Discovery Compilations (ALLCO Set 11, CLF-SC Set 3, OCC Set 24).
Files4
Docket No. 26-05-10 Discovery Compilations October 22 2026.pdf
PDF · 155 KB · 1 pageText searchable
Download Docket No. 26-05-10 Discovery Compilations October 22 2026.pdfRead the text of Docket No. 26-05-10 Discovery Compilations October 22 2026.pdf
ALLCO Set 11_COMBINED.pdf
PDF · 1.2 MB · 99 pagesText searchable
Download ALLCO Set 11_COMBINED.pdfRead the text of ALLCO Set 11_COMBINED.pdf
CLF-SC Set 3_COMBINED.pdf
PDF · 390 KB · 16 pagesText searchable
Download CLF-SC Set 3_COMBINED.pdfRead the text of CLF-SC Set 3_COMBINED.pdf
OCC Set 24_COMBINED.pdf
PDF · 503 KB · 41 pagesText searchable
Download OCC Set 24_COMBINED.pdfRead the text of OCC Set 24_COMBINED.pdf
Page 6 of 41
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-24 Date Issued October 02, 2026 OCC-902 Page 2 of 3 a. Additional Criteria The Company did not recommend a MED-based criterion because the MED designation is based on system reliability performance rather than restoration cost for outages caused by operating circumstances not recognized by MED. Under the IEEE 2.5 Beta methodology, the MED threshold changes over time based on historical reliability performance. As the Company continues to invest in automation, sectionalizing, and other reliability improvements, outage impacts measured through SAIDI may decrease even though the underlying damage and restoration effort remain substantial. Consequently, the use of an MED threshold could produce the unintended result that a storm requiring significant incremental restoration resources, including external crews and their associated costs, would be ineligible for a prudence review under the SCRAF simply because customer outage impacts were reduced through prior reliability investments, even in situations where the costs were incremental and prudently incurred in accordance with the PURA approved ERP. Similarly, a minimum customer interruption threshold is not an appropriate criterion because restoration costs are driven by the nature and extent of system damage rather than solely by the number of customers affected. For example, a fault on a heavily automated circuit may affect fewer customers than a similar event on a circuit without such automation, or on the same circuit in prior years prior to installation of automation, while still requiring the same field resources, equipment, and repair activities to restore service. As system automation expands, the relationship between customer interruptions and restoration costs becomes increasingly disconnected, even in situations where the costs are still determined to be incremental and prudently incurred. Also, a major component of storm response is the clearing of blocked roads and other public-safety necessities, which are not reflected in customer outages. Similarly, a fixed ERP tier would similarly not be an appropriate criterion because ERP classifications are operational tools used to manage Company resources and may be influenced by factors such as forecast uncertainty, geographic scope, and restoration complexity. ERP levels are not designed to determine whether costs are incremental to normal operations or suitable for regulatory cost recovery. Accordingly, the primary indicator of whether an event exceeds normal operating conditions and should be eligible for recovery under the SCRAF is the magnitude of incremental restoration costs, which is a function of external crew utilization. Catastrophic storm costs are impossible to predict with accuracy and are therefore not possible to reflect in rates on a representative level. Moreover, incremental costs may still be prudently incurred in accordance with the ERP even if the triggers discussed in this response are not met, and therefore cost should be the determining factor of SCRAF cost recovery eligibility rather than another measure.Page 7 of 41
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-24 Date Issued October 02, 2026 OCC-902 Page 3 of 3 b. Implications of Adopting Additional Criteria If eligibility for SCRAF recovery were conditioned on an MED designation, customer interruption count, or ERP tier, the Company would need to evaluate how those requirements could affect restoration planning and resource deployment decisions. For example, an MED or customer-count criterion could create a situation where investments that reduce outage impacts also reduce the likelihood that an event qualifies for recovery, even when restoration costs remain substantial. This could create a disconnect between reliability objectives and cost recovery mechanisms. The Company's objective during storm response is to restore customers as quickly and safely as possible, and cost recovery criteria should not eliminate the potential for cost recovery without a prudence review. Likewise, if a specific ERP tier were required, the Company would need to consider the interaction between operational activation decisions and regulatory recovery treatment. The Company's ERP classifications are intended to support safe and effective storm response and should remain focused on operational needs rather than cost recovery outcomes. c. Alternative Objective Criteria If an additional objective criterion were required, the Company would be more comfortable with a criterion tied to the need for external restoration resources. In the Company's view, the clearest indication that an event exceeds normal operating conditions is that internal resources are insufficient and external mutual assistance or contract crews must be mobilized to support restoration efforts. In essence, evaluating the need for additional crew assistance encompasses concerns relating to both customer outages and public-safety demands. The need for external resources reflects the scale and complexity of the event and is directly related to the incremental costs the SCRAF is intended to address. Unlike MED designations or customer interruption thresholds, which are based primarily on outage outcomes, the use of external resources is more closely aligned with the underlying restoration effort and associated incremental costs. In addition, the Company is often required to procure crews in advance of a weather event, based on forecasted information which may or may not materialize as expected. The incremental costs associated with those events should still be eligible for recovery, based on a prudence review and determination by PURA, even if the weather does not materialize as forecast, meaning that designated MED or customer interruption thresholds are not triggered.Page 8 of 41
