Discovery Compilations (ALLCO Set 11, CLF-SC Set 3, OCC Set 24).
Files4
Docket No. 26-05-10 Discovery Compilations October 22 2026.pdf
PDF · 155 KB · 1 pageText searchable
Download Docket No. 26-05-10 Discovery Compilations October 22 2026.pdfRead the text of Docket No. 26-05-10 Discovery Compilations October 22 2026.pdf
ALLCO Set 11_COMBINED.pdf
PDF · 1.2 MB · 99 pagesText searchable
Download ALLCO Set 11_COMBINED.pdfRead the text of ALLCO Set 11_COMBINED.pdf
CLF-SC Set 3_COMBINED.pdf
PDF · 390 KB · 16 pagesText searchable
Download CLF-SC Set 3_COMBINED.pdfRead the text of CLF-SC Set 3_COMBINED.pdf
OCC Set 24_COMBINED.pdf
PDF · 503 KB · 41 pagesText searchable
Download OCC Set 24_COMBINED.pdfRead the text of OCC Set 24_COMBINED.pdf
Page 30 of 99
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set ALLCO-11 Date Issued September 24, 2026 ALLCO-132 Page 2 of 2 within the Agreement.” Also, Section 3.2 of the PURA-approved Interconnection Guidelines states, in part, “If there are additional requirements set forth by ISO-NE for any proposed Generating Facility, these requirements will need to be addressed and receive proper approval by ISO-NE prior to the EDC issuance of an executable Interconnection Agreement.” This procedure is under the jurisdiction of ISO-NE. The Generator may obtain guidance from the ISO-NE Tariff, Schedules 22 and 23 and Section I.3.9.Page 31 of 99
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set ALLCO-11 Date Issued September 24, 2026 ALLCO-133 Page 1 of 3 Date Filed: October 16, 2026 Witness: Brendan J. O’Brien, Garrett J. Murray, Leanne M. Landry, Warren R. Boutin, and Marisa B. Paruta Request from: Question: (Follow-up to ALLCO-055 — Burns & McDonnell charges billed to interconnection customers.) The Company’s response to ALLCO-055 states that $752,873 was paid to Burns & McDonnell for services relating to Connecticut distributed generation interconnection, that those amounts “are not in the cost of service or rate base,” and that they “are recorded to FERC Account 186010, and are then billed to customers / counterparties for reimbursable work.” (a) For each year 2018 through 2025 and the Test Year, state the total Burns & McDonnell charges recorded to Account 186010 for Connecticut DG interconnection work and the total billed to interconnection customers, and identify each Allco Application to which any such charge was billed, the amount, the date, and the invoice or work-order reference. (b) State whether any percentage overhead, CIAC, or other loader was applied to Burns & McDonnell charges when billed to interconnection customers, and if so identify the loader and percentage. (c) State whether the project-management and administration functions performed by Burns & McDonnell are the same functions for which the Company applies a project-management, administration, or overhead percentage to interconnection customers, and if not, describe the difference. (d) State the total Test Year and Rate Year cost of administering the Connecticut DG interconnection program that is recovered from ratepayers through the revenue requirement (ALLCO-010: $1,257,007 / $1,342,362) and, separately, the total amount of administration, project-management, or overhead charges collected from interconnection customers in each year 2018 through 2025, and explain how the Company ensures the same administrative cost is not recovered from both ratepayers and interconnection customers. Response: CL&P objects to this request on the ground that it is an improper effort by ALLCO to use this rate case proceeding to obtain discovery for purposes of a lawsuit that it filed against the Company on August 10, 2026, in the United States District Court for the District of Connecticut (Civil Action No. 3:26-cv-1277), outside of and in contravention of the rules of procedure that govern discovery in that lawsuit. CL&P further objects to this request on the ground that it is not within the scope of the proceeding to review the Company’s application to amend its existing rates schedules because the interrogatory either seeks information specific to Allco projects or seeks information that Allco views as relevant to its specific projects.Page 32 of 99
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set ALLCO-11 Date Issued September 24, 2026 ALLCO-133 Page 2 of 3 Without waiving said objection, please refer to the Company’s responses to ALLCO-044 iand ALLCO-109 ii. The Burns & McDonnell charges recorded to FERC Account 186010 are $138,311 for 2023, $311,706 for 2024, and $752,873 for 2025. No charges were recorded to the account for each year 2018 through 2022. Prior Referenced Response: i ALLCO-044 Question: With respect to each cost category included in the percentage overhead or "CIAC" rates applied to interconnection upgrade, study, and construction costs charged to distributed generation, qualifying facility, and other interconnection customers (including, without limitation, project management, engineering and supervision, administrative and general expense, employee benefits or compensation loaders, insurance, and Eversource Energy Service Company charges): (a) identify each such cost category and its share of the overhead rate in effect in each year 2018 through 2025; (b) state whether the costs in each such category were included, in