A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Discovery Compilations (ALLCO Set 11, CLF-SC Set 3, OCC Set 24).

Files4

Search terms highlighted
Eversource rate increase is on 15 pages across 3 files of the text below, highlighted. Go to the first matchClear highlighting
Words on different pages
3 pages match
  1. Page 17 of 99

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set ALLCO-11 Date Issued September 24, 2026 ALLCO-124 Page 4 of 4 the confidentiality-designation and redaction work are incurred to comply with legal obligations governing disclosure of public records and confidential information. iii ALLCO-079 Question (Follow-up to ALLCO-034.) Supplement the response as the Company committed: produce the Keegan Werlin LLP invoices for redaction and confidentiality-designation services as they are rendered, and state the amounts billed to date; provide the Company’s best estimate of the internal Company and ESC personnel time (by title, with hours and loaded cost) devoted to redaction and confidentiality-designation work in this proceeding, notwithstanding that such time is not separately tracked; identify the account(s) to which all such costs have been charged; and state the amount included in, or to be sought through, the Test Year or Rate Year revenue requirement, rate case expense, or any deferral, with the schedule and line. ALLCO-079 Response Please refer to the Company’s response to ALLCO-034i wherein the Company stated that it “will supplement this response with the requested information for Keegan Werlin LLP once it becomes available” (emphasis added). The Company’s response to this interrogatory was recently submitted on September 16, 2026, and to-date, the Company has not received an invoice from Keegan Werlin for these services. Eversource will supplement ALLCO-034 once this information becomes available. Also as stated in the Company’s response to ALLCO-034, Eversource does not separately track time for redaction and confidentiality designation work performed by internal resources. iv ALLCO-076 Question (Follow-up to ALLCO-023.) The response omitted 2018 through 2020 entirely and provided no breakdown by vendor category. State, for each calendar year 2018 through 2025 and the Test Year: (a) the Company’s total outside counsel fees (direct and allocated), by firm for the ten highest billing firms each year; (b) total other legal-related vendor costs, stated separately for e-discovery and litigation-support vendors, court reporters, expert witnesses and consultants engaged through counsel, and claims administrators; and (c) the amounts of (a) and (b) allocated to the Company, with the FERC accounts used; and reconcile the 2021-2025 amounts to Exhibit CLP-REVREQ-3, identifying page and line. ALLCO-076 Response (a) Please refer to ALLCO-076, Attachment 1, for a list of outside legal expenses by vendor for each years 2021, 2022, 2023, 2024 and 2025 (Test Year). ALLCO-076, Attachment 1, shows the outside legal expenses identified by: (1) legal service category consistent with the categories included in Exhibit CLP-REVREQ3.20; (2) whether it is a direct or allocated charge; and (3) the applicable FERC account(s). For each year 2018 through 2020, the information is not readily retrievable. The Company notes ALLCO-023i did not ask for a “breakdown by vendor category” or “for total outside counsel fees (direct and allocated), by firm for the ten highest-billing firms each year.” ALLCO-023 asked for the Company’s total legal spend “separated into (a) internal/ESC legal function costs, (b) outside counsel fees, and (c) other legal-related vendors (e.g., e-discovery, court reports, expert witness, claims administrators).”
  2. Page 18 of 99

