  1. Page 81 of 99

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set ALLCO-11 Date Issued September 24, 2026 ALLCO-149 Page 3 of 4 ALLCO-033 Response: CL&P does not track or maintain information on outside legal expense in a format that is commercially reasonable for the Company to collect and provide during the time period designated by Allco for the submission of this interrogatory response. Subject to and without waiving the foregoing, please refer to ALLCO-033, Attachment 1, for a listing of CL&P’s legal service costs incurred in the Test Year (2025) and any adjustments for the Rate Year. In the course of responding to this interrogatory the Company identified storm attestation work initially recorded to the legal cost element and should have been removed in the preparation of the initial cost of service and therefore has been adjusted out of this attachment. The Company plans to incorporate this update in its next applicable cost of service update. To prepare this listing , the Company identified the category of legal services provided and identified the direct or allocated charges. Legal costs are either directly charged to CL&P when the Company is the only beneficiary of the services, or allocated when multiple business segments benefit from the activity. The Company confirms that the totals on line 145 of OCC-309, Attachment 1, are the amounts charged to CL&P. Please also refer to OCC-308, Attachment 1 CONFIDENTIAL, for a list of litigation, status of the matter and the dates these legal matters were resolved. ii ALLCO-019 Question: With respect to the injuries and damages expense, judgments and settlements, and outside legal expense that are the subject of OCC-303, OCC-308, and OCC-309, identify the portion of each that relates to disputes with distributed generation developers, qualifying facilities, or interconnection customers (including disputes with Allco or its affiliates), stating the amount, FERC account, and matter; and state whether the Company proposes to recover through rates any judgment, settlement, refund, or interest obligation arising from such disputes. ALLCO-019 Response: With respect to the Company’s response to OCC-303, CL&P does not track injuries and damages expense in a format that would allow the Company to identify the portion of expense that relates to disputes with distributed generation developers, qualifying facilities, or interconnection customers. With respect to the Company’s response to OCC-308, there are no judgments and/or settlements resulting from lawsuits brought by distributed generation developers, qualifying facilities, or interconnection customers. With respect to the Company’s responses to OCC-309, CL&P does not track legal expense in a format that would allow the Company to identify the portion of expense that relates to disputes with distributed generation developers, qualifying facilities, or interconnection customers. iii OCC-308 Question: Judgments/Settlements (Direct and Allocated). a. Please provide, in list form, the details of all judgments and/or settlements resulting from suits brought which involved the Company or affiliates as a defendant, which resulted in the Company or affiliates, during the test year, paying or agreeing to pay or being ordered to pay an amount in excess of $10,000, including but not limited to the case name, a brief description of the case, the date filed, the date of settlement or the date of judgment and the amount the Company or affiliates was ordered or agreed to pay. Provide this information even if appeals are pending and note every instance of an appeal.
  2. Page 82 of 99

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set ALLCO-11 Date Issued September 24, 2026 ALLCO-149 Page 4 of 4 b. Provide the total amount of judgments/settlements expense (direct and allocated) for each of the years 2021, 2022, 2023, 2024, 2025, and the amount included in the rate year. OCC-308 Response: a. Please refer to OCC-308, Attachment 1 CONFIDENTIAL, for a list of all judgements and/or settlements resulting from suits brought in federal or state court, which resulted in the Company either paying or agreeing to pay an amount in excess of $10,000 during the years 2021, 2022, 2023, 2024, and 2025. b. Settlements and judgments that are property damage or bodily injury claims are funded out of the Company’s public liability reserve up to $1 million. Property damage and bodily injury settlements and judgements over $1 million are covered by the Company’s excess liability insurance. The Company has included $3.829 million in its Rate Year to accrue into the public liability reserve which is recovered from customers through base distribution rates. The table below summarizes the public liability expense for each year 2021 through 2025 and the legal settlement payments that are not covered by the Public Liability Reserve and excess liability insurance. The Public Liability Reserve Accrual values are included in herein are from OCC-303, Attachment 2. CL&P Legal Settlements Reserve Payments Year Public Liability Accrual 2021 2022 $ $ 616,606 10,474,004 $ $ 21,041 320,000 2023 $ 6,015,776 $ 1,030,000 2024 $ 1,340,332 2025 $ 2,923,957
  3. Page 83 of 99