whole or in part, in the test-year cost of service and revenue requirement approved in the Company’s most recent prior general distribution rate proceeding, Docket No. 17-10-46, and therefore recovered from all ratepayers through base distribution rates during 2018 through the present; (c) if the answer to any part of subpart (b) is affirmative, explain why applying overhead rates that include the same cost categories to amounts charged to interconnection customers does not result in the Company recovering the same costs twice — once from ratepayers generally and again from interconnection customers; (d) quantify, for each year 2018 through 2025, the total dollar amount of overheads collected from interconnection customers in cost categories that were also reflected in base rates; and (e) state whether amounts collected from interconnection customers through overhead rates are recorded as a credit or offset to the corresponding expense or plant accounts recovered in base rates and, if not, where those amounts are recorded, consistent with the Company’s description of its netting treatment of third-party attacher billings in its response to RRU-002. ALLCO-044 Response: CL&P objects to this request on the ground that it is an improper effort by ALLCO to use this rate case proceeding to obtain discovery for purposes of a lawsuit that it filed against the Company on August 10, 2026, in the United States District Court for the District of Connecticut (Civil Action No. 3:26-cv-1277), outside of and in contravention of the rules of procedure that govern discovery in that lawsuit. Without waiving said objection, please note that capital expenditures (direct costs and overheads applied to those amounts) are entirely billed to the interconnection customer and reimbursed through the CIAC process; therefore, these asset additions are not included in rate base. Please refer to ALLCO-064i for additional discussion on the CIAC rate and ALLCO-003ii where the Company goes into more detail on the CIAC Tax Adder. ii ALLCO-109 Question: Identify the agreement or agreements under which Burns & McDonnell performs interconnection-related functions for the Company, and produce each, including statements of work: (a) describe the functions Burns & McDonnell performs — application processing, study administration, cost estimating, account maintenance, final accounting, refund administration, or otherwise; (b) state the basis on which Burns & McDonnell is compensated, and statePage 33 of 99
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set ALLCO-11 Date Issued September 24, 2026 ALLCO-133 Page 3 of 3 whether any component of its compensation varies with the amounts estimated, billed, or collected from interconnecting customers; (c) identify, by title, the Burns & McDonnell personnel who perform the final accounting and refund-administration functions and the CL&P or ESC personnel who supervise them; and (d) state whether Burns & McDonnell’s costs are recovered through the interconnection overhead loaders, through the approximately $1.257 million annual interconnection program administration cost identified in ALLCO-010, through base rates, or through some combination, and quantify each component for the test year ALLCO-109 Response: CL&P objects to this request on the ground that it is an improper effort by ALLCO to use this rate case proceeding to obtain discovery for purposes of a lawsuit that it filed against the Company on August 10, 2026, in the United States District Court for the District of Connecticut (Civil Action No. 3:26-cv-1277), outside of and in contravention of the rules of procedure that govern discovery in that lawsuit. Without waiving said objection, the Company states as follows: a. The functions performed by Burns and McDonnell are related to Construction Project Management and Analysis that support the Project Manager. b. Burns and McDonnell employees charge their time to individual work orders. The charges are applied against the customer payments. The compensation does not vary with the amounts estimated, billed or collected from interconnecting customers. The employees performing this work include DER Construction Project Management and Analysts c. d. The Burns & McDonnell costs are not recovered through the approximately $1.257 million annual interconnection program administration costs identified in ALLCO-010i, as stated in the Company’s response to ALLCO-055Page 34 of 99
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set ALLCO-11 Date Issued September 24, 2026 ALLCO-134 Page 1 of 3 Date Filed: October 16, 2026 Witness: Brendan J. O’Brien, Garrett J. Murray, Leanne M. Landry, Warren R. Boutin, and Jeffrey D. Turano Request from: ALLCO Question: (Follow-up to ALLCO-059 and ALLCO-002 — CIAC offset timing and rate base.) The Company’s response to ALLCO-059 states that CIAC “would not be considered a component of rate base until the underlying capital project is placed in service,” that “the underlying capital project costs in rate base would be wholly offset by CIAC at the time of final project billing and reconciliation,” and that the Account 252500 balance was ($28,277,769) at June 2026. (a) Identify, in native format, each interconnection project placed in service from January 1, 2018 through June 30, 2026 for which CIAC or other