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set ALLCO-11 Date Issued September 24, 2026 ALLCO-125 Page 1 of 2 Date Filed: October 16, 2026 Witness: Brendan J. O’Brien and Garrett J. Murray Request from: ALLCO Question: (ALLCO-034(c) — cost tracking for this proceeding.) The Company’s response to ALLCO-034(c) states that it “is tracking the costs associated with the redaction and confidentiality-designation work and plans to seek recovery for these costs in this proceeding.” (a) Identify the system, account, project number, work order, or other code the Company uses to track those costs. (b) State whether the Company tracks, by the same or any other means, every other cost of its attendance in, participation in, preparation for, or appeal of this proceeding — including outside counsel and consultant fees, expert fees, and the time of Company and ESC employees — and, if not, identify each category that is not tracked and explain how the Company proposes to demonstrate that such costs have been excluded from rates as § 16-243p(b) requires. (c) Produce, in native Excel format, the current balance of each tracked category of proceeding-related cost, by vendor or employee group and by month, from May 20, 2026 through September 30, 2026. Response: (a) These costs are directly invoiced and itemized for recovery in this proceeding. (b) The Company will itemize and summarize the actual rate case expenses invoiced throughout this proceeding. Also, the Company will update the rate case expense during the proceeding for known and measurable costs incurred by PURA, the OCC, and other state agencies to participate in the rate proceeding that are passed through to the Company. Please refer to the Company’s response to ALLCO-078 i for treatment of internal resources participating in the rate case. (c) Please refer to ALLCO-027, Attachment 9, for the summary billed by vendor through June 2026. The Company will periodically update the rate case expense incurred. Prior Referenced Response: i ALLCO -078 Question: (Follow-up to ALLCO-030.) The response cross-referenced OCC-438, which contains no itemization. Itemize the approximately $3.1 million of rate case expense in Exhibit CLP-REVREQ-9 by vendor or firm, matter or workstream, and amount; identify each Company or ESC position (by title) whose Test Year or Rate Year payroll, incentive compensation, or benefits include time associated with attendance in, participation in, or preparation for rate
  3. Page 19 of 99

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set ALLCO-11 Date Issued September 24, 2026 ALLCO-125 Page 2 of 2 proceedings, and the amounts included; state whether any rate-proceeding-associated costs are recorded outside Exhibit CLP-REVREQ-9 — including in payroll, A&G, service-company charges, or any deferral — and identify the amounts and locations; and state the total of all costs associated with rate proceedings initiated on or after January 1, 2024 that are included anywhere in the proposed revenue requirement ALLCO-078 Response: The rate case expense in Exhibit CLP-REVREQ-9 in the amount of $3.1 million is itemized by vendor and Exhibit CLP-REVREQ-2, WP C-3.36, at page 10, shows the annual amortized rate case expense proposed in the revenue requirement. Additionally, please refer to ALLCO-027 Attachment 9, for a summary of billed rate-case expenses by vendor through June 30, 2026. As outlined within Exhibit CLP-REVREQ-9, all rate case expenses requested for recovery are from external vendors/contractors. There are no internal payroll, labor or benefits costs included within the $3.1 million rate case expense outlined in Exhibit CLP-REVREQ-9. Please note that the Company does not incur incremental payroll, labor or benefits costs when preparing, filing or adjudicating a rate case. All internal labor associated with this proceeding is staffed with current employees that work for the Company on a permanent basis, which means that there is no additional internal cost caused by the rate case. The Company’s departments handling the rate case is the Connecticut revenue requirements Group; the Connecticut rates group; and the internal legal department. The test year for this case is fiscal year ending December 31, 2025, and the internal work on the rate case is exclusively contained in fiscal year 2026, and the Company has confirmed that there is less than $10,000 recorded in 2025 in relation to the rate case. Please refer to the Company’s response to OCC332,i for a detailed explanation as to how the Company calculates its test year pro-forma and rate year payroll expense. Applying the Company’s calculation of payroll expense, there are no payroll, labor or benefit costs pertaining to the rate case in the proposed revenue requirement
  4. Page 20 of 99

