Discovery Compilations (ALLCO Set 11, CLF-SC Set 3, OCC Set 24).
Files4
Docket No. 26-05-10 Discovery Compilations October 22 2026.pdf
PDF · 155 KB · 1 pageText searchable
Download Docket No. 26-05-10 Discovery Compilations October 22 2026.pdfRead the text of Docket No. 26-05-10 Discovery Compilations October 22 2026.pdf
ALLCO Set 11_COMBINED.pdf
PDF · 1.2 MB · 99 pagesText searchable
Download ALLCO Set 11_COMBINED.pdfRead the text of ALLCO Set 11_COMBINED.pdf
CLF-SC Set 3_COMBINED.pdf
PDF · 390 KB · 16 pagesText searchable
Download CLF-SC Set 3_COMBINED.pdfRead the text of CLF-SC Set 3_COMBINED.pdf
OCC Set 24_COMBINED.pdf
PDF · 503 KB · 41 pagesText searchable
Download OCC Set 24_COMBINED.pdfRead the text of OCC Set 24_COMBINED.pdf
Page 17 of 41
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-24 Date Issued October 02, 2026 OCC-905 Page 7 of 14 Category Massachusetts CL&P Connecticut Proposal There is a symmetrical cap of $30 million on the Storm Fund balance that triggers either a customer refund for an over-recovery balance that exceeds the cap, or a customer charge for an underrecovery balance that exceeds the cap. The symmetrical cap of $30 million on the Storm Fund Symmetrical balance minimizes the Cap on Storm potential for frequent rate Fund changes (either positive or negative), realigns the risks associated with storm cost recovery to protect customers. NSTAR would only implement a rate change to the Storm Reserve Adjustment Mechanism (“SRAM”) if the Storm Fund is in a surplus or deficit of $30 million. N/A Comments The symmetrical cap has never been triggered in Massachusetts. CL&P has not proposed a symmetrical cap because the proposed annual review process is designed to prevent the accumulation of significant storm cost balances, thereby reducing the need for balancing and mitigation mechanisms such as a deductible, a symmetrical cap, or an exogenous storm component. Instead of a hard cap, the Company is proposing in Connecticut to implement flexible rate changes based on the funded status, rather than establishing fixed points at which rates would change, or establishing a predetermined amortization period.Page 18 of 41
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-24 Date Issued October 02, 2026 OCC-905 Page 8 of 14 Category Massachusetts Any single storm event that exceeds $30 million in incremental costs is excluded from Storm Fund eligibility. These costs can be recovered through the exogenous cost provision of the Performancebased Ratemaking (“PBR”) mechanism annual adjustment or deferred to NSTAR’s next base distribution rate case. Exogenous Storms NSTAR may seek cost recovery through the exogenous cost provision of the PBR (pending a prudence review) provided that the combination of any single storm in excess of $30 million and the balance of the Storm Fund exceeds $75.0 million. The DPU has expressed a preference that costs incurred in preparing for and responding to an exogenous storm event be recovered through the Storm Cost Adjustment Recovery Factor (“SCRAF”) CL&P Connecticut Proposal N/A Comments CL&P has not proposed an exogenous storm component because its proposed annual review process is intended to prevent the accumulation of significant balances, thereby reducing the need for balancing mechanisms such as a deductible, a symmetrical cap, or an exogenous storm component.Page 19 of 41
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-24 Date Issued October 02, 2026 OCC-905 Page 9 of 14 NSTAR accrues carrying charges at the Prime rate for Storm Fund-eligible events, with recovery to begin at the time that the costs are incurred. Carrying charges accrue on the net balance of storm costs, offset by reserve funding in rates (meaning that if the Company is in a netunder recovery position, carrying costs will accrue on the net balance of storm costs offset by the balance of storm funding). Carrying Charges This applies to both exogenous (storms that exceed $30 million in costs recovered through the SCRAF) and non-exogenous (exceeding $1.3 million but less than $30 million in costs) storm events. For exogenous events (storms in excess of $30 million), the DPU determines the propriety of recovering carrying charges when the Company files for storm cost recovery. If costs are ultimately deemed to be imprudent, the carrying costs accrued on these amounts are refunded to customers. CL&P’s proposal is aligned with the Massachusetts approach, apart from the fact that the Massachusetts design features both exogenous and nonexogenous events to which carrying costs may apply. CL&P proposes to accrue carrying charges at the Prime rate for Storm Reserve-eligible events on the net balance of storm costs, offset by reserve funding in rates, identical to the operation of the Massachusetts mechanism. As discussed in the Company’s response to