    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set ALLCO-11 Date Issued September 24, 2026 ALLCO-134 Page 1 of 3 Date Filed: October 16, 2026 Witness: Brendan J. O’Brien, Garrett J. Murray, Leanne M. Landry, Warren R. Boutin, and Jeffrey D. Turano Request from: ALLCO Question: (Follow-up to ALLCO-059 and ALLCO-002 — CIAC offset timing and rate base.) The Company’s response to ALLCO-059 states that CIAC “would not be considered a component of rate base until the underlying capital project is placed in service,” that “the underlying capital project costs in rate base would be wholly offset by CIAC at the time of final project billing and reconciliation,” and that the Account 252500 balance was ($28,277,769) at June 2026. (a) Identify, in native format, each interconnection project placed in service from January 1, 2018 through June 30, 2026 for which CIAC or other interconnection-customer payments were collected but final project billing and reconciliation had not been completed as of June 30, 2026, stating for each the in-service date, the amount collected, the plant cost recorded, and the elapsed time since in-service. (b) State the aggregate plant in service at June 30, 2026 attributable to such projects that is included in rate base in this proceeding without a corresponding CIAC offset, and the revenue-requirement effect of that inclusion. (c) State the Company’s policy on the time within which final project billing and reconciliation is to be completed after in-service, and the average and maximum elapsed time actually experienced for projects placed in service in each year 2018 through 2025. (d) State whether the Company earns a return on plant funded by interconnection-customer payments during the period between in-service and reconciliation, and if so quantify it for the Test Year. (e) State the date by which the Company will serve the supplementation promised in its response to ALLCO-059, and identify each element of that interrogatory it contends cannot be answered and why. Response: CL&P objects to this request on the ground that it is an improper effort by ALLCO to use this rate case proceeding to obtain discovery for purposes of a lawsuit that it filed against the Company on August 10, 2026, in the United States District Court for the District of Connecticut (Civil Action No. 3:26-cv-1277), outside of and in contravention of the rules of procedure that govern discovery in that lawsuit. Without waiving said objection, please refer to the Company’s response to ALLCO-002 i and ALLCO-103 ii. ALLCO-059 iii will be updated when our analysis is complete.
  2. Page 35 of 99

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set ALLCO-11 Date Issued September 24, 2026 ALLCO-134 Page 2 of 3 Prior Referenced Responses: i ALLCO-002 Question: State the total dollar amount of CIAC and interconnection-related payments collected from DER and QF interconnection customers in each year 2018 through 2025, and explain precisely how those amounts are reflected in (a) rate base, (b) the Test Year revenue requirement, and (c) the Rate Year revenue requirement proposed in this docket, identifying the specific schedules and workpapers. ALLCO-002 Response: CL&P objects to this request on the ground that it is an improper effort by Allco to use this rate case proceeding to obtain discovery for purposes of a lawsuit that it filed against the Company on August 10, 2026, in the United States District Court for the District of Connecticut (Civil Action No. 3:26-cv-1277), outside of and in contravention of the rules of procedure that govern discovery in that lawsuit. Without waiving said objection, please refer to the Company’s response to ALLCO-001i for CIAC year-end balances from 2018 through 2025. CIAC and interconnection-related payments received by the Company reduce the cost of construction or plant placed in service. CIAC is recognized as an offset to the underlying capital project. CIAC would not be considered a component of rate base until the underlying capital project is placed in service. At that time, the underlying capital project costs in rate base would be wholly offset by CIAC at the time of final project billing and reconciliation. In the Company’s next cost of service update, the rate base and the Rate Year revenue requirement will reflect the CIAC and the underlying capital project cost for projects placed in service ii ALLCO-103 Question: For each calendar year 2017 through 2025, state the number of distributed-generation interconnection projects for which construction was completed, and, of those, the number for which a final accounting or reconciliation of actual costs against amounts collected was performed and the number for which a final accounting report was issued to the interconnecting customer. Identify the written policy or procedure governing when a final accounting is performed and when a report is issued to the customer, including any standard interval after project completion, and produce it. If no written policy exists, state so and describe the practice and who administers it ALLCO-103 Response: CL&P objects to this request on the ground that it is an improper effort by ALLCO to use this rate case proceeding to obtain discovery for purposes of a lawsuit that it filed against the Company on August 10, 2026, in the United States District Court for the District of Connecticut (Civil Action No. 3:26-cv-1277), outside of and in contravention of the rules of procedure that govern discovery in that lawsuit. Without waiving said objection, the final accounting process is performed manually and is not tracked or maintained in PowerClerk. The data is entered and tracked across multiple systems. Accordingly, the requested information is inconsistent or not available in Power Clerk and would require a manual review of the underlying records. Section 1.2 of the PURA-approved Interconnection Guidelines states, in part, “At the conclusion of the project, the EDC will reconcile actual vs. estimated cost and reimburse or bill the Generator accordingly. Cost estimates provided to applicants will be subject to a six-month true-up.” Please also refer to the Company’s response to ALLCO-005.
  3. Page 36 of 99