interconnection-customer payments were collected but final project billing and reconciliation had not been completed as of June 30, 2026, stating for each the in-service date, the amount collected, the plant cost recorded, and the elapsed time since in-service. (b) State the aggregate plant in service at June 30, 2026 attributable to such projects that is included in rate base in this proceeding without a corresponding CIAC offset, and the revenue-requirement effect of that inclusion. (c) State the Company’s policy on the time within which final project billing and reconciliation is to be completed after in-service, and the average and maximum elapsed time actually experienced for projects placed in service in each year 2018 through 2025. (d) State whether the Company earns a return on plant funded by interconnection-customer payments during the period between in-service and reconciliation, and if so quantify it for the Test Year. (e) State the date by which the Company will serve the supplementation promised in its response to ALLCO-059, and identify each element of that interrogatory it contends cannot be answered and why. Response: CL&P objects to this request on the ground that it is an improper effort by ALLCO to use this rate case proceeding to obtain discovery for purposes of a lawsuit that it filed against the Company on August 10, 2026, in the United States District Court for the District of Connecticut (Civil Action No. 3:26-cv-1277), outside of and in contravention of the rules of procedure that govern discovery in that lawsuit. Without waiving said objection, please refer to the Company’s response to ALLCO-002 i and ALLCO-103 ii. ALLCO-059 iii will be updated when our analysis is complete.Page 35 of 99
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set ALLCO-11 Date Issued September 24, 2026 ALLCO-134 Page 2 of 3 Prior Referenced Responses: i ALLCO-002 Question: State the total dollar amount of CIAC and interconnection-related payments collected from DER and QF interconnection customers in each year 2018 through 2025, and explain precisely how those amounts are reflected in (a) rate base, (b) the Test Year revenue requirement, and (c) the Rate Year revenue requirement proposed in this docket, identifying the specific schedules and workpapers. ALLCO-002 Response: CL&P objects to this request on the ground that it is an improper effort by Allco to use this rate case proceeding to obtain discovery for purposes of a lawsuit that it filed against the Company on August 10, 2026, in the United States District Court for the District of Connecticut (Civil Action No. 3:26-cv-1277), outside of and in contravention of the rules of procedure that govern discovery in that lawsuit. Without waiving said objection, please refer to the Company’s response to ALLCO-001i for CIAC year-end balances from 2018 through 2025. CIAC and interconnection-related payments received by the Company reduce the cost of construction or plant placed in service. CIAC is recognized as an offset to the underlying capital project. CIAC would not be considered a component of rate base until the underlying capital project is placed in service. At that time, the underlying capital project costs in rate base would be wholly offset by CIAC at the time of final project billing and reconciliation. In the Company’s next cost of service update, the rate base and the Rate Year revenue requirement will reflect the CIAC and the underlying capital project cost for projects placed in service ii ALLCO-103 Question: For each calendar year 2017 through 2025, state the number of distributed-generation interconnection projects for which construction was completed, and, of those, the number for which a final accounting or reconciliation of actual costs against amounts collected was performed and the number for which a final accounting report was issued to the interconnecting customer. Identify the written policy or procedure governing when a final accounting is performed and when a report is issued to the customer, including any standard interval after project completion, and produce it. If no written policy exists, state so and describe the practice and who administers it ALLCO-103 Response: CL&P objects to this request on the ground that it is an improper effort by ALLCO to use this rate case proceeding to obtain discovery for purposes of a lawsuit that it filed against the Company on August 10, 2026, in the United States District Court for the District of Connecticut (Civil Action No. 3:26-cv-1277), outside of and in contravention of the rules of procedure that govern discovery in that lawsuit. Without waiving said objection, the final accounting process is performed manually and is not tracked or maintained in PowerClerk. The data is entered and tracked across multiple systems. Accordingly, the requested information is inconsistent or not available in Power Clerk and would require a manual review of the underlying records. Section 1.2 of the PURA-approved Interconnection Guidelines states, in part, “At the conclusion of the project, the EDC will reconcile actual vs. estimated cost and reimburse or bill the Generator accordingly. Cost estimates provided to applicants will be subject to a six-month true-up.” Please also refer to the Company’s response to ALLCO-005.Page 36 of 99