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set ALLCO-11 Date Issued September 24, 2026 ALLCO-126 Page 1 of 1 Date Filed: October 08, 2026 Witness: Counsel Request from: ALLCO Question: (Windham Solar Facilities — estimate, collection, actual cost, and reconciliation.) With respect to the interconnection of the Windham Solar Facilities: (a) state the Company’s estimate of Upgrade costs as set out in Appendix G of the Interconnection Agreements as executed in May 2016 and as revised by each subsequent amendment, and the date of each; (b) state each amount the Company collected from Windham Solar LLC for interconnection costs, the date collected, and the account in which it was recorded; (c) state the actual cost recorded in the Company’s books for the Upgrades and interconnection facilities constructed for the Windham Solar Facilities, by work order and cost element, including any overhead or CIAC loaders applied, and produce the work-order cost detail in native format; (d) state each amount refunded or credited to Windham Solar LLC, the date, and the basis; (e) state whether the Company performed a final accounting or reconciliation of actual to estimated costs for that interconnection, and if so its date and result, and if not, why not; and (f) state the amount, if any, by which amounts collected exceeded the actual cost recorded in (c), and the current disposition of any such excess. Response: CL&P objects to this request on the ground that it is an improper effort by ALLCO to use this rate case proceeding to obtain discovery for purposes of a lawsuit that it filed against the Company on August 10, 2026, in the United States District Court for the District of Connecticut (Civil Action No. 3:26-cv-1277), outside of and in contravention of the rules of procedure that govern discovery in that lawsuit. CL&P further objects to this request on the ground that it is not within the scope of the proceeding to review the Company’s application to amend its existing rates schedules because the interrogatory either seeks information specific to Allco projects or seeks information that Allco views as relevant to its specific projects.
  5. Page 21 of 99

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set ALLCO-11 Date Issued September 24, 2026 ALLCO-127 Page 1 of 1 Date Filed: October 08, 2026 Witness: Counsel Request from: ALLCO Question: (Windham Solar Facilities — transfer-trip and substation components; post-2017 charges.) (a) State the estimated and the actual cost of the transfer-trip scheme and of the substation work included in the Upgrade estimate for the Windham Solar Facilities, identify the technology installed (power-line carrier, fiber optic, or other), and state who bore the cost of each. (b) Identify every charge billed to or withheld from Windham Solar LLC in connection with the Lebanon interconnection since September 1, 2017, including any operations and maintenance, ongoing, study, metering, or upgrade charge, stating the amount, date, and basis of each, or state that there have been none. Response: CL&P objects to this request on the ground that it is an improper effort by ALLCO to use this rate case proceeding to obtain discovery for purposes of a lawsuit that it filed against the Company on August 10, 2026, in the United States District Court for the District of Connecticut (Civil Action No. 3:26-cv-1277), outside of and in contravention of the rules of procedure that govern discovery in that lawsuit. CL&P further objects to this request on the ground that it is not within the scope of the proceeding to review the Company’s application to amend its existing rates schedules because the interrogatory either seeks information specific to Allco projects or seeks information that Allco views as relevant to its specific projects.
  6. Page 22 of 99

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set ALLCO-11 Date Issued September 24, 2026 ALLCO-128 Page 1 of 1 Date Filed: October 08, 2026 Witness: Counsel Request from: ALLCO Question: (Abington Solar Projects — line-extension estimate and CIAC.) With respect to the system impact study and cost estimate the Company provided for the Abington Solar Projects in or about 2017: (a) state the estimated cost of converting approximately 2.1 miles of single-phase 4.8 kV line to three-phase, the unit cost per mile on which it was based, and the source of that unit cost; (b) state the amount of the estimate designated as CIAC, the percentage applied, and the tax or other rationale for it, and identify the Company policy or tariff provision under which CIAC was assessed; (c) state whether the Company obtained or considered any third-party contractor pricing for the work, and if so identify it; (d) state the Company’s actual average cost per mile for single-phase-to-three-phase line conversions completed in each year 2017 through 2025, and produce the supporting work-order data in native format; and (e) state whether the Company’s current interconnection cost estimates for line conversions are derived from actual historical unit costs, and if so identify the unit-cost tables used. Response: CL&P objects to this request on the ground that it is an improper effort by ALLCO to use this rate case proceeding to obtain discovery for purposes of a lawsuit that it filed against the Company on August 10, 2026, in the United States District Court for the District of Connecticut (Civil Action No. 3:26-cv-1277), outside of and in contravention of the rules of procedure that govern discovery in that lawsuit. CL&P further objects to this request on the ground that it is not within the scope of the proceeding to review the Company’s application to amend its existing rates schedules because the interrogatory either seeks information specific to Allco projects or seeks information that Allco views as relevant to its specific projects.
  7. Page 23 of 99