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set ALLCO-11 Date Issued September 24, 2026 ALLCO-134 Page 3 of 3 iii ALLCO-059 Question: For each project or interconnection for which the Company collected, billed, or recorded contributions in aid of construction ("CIAC") — including any percentage overhead or "CIAC" charge applied to interconnection study, upgrade, or construction costs, and any SHARE or other prepaid capital contribution treated as CIAC — in each year 2018 through 2025 and in the test year, provide a schedule, in native (Excel) format, identifying: (a) the project or interconnection name and work-order number; (b) the customer or counterparty type (distributed generation, qualifying facility, third-party attacher, municipal, or other); (c) the construction or upgrade cost of the project; (d) the CIAC amount collected or billed, stating separately the base construction component, each overhead or loader component and the percentage applied, and any tax gross-up; (e) the FERC account(s) in which each amount was recorded and the amount, if any, netted against or offsetting plant in service; and (f) whether the amount has been the subject of any final accounting, true-up, reconciliation, or refund, and if so the amount and date of any refund and any interest paid. Reconcile the annual totals in this schedule to (i) the annual CIAC totals provided in response to Q-ALLCO-002, and (ii) the "Deferred Taxes on CIAC, Net of Gross-up" amounts included in rate base on Schedule B-1.0 ($35,961,000 for the test year), identifying the CIAC balances from which those deferred tax amounts are derived. ALLCO-059 Response: CL&P objects to this request on the ground that it is an improper effort by ALLCO to use this rate case proceeding to obtain discovery for purposes of a lawsuit that it filed against the Company on August 10, 2026, in the United States District Court for the District of Connecticut (Civil Action No. 3:26-cv-1277), outside of and in contravention of the rules of procedure that govern discovery in that lawsuit. Without waiving said objection, CL&P does not track or maintain information on interconnections in a format that is commercially reasonable for the Company to collect and provide a response to the entirety of the interrogatory. As of the date of this response, CL&P is querying its system to try to collect and provide as much of the requested information as possible and will supplement this response with whatever requested information can reasonably be provided. In an effort to be responsive to the interrogatory in the immediate term, please refer to the Company’s response to ALLCO-001i for CIAC year-end balances from 2018 through 2025, as well as the FERC account used to record the CIAC activity. CIAC is recognized as an offset to the underlying capital project. CIAC would not be considered a component of rate base until the underlying capital project is placed in service. At that time, the underlying capital project costs in rate base would be wholly offset by CIAC at the time of final project billing and reconciliation. In the Company’s next cost of service update, the rate base and the Rate Year revenue requirement will reflect the CIAC and the underlying capital project cost for projects placed in service not yet already reflected in the balances as of December 31, 2025.
  4. Page 37 of 99