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set ALLCO-11 Date Issued September 24, 2026 ALLCO-150 Page 1 of 4 Date Filed: October 21, 2026 Witness: Brendan J. O’Brien and Garrett J. Murray Request from: ALLCO Question: (Follow-up to ALLCO-021, and ALLCO-029 — internal legal department and recoveries.) (a) Reconcile the statement in ALLCO-021 that Eversource Legal “currently has 34 attorneys” with the table showing 36 attorneys in 2025, and state the attorney, paralegal, and support headcount and FTE as of the date of the response. (b) State, for each year 2021 through 2025 and the Rate Year, the total cost of Eversource Legal and the amount allocated or directly charged to the Company, by practice area, and identify the allocation factor used (crossreferencing ALLCO-022, Attachment 1, where applicable). (c) State the number of attorneys and paralegals in the Litigation & Dispute Resolution practice area and the State Regulatory practice area, and the portion of each area’s cost charged to the Company. (d) State whether any Eversource Legal attorney time was charged to the Company for work on Allco matters, FERC Docket No. EL25-117-000, or Civil Action No. 3:26-cv-01277 in 2025 or 2026, and the hours and cost. (e) Identify the matter(s) that produced the $546,923.86 and $686,979.99 insurance reimbursements in 2023, state whether the underlying defense costs were included in the Company’s cost of service in the year incurred, and state whether the Test Year legal expense used to set the Rate Year was normalized for the absence of comparable recoveries. Response: a) The staffing levels for the Legal Department are in transition due to several employee retirements and new employees being hired over the course of responding to these staffing data requests. There are currently 36 attorneys employed in the Eversource Legal Department as of the date of 10/01/2026. b) Please refer to the table below for 2021 through 2025 and the Rate Year showing the Eversource Legal cost by legal category allocated to CL&P. Legal Regulatory1 Corporate Compliance Legal Operations2 Regulatory Policy FERC Legal Administration $ $ 1 2 2021 1,351,552 $ 25,834 546,535 27,244 107,898 2,059,064 $ 2022 1,563,681 $ 43,230 592,467 111,121 2,310,498 $ 2023 1,519,771 $ 44,028 566,778 66,324 114,497 2,311,398 $ 2024 1,004,145 $ 28,230 998,220 69,181 117,886 2,217,661 $ 2025 Rate Year 1,002,277 $ 1,079,266 29,076 31,310 1,054,227 1,135,206 71,468 76,957 119,271 128,433 2,276,320 $ 2,451,172 Legal Regulatory is comprised of Labor & Employment, Federal Regulatory, State Regulatory, and Corporate & SEC Compliance Legal Operations is comprised of Litigation, Environmental, Siting, Real Estate, Procurement, IT Cyber Security and Customer Group
  4. Page 84 of 99

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set ALLCO-11 Date Issued September 24, 2026 ALLCO-150 Page 2 of 4 c) The number of attorneys and paralegals employed by Eversource Energy Service Company in the Litigation & Dispute Resolution practice area has 6 attorneys and 2 paralegals and the State Regulatory practice area has 8 attorneys and no paralegals. Please refer to the Company’s responses to ALLCO-022 i, and ALLCO-075 ii. d) Each legal practice area has time codes for CL&P related regulatory matters’ legal work that occur at the FERC or the state level. The attorneys working on the ALLCO regulatory matters filed at FERC and in CT civil court charged their respective CL&P regulatory matter time code and do not typically distinguish on their time sheet that these regulatory or civil matters involved the ALLCO company. For the ALLCO FERC regulatory matter, Eversource’s FERC attorneys identified the following hours worked on the ALLCO complaint: Federal Regulatory Employee Job Cost Time Title Center Code: Assistant General Counsel 1FE LGFR8N11 Senior Counsel 1FE Hours Worked Sept 2025 Hours Worked Oct 2025 Hours Worked Nov 2025 Comment Description: 0.5 1.5 0 4 4 LGFR8N11 3 ALLCO Complaint Docket EL25117 ALLCO Complaint Docket EL25117 e) Please refer to OCC-896 iii, for a description of the matters that produced the $546,923.86 and $686,979.99. The associated defense costs were not included in the Company’s cost of service and therefore, the Rate Year did not need to be normalized. Prior Referenced Responses: i ALLCO-022 Question: State, for each year 2018 through 2025, the Test Year, and the proposed Rate Year, the total annual cost of the internal legal function (including compensation, benefits, occupancy, technology, library/research services, and allocated overheads), and the amount of that cost charged or allocated to the Company; identify the allocation methodology and allocation factor(s) used (referencing, as applicable, the cost allocation methodologies produced in response to EOE066); and identify the FERC account(s) and the specific revenue requirement schedules and workpapers in this docket in which the amounts allocated to the Company appear. ALLCO-022 Response Please refer to ALLCO-022, Attachment 1 CONFIDENTIAL. The Company’s Legal function proposed total compensation in the Rate Year is $4.940 million reflected in Exhibit CLP-REVREQ-2, Schedules C-3.5 Payroll
  5. Page 85 of 99