OCC-522, in establishing a going-forward framework for storm cost recovery, the Company agrees that it would be within PURA’s discretion to strike a balance between the Company’s costs of financing storm costs while ensuring that the Company is not ‘profiting’ on a force majeure event like a storm. This is the Company’s experience in Massachusetts, where the DPU has authorized a carrying charge rate that is different from and generally less than the Company’s WACC, but that still recognizes that the Company is using its longer-term capital resources to finance storm costs (not its shorter term commercial paper source of liquidity). Thus, should PURA implement the SCRAF, which provides for more timely review andPage 20 of 41
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-24 Date Issued October 02, 2026 OCC-905 Page 10 of 14 Category Pre-Staging Costs Massachusetts The Massachusetts Storm Fund does not separately provide for recovery of prestaging costs, nor does it need to because the threshold to access the Storm Fund is lower ($1.3M) and the amounts below the threshold are covered in base rates. CL&P Connecticut Proposal The Company is proposing to establish a level of pre-staging reserve funding in base rates at $4 million per year. Pre-staging events would continue to be defined as events in which the Company has notified PURA of its intent to prestage for an expected weather event, but where that event does not materialize into a catastrophic storm (i.e., total incremental costs do not exceed $5.4 million). Comments recovery of storm and prestaging costs, the Company would accept the Prime rate from the date of cost incurrence, applied to the net balance of the storm fund and pre-staging reserve fund for storms occurring after March, 2025. For storms occurring after 2023 but prior to March, 2025, the Company has requested to apply the WACC as part of this pending proceeding. CL&P’s proposal aligns with PURA’s directive to “aggressively pursue prestaging resources to ensure that sufficient crews are available to respond to restoration events within 48 hours of a potential catastrophic storm.” Decision, April 28, 2021, Docket No. 20-08-03, Investigation into Electric Distribution Companies’ Preparation for and Response to Tropical Storm Isaias at 40.Page 21 of 41
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-24 Date Issued October 02, 2026 OCC-905 Page 11 of 14 Reporting No later than 6 months after the occurrence of a Storm Fund qualifying event, NSTAR must submit a preliminary report providing: (1) a detailed explanation of the storm event; (2) a detailed CL&P proposes an annual filing on September 1st, summary of costs brokendown by cost category; (3) the including the storm costs amount of carrying costs incurred for the prior incurred; and (4) a detailed calendar year and all summary of anticipated supporting documentation. CL&P’s proposal and the additional costs to be incurred Massachusetts model are or finalized, including an PURA would conduct a aligned in terms of the estimated timeframe for the contested proceeding to requirement for a prudence receipt of outstanding cost evaluate the prudence of review conducted by the information or final cost all incremental respective agencies. accounting. catastrophic storm and pre-staging costs, the The key difference is the Thereafter, NSTAR must accumulated reserve frequency of that prudence provide a quarterly update on balances and the potential review. CL&P is proposing the status of finalizing the need for a SCRAF rate a more frequent and accounting of storm costs. change to begin recovery predictable review process, of prudently incurred that would occur annually DPU’s expects NSTAR to costs. and is intended to avoid the petition for recovery of storm accumulation of significant costs, including complete and CL&P proposes to balances of catastrophic final documentation and implement any rate storm and pre-staging costs. supporting testimony, as soon changes on September 1st as practicable after finalizing of the following year, the storm costs, and no later aligning with the than 6 months after such costs Company’s RAM Phase II rate changes on the same are finalized. If NSTAR day. cannot make the filing within the 6-month timeframe, it must file a petition for storm cost recovery as soon as such information (i.e., the complete cost documentation) is complete.Page 22 of 41
