  1. Page 20 of 99

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set ALLCO-11 Date Issued September 24, 2026 ALLCO-126 Page 1 of 1 Date Filed: October 08, 2026 Witness: Counsel Request from: ALLCO Question: (Windham Solar Facilities — estimate, collection, actual cost, and reconciliation.) With respect to the interconnection of the Windham Solar Facilities: (a) state the Company’s estimate of Upgrade costs as set out in Appendix G of the Interconnection Agreements as executed in May 2016 and as revised by each subsequent amendment, and the date of each; (b) state each amount the Company collected from Windham Solar LLC for interconnection costs, the date collected, and the account in which it was recorded; (c) state the actual cost recorded in the Company’s books for the Upgrades and interconnection facilities constructed for the Windham Solar Facilities, by work order and cost element, including any overhead or CIAC loaders applied, and produce the work-order cost detail in native format; (d) state each amount refunded or credited to Windham Solar LLC, the date, and the basis; (e) state whether the Company performed a final accounting or reconciliation of actual to estimated costs for that interconnection, and if so its date and result, and if not, why not; and (f) state the amount, if any, by which amounts collected exceeded the actual cost recorded in (c), and the current disposition of any such excess. Response: CL&P objects to this request on the ground that it is an improper effort by ALLCO to use this rate case proceeding to obtain discovery for purposes of a lawsuit that it filed against the Company on August 10, 2026, in the United States District Court for the District of Connecticut (Civil Action No. 3:26-cv-1277), outside of and in contravention of the rules of procedure that govern discovery in that lawsuit. CL&P further objects to this request on the ground that it is not within the scope of the proceeding to review the Company’s application to amend its existing rates schedules because the interrogatory either seeks information specific to Allco projects or seeks information that Allco views as relevant to its specific projects.
  2. Page 21 of 99

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set ALLCO-11 Date Issued September 24, 2026 ALLCO-127 Page 1 of 1 Date Filed: October 08, 2026 Witness: Counsel Request from: ALLCO Question: (Windham Solar Facilities — transfer-trip and substation components; post-2017 charges.) (a) State the estimated and the actual cost of the transfer-trip scheme and of the substation work included in the Upgrade estimate for the Windham Solar Facilities, identify the technology installed (power-line carrier, fiber optic, or other), and state who bore the cost of each. (b) Identify every charge billed to or withheld from Windham Solar LLC in connection with the Lebanon interconnection since September 1, 2017, including any operations and maintenance, ongoing, study, metering, or upgrade charge, stating the amount, date, and basis of each, or state that there have been none. Response: CL&P objects to this request on the ground that it is an improper effort by ALLCO to use this rate case proceeding to obtain discovery for purposes of a lawsuit that it filed against the Company on August 10, 2026, in the United States District Court for the District of Connecticut (Civil Action No. 3:26-cv-1277), outside of and in contravention of the rules of procedure that govern discovery in that lawsuit. CL&P further objects to this request on the ground that it is not within the scope of the proceeding to review the Company’s application to amend its existing rates schedules because the interrogatory either seeks information specific to Allco projects or seeks information that Allco views as relevant to its specific projects.
  3. Page 22 of 99

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set ALLCO-11 Date Issued September 24, 2026 ALLCO-128 Page 1 of 1 Date Filed: October 08, 2026 Witness: Counsel Request from: ALLCO Question: (Abington Solar Projects — line-extension estimate and CIAC.) With respect to the system impact study and cost estimate the Company provided for the Abington Solar Projects in or about 2017: (a) state the estimated cost of converting approximately 2.1 miles of single-phase 4.8 kV line to three-phase, the unit cost per mile on which it was based, and the source of that unit cost; (b) state the amount of the estimate designated as CIAC, the percentage applied, and the tax or other rationale for it, and identify the Company policy or tariff provision under which CIAC was assessed; (c) state whether the Company obtained or considered any third-party contractor pricing for the work, and if so identify it; (d) state the Company’s actual average cost per mile for single-phase-to-three-phase line conversions completed in each year 2017 through 2025, and produce the supporting work-order data in native format; and (e) state whether the Company’s current interconnection cost estimates for line conversions are derived from actual historical unit costs, and if so identify the unit-cost tables used. Response: CL&P objects to this request on the ground that it is an improper effort by ALLCO to use this rate case proceeding to obtain discovery for purposes of a lawsuit that it filed against the Company on August 10, 2026, in the United States District Court for the District of Connecticut (Civil Action No. 3:26-cv-1277), outside of and in contravention of the rules of procedure that govern discovery in that lawsuit. CL&P further objects to this request on the ground that it is not within the scope of the proceeding to review the Company’s application to amend its existing rates schedules because the interrogatory either seeks information specific to Allco projects or seeks information that Allco views as relevant to its specific projects.
  4. Page 23 of 99

