrew C. Belden Request from: ALLCO Question: (Follow-up to ALLCO-057 — Level 2 and Level 3 applications.) The Company’s response to ALLCO-057 confined its figures to Level 1 applications and defined “completed or otherwise closed” as applications that received Permission to Operate. ALLCO-057 asked for all Connecticut DG interconnection applications. For each calendar year 2020 through 2025, separately for Level 2 applications, Level 3 applications, and any other category of application that is not Level 1, state: (a) the number and aggregate MW AC of applications received; (b) the number that received Permission to Operate; (c) the number withdrawn; (d) the number denied, rejected, or cancelled by the Company; (e) the number pending at December 31 of that year; (f) the number and aggregate MW AC that required electric power system modifications or upgrades; and (g) item (f) as a percentage of items (a), (b), and (e). Provide the schedule in native Excel format derived from PowerClerk, and state why the Company’s response to ALLCO-057 omitted Level 2 and Level 3 applications. Response: Eversource has only Level 1 and Level 2 applications. The reporting included in this response is for Level 2. The Level 1 applications were previously reported in the Company’s response to ALLCO-057 i. Level 2 (≤2 MW) Calendar Year a. 2020 2021 2022 2023 2024 2025 2020–2025 Level Type = Level 2 and System Size ≤ 2 MW (a) # Applications (a) Aggregate Received MW AC Received 574 626 314 401 479 436 2,830 207.3 117.8 110.0 92.4 138.9 91.3 757.8 (b) # Received Permission to Operate (c) # Withdrawn 273 398 309 195 279 395 1,849 121 150 96 84 165 72 688 (e) # Pending at Dec 31 581 659 568 693 725 694Page 2 of 99
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set ALLCO-11 Date Issued September 24, 2026 ALLCO-119 Page 2 of 3 Over 2 MW Calendar Year b. Level Type = Level 2 and System Size > 2 MW (a) # Applications (a) Aggregate Received MW AC Received 2020 2021 2022 2023 2024 2025 2020–2025 17 31 37 46 36 35 202 140.0 146.0 276.4 281.2 184.9 158.7 1,187.3 (b) # Received Permission to Operate (c) # Withdrawn 2 2 2 1 7 6 20 7 12 19 27 24 5 94 (e) # Pending at Dec 31 36 53 69 87 92 116 c. Please refer to the Company’s responses to subparts (a) and (b) above. d. The Company does not deny, reject or cancel projects. The Company notifies the customer/developer of action needed, including investments, for the project to move forward. The customer/developer decides if the actions are a viable option for the project. e. Please refer to the Company’s responses to subparts (a) and (b) above. f. This data is not tracked in Power Clerk. g. The percentages cannot be calculated. The Company notes that the Company’s response to ALLCO-057, which was a follow-up to the Company’s response to ALLCO-016 ii regarding the proposed Level 1 DER Interconnection Processing metric, requested additional information to what the Company provided in ALLCO016, Attachment 1. ALLCO-057 did not request that Eversource provide information on Level 2 applications, which is irrelevant to the proposed metric. There are no Level 3 applications. Prior Referenced Response: i ALLCO-057 Question: Follow-up to the Company’s response to Q-ALLCO-016 (applications excluded from interconnection performance metrics). The Company’s response and Attachment 1 provided annual counts of interconnection applications excluded from the Company’s interconnection-timeline performance metrics because they require transformer upgrades (187 in 2020; 142 in 2021; 122 in 2022; 406 in 2023; 534 in 2024; 671 in 2025), but did not provide the percentage figures and total-application denominators requested. For each calendar year 2020 through 2025: (a) state the total number of Connecticut DG interconnection applications received; (b) state the total number of applications completed or otherwise closed; andPage 3 of 99
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set ALLCO-11 Date Issued September 24, 2026 ALLCO-119 Page 3 of 3 (c) state the excluded applications identified in the Company’s response as a percentage of each of (a) and (b). (d) If the Company contends it cannot derive these figures from PowerClerk or any other system, describe each system of record for interconnection applications and state which data fields it maintains. ALLCO-057 Response: Please refer to ALLCO-057, Attachment 1, which includes the previously provided count and percentage of Level 1 projects requiring an upgrade as requested in the Company’s response to ALLCO-016i, with the addition of three newly requested columns as detailed above in bullets a-c. The figures are for Level 1 Connecticut DG interconnection applications as referenced in ALLCO-016. For the purposes of this filing the Company is considering “completed or otherwise closed” applications as those that received Permission to Operate. The Company has derived these figures from PowerClerk, so no alternative