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-24 Date Issued October 02, 2026 OCC-905 Page 12 of 14 SCRAF The SCRAF is a reconciling mechanism to adjust rates to recover certain storm-related costs, including: (a) exogenous storm costs incurred on or after February 1, 2018 when the combination of any single storm exceeds $30 million and the balance in the Storm Fund exceeds $75 million and not otherwise recoverable through the Company’s SRAM, (b) the outstanding Storm Fund balance for costs attributable to emergency response occurring from February 1, 2018 through December 31, 2022, including the recovery of Storm Fund-eligible event thresholds as approved by the Department and (c) any prior period balances associated with storm costs approved for recovery by the DPU. The SCRAF is a per kilowatthour factor applicable to all electricity delivered by the Company to its customers under its Distribution Service tariffs. Exogenous storm costs recovered through the SCRAF are amortized over five years plus carrying charges from the date the Company is billed at the prime rate. The SCRAF is a reconciling mechanism to adjust rates to recover (a) any prior period balances associated with catastrophic storm and pre-staging costs found prudent and approved for recovery by the PURA; (b) any storm costs that are not securitized in Docket No. 25-12-13; and (c) the net balance associated with the 14 storms and pre-staging events that occurred during 2024 and in February and March, 2025. Like Massachusetts, the SCRAF is a per kilowatthour factor applicable to all electricity delivered by the Company to its customers under its Distribution Service tariffs. CL&P recommends that PURA should not impose a strict period over which over- or under-recoveries will be collected or refunded, but rather identify the appropriate time period based on the facts and circumstances at the time of the proposed rate change. CL&P proposes a range of As discussed in the Company’s response to OCC-521, ideally base distribution rates would be set to recover the exact amount of storm costs incurred each year, however, because the frequency of storms and magnitude of the impact is indeterminate, storm costs are not susceptible to recovery solely through base rates. Thus, base rate funding paired with the Company’s proposed SCRAF aims to mitigate customer bill impacts amid the myriad factors described in the Company’s application and more broadly throughout the Company’s application that are putting upward pressure on the cost of service and customers’ bills. The function of CL&P’s proposed SCRAF is fundamentally the same as Massachusetts: a reconciling mechanism to adjust rates to recover any prior period balances. For Connecticut, CL&P is proposing additional flexibility, a flexible SCRAF that will allow PURA to adopt periodsPage 23 of 41
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-24 Date Issued October 02, 2026 OCC-905 Page 13 of 14 Category Massachusetts CL&P Connecticut Proposal amortizations for prudent catastrophic storm and pre-staging events should be considered -- from one to five years. This would allow PURA to evaluate the unique circumstances at the time of a proposed rate change to balance the interests of customers and the Company. Comments over which over- or underrecoveries will be collected or refunded, based on the specific facts and circumstances at the time of the proposed rate change. b. The Major Storm Cost Reserve (“MSCR”) in New Hampshire was first established in Docket No. DE 99-099. The Company is allowed to defer costs attributable to qualifying major storm events. Under the terms of the MSCR, a qualifying major storm event is defined as a storm that results in either (1) 10 percent or more of the Company’s retail customers being without power in conjunction with more than 200 reported troubles; or (2) more than 300 reported troubles during the major storm event. Docket No. DE 12-320, Order No. 25,465, at 1 (2013). The MSCR was amended in Docket No. DE 12-320 to allow for recovery of qualifying prestaging costs. Pursuant to the criteria established in Docket No. DE 12-320, pre-staging costs can be recovered through the MSCR if the weather event has a “high” (greater than 60% based on the forecast) probability of reaching “Level 3” or stronger, according to the DTN’s Energy Event Index (EEI). Docket No. DE 12-320, Order No. 25,465, at 4 (2013). A copy of Order No. 25,465 is provided as OCC-905, Attachment 1. Public Service Company of New Hampshire (“PSNH”) accrues a carrying charge on deferred storm costs at a stipulated rate. Docket No. DE 14-238, Settlement Agreement, Page 15, Section F Storm Funding. The annual funding for the MSCR was most recently updated in Docket No. DE 24-070 to allow the Company to collect $19 million in base rates on an annual basis. Docket No. DE 24-070, Order No. 28,170 (July 25, 2025), at 68. A copy of Order No. 28,170 is provided as OCC-905, Attachment 2. The Company’s Regulatory Reconciliation Adjustment (RRA) rate mechanism is the vehicle for the amortization of major Storm Costs in excess of the amount approved in base rates (through the MSCR), if approved by the New Hampshire Commission in a Storm Cost review proceeding. Docket No. DE 24-070, Order No. 28,170 (July 25, 2025), at 60-61. The Company’s current electric delivery tariff (NHPUC NO. 11) is provided as OCC-905, Attachment 4. On page 22, the tariff specifies that RRA reconciles unrecovered storm costs in excess of the Major Storm Cost Reserve per Order No. 28,170 in DE 24-070.Page 24 of 41
