Discovery Compilations (ALLCO Set 11, CLF-SC Set 3, OCC Set 24).
Files4
Docket No. 26-05-10 Discovery Compilations October 22 2026.pdf
PDF · 155 KB · 1 pageText searchable
Download Docket No. 26-05-10 Discovery Compilations October 22 2026.pdfRead the text of Docket No. 26-05-10 Discovery Compilations October 22 2026.pdf
ALLCO Set 11_COMBINED.pdf
PDF · 1.2 MB · 99 pagesText searchable
Download ALLCO Set 11_COMBINED.pdfRead the text of ALLCO Set 11_COMBINED.pdf
CLF-SC Set 3_COMBINED.pdf
PDF · 390 KB · 16 pagesText searchable
Download CLF-SC Set 3_COMBINED.pdfRead the text of CLF-SC Set 3_COMBINED.pdf
OCC Set 24_COMBINED.pdf
PDF · 503 KB · 41 pagesText searchable
Download OCC Set 24_COMBINED.pdfRead the text of OCC Set 24_COMBINED.pdf
Page 32 of 41
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-24 Date Issued October 02, 2026 OCC-906 Page 8 of 10 • • • • • • • • • • • • • • iii COMMODITY GROUP (UNSPSC) (PO LINE) COMMODITY (UNSPSC) (PO LINE) LINE COST (PO LINE) COMMODITY DESCRIPTION (PO LINE) TAX CODE (PO LINE) TAX VALUE (PO LINE) REMAINING CONTINGENCY AMOUNT (PO LINE) ENTER DATE (PO LINE) REQUESTED BY (PO LINE) REQUIRED DELIVERY DATE (PO LINE) ENTER BY (PO LINE) VENDER COMMENT (PO LINE) SUPPLIER COMMIT DATE (PO LINE) GENERAL LEDGER DEBIT ACCT (PO LINE) EOE-134 Question: (2Q-4Q25 CATASTROPHIC STORM EVENTS) Discuss the impact that would result with respect to the Company’s revenue requirements (i.e., for a proposed rate year) if a catastrophic storm event occurred during the test year (i.e., 2025) but the underlying costs were not deferred as permitted. Specifically explain if the revenue requirements could be overstated based on the higher O&M expenses for the test year. EOE-134 Response: The ratemaking framework for storm events revolves around the central point of this question, which is that the incremental operating and maintenance (“O&M”) expenses caused by larger, more sporadic weather events need to be excluded from base rates so that the recurring base rates that customers pay do not include the large, “one-time” costs that are non-recurring and cannot be captured as a “representative” cost for the Rate Year revenue requirement. The method by which storm events are classified as catastrophic, non-catastrophic or pre-staging events – and the ratemaking treatment for each category of weather event – are important regulatory decisions to assure that (1) customers are not paying for storm costs that are not incurred in relation to actual storm events; and (2) actual, prudently incurred storm costs have a path for recovery consistent with law and appropriate ratemaking policy. Without an appropriate mechanism for recovery of costs outside of base rates (or in base rates as an after-the-fact amortization), there is a high likelihood that customers would either pay too much storm costs, or that the Company will not have a fair and reasonable opportunity to recover its prudently incurred costs. For example, given the Company’s historical experience, PURA would have to include an amount in the range of $150 million annually to cover the costs of storm restoration for major weather events, which is a significant amount of money for customers to pay in base rates without specific knowledge or expectations about when, or to what extent, the actual underlying costs would be incurred. Moreover, if included in base rates as a normally recurring cost item rather than deferred to a regulatory asset, no prudence review would be applicable after setting that amount in base rates, which does not make sense for storm costs. Accordingly, as identified by the question, an increase to base distribution rates of $150 million would likely mean that the resulting revenue requirement would be overstated or understated in future years, even though the amount imputed into base rates would be informed by actual historical storm data and would attempt to impute a level of costs into rates that would reflect the expected costs in future years. Thus, even at the level of $150 million included in base rates, PURA would need to provide for a deferral mechanism because storms are completely unique in nature andPage 33 of 41
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-24 Date Issued October 02, 2026 OCC-906 Page 9 of 10 severity and any amount built into base rates would require adjustment based on actual circumstances. For example, Storm Isaias in 2020 and Storm Henri in 2021 were each approximately $150M or more in costs by themselves, so that even an allowance of that magnitude in rates would not be sufficient to cover the costs that were actually incurred. Please refer to the Company’s response to OCC-055i, which states that the Company’s proposals for base distribution rate funding for non-catastrophic storm/non pre-staging events, catastrophic storms and pre-staging events are based on a catastrophic storm threshold of $5.4 million, calculated by escalating the prior authorized threshold of $4 million using the GDP-PI from 2018 through the Rate Year. Importantly, if the $5.4 million threshold proposed by the Company is modified in this proceeding, the historical level of storm activity would need to be re-evaluated as well to determine if a level of reserve funding in base rates different than what the company has proposed is necessary. In addition, if the $5.4 million threshold is adjusted in this proceeding, the base level of non-catastrophic expense in base rates likewise need to be adjusted. Lastly, although