description of additional data sources is applicable. ii ALLCO-016 Question: State, for each year 2020 through 2025, the number and aggregate MW of DER interconnection applications that would be excluded from the proposed Level 1 DER Interconnection Processing metric because they “require electric power system modifications” (Exhibit CLP-CUSTOMER-1 at 34 n.22), as a count and as a percentage of all applications and of all applied-for MW, and explain the basis for excluding such projects from a metric intended to measure interconnection performance. ALLCO-016 Response: Please refer to ALLCO-016, Attachment 1, which specifies the number, percentage, and MW of Level 1 DER interconnection applications that required electric power system modifications. These projects are proposed to be excluded from the Level 1 DER Interconnection Processing PIM since they represent time periods outside the scope of a standard project. In addition, the system modification process is not tracked in PowerClerk to the level of detail the PIM requires, which is designed to only track the time requiring Company action.Page 4 of 99
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set ALLCO-11 Date Issued September 24, 2026 ALLCO-120 Page 1 of 4 Date Filed: October 08, 2026 Witness: Warren R. Boutin and Andrew C. Belden Request from: ALLCO Question: (Follow-up to ALLCO-057 and ALLCO-007 — pendency.) For all applications pending at December 31, 2025, separately for Level 1, Level 2, and Level 3: (a) state the number pending less than one year, one to three years, three to five years, and more than five years after the applicationreceived date recorded in PowerClerk; and (b) for each Level 2 or Level 3 application pending more than three years, identify the application number, the MW AC, the circuit and substation, the current PowerClerk status, the date of the most recent Company action, and the reason the application remains pending. Applicant identities other than Allco and its affiliates may be anonymized. Response: CL&P objects to this request on the ground that it is an improper effort by Allco to use this rate case proceeding to obtain discovery for purposes of a lawsuit that it filed against the Company on August 10, 2026, in the United States District Court for the District of Connecticut (Civil Action No. 3:26-cv-1277), outside of and in contravention of the rules of procedure that govern discovery in that lawsuit. CL&P further objects to this request on the ground that it is not within the scope of the proceeding to review the Company’s application to amend its existing rates schedules because the interrogatory either seeks information specific to Allco projects or seeks information that Allco views as relevant to its specific projects. Without waiving said objections, the Company states as follows: a. Please refer to the tables below. Please also refer to the Company’s response to ALLCO-119 i. There are no level 3 projects. b. Refer to the Company’s response to ALLCO-007 ii.Page 5 of 99
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set ALLCO-11 Date Issued September 24, 2026 ALLCO-120 Page 2 of 4 Level 1 Pending >5yrs Pending 5 yrs Pending 3 yrs Pending 1 yr Pending <1yr 4 29 4275 1223 1366 Level 2 Pending >5yr Pending 5 yrs Pending 3 yrs Pending 1yr Pending <1yr 23 56 67 134 221 Prior Referenced Response: i ALLCO-119 Question: (Follow-up to ALLCO-057 — Level 2 and Level 3 applications.) The Company’s response to ALLCO-057 confined its figures to Level 1 applications and defined “completed or otherwise closed” as applications that received Permission to Operate. ALLCO-057 asked for all Connecticut DG interconnection applications. For each calendar year 2020 through 2025, separately for Level 2 applications, Level 3 applications, and any other category of application that is not Level 1, state: (a) the number and aggregate MW AC of applications received; (b) the number that received Permission to Operate; (c) the number withdrawn; (d) the number denied, rejected, or cancelled by the Company; (e) the number pending at December 31 of that year; (f) the number and aggregate MW AC that required electric power system modifications or upgrades; and (g) item (f) as a percentage of items (a), (b), and (e). Provide the schedule in native Excel format derived from PowerClerk, and state why the Company’s response to ALLCO-057 omitted Level 2 and Level 3 applications. ALLCO-119 Response: Eversource has only Level 1 and Level 2 applications. The reporting included in this response is for Level 2. The Level 1 applications were previously reported in the Company’s response to ALLCO-057i.Page 6 of 99