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set ALLCO-11 Date Issued September 24, 2026 ALLCO-150 Page 3 of 4 Expense, C-3.6 Employee Variable Compensation, C-3.7 Officer Variable Compensation and C-3.12 Employee Benefits. Please refer to the Company’s response to OCC-332 for the allocation methodology and factors used in the cost of service. ii ALLCO-075 Question: (Follow-up to ALLCO-020.) The public version of ALLCO-020, Attachment 1, is redacted to a handful of boxes. Because the interrogatory sought “positions by title and reporting lines” — not names — produce a public version of the organizational chart of the legal function showing every position by title and its reporting line, with individual names redacted; state the number of attorneys and non-attorney staff in each practice area identified in the response, as of December 31, 2025 and as of the date of the response; and state, for each practice area, the portion of its 2025 compensation allocated to the Company (which may be provided by cross-reference to ALLCO-022, Attachment 1 CONFIDENTIAL, with practice-area subtotals). ALLCO-075 Response: Please refer to ALLCO-075, Attachment 1, for an updated public version of the organizational chart of the legal function showing every position by title and reporting line as of September 21, 2026; this version also indicates practice areas. It should be noted that the titles indicated on this organizational chart are the actual titles for these specific roles. ALLCO-075, Attachment 2, provides the numbers of attorneys and non-attorney staff in each practice area as of December 31, 2025, and as of September 21, 2026. Please see the Company’s response to ALLCO-022i, for the portion of the Legal organization’s 2025 compensation allocated to CL&P by position. iii OCC-896 Question: OCC-896. Legal reimbursements. Refer to the response to ALLCO-029. a. Who paid for defense costs associated with the reimbursements shown? b. Describe the nature of the cases shown, and specify whether each were related to the Company’s Connecticut utility business operations. OCC-896 Response: a. b. i. The defense costs reimbursed for years 2021-2024 were paid by insurance companies that the Company purchases insurance from. ii. The defense costs reimbursed for the year 2025 were paid by an Eversource contractor’s insurance company. i. The case from 2023 was a wrongful death claim related to the Company’s Connecticut utility business operations.
  6. Page 86 of 99

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set ALLCO-11 Date Issued September 24, 2026 ALLCO-150 Page 4 of 4 ii. The case from 2021-2024 is related to an ERISA Class Action lawsuit against the Company’s retirement plans for employees. iii. The case from 2025 was a personal injury claim related to the Company’s Connecticut utility business operations.
  7. Page 87 of 99

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set ALLCO-11 Date Issued September 24, 2026 ALLCO-151 Page 1 of 1 Date Filed: October 19, 2026 Witness: Edward A. Davis and Kimberly R. Parsons Request from: ALLCO Question: (Follow-up to ALLCO-062 — data anomalies.) In ALLCO-062, Attachment 1: (a) explain the January 2025 Rate 35 figure of 124,140,351 kWh, which exceeds every other month for that rate by a factor of approximately twenty; (b) explain the October 2025 Rate 37 figure of 87,505,530 kWh, which exceeds every other month for that rate by a factor of approximately five; (c) explain the negative January 2025 Rate 29 figure of (1,371,750) kWh and the negative and sporadic Rate 39 and Rate 119 figures; (d) state whether each such figure reflects a billing correction, a cancel-and-rebill, or an error, and provide a corrected attachment; and (e) state whether the billing determinants used in the Company’s cost-of-service and rate-design exhibits incorporate these figures as shown. Response: (a) The January 2025 Rate 35 figure of 124,140,351 kWh was input incorrectly. The correct January 2025 Rate 35 figure is 6,446,771 kWh. (b) (c), (d) The above-referenced fluctuations in customer energy supply usage patterns, which reflect customers switching back and forth between electing to take energy supply service from competitive retail suppliers versus taking standard or last resort electric service from an electric distribution company as well as general usage trends, are not attributable to a single causal factor and instead are impacted by a variety of different factors that influence customers’ decisions to leave and then rejoin standard service or last resort electric service or increase/decrease usage. Nor is the Company able to speculate what the primary reasons are that caused customers, at certain points in time, to leave and then rejoin standard service or last resort electric service or increase/decrease usage. (e) The Company uses total company annual sales to determine its Rate Year billing determinants and does not rely on monthly, standard service, or last resort service sales data in its analysis. Please refer to OCC-365, Attachment 1, for the workpapers behind the Test Year and Rate Year sales determinants used by the Company in this proceeding.
  8. Page 88 of 99