it may be counterintuitive, maintaining a reasonable threshold for the major storm reserve is the best approach for customers because the Company’s base distribution revenue requirement would then, consequently, have a lower amount of non-catastrophic storm/non pre-staging event costs incorporated into it and customers would pay only for those costs that actually occur, at the time those costs occur, reducing the risk to both customers and the Company as more costs would be funded at exactly the amount that’s deemed prudent by PURA, no more and no less. iv OCC-434 Question: Exhibit CLP-ELP-1 Please compare the Company's proposed $5.4 million threshold for catastrophic storm cost deferral treatment to a threshold equal to 1% of the Company's authorized distribution revenue requirement, as contemplated in the Docket No. 21-05-15RE01 Proposed Final Decision. Please quantify the dollar amount represented by a 1% threshold using the Company's proposed revenue requirement and explain why the Company believes the proposed $5.4 million threshold is more appropriate than a materiality threshold of 1% of the Company’s revenue requirement. OCC-434 Response: The Company’s written comments submitted in Docket No. 21-05-15RE01 on March 26, 2025, at pages 42-49, provided a comprehensive discussion as to why it is ill advised to establish a 1% threshold for catastrophic storm cost deferral. There, the Company explained that: The tables above also demonstrate the relationship between the catastrophic storm threshold level and the level of non-catastrophic storm costs that must be established in base distribution rates. This is because base rates must reflect a representative level of expenses so that the utility has an opportunity, but not a guarantee, to cover its costs of service in any given year. Base rates therefore must be set to reflect a representative level of expenses for storms that do not qualify for deferred treatment as a catastrophic (or pre-staging) storm event. The table above demonstrates that, if the catastrophic storm threshold is held at current levels, base rates would be set at a lower level if using any measure (i.e., any individual test year, the average of all years, the maximum, or the minimum) than if the threshold is increased as contemplated by the straw proposal. To illustrate the point, if 2024 were used as the test year, base rates would be set to include approximately $30 million in non-catastrophic storm costs if the threshold were maintained at its current level, whereas base rates would have to be set $73 million higher if the threshold is increased to the level contemplated by the Revised Straw Proposal (to reflect $103 million in non-catastrophic storm activity). The same analysis holds if using the average of the four prior years, or if using anyPage 34 of 41
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-24 Date Issued October 02, 2026 OCC-906 Page 10 of 10 one of the years shown in the table. Moreover, the volatility and risk of over or under recovery to both customers and the companies is exacerbated with a higher threshold. For instance, if the level of non-catastrophic storms is increased as contemplated by the Revised Straw Proposal and PURA establishes the level of non-catastrophic storm costs in base rates at the 4 year average of $78 million, the standard deviation of $18 million indicates that the swing from year to year would be significant, causing a potential annual $18 million “over recovery” or “under recovery”, depending on the frequency and magnitude of storms below the threshold as compared to the $78 million established in base rates. Whereas with the current threshold, that standard deviation is significantly lower, ensuring that customer rates remain more closer aligned with actual and expected storm expenses. Docket No. 21-05-15RE01, Eversource, March 26, 2025 Written Comments at 47-48. In this case, a 1% threshold based on the Company’s proposed authorized distribution revenue requirement equates to $19,219,230, compared to a threshold of $5.4 million proposed in this application (refer to Docket No. 26-05-10, Exhibit CLP-REVREQ-2, WP C-3.26). While the dollar values in this proceeding differ from the dollar values presented in Docket No. 21-05-15RE01, the concerns remain the same. Although PURA has broad ratemaking discretion, PURA cannot simply decide to cut costs out of the equation for recovery, particularly incremental storm costs. Pursuant to Conn. Gen. Stat. § 16-19e(a)(4) and (5), the Company at least has the opportunity to prove that its costs were prudently and efficiently incurred. As a result, if not included in the storm-cost recovery framework, the costs have to be accounted for in base rates. The ratemaking framework is an important component for classifying storm events as catastrophic, noncatastrophic or pre-staging. The method by which storm events are classified and the ratemaking treatment for each weather event are important regulatory decisions to ensure that (1) customers are not paying for storm costs that are not incurred in relation to actual storm events; and (2) actual, prudently incurred costs have a path for recovery consistent with law and appropriate ratemaking policy. Without an appropriate mechanism for recovery of costs outside of base distribution rates, there is a high likelihood that customers would either pay too much for storm costs, or that the Company will not have a fair and reasonable opportunity