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set ALLCO-11 Date Issued September 24, 2026 ALLCO-135 Page 1 of 3 Date Filed: October 08, 2026 Witness: Warren R. Boutin and Andrew C. Belden Request from: ALLCO Question: (Follow-up to ICC-005 — applications held pending ISO-NE requirements.) The Company’s response to ICC-005 states that any generating facility over 1 MW “must comply with ISO-NE rules, including Tariff Section I.3.9 and Planning Procedure 5,” and that “[t]he EDC cannot issue an executable Interconnection Agreement until applicable ISO-NE requirements are met.” (a) State the date on which the Company first withheld, delayed, or declined to issue an executable Interconnection Agreement on the ground that ISO-NE requirements had not been met, identify the application to which that first occurred, and, if that date differs from the policy adoption date given in response to Q-ALLCO-132(b), explain the difference. (b) Identify, in native (Excel) format, every distribution interconnection application in Connecticut, from January 1, 2018 to the present, to which the practice described in ICC-005 has been applied — that is, every application for which the Company has declined to issue, or has withheld, an executable Interconnection Agreement pending an ISO-NE review, screening, study, determination, or other requirement — stating for each: (i) the application number and PowerClerk identifier; (ii) the nameplate capacity in kW; (iii) the date the application was filed; (iv) the date the Company completed its own Guidelines-process review (or the current Guidelines milestone); (v) the date the Company referred the application to ISO-NE, the ISO-NE process invoked (Section I.3.9 proposed plan application, Planning Procedure 5 screening, Level I/II/III study, or other), and the ISO-NE queue or reference number, if any; (vi) the date of each ISO-NE determination or study result received, and its substance; (vii) the current status of the application with the Company (including whether an executable Interconnection Agreement has been issued and on what date) and with ISO-NE; (viii) the elapsed time from application filing to the issuance of an executable Interconnection Agreement, or to the present if none has been issued; and (ix) whether the applicant was notified in writing that the executable Interconnection Agreement was being withheld pending ISO-NE requirements, and on what date. (c) For each application listed in (b) that was subsequently withdrawn, cancelled, or deemed withdrawn, state the date and the stated reason. (d) State the number of applications in (b) that are 1 MW or less, and for each explain why the ISO-NE requirements described in ICC-005 for facilities “over 1 MW” were applied. Response: CL&P objects to this request on the ground that it is an improper effort by ALLCO to use this rate case proceeding to obtain discovery for purposes of a lawsuit that it filed against the Company on August 10, 2026, in the United States District Court for the District of Connecticut (Civil Action
  5. Page 38 of 99

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set ALLCO-11 Date Issued September 24, 2026 ALLCO-135 Page 2 of 3 No. 3:26-cv-1277), outside of and in contravention of the rules of procedure that govern discovery in that lawsuit. CL&P further objects to this request on the ground that it is not within the scope of the proceeding to review the Company’s application to amend its existing rates schedules because the interrogatory either seeks information specific to Allco projects or seeks information that Allco views as relevant to its specific projects. Without waiving said objections, the Company complies with the requirements of the PURAapproved Interconnection Guidelines. Please refer to the Company’s response to ALLCO-132 i. Prior Referenced Response: i ALLCO-132 Question: (Follow-up to ICC-005 and ICC-010 — monthly PowerClerk Reports and the executable-IA policy.) The Company’s response to ICC-010 states that “[m]anagement receives a monthly PowerClerk Report where Process timelines are reviewed to ensure that the timelines are adhered to,” and its response to ICC-005 states that “[t]he EDC cannot issue an executable Interconnection Agreement until applicable ISO-NE requirements are met.” (a) Produce each monthly PowerClerk Report, in native format, from January 1, 2020, to the present, and identify each metric, timeline, and milestone it reports and the recipients of the report. (b) State the date on which the Company adopted the policy that it will not issue an executable Interconnection Agreement until ISO-NE requirements are met, identify the Guideline provision, PURA order, ISO-NE tariff provision, or other authority on which it rests, and identify the document in which the policy is recorded. (c) For each Allco Application, state whether that policy was applied, the date the Company determined ISO-NE requirements had or had not been met, and the date, if any, on which the Company communicated that determination to the applicant. (d) State whether the policy in (b) is applied to applications of 1 MW or less, and if not, identify the Company’s basis for treating LEG-22708 and LEG-22709 (or any other Allco Application of 1 MW or less) as subject to ISO-NE review. ALLCO-132 Response: CL&P objects to this request on the ground that it is an improper effort by ALLCO to use this rate case proceeding to obtain discovery for purposes of a lawsuit that it filed against the Company on August 10, 2026, in the United States District Court for the District of Connecticut (Civil Action No. 3:26-cv-1277), outside of and in contravention of the rules of procedure that govern discovery in that lawsuit. CL&P further objects to this request on the ground that it is not within the scope of the proceeding to review the Company’s application to amend its existing rates schedules because the interrogatory either seeks information specific to Allco projects or seeks information that Allco views as relevant to its specific projects. Without waiving said objections, the monthly PowerClerk Reports referenced is not a formal report, but an internal tool used to review performance and to strategize for future success. Section 1.2 of the PURA-approved Interconnection Guidelines states, in part, “At the conclusion of the studies including any Transmission studies or additional requirements from ISO-NE, the EDC will submit an Interconnection Agreement (IA) to the Generator with payment milestones included within the Agreement.” Also, Section 3.2 of the PURA-approved Interconnection Guidelines states, in part, “If there are additional requirements set forth by ISO-NE for any proposed Generating
  6. Page 39 of 99