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set ALLCO-11 Date Issued September 24, 2026 ALLCO-152 Page 1 of 4 Date Filed: October 19, 2026 Witness: Edward A. Davis, Kimberly R. Parsons and Justin Pelkowski Request from: ALLCO Question: (Follow-up to ALLCO-063 — load settlement and losses.) The response states that “[t]he Company does not serve load and therefore does not receive settlement statements for any load assets.” (a) Identify the entity that is the ISO-NE load-asset owner and settlement counterparty for Standard Service and Last Resort Service load in the Company’s service territory, and the contractual or regulatory basis on which that entity, rather than the Company, holds the load asset. (b) State the distribution loss factor(s) the Company applies in converting metered retail sales to wholesale load for settlement, the source and date of the loss study supporting each, and produce the study. (c) State the annual 2025 total of the hourly wholesale loads in ALLCO063, Attachment 1, for Standard Service, Last Resort Service, and competitive supply, and the annual 2025 total retail kWh billed (CIEC-020, Attachment 2), and state the difference and the Company’s explanation of it, including losses, unaccounted-for energy, company use, and unbilled usage, in whatever level of detail the Company’s records permit. Response: PURA’s June 2, 2026, Notice of Proceeding in Docket No. 26-05-10, states that, upon a receipt of a completed application from Eversource to amend the Company’s existing rate schedules, PURA will conduct a contested proceeding to review Eversource’s application. Eversource objects to Allco’s effort to litigate an issue that is outside the scope of this rate case proceeding. Considering the statutory 350-day timeframe to issue a final decision on the Company’s application and the number of interrogatories issued in this proceeding to-date, the litigation of issues irrelevant to the Company’s application threatens to adversely impact the orderly conduct of this proceeding. 1 Without waiving said objection, (a) This information related to Standard Service and Last Resort Service has already been provided in ALLCO-038, and ALLCO-086, and is part of the public record in Docket No. 25-01-01. Specific entities that won Standard Service and Last Resort Service solicitations are reported in that docket in the Company’s compliance filings. The regulatory and legislative basis for third parties serving load instead of the distribution company is a Allco previously litigated the Millstone PPA in the Company’s Docket No. 24-01-03 Revenue Adjustment Mechanism proceeding. See, Docket No. 24-01-03, Eversource responses to ALLCO-02, ALLCO-03, ALLCO-05, ALLCO-06, ALLCO-07, and ALLCO-21. Eversource objected to each of these questions. 1
  9. Page 89 of 99

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set ALLCO-11 Date Issued September 24, 2026 ALLCO-152 Page 2 of 4 fundamental aspect of electric deregulation, originally set forth in Public Act No. 98-28, and codified in Conn. Gen. Stat. § 16-244e(a), and the state’s procurement practices following electric deregulation, as set forth in Conn. Gen. Stat. § 16-244m, and the PURAapproved Procurement Plan. (b) For ISO-NE load settlement reporting purposes the Company does not apply a static value to convert metered retail sales to wholesale loads. (c) The total 8,760 hourly wholesale load data was already provided as part of ALLCO-038 i, ALLCO-063 ii, and ALLCO-086 iii. Test Year total retail sales are included in CIEC-020, Attachment 2. Retail sales and wholesale load will not and cannot equal one another due to a host of various reasons including but not limited to thermal losses. Prior Referenced Response: i ALLCO-038 Question: For each year 2019 through 2025: state (a) the Company’s total standard service and supplier of last resort service load (MWh) and the average all-in supply cost per kWh the Company paid to wholesale suppliers for that load; (b) the average cost per kWh of energy purchased under the Millstone PPA; and (c) the net amount charged to customers through the NBFMCC in respect of the Millstone PPA for that year; and produce data sufficient to calculate, for each such year, the net impact on customers had the Company used Millstone PPA energy to serve standard service and supplier of last resort service load up to the lesser of the Millstone PPA quantities or that load (accounting for the residual quantities that would still have been resold into the market), including hourly standard service load data and hourly Millstone PPA delivery quantities in native format. ALLCO-038 Response: PURA’s June 2, 2026, Notice of Proceeding in Docket No. 26-05-10 states that, upon a receipt of a completed application from Eversource to amend the Company’s existing rate schedules, PURA will conduct a contested proceeding to review Eversource’s application. Eversource objects to Allco’s effort to litigate an issue that is outside the scope of this rate case proceeding. Considering the statutory 350-day timeframe to issue a final decision on the Company’s application and the number of interrogatories issued in this proceeding to-date, the litigation of issues irrelevant to the Company’s application threatens to adversely impact the orderly conduct of this proceeding.1 Without waiving said objection, the Company’s Standard Service loads can be found on the following website: https://www.eversource.com/residential/about/doing-business-with-us/energy-suppliers/connecticut-wholesalesupply. The supply costs paid to suppliers can be found in the following dockets: 2019-01-01; 2020-01-01; 2021-0101; 2022-01-01; 2023-01-01; 2024-01-01; 2025-01-01. As noted in the Millstone PPA,2 “The Price for the Buyer’s Percentage Entitlement of Delivered Products up to the Contract Maximum Amount shall be USD $49.99/MWh,” which is equivalent to $0.0499/kWh. Eversource provides the net amount charged to customers through the NBFMCC for the Millstone PPA in its March 1st annual RAM filings.
  10. Page 90 of 99