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set ALLCO-11 Date Issued September 24, 2026 ALLCO-134 Page 3 of 3 iii ALLCO-059 Question: For each project or interconnection for which the Company collected, billed, or recorded contributions in aid of construction ("CIAC") — including any percentage overhead or "CIAC" charge applied to interconnection study, upgrade, or construction costs, and any SHARE or other prepaid capital contribution treated as CIAC — in each year 2018 through 2025 and in the test year, provide a schedule, in native (Excel) format, identifying: (a) the project or interconnection name and work-order number; (b) the customer or counterparty type (distributed generation, qualifying facility, third-party attacher, municipal, or other); (c) the construction or upgrade cost of the project; (d) the CIAC amount collected or billed, stating separately the base construction component, each overhead or loader component and the percentage applied, and any tax gross-up; (e) the FERC account(s) in which each amount was recorded and the amount, if any, netted against or offsetting plant in service; and (f) whether the amount has been the subject of any final accounting, true-up, reconciliation, or refund, and if so the amount and date of any refund and any interest paid. Reconcile the annual totals in this schedule to (i) the annual CIAC totals provided in response to Q-ALLCO-002, and (ii) the "Deferred Taxes on CIAC, Net of Gross-up" amounts included in rate base on Schedule B-1.0 ($35,961,000 for the test year), identifying the CIAC balances from which those deferred tax amounts are derived. ALLCO-059 Response: CL&P objects to this request on the ground that it is an improper effort by ALLCO to use this rate case proceeding to obtain discovery for purposes of a lawsuit that it filed against the Company on August 10, 2026, in the United States District Court for the District of Connecticut (Civil Action No. 3:26-cv-1277), outside of and in contravention of the rules of procedure that govern discovery in that lawsuit. Without waiving said objection, CL&P does not track or maintain information on interconnections in a format that is commercially reasonable for the Company to collect and provide a response to the entirety of the interrogatory. As of the date of this response, CL&P is querying its system to try to collect and provide as much of the requested information as possible and will supplement this response with whatever requested information can reasonably be provided. In an effort to be responsive to the interrogatory in the immediate term, please refer to the Company’s response to ALLCO-001i for CIAC year-end balances from 2018 through 2025, as well as the FERC account used to record the CIAC activity. CIAC is recognized as an offset to the underlying capital project. CIAC would not be considered a component of rate base until the underlying capital project is placed in service. At that time, the underlying capital project costs in rate base would be wholly offset by CIAC at the time of final project billing and reconciliation. In the Company’s next cost of service update, the rate base and the Rate Year revenue requirement will reflect the CIAC and the underlying capital project cost for projects placed in service not yet already reflected in the balances as of December 31, 2025.Page 37 of 99
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set ALLCO-11 Date Issued September 24, 2026 ALLCO-135 Page 1 of 3 Date Filed: October 08, 2026 Witness: Warren R. Boutin and Andrew C. Belden Request from: ALLCO Question: (Follow-up to ICC-005 — applications held pending ISO-NE requirements.) The Company’s response to ICC-005 states that any generating facility over 1 MW “must comply with ISO-NE rules, including Tariff Section I.3.9 and Planning Procedure 5,” and that “[t]he EDC cannot issue an executable Interconnection Agreement until applicable ISO-NE requirements are met.” (a) State the date on which the Company first withheld, delayed, or declined to issue an executable Interconnection Agreement on the ground that ISO-NE requirements had not been met, identify the application to which that first occurred, and, if that date differs from the policy adoption date given in response to Q-ALLCO-132(b), explain the difference. (b) Identify, in native (Excel) format, every distribution interconnection application in Connecticut, from January 1, 2018 to the present, to which the practice described in ICC-005 has been applied — that is, every application for which the Company has declined to issue, or has withheld, an executable Interconnection Agreement pending an ISO-NE review, screening, study, determination, or other requirement — stating for each: (i) the application number and PowerClerk identifier; (ii) the nameplate capacity in kW; (iii) the date the application was filed; (iv) the date the Company completed its own Guidelines-process review (or the current Guidelines milestone); (v) the date the Company referred the application to ISO-NE, the ISO-NE process invoked (Section I.3.9 proposed plan application, Planning Procedure 5 screening, Level I/II/III study, or other), and the ISO-NE queue or reference number, if any; (vi) the date of each ISO-NE determination or study result received, and its substance; (vii) the current status