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-24 Date Issued October 02, 2026 OCC-905 Page 14 of 14 A key distinction between the recovery mechanisms is the threshold for accessing catastrophic storm cost deferral treatment. In this proceeding, the Company proposes a $5.4 million cost threshold, whereas New Hampshire uses a threshold based on the number of reported troubles for major storms and the probability of the storm reaching “Level 3” or higher for prestaging events. CL&P has not proposed to use trouble spots as the threshold for reserve access because, while the number of troubles is an informative data point, it does not reliably indicate the required response or the associated costs. Two storms with the same number of trouble spots can demand vastly different resources. For example, a trouble might be a (1) broken pole or (2) a tree limb on a line. Both of those trouble spots count equally, yet a broken pole typically requires multiple crews, equipment, and extended restoration time, whereas a tree limb may need only a single crew and minimal time. As such, the number of trouble spots, by itself, does not necessarily reflect the scale or cost of the response needed. To further illustrate, a broken pole can require up to 12 hours to set and requires a tree crew, line crew, delivery of a new pole, digging the hole, setting the pole, installing equipment on the pole, transferring the power lines and any attachments to the new pole, and then restoring service. Frequently, such events also damage adjacent wires, poles, and equipment, further extending the restoration time. By comparison, a trouble caused by a limb on a line usually requires just one line crew, who can remove the limb, patrol the line for any additional damage, and restore service within one to two hours. Despite these significant differences in resources and time, both scenarios are counted as a single trouble event. This disparity underscores why a cost threshold provides a more accurate measure for deferral treatment eligibility than simply counting trouble spots. For pre-staging events, the Company proposes to define these as events as situations where PURA is notified of the Company’s intent to pre-stage for an anticipated weather event, but the event ultimately does not materialize into a catastrophic storm (i.e., total incremental costs remain below $5.4 million). The Company does not recommend adopting New Hampshire’s probability-based measure, because it does not offer a clearer or more objective threshold than the cost-based approach proposed here. The central goal of pre-staging is to minimize outages and protect public safety. PURA has directed CL&P to “aggressively pursue pre-staging resources to ensure that sufficient crews are available to respond to restoration events within 48 hours of a potential catastrophic storm.” Decision, April 28, 2021, Docket No. 20-08-03, Investigation into Electric Distribution Companies’ Preparation for and Response to Tropical Storm Isaias at 40. The Company’s pre-staging proposal is designed to comply with this directive.Page 25 of 41
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-24 Date Issued October 02, 2026 OCC-906 Page 1 of 10 Date Filed: October 20, 2026 Witness: Douglas P. Horton Request from: Office of Consumer Counsel Question: (Storm Cost Recovery) In 21-05-15RE01 - ES Comments on Revised Straw Proposal, page 44, the Company calculated the impact of setting the catastrophic storm cost materiality threshold equivalent to 1% of the Company’s authorized annual base distribution revenue requirement for 2024. Please conduct a similar analysis, using the Company's proposed test year revenue requirement in this proceeding to calculate the resulting catastrophic storm cost materiality threshold using 1% of 2025 test year distribution revenue. a. What is the dollar amount equivalent of the 1% materiality threshold for the 2025 test year? b. What is the average count of non-catastrophic storms per year using (a) as the threshold for the last four years (2023-2025)? c. Using (a), what would the average annual cost of non-catastrophic storm have been over the last four-year period? What is the standard deviation? d. Provide an updated version of the table “Number of Storms Incurred” on page 45 of 21-0515RE01 - ES Comments on Revised Straw Proposal using the Company’s proposed threshold of $5.4 million and (a) for the last four years. e. Provide an updated version of the table “Annual Non-Catastrophic Storm Costs” on page 46 of 21-05-15RE01 - ES Comments on