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set ALLCO-11 Date Issued September 24, 2026 ALLCO-129 Page 1 of 3 Date Filed: October 09, 2026 Witness: Warren R. Boutin and Andrew C. Belden Request from: ALLCO Question: (ISO-NE Determinations — practice and timing.) The Company’s response to ICC-008 states that “ISO-NE review required for projects greater than 1 MW is outside the state Guideline clocks and can extend the overall.” For each calendar year 2023 through 2025 and 2026 to date: (a) state the number of Connecticut DG interconnection applications the Company referred to ISO-NE for a Determination, by Level and by size band; (b) state the criterion or criteria the Company applied in deciding to refer each application (including any practice that a generator greater than 1 MW connected to a substation with 20 MW of DER online and in queue requires a Level III transmission study), identify who formulated each criterion and when, and identify every communication with ISO-NE concerning it; (c) state the average, median, and maximum elapsed time from referral to Determination; (d) state whether the time an application spends awaiting a Determination is excluded from the interconnection-timeline metrics proposed in Exhibit CLP-CUSTOMER-1, and if so under what authority; and (e) produce, in native format, a schedule listing each referred application, the date of referral, the date of Determination, the outcome, and any study or fee required. Response: The Company's referral criterion is based on ISO-NE requirements applicable to DER projects with incremental aggregate on-site nameplate capacity exceeding 1 MW. This criterion is independent of how much generation is on the substation. The Company will notify ISO-NE of such projects, and ISO-NE will determine the level of review required. This may include: I. II. III. PP5 notification - estimated cost of $5,000; Determination Study- estimated cost of $15,000 (This could lead to a Transmission Level III Study); and Transmission Level III Study - estimated cost of $65,000. Actual costs are subject to change and may increase over time. In addition to the foregoing, the Company states as follows:
  5. Page 24 of 99

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set ALLCO-11 Date Issued September 24, 2026 ALLCO-129 Page 2 of 3 (a) The number of projects greater than 1MW can be found on the Company’s publiclyavailable Hosting Capacity Maps site. 1 (b) The criteria the Company applied to each application greater than 1MW comes directly from ISO-NE. Please refer to the Company’s response to ALLCO-132 i (c) Because this determination is made by a third party (ISO-NE), Eversource does not track the referral time. (d) The interconnection timeline metrics proposed are for the level 1 residential projects. Residential projects are all less than 1MW. (e) Please refer to the Company’s response to subpart (a). Prior Referenced Response: i ALLCO-132 Question: (Follow-up to ICC-005 and ICC-010 — monthly PowerClerk Reports and the executable-IA policy.) The Company’s response to ICC-010 states that “[m]anagement receives a monthly PowerClerk Report where Process timelines are reviewed to ensure that the timelines are adhered to,” and its response to ICC-005 states that “[t]he EDC cannot issue an executable Interconnection Agreement until applicable ISO-NE requirements are met.” (a) Produce each monthly PowerClerk Report, in native format, from January 1, 2020 to the present, and identify each metric, timeline, and milestone it reports and the recipients of the report. (b) State the date on which the Company adopted the policy that it will not issue an executable Interconnection Agreement until ISO-NE requirements are met, identify the Guideline provision, PURA order, ISO-NE tariff provision, or other authority on which it rests, and identify the document in which the policy is recorded. (c) For each Allco Application, state whether that policy was applied, the date the Company determined ISO-NE requirements had or had not been met, and the date, if any, on which the Company communicated that determination to the applicant. (d) State whether the policy in (b) is applied to applications of 1 MW or less, and if not, identify the Company’s basis for treating LEG-22708 and LEG-22709 (or any other Allco Application of 1 MW or less) as subject to ISO-NE review. ALLCO-132 Response: CL&P objects to this request on the ground that it is an improper effort by ALLCO to use this rate case proceeding to obtain discovery for purposes of a lawsuit that it filed against the Company on August 10, 2026, in the United States District Court for the District of Connecticut (Civil Action No. 3:26-cv-1277), outside of and in contravention of the rules of procedure that govern discovery in that lawsuit. CL&P further objects to this request on the ground that it is not within the scope of the proceeding to review the Company’s application to amend its existing rates schedules because the interrogatory either seeks information specific to Allco projects or seeks information that Allco views as relevant to its specific projects. See, https://www.eversource.com/residential/about/doing-business-withus/interconnections/connecticut/connecticut-application-to-connect. 1
  6. Page 25 of 99