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set ALLCO-11 Date Issued September 24, 2026 ALLCO-135 Page 3 of 3 Facility, these requirements will need to be addressed and receive proper approval by ISO-NE prior to the EDC issuance of an executable Interconnection Agreement.” This procedure is under the jurisdiction of ISO-NE. The Generator may obtain guidance from the ISO-NE Tariff, Schedules 22 and 23 and Section I.3.9.
  7. Page 40 of 99

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set ALLCO-11 Date Issued September 24, 2026 ALLCO-136 Page 1 of 4 Date Filed: October 08, 2026 Witness: Douglas P. Horton, Brendan J. O’Brien and Garrett J. Murray Request from: ALLCO Question: (Follow-up to ALLCO-054 — earned return, capital-forecast contingency, and incremental equity.) (a) The Company’s response to ALLCO-054(a) states that it “is currently earning below its authorized return on equity of 9.25 percent.” Produce, in native (Excel) format, the calculation supporting that statement, showing for the Test Year and for each calendar year 2023 through 2025 and each completed quarter of 2026 the earned return on common equity for the Connecticut distribution business, the net income, the average common equity balance, every adjustment made in deriving the earned return (including any normalization, exclusion of storm, pension, or other items, and any adjustment for the capital structure), and a reconciliation to the earned-return figures reported to PURA in the Company’s annual and quarterly earnings reports for the same periods. (b) The response to ALLCO-054(c) states that if revenues are insufficient the Company “would have no choice but to reconsider its capital investment forecast.” Identify each project, program, or category of capital investment in the Application that the Company would defer, downsize, or cancel if the currently authorized 9.25% return on equity were retained, stating for each the amount and timing of the investment affected, and produce every analysis, presentation, or communication (including to the Eversource Energy Board of Trustees, rating agencies, or investors) that identifies capital investment as contingent on the outcome of this proceeding; if no such project, program, or analysis exists, so state. (c) The response to ALLCO-054(d) describes the practice of pricing debt at embedded cost while pricing the entire equity balance at the requested return as “consistent with . . . PURA practice.” Identify each PURA decision the Company relies on for that practice, and state whether the Company has ever, in any jurisdiction, prepared or presented an analysis in which only incremental common equity is priced at a requested return; if so, produce it. (d) State the after-tax equity return and income-tax gross-up, for the Rate Year and each subsequent year of the proposed PBMRP term, that would result from applying (i) the currently authorized 9.25% return and (ii) the Company’s calculation of its currently earned return, to the rate base in service at December 31, 2025, in the same format as ALLCO-054, Attachment 1. (e) Identify the Moody’s ratings criteria referred to in the response to ALLCO054(c) by title and date, and produce the most recent Moody’s and S&P credit opinions or reports on The Connecticut Light and Power Company and on Eversource Energy. Response: a. Please refer to the Company’s response to EOE-062 i for the actual ROEs filed for each of the requested periods.
  8. Page 41 of 99

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set ALLCO-11 Date Issued September 24, 2026 ALLCO-136 Page 2 of 4 b. No project-by-project contingency study was performed. Capital allocation decisions are dynamic, and result from multiple considerations, including safety, reliability, legal and regulatory obligations, customer needs, and the Company’s financial considerations. As with any business, the Company’s financial resources are not unlimited, and management continuously evaluates how best to allocate available capital to meet customer, operational, and regulatory obligations. c. Utility ratemaking compensates investors for the opportunity cost and risk associated with all investor-supplied equity capital committed to utility operations, not merely recently issued or incremental equity contributions. This principle reflects several fundamental aspects of utility finance and ratemaking: i. Retained earnings remain shareholder-supplied capital and continue to represent investor funds committed to utility operations. ii. Investors continue to bear the risks associated with that capital for so long as it remains invested in the utility. iii. Regulatory capital structures are applied to the entire rate base and capital supporting utility operations, not solely to incremental investments. iv. The authorized return on equity applies to the full common equity component supporting utility assets and service to customers. Connecticut ratemaking practice has consistently applied the authorized return on equity to the common equity component of the utility’s capital structure supporting utility operations. However, the following examples of rate cases in which the authorized return on equity applied to the entire balance of equity that supported rate base: • Docket No. 24-10-04, The United Illuminating Company • Docket No. 24-12-01, Yankee Gas Services Company • Docket No. 23-11-02, Connecticut Natural Gas Corporation and Southern Connecticut Gas Company • Docket No. 23-08-32, Connecticut Water Company • Docket No. 22-08-08, The United Illuminating Company • Docket No. 18-05-10, Yankee Gas Services Company
  9. Page 42 of 99

