  1. Page 12 of 41

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-24 Date Issued October 02, 2026 OCC-905 Page 2 of 14 Category Reserve Threshold Massachusetts CL&P Connecticut Proposal Any single storm in which NSTAR incurs $1.3 million in incremental O&M cost will be eligible for recovery Any single storm in which through the Storm Fund. CL&P incurs $5.4 million in incremental O&M cost Massachusetts does not have will be eligible for a pre-staging mechanism, but recovery through the these costs are generally Storm Reserve. covered with the lower threshold, and recovery of the thresholds in base rates. Comments Storm fund design involves tradeoffs between funding recovery for NonCatastrophic and NonPreStaging through base rates and the threshold for accessing the reserve fund. The Connecticut threshold has historically been much higher than Massachusetts (i.e., $1.3M vs. $4M). The Company’s proposed threshold aligns with historical practice, maintaining continuity in the design of the mechanism. Specifically, the proposed $5.4M threshold for Connecticut was calculated by escalating the current catastrophic storm threshold of $4 million using inflation factors based on GDP-PI from 2018 through the Rate Year.
  2. Page 13 of 41

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-24 Date Issued October 02, 2026 OCC-905 Page 3 of 14 Category Storm Cost Recovery Deductible Massachusetts For each of the first eight Storm Fund-eligible events in a calendar year—that is, storms meeting the $1.3 million threshold—NSTAR must deduct the first $1.3 million from its recovery request for each event. To provide for recovery of those “thresholds,” the MDPU incorporated $7.8 million in base rates, representing six storms at $1.3 million storm deductibles per storm. For each Storm Fund-eligible event after the eighth in a calendar year (i.e., events 9 and beyond), NSTAR is allowed to recover the total costs for each event; i.e., the $1.3 million deductible no longer applies. If there are fewer than five Storm Fund-eligible events in a calendar year, customers receive a $1.3 million credit for each event below the fiveevent threshold that did not occur. CL&P Connecticut Proposal Comments N/A From a practical perspective, the framework in CT is no different because the Company is allowed to recover the full cost of catastrophic storm events, so long as the threshold is surpassed (i.e., there is no so-called “deductible” that is collected through base rates). PURA has implemented a higher per-storm threshold than the MDPU ($4 million versus $1.3 million), allowing for recovery of all costs (including the $4 million) once the threshold is reached. Thus, the only real difference is that there are two storm deductibles in MA (i.e., storms # 7 and #8) that the Company does not recover, totaling $2.6 million. All other costs are recoverable, including prestaging regardless of whether the storm materializes.
  3. Page 14 of 41

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-24 Date Issued October 02, 2026 OCC-905 Page 4 of 14 Category Amount Fixed in Base Rates for NonCatastrophic and NonPrestaging Storm Costs Massachusetts NSTAR includes $7.8 million annually in base distribution rates to recover a representative level of the Storm Fund threshold that occurs each year ($1.3 million cost-per-storm threshold amount multiplied by six Storm Fund eligible storms per year). The six eligible events represent the average number of storm-fund-eligible events from 2017 through 2020). CL&P Connecticut Proposal CL&P has proposed to include $38 million in the Rate Year annually to cover Non-Catastrophic and Non-Pre-Staging storms costs, assuming a $5.4 million threshold. Comments Because the Massachusetts Storm Fund threshold is lower ($1.3 million), this design should, in theory, result in a greater proportion of storm costs being recovered through the Storm Fund, allowing the amount of NonCatastrophic and NonPrestaging storm costs fixed in base rates to be set lower. For Connecticut, the Company calibrated its proposal to strike an appropriate balance between recovery through rates and recovery through the Storm Reserve.
  4. Page 15 of 41