to recover its prudently incurred costs. Please refer to the Company’s response in EOE-134i, for additional discussion on the impact of storm events on the proposed revenue requirement. Using 1% of the Company’s proposed authorized distribution revenue requirement as the catastrophic storm threshold, the five-year average annual non-catastrophic expenses would be $117.1 million in 2028 dollars, which represents a $75 million increase as compared to the Company’s proposed non-catastrophic storm funding of $42 million. Therefore, as stated in the Company’s response to OCC-055ii, if the $5.4 million threshold is modified in this proceeding, the historical level of storm activity should be re-evaluated as well to determine if a level of reserve funding, both catastrophic and pre-staging, in base rates different than what the company has proposed is necessary. In addition, if the $5.4 million threshold is adjusted in this proceeding, the base level of non-catastrophic expense in base rates would likewise need to be adjusted. Further, a reasonable threshold for major storm events will enhance PURA’s regulatory oversight for future major storm events as proposed in the Company’s SCRAF initiative.Page 35 of 41
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-24 Date Issued October 02, 2026 OCC-907 Page 1 of 1 Date Filed: October 19, 2026 Witness: Donald J. Scacco Jr., Christopher E. Colorio, Mark P. Baldwin, John G. Griffin and Leanne M. Landry Request from: Office of Consumer Counsel Question: (Storm Cost Recovery) For each calendar year from 2018 through 2025, please identify by ERP event level (Level 1 through 5, and events with no declared ERP level) the number of weather events declared under the Company's Emergency Response Plan, and the average total incremental cost of events within each ERP level, for each year. Response: For this question, the Company is interpreting the request to show “events with no declared ERP level” to be non-catastrophic events or “minor” events, for which the Company does not defer to the Storm Reserve. Please refer to the table below, for a summary of Storm Work Orders associated with Catastrophic Storms, submitted for recovery in Docket No. 25-12-13 and Docket No. 26-05-10, as well as the Work Orders associated with minor weather events occurring in the years 2018-2025.Page 36 of 41
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-24 Date Issued October 02, 2026 OCC-908 Page 1 of 2 `Date Filed: October 16, 2026 Witness: Christopher E. Colorio, Mark P. Baldwin, John G. Griffin and Leanne M. Landry Request from: Office of Consumer Counsel Question: (Storm Cost Recovery) In Exhibit CLP-STORM-1, page 82, the Company states: “[T]he proportion of direct internal labor costs has increased, while the proportion of external labor costs has decreased.”, but in the same document, page 39, the Company also states: “[I]n most events, the Company now relies more heavily on external crews obtained through direct outreach to local, regional, and national contractors.” Please explain the inconsistency. In your response, please provide, for the 2024-2025 Storm Events compared with the 2018-2023 Storm Events: a. the percentage of total labor cost that was internal versus external in each period; and b. within the external-crew category only, the percentage that was mutual aid versus independent contractors in each period. Response: a. These two statements address different analytical points, and both are correct. With respect to the statement that the “proportion of direct internal labor costs has increased, while the proportion of external labor costs has decreased,” this refers to the breakdown of total storm costs into categories for the initial filing in this docket (Exhibit CLP-STORM-1, at 81), as compared to the breakdown of costs for the 2018-2023 Storms. As shown by the cost breakdowns for each grouping of storms, below, the percentage of total costs has increased for internal line crews and decreased for external line crews, as follows: Storm Interval Internal Crew Costs as a Percent of Total 2018-2023 Storms #1 2018-2023 Storms #2 6% 6% External Crew Costs as a Percent of Total 66% 72% 2018-2023 Storms #3 7% 69% 2024-2025 Storms 15% 58% Source Docket No. 24-03-40, Exh. ES-ACCT-1, at 11 Docket No. 24-03-40, Exh. ES-ACCT-1 (Supp), at 11 Docket 24-03-40, Exh. ES-ACCT-1 (Supp 2), at 13 Exh. CLP-STORM-1, at 81Page 37 of 41
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-24 Date Issued October 02, 2026 OCC-908 Page 2 of 2 Note that, in each of the referenced exhibits, the cost breakdowns are showing the proportional share of the categories of costs incurred. This means that the proportion of costs associated with internal and external line crews will change simply if other proportions change. In other words, these are not the only two percentages that have changed between storm intervals. Still, the analysis indicates that – out of the total costs, the proportion of total cost attributable to external line crews is reduced and the proportion of internal line crew costs is increasing by a modest margin, consistent with the fact that the Company has more internal crews available to it in 2024-2025 than it did in the 2018-2023 interval. In addition to increased utilization of internal crews, other cost drivers are contributing to the reduction in the proportion of external crew costs – it is not a one-for-one trade-off of external to internal crews. With respect to