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set ALLCO-11 Date Issued September 24, 2026 ALLCO-136 Page 3 of 4 • Docket No. 17-10-46, The Connecticut Light and Power Company d. The Company provided the after-tax equity return on rate base in its response to ALLCO054, Attachment 1. The amount associated with rate base as of December 31, 2025, is presented in Column C, Line 2 of that attachment. The return requirement attributable to that investment base does not change solely as a result of the passage of time during the proposed PBMRP term. To the extent the return requirement changes in subsequent years, such changes result from changes in rate base and are reflected on Line 2 of the applicable yearly amounts contained in the attachment. With respect to part (ii), the Company’s currently earned return is provided in response to subpart (a). The Company does not calculate, and has not relied upon, a forecasted future “earned return” on the December 31, 2025, rate base held constant through future periods. Earned return is a measurement of performance that reflects the relationship between the revenues, expenses, and capital supporting utility operations during a particular period. Applying a historical earned-return percentage to a fixed historical rate base and then extending that result into future years would not reflect the revenues, costs, capital investments, or operating conditions expected to exist during those future periods and therefore would not provide a meaningful measure of future utility performance e. Please refer to ALLCO-136, Attachment 1, for Moody’s Rating Methodology for Regulated Electric and Gas Utilities, dated August 6, 2024. Specifically, page 5 discusses “Sufficiency of Rates and Returns.” Please refer ALLCO-136, Attachment 2 and ALLCO136, Attachment 3 for the latest credit opinions from Moody’s and S&P, respectively. Prior Referenced Response: i EOE-062 Question: (EARNINGS SHARING MECHANISM-ESM) Provide an unlocked Excel spreadsheet detailing the Company’s annual ESM results (i.e., calculated return on equity-ROE) in comparison to the Company’s authorized ROE each annual ESM filing since the Company’s last rate case. Separately, provide a similar comparison of the Company’s “hypothetical” annual ROE results to the Company’s authorized ROE whereby the “hypothetical” ROE results are capped at the equity ratio authorized in the last rate case. EOE-062 Response: In accordance with Section 10(a) of the 2018 Rate Settlement approved by PURA in Docket No. 17-10-46, earnings at the end of each calendar year above the authorized return on equity (“ROE”) of 9.25% shall be shared between customers and the Company on a 50/50 basis. The Company reports its ROE at the end of each calendar year in Docket
  10. Page 43 of 99

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set ALLCO-11 Date Issued September 24, 2026 ALLCO-136 Page 4 of 4 No. 76-03-07 (2018 – 2020) or Docket No. 76-03-07RE01 (2021 – 2025) as the basis for any earnings sharing.1 The Company did not earn above the authorized 9.25% at the end of any calendar year between 2018 and 2025. Please refer to Exhibit 1(C)(1) of Attachments 1a through 5a for each actual ROE for the period 2018 through 2022. Please refer to Exhibit 1(C)(1a) of Attachments 6 through 8 for each actual ROE for the period 2023 through 2025. Please refer to Exhibit 1(C)(1) of Attachments 1b through 5b for each illustrative ROE for 2018 through 2022 utilizing the Company’s authorized equity ratio from Docket No. 17-10-46. The Company began reporting an illustrative ROE utilizing the Company’s authorized equity ratio from Docket No. 17-10-46, beginning with its year-end 2023 results. Please refer to Exhibit 1(C)(1b) of Attachments 6 through 8 for each illustrative ROE for 2023 through 2025 utilizing the Company’s authorized equity ratio from Docket No. 17-10-46. A table summarizing the results is presented below: Year Earned ROE w/ Actual Illustrative ROE Using Reference Capital Structure Authorized Capital Structure 2018 2019 2020 2021 2022 2023 2024 2025 8.98% 8.70% 9.03% 9.09% 8.33% 7.35% 6.13% 6.51% 9.00% 8.85% 9.26% 9.26% 8.60% 7.57% 6.23% 6.57% Attachments 1a and 1b Attachments 2a and 2b Attachments 3a and 3b Attachments 4a and 4b Attachments 5a and 5b Attachment 6 Attachment 7 Attachment 8
3 pages match
9 pages match

As listed on the current system

Corres. 10/22/2026 [26-05-10] (Keegan Werlin LLP) - Discovery Compilations (ALLCO Set 11, CLF-SC Set 3, OCC Set 24).