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set ALLCO-11 Date Issued September 24, 2026 ALLCO-129 Page 3 of 3 Without waiving said objections, the monthly PowerClerk Reports referenced is not a formal report, but an internal tool used to review performance and to strategize for future success. Section 1.2 of the PURA-approved Interconnection Guidelines states, in part, “At the conclusion of the studies including any Transmission studies or additional requirements from ISO-NE, the EDC will submit an Interconnection Agreement (IA) to the Generator with payment milestones included within the Agreement.” Also, Section 3.2 of the PURA-approved Interconnection Guidelines states, in part, “If there are additional requirements set forth by ISO-NE for any proposed Generating Facility, these requirements will need to be addressed and receive proper approval by ISO-NE prior to the EDC issuance of an executable Interconnection Agreement.” This procedure is under the jurisdiction of ISO-NE. The Generator may obtain guidance from the ISO-NE Tariff, Schedules 22 and 23 and Section I.3.9.
  7. Page 26 of 99

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set ALLCO-11 Date Issued September 24, 2026 ALLCO-130 Page 1 of 2 Date Filed: October 09, 2026 Witness: Warren R. Boutin and Andrew C. Belden Request from: ALLCO Question: (ISO-NE Determinations — fees and study costs charged to customers.) For January 1, 2023 to the present: (a) identify every fee, study deposit, or cost (including system impact study fees and PSCAD or other modeling costs, and including the approximately $85,000 system impact study fee demanded in connection with the Spencer Hill Projects) that the Company has demanded, collected, or passed through to any Connecticut DG interconnection customer in connection with an ISO-NE Determination, review, or study, stating the application, amount, date, and current status; (b) identify the account(s) in which each such amount is recorded and state whether any such amount, or any Company cost of performing or supporting such studies, is included in rate base, the Test Year or Rate Year revenue requirement, or any tracker or deferral in this proceeding; and (c) state whether any such amount has been refunded or credited to the customer, and if so when. Response: CL&P objects to this request on the ground that it is an improper effort by ALLCO to use this rate case proceeding to obtain discovery for purposes of a lawsuit that it filed against the Company on August 10, 2026, in the United States District Court for the District of Connecticut (Civil Action No. 3:26-cv-1277), outside of and in contravention of the rules of procedure that govern discovery in that lawsuit. CL&P further objects to this request on the ground that it is not within the scope of the proceeding to review the Company’s application to amend its existing rates schedules because the interrogatory either seeks information specific to Allco projects or seeks information that Allco views as relevant to its specific projects. Without waiving said objection, please refer to the Company’s response to ALLCO-129 i. Prior Referenced Response: i ALLCO-129 Question: (ISO-NE Determinations — practice and timing.) The Company’s response to ICC-008 states that “ISO-NE review required for projects greater than 1 MW is outside the state Guideline clocks and can extend the overall.” For each calendar year 2023 through 2025 and 2026 to date: (a) state the number of Connecticut DG interconnection
  8. Page 27 of 99

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set ALLCO-11 Date Issued September 24, 2026 ALLCO-130 Page 2 of 2 applications the Company referred to ISO-NE for a Determination, by Level and by size band; (b) state the criterion or criteria the Company applied in deciding to refer each application (including any practice that a generator greater than 1 MW connected to a substation with 20 MW of DER online and in queue requires a Level III transmission study), identify who formulated each criterion and when, and identify every communication with ISO-NE concerning it; (c) state the average, median, and maximum elapsed time from referral to Determination; (d) state whether the time an application spends awaiting a Determination is excluded from the interconnection-timeline metrics proposed in Exhibit CLP-CUSTOMER-1, and if so under what authority; and (e) produce, in native format, a schedule listing each referred application, the date of referral, the date of Determination, the outcome, and any study or fee required. ALLCO-129 Response: The Company's referral criterion is based on ISO-NE requirements applicable to DER projects with incremental aggregate on-site nameplate capacity exceeding 1 MW. This criterion is independent of how much generation is on the substation. The Company will notify ISO-NE of such projects, and ISO-NE will determine the level of review required. This may include: I. II. III. PP5 notification - estimated cost of $5,000; Determination Study- estimated cost of $15,000 (This could lead to a Transmission Level III Study); and Transmission Level III Study - estimated cost of $65,000. Actual costs are subject to change and may increase over time. In addition to the foregoing, the Company states as follows: (a) The number of projects greater than 1MW can be found on the Company’s publicly-available Hosting Capacity Maps site. (b) The criteria the Company applied to each application greater than 1MW comes directly from ISO-NE. Please refer to the Company’s response to ALLCO-132 (c) Because this determination is made by a third party (ISO-NE), Eversource does not track the referral time. (d) The interconnection timeline metrics proposed are for the level 1 residential projects. Residential projects are all less than 1MW. (e) Please refer to the Company’s response to subpart (a).
  9. Page 28 of 99