the statement that the Company now relies “more heavily on external crews obtained through direct outreach to local, regional, and national contractors,” this refers to the Company’s lesser use of dock crews on the system for execution of the Company’s blue-sky capital plan work. Because the Company is routinely relying on internal crews for a greater proportion of the blue-sky capital work, the Company does not have ready, locked-in access to as great a complement of dock crews in the pre-staging phase of an ERP event, causing the Company to have to reach out to further distances at the time of a storm event (depending on the circumstances of the event). b. Mutual Aid is a term that refers to support from non-Eversource utility companies. Please refer to Table 2, below, detailing the percentage of Mutual Aid versus Independent Contractors used in the two storm intervals. Over the most recent time interval, the Company utilized a greater percentage of independent contractors and lesser amount of utility-based Mutual Aid crews, due primarily to the nature of the events that the Company had to manage in 2024 and 2025. Mutual Aid crews do not typically become available to the Company until the later stages of an extended restoration because utility crews first serve their own systems and do not become available to the Company until the later stages of an extended event when work on their own system is complete. For the events that occurred in 2024-2025, the Company did not generally encounter circumstances where Mutual Aid could be of assistance. Table 2 Period 2018-2023 2024-2025 Mutual Aid 4.08% 0.35% Independent Contractors 95.92% 99.65%Page 38 of 41
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-24 Date Issued October 02, 2026 OCC-909 Page 1 of 3 Date Filed: October 16, 2026 Witness: Christopher E. Colorio and Mark P. Baldwin Request from: Office of Consumer Counsel Question: (Storm Cost Recovery) Of the $157 million in total costs, external line and tree crews represent 68 percent (Exhibit CLP-STORM-1 page 81). Please provide the Company's analysis of whether greater use of internal or affiliated resources, rather than non-affiliated contractors or mutual aid, was feasible for any of the events, and the basis for the resource mix actually chosen. In your response, a. please describe, for each storm event, the process and personnel responsible for deciding to request mutual aid versus independent contractor crews, and the comparative cost of each option at the time the decision was made, b. please provide all after-action reports for each storm event, including any internal criticism of restoration timing, crew sizing, or cost control. Response: a. The Company follows the same analytical path for each storm event, whether the storm ultimately is categorized as a non-catastrophic or catastrophic. Specifically, when a weather system is approaching the Company’s service area, the Company will analyze the weather forecast to determine whether the Company’s own resources are likely to be able to handle the contemplated damage and associated outages, or whether it is advisable to pre-stage resources. If it is determined that external crews are needed in advance of the weather onset to the system, the Company identifies a quantity of resources to procure, based on a number of factors including the number of internal resources that are available, anticipated storm conditions, the expected regional impact, and several other factors. The Company then proceeds through a protocol starting with local dock crews (crews with blue-sky work on the system), then local independent contractors, then the Company’s affiliate crews from other states (not always available where weather events are commonly experienced), then contractors from outside the state, moving from shorter distances to longer distances for crew mobilization. The Company’s Emergency Response Plan delegates emergency response authority to the Incident Commander, who maintains communication with the President and executive leadership of Eversource Energy. Through the course of this tiered approach, the Company incorporates information on contractor availability, mobilizationPage 39 of 41
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-24 Date Issued October 02, 2026 OCC-909 Page 2 of 3 timelines, existing contractual arrangements and cost. Contractors are generally engaged in accordance with this tiered approach before seeking further assistance. If restoration requirements exceed the capacity of available on-system and contracted resources, the Incident Commander may request assistance through the Mutual Aid network. Mutual Aid resources are utilized when available and additional qualified personnel are necessary to support restoration objectives and are available from participating utilities. The question asks whether greater use of internal or affiliated resources, rather than nonaffiliated contractors or mutual aid, was feasible for any of the events. Please note that, for all events, the Company’s process utilizes any and all available internal resources first, eliminating the possibility the there was a “feasible” opportunity to utilize a greater number of internal crew resources. Similarly, once the Company decides that it needs to bring external crews in, the decision point largely rests on proximity. In terms of cost, the differentiating factor is primarily one of distance, given that the hourly crew rates all fall within a