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set ALLCO-11 Date Issued September 24, 2026 ALLCO-129 Page 1 of 3 Date Filed: October 09, 2026 Witness: Warren R. Boutin and Andrew C. Belden Request from: ALLCO Question: (ISO-NE Determinations — practice and timing.) The Company’s response to ICC-008 states that “ISO-NE review required for projects greater than 1 MW is outside the state Guideline clocks and can extend the overall.” For each calendar year 2023 through 2025 and 2026 to date: (a) state the number of Connecticut DG interconnection applications the Company referred to ISO-NE for a Determination, by Level and by size band; (b) state the criterion or criteria the Company applied in deciding to refer each application (including any practice that a generator greater than 1 MW connected to a substation with 20 MW of DER online and in queue requires a Level III transmission study), identify who formulated each criterion and when, and identify every communication with ISO-NE concerning it; (c) state the average, median, and maximum elapsed time from referral to Determination; (d) state whether the time an application spends awaiting a Determination is excluded from the interconnection-timeline metrics proposed in Exhibit CLP-CUSTOMER-1, and if so under what authority; and (e) produce, in native format, a schedule listing each referred application, the date of referral, the date of Determination, the outcome, and any study or fee required. Response: The Company's referral criterion is based on ISO-NE requirements applicable to DER projects with incremental aggregate on-site nameplate capacity exceeding 1 MW. This criterion is independent of how much generation is on the substation. The Company will notify ISO-NE of such projects, and ISO-NE will determine the level of review required. This may include: I. II. III. PP5 notification - estimated cost of $5,000; Determination Study- estimated cost of $15,000 (This could lead to a Transmission Level III Study); and Transmission Level III Study - estimated cost of $65,000. Actual costs are subject to change and may increase over time. In addition to the foregoing, the Company states as follows:
  8. Page 24 of 99

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set ALLCO-11 Date Issued September 24, 2026 ALLCO-129 Page 2 of 3 (a) The number of projects greater than 1MW can be found on the Company’s publiclyavailable Hosting Capacity Maps site. 1 (b) The criteria the Company applied to each application greater than 1MW comes directly from ISO-NE. Please refer to the Company’s response to ALLCO-132 i (c) Because this determination is made by a third party (ISO-NE), Eversource does not track the referral time. (d) The interconnection timeline metrics proposed are for the level 1 residential projects. Residential projects are all less than 1MW. (e) Please refer to the Company’s response to subpart (a). Prior Referenced Response: i ALLCO-132 Question: (Follow-up to ICC-005 and ICC-010 — monthly PowerClerk Reports and the executable-IA policy.) The Company’s response to ICC-010 states that “[m]anagement receives a monthly PowerClerk Report where Process timelines are reviewed to ensure that the timelines are adhered to,” and its response to ICC-005 states that “[t]he EDC cannot issue an executable Interconnection Agreement until applicable ISO-NE requirements are met.” (a) Produce each monthly PowerClerk Report, in native format, from January 1, 2020 to the present, and identify each metric, timeline, and milestone it reports and the recipients of the report. (b) State the date on which the Company adopted the policy that it will not issue an executable Interconnection Agreement until ISO-NE requirements are met, identify the Guideline provision, PURA order, ISO-NE tariff provision, or other authority on which it rests, and identify the document in which the policy is recorded. (c) For each Allco Application, state whether that policy was applied, the date the Company determined ISO-NE requirements had or had not been met, and the date, if any, on which the Company communicated that determination to the applicant. (d) State whether the policy in (b) is applied to applications of 1 MW or less, and if not, identify the Company’s basis for treating LEG-22708 and LEG-22709 (or any other Allco Application of 1 MW or less) as subject to ISO-NE review. ALLCO-132 Response: CL&P objects to this request on the ground that it is an improper effort by ALLCO to use this rate case proceeding to obtain discovery for purposes of a lawsuit that it filed against the Company on August 10, 2026, in the United States District Court for the District of Connecticut (Civil Action No. 3:26-cv-1277), outside of and in contravention of the rules of procedure that govern discovery in that lawsuit. CL&P further objects to this request on the ground that it is not within the scope of the proceeding to review the Company’s application to amend its existing rates schedules because the interrogatory either seeks information specific to Allco projects or seeks information that Allco views as relevant to its specific projects. See, https://www.eversource.com/residential/about/doing-business-withus/interconnections/connecticut/connecticut-application-to-connect. 1
  9. Page 25 of 99