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set ALLCO-11 Date Issued September 24, 2026 ALLCO-120 Page 3 of 4 Level 2 (≤2 MW) Calendar Year a. Level Type = Level 2 and System Size ≤ 2 MW (a) # Applications (a) Aggregate Received MW AC Received 2020 2021 2022 2023 2024 2025 2020–2025 Over 2 MW Calendar Year b. 207.3 117.8 110.0 92.4 138.9 91.3 757.8 574 626 314 401 479 436 2,830 (b) # Received Permission to Operate (c) # Withdrawn 273 398 309 195 279 395 1,849 121 150 96 84 165 72 688 (e) # Pending at Dec 31 581 659 568 693 725 694 Level Type = Level 2 and System Size > 2 MW (a) # Applications (a) Aggregate Received MW AC Received 2020 2021 2022 2023 2024 2025 2020–2025 17 31 37 46 36 35 202 140.0 146.0 276.4 281.2 184.9 158.7 1,187.3 (b) # Received Permission to Operate (c) # Withdrawn 2 2 2 1 7 6 20 7 12 19 27 24 5 94 (e) # Pending at Dec 31 36 53 69 87 92 116 c. Please refer to the Company’s responses to subparts (a) and (b) above. d. The Company does not deny, reject or cancel projects. The Company notifies the customer/developer of action needed, including investments, for the project to move forward. The customer/developer decides if the actions are a viable option for the project. e. Please refer to the Company’s responses to subparts (a) and (b) above. f. This data is not tracked in Power Clerk. g. The percentages cannot be calculated. The Company notes that the Company’s response to ALLCO-057, which was a follow-up to the Company’s response to ALLCO-016i regarding the proposed Level 1 DER Interconnection Processing metric, requested additional information to what the Company provided in ALLCO-016, Attachment 1. ALLCO-057 did not request that Eversource provide information on Level 2 applications, which is irrelevant to the proposed metric. There are no Level 3 applications. ii ALLCO-007 Question: State the number of pending distribution interconnection applications in Connecticut that have been pending for more than one year, more than three years, and more than five years, respectively, as of the most recent date available, andPage 7 of 99
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set ALLCO-11 Date Issued September 24, 2026 ALLCO-120 Page 4 of 4 for each application pending more than five years, identify the application number, application date, requested capacity (MW), substation and circuit, and current status. ALLCO-007 Response: CL&P objects to this request on the ground that it is an improper effort by Allco to use this rate case proceeding to obtain discovery for purposes of a lawsuit that it filed against the Company on August 10, 2026, in the United States District Court for the District of Connecticut (Civil Action No. 3:26-cv-1277), outside of and in contravention of the rules of procedure that govern discovery in that lawsuit. Without waiving said objection, the Company maintains and publishes an active interconnection queue for generators greater than 25 kW. The published queue identifies, among other information, the applicable substation, circuit, queue date, and project capacity. The Company also publishes hosting capacity maps that provide location-specific information, including hosting capacity values and DER currently online or in the queue. The information requested regarding individual projects and the applicable substations and circuits is available through the Company’s publicly available interconnection resources.1 https://www.eversource.com/residential/about/doing-business-withus/interconnections/connecticut/connecticut-application-to-connect. 1Page 8 of 99
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set ALLCO-11 Date Issued September 24, 2026 ALLCO-121 Page 1 of 3 Date Filed: October 16, 2026 Witness: Warren R. Boutin and Andrew C. Belden Request from: ALLCO Question: (Follow-up to ICC-011, ICC-017, and ALLCO-017 — PowerClerk milestone data.) The Company’s responses to ICC-011 and ICC-017 state that PowerClerk records “application status changes which are then used to track milestones,” and its response to ALLCO-057 states that the figures provided were “derived from PowerClerk.” Its response to ALLCO-017 states that the Company “does not track” the time between its receipt of a generator-executed interconnection agreement and its countersignature. (a) Identify each status, milestone, and date field that PowerClerk records for an application, and state for each whether a timestamp is captured automatically or entered manually. (b) For each Allco Application, produce the complete PowerClerk status-change history with the date and time of each status change, including the dates the application was received, deemed complete, screened, studied, approved (contingent or otherwise), the date an interconnection agreement was issued, the date a generator-executed agreement was received, the date of the Company’s countersignature, and the date of Permission to Operate. (c) For all Level 2 and Level 3 applications received from January 1, 2019 through the present, produce in native Excel format the same fields listed in (b). (d) State whether, in light of (a) through (c), the Company withdraws the statement in its response to ALLCO-017 that it “does not track” countersignature timing, and if not, reconcile