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set ALLCO-11 Date Issued September 24, 2026 ALLCO-131 Page 1 of 1 Date Filed: October 16, 2026 Witness: Warren R. Boutin and Andrew C. Belden Request from: ALLCO Question: (Substation DER thresholds and SHARE.) (a) Identify each Company substation at which DER online plus DER in queue equals or exceeds 20 MW, including the Campville 14R substation, stating for each the DER online, the DER in queue, and the number and aggregate MW of pending applications; (b) for each such substation, identify any investment proposed in the Application (including under the SHARE proposal in Exhibit CLP-TSP-3) to expand hosting capacity or to relieve the constraint, its estimated cost, and its proposed rate treatment; and (c) state whether study fees, deposits, or upgrade payments collected from interconnection customers at those substations are, or will be, credited against the cost of any such investment before it is added to rate base, and if not, why not. Response: (a) The Company publicly provides Distributed Energy Resource (“DER”) hosting capacity and interconnection queue information through its Hosting Capacity Map and DER queue reports, which are updated regularly and available on the Company’s website. 1 These resources contain the information necessary to identify substations where DER online plus DER in queue equals or exceeds specified thresholds, including the associated online capacity, queue capacity. (b) The Company has not completed detailed engineering, design, or cost estimating for potential system modifications associated with the identified substations. Accordingly, the Company cannot provide additional project-specific cost information beyond what was previously provided. (c) The Connecticut Generator Interconnection Guidelines, available on the Company’s website, and approved by PURA, establish that interconnection customers are responsible for the costs associated with the interconnection process, including any studies, system modifications, and network upgrades required to accommodate the proposed generation facility. Accordingly, costs associated with an individual interconnection are borne by the developer in accordance with the applicable interconnection requirements. See,https://www.eversource.com/residential/about/doing-business-withus/interconnections/connecticut/connecticut-application-to-connect. 1
  10. Page 29 of 99

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set ALLCO-11 Date Issued September 24, 2026 ALLCO-132 Page 1 of 2 Date Filed: October 08, 2026 Witness: Warren R. Boutin and Andrew C. Belden Request from: ALLCO Question: (Follow-up to ICC-005 and ICC-010 — monthly PowerClerk Reports and the executable-IA policy.) The Company’s response to ICC-010 states that “[m]anagement receives a monthly PowerClerk Report where Process timelines are reviewed to ensure that the timelines are adhered to,” and its response to ICC-005 states that “[t]he EDC cannot issue an executable Interconnection Agreement until applicable ISO-NE requirements are met.” (a) Produce each monthly PowerClerk Report, in native format, from January 1, 2020, to the present, and identify each metric, timeline, and milestone it reports and the recipients of the report. (b) State the date on which the Company adopted the policy that it will not issue an executable Interconnection Agreement until ISO-NE requirements are met, identify the Guideline provision, PURA order, ISO-NE tariff provision, or other authority on which it rests, and identify the document in which the policy is recorded. (c) For each Allco Application, state whether that policy was applied, the date the Company determined ISO-NE requirements had or had not been met, and the date, if any, on which the Company communicated that determination to the applicant. (d) State whether the policy in (b) is applied to applications of 1 MW or less, and if not, identify the Company’s basis for treating LEG-22708 and LEG-22709 (or any other Allco Application of 1 MW or less) as subject to ISO-NE review. Response: CL&P objects to this request on the ground that it is an improper effort by ALLCO to use this rate case proceeding to obtain discovery for purposes of a lawsuit that it filed against the Company on August 10, 2026, in the United States District Court for the District of Connecticut (Civil Action No. 3:26-cv-1277), outside of and in contravention of the rules of procedure that govern discovery in that lawsuit. CL&P further objects to this request on the ground that it is not within the scope of the proceeding to review the Company’s application to amend its existing rates schedules because the interrogatory either seeks information specific to Allco projects or seeks information that Allco views as relevant to its specific projects. Without waiving said objections, the monthly PowerClerk Reports referenced is not a formal report, but an internal tool used to review performance and to strategize for future success. Section 1.2 of the PURA-approved Interconnection Guidelines states, in part, “At the conclusion of the studies including any Transmission studies or additional requirements from ISO-NE, the EDC will submit an Interconnection Agreement (IA) to the Generator with payment milestones included
3 pages match
9 pages match

As listed on the current system

Corres. 10/22/2026 [26-05-10] (Keegan Werlin LLP) - Discovery Compilations (ALLCO Set 11, CLF-SC Set 3, OCC Set 24).

This filing on the current system (opens in a new tab)