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-24 Date Issued October 02, 2026 OCC-905 Page 5 of 14 In aggregate, NSTAR collects $31 million per year in annual base distribution rate contributions to the Storm Fund. Storm Fund Contributions through Base Rates In approving the $31 million, the DPU considered the number of storms that occurred between the Company’s 2017 rate case and the end of the test year in D.P.U. 22-22 (12/31/20); the incremental cost of these storms; the number of storms with incremental O&M costs that were so extraordinarily high that they should be deemed statistical outliers; and the number of storms that would not have been eligible for storm fund recovery had the $1.3 million storm-fundeligible threshold been in effect. The Company is proposing that the annual customer contribution to the catastrophic storm reserve be set at $60 million in base rates. The Company proposes that the annual customer contribution to the prestaging reserve be set at $4 million in base rates. Storm fund design involves tradeoffs between funding recovery for NonCatastrophic and NonPrestaging and the threshold for accessing the reserve fund. As discussed in the Company’s response to OCC-521, the Company’s average annual catastrophic storm activity is approximately $151.5 million (Exhibit CLPREVREQ-2, WP C-3.26, lines 27 through 35). However, the Company proposes to maintain catastrophic storm funding at approximately the same level as is currently in base rates, recognizing that annual activity is variable and difficult to predict. This approach is designed to mitigate customer bill impacts amid the myriad factors that are putting upward pressure on costs. The Company presented its proposal for pre-staging event reserve accrual in Exhibit CLP-REVREQ-1, pages 107-108. The testimony calculated an average annual prestaging event expense of $4.097 million (Exhibit CLPREVREQ-2, WP C-3.27, lines 27 through 35), based on actual pre-staging event
  5. Page 16 of 41Match

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-24 Date Issued October 02, 2026 OCC-905 Page 6 of 14 Category Massachusetts CL&P Connecticut Proposal Comments costs at $4.229 million in 2021, $6.350 million in 2022, $6.183 million in 2023, $0 in 2024, and $3.723 million in 2025 (using Gross Domestic Product – Price Index (“GDP-PI”) to escalate costs to the Rate Year amounts). This average annual expense of $4.097 million supports the Company’s proposed adjustment, increasing annual base distribution funding for pre-staging events from $3 million to $4 million.
  6. Page 17 of 41

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-24 Date Issued October 02, 2026 OCC-905 Page 7 of 14 Category Massachusetts CL&P Connecticut Proposal There is a symmetrical cap of $30 million on the Storm Fund balance that triggers either a customer refund for an over-recovery balance that exceeds the cap, or a customer charge for an underrecovery balance that exceeds the cap. The symmetrical cap of $30 million on the Storm Fund Symmetrical balance minimizes the Cap on Storm potential for frequent rate Fund changes (either positive or negative), realigns the risks associated with storm cost recovery to protect customers. NSTAR would only implement a rate change to the Storm Reserve Adjustment Mechanism (“SRAM”) if the Storm Fund is in a surplus or deficit of $30 million. N/A Comments The symmetrical cap has never been triggered in Massachusetts. CL&P has not proposed a symmetrical cap because the proposed annual review process is designed to prevent the accumulation of significant storm cost balances, thereby reducing the need for balancing and mitigation mechanisms such as a deductible, a symmetrical cap, or an exogenous storm component. Instead of a hard cap, the Company is proposing in Connecticut to implement flexible rate changes based on the funded status, rather than establishing fixed points at which rates would change, or establishing a predetermined amortization period.
  7. Page 18 of 41

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-24 Date Issued October 02, 2026 OCC-905 Page 8 of 14 Category Massachusetts Any single storm event that exceeds $30 million in incremental costs is excluded from Storm Fund eligibility. These costs can be recovered through the exogenous cost provision of the Performancebased Ratemaking (“PBR”) mechanism annual adjustment or deferred to NSTAR’s next base distribution rate case. Exogenous Storms NSTAR may seek cost recovery through the exogenous cost provision of the PBR (pending a prudence review) provided that the combination of any single storm in excess of $30 million and the balance of the Storm Fund exceeds $75.0 million. The DPU has expressed a preference that costs incurred in preparing for and responding to an exogenous storm event be recovered through the Storm Cost Adjustment Recovery Factor (“SCRAF”) CL&P Connecticut Proposal N/A Comments CL&P has not proposed an exogenous storm component because its proposed annual review process is intended to prevent the accumulation of significant balances, thereby reducing the need for balancing mechanisms such as a deductible, a symmetrical cap, or an exogenous storm component.
  8. Page 19 of 41