Revised Straw Proposal using the Company’s proposed threshold of $5.4 million and (a) for the last four years. f. Provide a similar table as (e) for annual catastrophic storms using the Company’s proposed threshold of $5.4 million and (a) for the last four years. g. Please provide an updated calculation of the base distribution rates that would be necessary for non-catastrophic storms in the 2025 test year if the 1% materiality threshold from (a) was used. Explain the Company’s rationale for the amount suggested. What is the percent change change from the current base rates proposed for non-catastrophic storms? h. Discuss whether an increase, decrease, or no change in base distribution rates for catastrophic storms (i.e., catastrophic storm reserves of $60M) would be needed if (a) were used in this proceeding. Explain the Company’s rationale. Response: As an initial matter, the Company opposes any setting of the storm threshold based on an arbitrary percentage of operating revenues, whether calculated based on 2025 test year revenues, or any other operating year. The purpose of the threshold is to determine the appropriate recovery of storm costs, whether in base rates as a “minor” or routine event, or through a storm reserve and/orPage 26 of 41
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-24 Date Issued October 02, 2026 OCC-906 Page 2 of 10 reconciling mechanism that functions outside of base rates for unpredictable and non-routine weather events. Setting the threshold based on an arbitrary percentage of operating revenues will set the threshold too high for customers to cover in base rates and will potentially create a recovery gap, where costs are not represented either in base rates or in a catastrophic storm mechanism. PURA cannot establish ratemaking mechanisms that block costs from consideration under Conn. Gen. Stat. § 16-19e, which is what this approach is fundamentally aimed at doing. The Company raised these same concerns in comments filed on March 26, 2025, in Docket No. 21-05-15RE01, regarding PURA’s Revised Straw Proposal issued February 27, 2025. As noted in the comments, the materiality threshold for exogenous events cannot reasonably serve as the threshold applicable to catastrophic storm costs. PURA’s own analysis of the Z-Factor materiality threshold provides, “[t]he Authority’s materiality recommendation (e.g., 1%) ensures that exogenous events, for both regulatory assets and liabilities, are meaningful enough to be uncommon, while small enough to prevent the need for the impact, on its own, to require an offramp.” Revised Straw Proposal at 30. PURA concluded in the Revised Straw Proposal that storms in Connecticut “occur more regularly than the exogenous events intended to be captured by the Z-Factor; therefore, these costs merit separate cost recovery treatment.” Revised Straw Proposal at 32. The Company is obligated by law to restore power quickly and efficiently or be subject to significant financial penalties. This reflects a statewide policy that power outages and blocked roads must be addressed quickly and efficiently. To that end, larger weather events causing the condition that the law expects to be addressed by the Company quickly and efficiently are not unexpected or infrequent. In fact, these conditions are certain to occur and it is only the magnitude and frequency of those weather events that are unknown. Establishing a reasonable threshold for qualifying catastrophic storm cost recovery treatment is a necessity to give effect to the policies embodied in state law as protection for customers, municipalities and state operations. Setting an arbitrary threshold at a random 1 percent of operating revenue does not meet these requirements. A high threshold increases risk for customers for two reasons. First, it takes the storm event out of a mechanism where storm performance and cost incurrence will be scrutinized on an individual basis. Second, it requires a corresponding increase to base rates in order to establish a representative level of non-catastrophic storm activity that is recoverable through base rates. PURA does not have legal authority to create a gap where storm costs are ineligible for recovery because base rates are not set to recover adequate storm costs on a “representative” basis and there is no opportunity to present the costs for a prudence review through a storm mechanism. Therefore, where the threshold serves as the dividing line, the higher the threshold, the greater the risk that customers are paying more than they should for storm events. In considering the risks of over-recovery for customers or under-recovery for the Company, there is no methodological basis to conclude that 1% of distribution revenues is an appropriate percentage to determine a storm is “catastrophic” for ratemaking purposes. The threshold in