that statement with the data PowerClerk records. Response: CL&P objects to this request on the ground that it is an improper effort by ALLCO to use this rate case proceeding to obtain discovery for purposes of a lawsuit that it filed against the Company on August 10, 2026, in the United States District Court for the District of Connecticut (Civil Action No. 3:26-cv-1277), outside of and in contravention of the rules of procedure that govern discovery in that lawsuit. CL&P further objects to this request on the ground that it is not within the scope of the proceeding to review the Company’s application to amend its existing rates schedules because the interrogatory either seeks information specific to Allco projects or seeks information that Allco views as relevant to its specific projects. Without waiving said objections, there are 140 different statuses in PowerClerk, and each of these statuses reflect that a project is online, in queue or withdrawn. Further, there is no discrepancy among ALLCO-017 i, ICC-011 ii, and ICC-017 iii. Prior to 2026, Interconnection Agreements werePage 9 of 99
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set ALLCO-11 Date Issued September 24, 2026 ALLCO-121 Page 2 of 3 executed outside of PowerClerk and subsequently uploaded to PowerClerk after being signed by all parties thereto. Therefore, consistent with the Company’s response to ALLCO-017, this information was not tracked, either in or outside of PowerClerk. Prior Referenced Responses: i ALLCO-017 Question: State the average and maximum elapsed time, in each year 2019 through 2025, between the Company’s receipt of an interconnection agreement executed by a Connecticut generator and the Company’s countersignature and return of that agreement, and identify each instance exceeding 180 days, including project LEG-22708. ALLCO-017 Response: CL&P objects to this request on the ground that it is an improper effort by Allco to use this rate case proceeding to obtain discovery for purposes of a lawsuit that it filed against the Company on August 10, 2026, in the United States District Court for the District of Connecticut (Civil Action No. 3:26-cv-1277), outside of and in contravention of the rules of procedure that govern discovery in that lawsuit. Without waiving said objection, the Company does not track information on the average and maximum elapsed time between the receipt of a partially-executed interconnection agreement (“IA”) from a Generator and the Company’s countersignature and return of the fully-executed IA to the Generator. Starting in early 2026, the IA execution process was enhanced to leverage automation available in PowerClerk; therefore, the execution dates are now recorded electronically in a software platform. ii ICC-011 Question: Reference ICC-6. In a chart, provide monthly mean, median and average time each identified Eversource department spent reviewing interconnection applications since January 1, 2020. ICC-011 Response: The information requested is not reflected by department. Eversource uses PowerClerk to track application status changes which are then used to track milestones. The milestones include the total time for example; from the application received date to the contingent approval issued date. In this timeframe multiple departments may review an application, but the milestone encompasses the total time between the received date and the contingent approval issued date. Please refer to the Company’s response to ICC-017 iii ICC-017 Question: Reference Exhibit CLP-ELP-1 at Page 109 and Exhibit CLP-CUSTOMER-1 at 34. Describe any and all data Eversource currently uses to track whether it is meeting its own milestones in interconnection agreements. Provide software used, describe which milestones are tracked. Provide the most current outputs showing whether Eversource is currently meeting those milestones.Page 10 of 99
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set ALLCO-11 Date Issued September 24, 2026 ALLCO-121 Page 3 of 3 ICC-017 Response: The testimony referenced is specific to the Level 1 DER Interconnection metric. Eversource uses PowerClerk, the interconnection application portal, to track application status changes which can be used to track milestones. Eversource currently files data on application milestones on a quarterly basis for projects participating in the Residential Renewable Energy Solutions (RRES) program, which accounts for the vast majority of Level 1 applications. The most recent of these filings is the Compliance Filing to Order 13 in Docket No. 26-08-02, submitted July 28, 2026, refiled here as ICC-017, Attachment 1. While these milestones are tracked within the RRES program, there are no specified milestone targets within that program for the Level 1 DER Interconnection metric
As listed on the current system
Corres. 10/22/2026 [26-05-10] (Keegan Werlin LLP) - Discovery Compilations (ALLCO Set 11, CLF-SC Set 3, OCC Set 24).