relatively narrow range. In this regard, there is no certain “type” of crew that is more or less expensive – it is all a matter of distance. At the same time, cost is not the only – or even primary – driver of crew decision in the face of an oncoming weather system. Cost is considered as part of the contractor sourcing process, however, the primary objective is to ensure sufficient qualified resources are available to restore service as quickly and safely as possible. b. Please refer to the Company’s responses to interrogatories OCC-551 i and OCC-552 ii. Prior Referenced Responses: i OCC-551 Question: For each storm event, please provide the lessons-learned action tracker and show how completed actions changed later event plans or procedures and how their effectiveness was verified. OCC-551 Response: The Company conducts lessons learned exercises for larger events focused on managerial and operational processes and actively pursues opportunities for improvement following every ERP event. Items developed from a formal After Action Review are tracked in an Improvement Plan. Initiatives that the Company has identified through these efforts include but are not limited to initiatives for development of a Pole Setting Branch, cost tracking, contractor hiring processes, and invoice review processes. The effectiveness of these improvements is verified through routine training and exercises. Please refer to the Company’s response to interrogatory OCC-552i confirming that none of the storms included in the application met the requirements for an After Action Report under the standards set forth in PURA Doc. No. 12-06-09, PURA Establishment of Performance Standards for Electric and Gas Companies, Final Decision, Appendix A, Section 3.7 After Action Report. ii OCC-552 Question:Page 40 of 41
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-24 Date Issued October 02, 2026 OCC-909 Page 3 of 3 For each storm event, please provide the after-action reports and each post-event comparison of forecasts, resources, restoration performance and cost, including the management review and resulting corrective actions. OCC-552 Response: None of the storms included in the application met the requirements for an After-Action Report under the standards set forth in PURA Docket No. 12-06-09, PURA Establishment of Performance Standards for Electric and Gas Companies, Final Decision, Appendix A, Section 3.7 After-Action Report. PURA Doc. No. 12-06-09, Appendix A, Section 1 Purpose and Applicability states: The purpose of these standards is to ensure that the electric distribution companies (EDCs) are prepared for emergencies and disasters in order to minimize damage and inconvenience to the public which may occur as a result of electric system failures, major outages, or hazards posed by damage to electric distribution facilities. These standards apply to any Emergency Event, which is defined as electric service interruptions involving 10% or more of the EDC’s total number of customers who are out for a period of 48 consecutive hours or more…” Please refer to Exhibit CLP-STORM-IMT-2 for storm-by-storm breakdown of costs and outage data.Page 41 of 41
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-24 Date Issued October 02, 2026 OCC-910 Page 1 of 1 Date Filed: October 16, 2026 Witness: Leanne M. Landry and John G. Griffin Request from: Office of Consumer Counsel Question: (Storm Cost Recovery) Please explain the "refinements to capitalization practices" referenced as a driver of the shift toward internal labor costs in the 2024-2025 events compared to 20182023 (CLP-STORM-1, page 82), and quantify the dollar impact of this change on the amount sought for expense recovery versus capitalization. Response: Refer to EOE-029 i for an explanation of the “refinements to capitalization practices”. Prior Referenced Response: EOE-029 Question: (CAPITALIZATION) Refer to Exhibit CLP-STORM-1, p. 82. The Company’s PFT references a shift in the 20242025 costs as driven by “refinements to capitalization practices.” Explain the specific improvements and provide supporting documentation and calculations, if applicable. i EOE-029 Response: For the reasons explained in EOE-028i, the references to “capitalization practices” and “improvements in the Frontier Settlement billing process” are inadvertently out of place in this statement in the testimony. i It is correct that the Company endeavors to maintain its capitalization method in a manner that correctly reflects cost accounting principles and to refine that process when there is opportunity to do so. For example, hourly labor rates are updated annually based on the contractual hourly wage changes for the represented workforce. Contractor rates are also reviewed periodically and adjusted, when applicable. The unit estimates are also reviewed periodically to ensure they are in line with current engineering design estimates. Additionally, in 2024, the Company implemented a Robotic Process Automation (RPA) to automate the monthly capitalization process. This process was time-consuming and involved running several queries from the General Ledger and combining them all in the Microsoft Excel model. The output of this automated process is checked and reviewed by financial analysts but many of the heavy, time-consuming steps are performed by the RPA.
As listed on the current system
Corres. 10/22/2026 [26-05-10] (Keegan Werlin LLP) - Discovery Compilations (ALLCO Set 11, CLF-SC Set 3, OCC Set 24).