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-24 Date Issued October 02, 2026 OCC-905 Page 9 of 14 NSTAR accrues carrying charges at the Prime rate for Storm Fund-eligible events, with recovery to begin at the time that the costs are incurred. Carrying charges accrue on the net balance of storm costs, offset by reserve funding in rates (meaning that if the Company is in a netunder recovery position, carrying costs will accrue on the net balance of storm costs offset by the balance of storm funding). Carrying Charges This applies to both exogenous (storms that exceed $30 million in costs recovered through the SCRAF) and non-exogenous (exceeding $1.3 million but less than $30 million in costs) storm events. For exogenous events (storms in excess of $30 million), the DPU determines the propriety of recovering carrying charges when the Company files for storm cost recovery. If costs are ultimately deemed to be imprudent, the carrying costs accrued on these amounts are refunded to customers. CL&P’s proposal is aligned with the Massachusetts approach, apart from the fact that the Massachusetts design features both exogenous and nonexogenous events to which carrying costs may apply. CL&P proposes to accrue carrying charges at the Prime rate for Storm Reserve-eligible events on the net balance of storm costs, offset by reserve funding in rates, identical to the operation of the Massachusetts mechanism. As discussed in the Company’s response to OCC-522, in establishing a going-forward framework for storm cost recovery, the Company agrees that it would be within PURA’s discretion to strike a balance between the Company’s costs of financing storm costs while ensuring that the Company is not ‘profiting’ on a force majeure event like a storm. This is the Company’s experience in Massachusetts, where the DPU has authorized a carrying charge rate that is different from and generally less than the Company’s WACC, but that still recognizes that the Company is using its longer-term capital resources to finance storm costs (not its shorter term commercial paper source of liquidity). Thus, should PURA implement the SCRAF, which provides for more timely review and
  9. Page 20 of 41

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-24 Date Issued October 02, 2026 OCC-905 Page 10 of 14 Category Pre-Staging Costs Massachusetts The Massachusetts Storm Fund does not separately provide for recovery of prestaging costs, nor does it need to because the threshold to access the Storm Fund is lower ($1.3M) and the amounts below the threshold are covered in base rates. CL&P Connecticut Proposal The Company is proposing to establish a level of pre-staging reserve funding in base rates at $4 million per year. Pre-staging events would continue to be defined as events in which the Company has notified PURA of its intent to prestage for an expected weather event, but where that event does not materialize into a catastrophic storm (i.e., total incremental costs do not exceed $5.4 million). Comments recovery of storm and prestaging costs, the Company would accept the Prime rate from the date of cost incurrence, applied to the net balance of the storm fund and pre-staging reserve fund for storms occurring after March, 2025. For storms occurring after 2023 but prior to March, 2025, the Company has requested to apply the WACC as part of this pending proceeding. CL&P’s proposal aligns with PURA’s directive to “aggressively pursue prestaging resources to ensure that sufficient crews are available to respond to restoration events within 48 hours of a potential catastrophic storm.” Decision, April 28, 2021, Docket No. 20-08-03, Investigation into Electric Distribution Companies’ Preparation for and Response to Tropical Storm Isaias at 40.
  10. Page 21 of 41

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-24 Date Issued October 02, 2026 OCC-905 Page 11 of 14 Reporting No later than 6 months after the occurrence of a Storm Fund qualifying event, NSTAR must submit a preliminary report providing: (1) a detailed explanation of the storm event; (2) a detailed CL&P proposes an annual filing on September 1st, summary of costs brokendown by cost category; (3) the including the storm costs amount of carrying costs incurred for the prior incurred; and (4) a detailed calendar year and all summary of anticipated supporting documentation. CL&P’s proposal and the additional costs to be incurred Massachusetts model are or finalized, including an PURA would conduct a aligned in terms of the estimated timeframe for the contested proceeding to requirement for a prudence receipt of outstanding cost evaluate the prudence of review conducted by the information or final cost all incremental respective agencies. accounting. catastrophic storm and pre-staging costs, the The key difference is the Thereafter, NSTAR must accumulated reserve frequency of that prudence provide a quarterly update on balances and the potential review. CL&P is proposing the status of finalizing the need for a SCRAF rate a more frequent and accounting of storm costs. change to begin recovery predictable review process, of prudently incurred that would occur annually DPU’s expects NSTAR to costs. and is intended to avoid the petition for recovery of storm accumulation of significant costs, including complete and CL&P proposes to balances of catastrophic final documentation and implement any rate storm and pre-staging costs. supporting testimony, as soon changes on September 1st as practicable after finalizing of the following year, the storm costs, and no later aligning with the than 6 months after such costs Company’s RAM Phase II rate changes on the same are finalized. If NSTAR day. cannot make the filing within the 6-month timeframe, it must file a petition for storm cost recovery as soon as such information (i.e., the complete cost documentation) is complete.

As listed on the current system

Corres. 10/22/2026 [26-05-10] (Keegan Werlin LLP) - Discovery Compilations (ALLCO Set 11, CLF-SC Set 3, OCC Set 24).

This filing on the current system (opens in a new tab)