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set ALLCO-11 Date Issued September 24, 2026 ALLCO-152 Page 3 of 4 ii ALLCO-063 Question: For each month of the Test Year, produce the ISO New England settlement statements (including any resettlements) for the Company’s load asset(s), showing the kilowatt-hours of Real-Time Load Obligation charged or settled to the Company, and state the monthly and annual settled kilowatt-hour totals. Reconcile the annual ISO-NE settled kilowatthours to a) the total retail kilowatt-hours billed to all customers (Q-ALLCO-061) and b) the kilowatt-hours billed to standard-service customers (Q-ALLCO-062), separately itemizing and quantifying each reconciling item — including distribution losses, transmission losses, unaccounted-for energy, company use, station service, unbilled or estimated usage, and any other category — and stating the loss factor(s) applied at each stage and their source. Identify the system(s) and process by which the Company performs retail load settlement, and identify (by title, date, and custodian) every internal load-settlement, unaccounted-for-energy, or loss-study report prepared or updated for any period including the Test Year. ALLCO-063 Response: The Company does not serve load and therefore does not receive settlement statements for any load assets. In addition, wholesale loads for Standard Service, Last Resort Service and retail supply are not relevant to the adjudication of the Company’s proposed retail distribution revenue requirement in this rate case or retail customer loads. Nevertheless, for informational purposes please refer to ALLCO-063, Attachment 1, for the 2025 ISO-NE wholesale loads for Standard Service, Last Resort Service, and competitive supply. In addition to the fact that the above-described wholesale loads are not relevant to the adjudication of the Company’s proposed retail distribution revenue requirement in this rate case or retail sales, the Company also notes that it cannot readily reconcile wholesale load data with Test Year data due to rate class level data being based on monthly billing cycles at the customer meter, which vary for every customer, and wholesale load data being calendar month, summed by hour, and aggregated by competitive supplier at the wholesale level. iii ALLCO-086 Question: (Follow-up to ALLCO-038.) A referral to a public webpage and seven annual dockets is not an answer, and the remaining components are not public. Provide, in a single native-format table for each calendar year 2019 through 2025: (a) the Company’s standard service and supplier of last resort load in MWh and the average all-in supply cost per kWh paid to wholesale suppliers for that load (the figures the Company’s referral sources contain, compiled); (b) the MWh of the Company’s Buyer’s Percentage Entitlement of Millstone PPA products actually delivered or settled, by month; (c) the effective all-in price per MWh actually paid under the Millstone PPA, identifying any component other than the $49.99/MWh contract price; and (d) the net amount charged or credited to customers through the NBFMCC in respect of the Millstone PPA, by year. Produce the hourly (or most granular available) Millstone delivery quantities and standard service load data in native format. ALLCO-086 Response: PURA’s June 2, 2026, Notice of Proceeding in Docket No. 26-05-10, states that, upon a receipt of a completed application from Eversource to amend the Company’s existing rate schedules, PURA will conduct a contested proceeding to review Eversource’s application. Eversource objects to Allco’s effort to litigate an issue that is outside the scope of this rate case proceeding. Considering the statutory 350-day timeframe to issue a final decision on the
3 pages match
9 pages match

As listed on the current system

Corres. 10/22/2026 [26-05-10] (Keegan Werlin LLP) - Discovery Compilations (ALLCO Set 11, CLF-SC Set 3, OCC Set 24).

This filing on the current system (opens in a new tab)