of the application with the Company (including whether an executable Interconnection Agreement has been issued and on what date) and with ISO-NE; (viii) the elapsed time from application filing to the issuance of an executable Interconnection Agreement, or to the present if none has been issued; and (ix) whether the applicant was notified in writing that the executable Interconnection Agreement was being withheld pending ISO-NE requirements, and on what date. (c) For each application listed in (b) that was subsequently withdrawn, cancelled, or deemed withdrawn, state the date and the stated reason. (d) State the number of applications in (b) that are 1 MW or less, and for each explain why the ISO-NE requirements described in ICC-005 for facilities “over 1 MW” were applied. Response: CL&P objects to this request on the ground that it is an improper effort by ALLCO to use this rate case proceeding to obtain discovery for purposes of a lawsuit that it filed against the Company on August 10, 2026, in the United States District Court for the District of Connecticut (Civil ActionPage 38 of 99
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set ALLCO-11 Date Issued September 24, 2026 ALLCO-135 Page 2 of 3 No. 3:26-cv-1277), outside of and in contravention of the rules of procedure that govern discovery in that lawsuit. CL&P further objects to this request on the ground that it is not within the scope of the proceeding to review the Company’s application to amend its existing rates schedules because the interrogatory either seeks information specific to Allco projects or seeks information that Allco views as relevant to its specific projects. Without waiving said objections, the Company complies with the requirements of the PURAapproved Interconnection Guidelines. Please refer to the Company’s response to ALLCO-132 i. Prior Referenced Response: i ALLCO-132 Question: (Follow-up to ICC-005 and ICC-010 — monthly PowerClerk Reports and the executable-IA policy.) The Company’s response to ICC-010 states that “[m]anagement receives a monthly PowerClerk Report where Process timelines are reviewed to ensure that the timelines are adhered to,” and its response to ICC-005 states that “[t]he EDC cannot issue an executable Interconnection Agreement until applicable ISO-NE requirements are met.” (a) Produce each monthly PowerClerk Report, in native format, from January 1, 2020, to the present, and identify each metric, timeline, and milestone it reports and the recipients of the report. (b) State the date on which the Company adopted the policy that it will not issue an executable Interconnection Agreement until ISO-NE requirements are met, identify the Guideline provision, PURA order, ISO-NE tariff provision, or other authority on which it rests, and identify the document in which the policy is recorded. (c) For each Allco Application, state whether that policy was applied, the date the Company determined ISO-NE requirements had or had not been met, and the date, if any, on which the Company communicated that determination to the applicant. (d) State whether the policy in (b) is applied to applications of 1 MW or less, and if not, identify the Company’s basis for treating LEG-22708 and LEG-22709 (or any other Allco Application of 1 MW or less) as subject to ISO-NE review. ALLCO-132 Response: CL&P objects to this request on the ground that it is an improper effort by ALLCO to use this rate case proceeding to obtain discovery for purposes of a lawsuit that it filed against the Company on August 10, 2026, in the United States District Court for the District of Connecticut (Civil Action No. 3:26-cv-1277), outside of and in contravention of the rules of procedure that govern discovery in that lawsuit. CL&P further objects to this request on the ground that it is not within the scope of the proceeding to review the Company’s application to amend its existing rates schedules because the interrogatory either seeks information specific to Allco projects or seeks information that Allco views as relevant to its specific projects. Without waiving said objections, the monthly PowerClerk Reports referenced is not a formal report, but an internal tool used to review performance and to strategize for future success. Section 1.2 of the PURA-approved Interconnection Guidelines states, in part, “At the conclusion of the studies including any Transmission studies or additional requirements from ISO-NE, the EDC will submit an Interconnection Agreement (IA) to the Generator with payment milestones included within the Agreement.” Also, Section 3.2 of the PURA-approved Interconnection Guidelines states, in part, “If there are additional requirements set forth by ISO-NE for any proposed GeneratingPage 39 of 99
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set ALLCO-11 Date Issued September 24, 2026 ALLCO-135 Page 3 of 3 Facility, these requirements will need to be addressed and receive proper approval by ISO-NE prior to the EDC issuance of an executable Interconnection Agreement.” This procedure is under the jurisdiction of ISO-NE. The Generator may obtain guidance from the ISO-NE Tariff, Schedules 22 and 23 and Section I.3.9.
As listed on the current system
Corres. 10/22/2026 [26-05-10] (Keegan Werlin LLP) - Discovery Compilations (ALLCO Set 11, CLF-SC Set 3, OCC Set 24).