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set ALLCO-11 Date Issued September 24, 2026 ALLCO-129 Page 3 of 3 Without waiving said objections, the monthly PowerClerk Reports referenced is not a formal report, but an internal tool used to review performance and to strategize for future success. Section 1.2 of the PURA-approved Interconnection Guidelines states, in part, “At the conclusion of the studies including any Transmission studies or additional requirements from ISO-NE, the EDC will submit an Interconnection Agreement (IA) to the Generator with payment milestones included within the Agreement.” Also, Section 3.2 of the PURA-approved Interconnection Guidelines states, in part, “If there are additional requirements set forth by ISO-NE for any proposed Generating Facility, these requirements will need to be addressed and receive proper approval by ISO-NE prior to the EDC issuance of an executable Interconnection Agreement.” This procedure is under the jurisdiction of ISO-NE. The Generator may obtain guidance from the ISO-NE Tariff, Schedules 22 and 23 and Section I.3.9.
  10. Page 26 of 99

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set ALLCO-11 Date Issued September 24, 2026 ALLCO-130 Page 1 of 2 Date Filed: October 09, 2026 Witness: Warren R. Boutin and Andrew C. Belden Request from: ALLCO Question: (ISO-NE Determinations — fees and study costs charged to customers.) For January 1, 2023 to the present: (a) identify every fee, study deposit, or cost (including system impact study fees and PSCAD or other modeling costs, and including the approximately $85,000 system impact study fee demanded in connection with the Spencer Hill Projects) that the Company has demanded, collected, or passed through to any Connecticut DG interconnection customer in connection with an ISO-NE Determination, review, or study, stating the application, amount, date, and current status; (b) identify the account(s) in which each such amount is recorded and state whether any such amount, or any Company cost of performing or supporting such studies, is included in rate base, the Test Year or Rate Year revenue requirement, or any tracker or deferral in this proceeding; and (c) state whether any such amount has been refunded or credited to the customer, and if so when. Response: CL&P objects to this request on the ground that it is an improper effort by ALLCO to use this rate case proceeding to obtain discovery for purposes of a lawsuit that it filed against the Company on August 10, 2026, in the United States District Court for the District of Connecticut (Civil Action No. 3:26-cv-1277), outside of and in contravention of the rules of procedure that govern discovery in that lawsuit. CL&P further objects to this request on the ground that it is not within the scope of the proceeding to review the Company’s application to amend its existing rates schedules because the interrogatory either seeks information specific to Allco projects or seeks information that Allco views as relevant to its specific projects. Without waiving said objection, please refer to the Company’s response to ALLCO-129 i. Prior Referenced Response: i ALLCO-129 Question: (ISO-NE Determinations — practice and timing.) The Company’s response to ICC-008 states that “ISO-NE review required for projects greater than 1 MW is outside the state Guideline clocks and can extend the overall.” For each calendar year 2023 through 2025 and 2026 to date: (a) state the number of Connecticut DG interconnection
3 pages match
9 pages match

As listed on the current system

Corres. 10/22/2026 [26-05-10] (Keegan Werlin LLP) - Discovery Compilations (ALLCO Set 11, CLF-SC Set 3, OCC Set 24).

This filing on the current system (opens in a new tab)