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-24 Date Issued October 02, 2026 OCC-903 Page 1 of 2 Date Filed: October 16, 2026 Witness: Donald J. Scacco Jr., Christopher E. Colorio, Mark P. Baldwin, John G. Griffin and Leanne M. Landry Request from: Office of Consumer Counsel Question: (Storm costs) Please provide an excel workbook with all of the following data points for each of the 14 catastrophic storm events in the 2025-2025 period the Company is seeking recovery for in this proceeding, as well as all the catastrophic storm events that were authorized for recovery in Docket 25-12-13 for the 2018-2023 time period: a. Did the storm qualify as a Major Event Day designation under the IEEE Major Event Day methodology (2.5 Beta Method)? (yes or no) b. What was the corresponding ERP level (Level 1-5) for each storm event as outlined in the Company’s Emergency Response Plan? c. What was the count of customers whose service was interrupted by the storm event? d. Would the storm have met the 1% materiality threshold as calculated in OCC-6(a) (yes or no)? e. The total cost of each storm event. Response: The Company calculates the annual IEEE 1366 TMED (Threshold Major Event Day) value in accordance with the methodology prescribed by IEEE Std. 1366. The annual TMED threshold values for the 2018-2025 period are presented in the table below. A calendar day is classified as an IEEE Major Event Day (MED) if the daily SAIDI exceeds the applicable annual TMED threshold for that year. Historical TMED Thresholds YEAR 2018 2019 2020 2021 2022 2023 2024 2025 TMED Threshold 2.4653 2.8369 3.0301 4.0733 4.0468 3.9719 3.3314 3.1844Page 9 of 41
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-24 Date Issued October 02, 2026 OCC-903 Page 2 of 2 Please refer to OCC-903, Attachment 1, for a listing of storm events along with the requested data.Page 10 of 41
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-24 Date Issued October 02, 2026 OCC-904 Page 1 of 1 Date Filed: October 16, 2026 Witness: Donald J. Scacco Jr., Christopher E. Colorio, Mark P. Baldwin, John G. Griffin and Leanne M. Landry Request from: Office of Consumer Counsel Question: (Storm Cost Recovery) Please state what proportion of the catastrophic storms for which the Company is seeking recovery of costs in this proceeding were classified as Major Event Days under the IEEE Major Event Days methodology (2.5 Beta Method). In your response, provide all assumptions, calculations, and workpapers to support the following calculations: a. Provide the cost of each storm event and the average cost of all catastrophic storm events that are classified as Major Event Days, b. provide the cost of each storm event and the average cost of all the catastrophic storms that are not classified as Major Event Days. Response: Please refer to OCC-904, Attachment 1, for the requested information.Page 11 of 41
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-24 Date Issued October 02, 2026 OCC-905 Page 1 of 14 Date Filed: October 21, 2026 Witness: Douglas P. Horton Request from: Office of Consumer Counsel Question: (SCRAF Mechanism) In CLP-ELP-1, page 155, the Company cites the Massachusetts storm cost mechanism as a model. a. Please identify every material difference between the Massachusetts mechanism and the proposed SCRAF, including the five-year amortization period, the prudence review process, eligibility criteria or thresholds for recovery, and the carrying charge methodology. b. Please identify other jurisdictions in which Eversource (or an affiliate) operates a storm cost recovery mechanism similar to the proposed SCRAF. Name any material differences between the other jurisdiction’s adopted storm cost recovery mechanism and the proposed SCRAF. Explain why the Company has proposed a modification in the current proceeding. Provide the approved tariff or decision for each. Response: a. The table below compares the Company’s proposed storm cost recovery mechanism in Connecticut with the existing, approved storm cost recovery mechanism under which NSTAR Electric Company (“NSTAR”) operates in Massachusetts. The table highlights the key differences between the two mechanisms and provides the rationale for the Company’s proposed approach for Connecticut.Page 12 of 41
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-24 Date Issued October 02, 2026 OCC-905 Page 2 of 14 Category Reserve Threshold Massachusetts CL&P Connecticut Proposal Any single storm in which NSTAR incurs $1.3 million in incremental O&M cost will be eligible for recovery Any single storm in which through the Storm Fund. CL&P incurs $5.4 million in incremental O&M cost Massachusetts does not have will be eligible for a pre-staging mechanism, but recovery through the these costs are generally Storm Reserve. covered with the lower threshold, and recovery of the thresholds in base rates. Comments Storm fund design involves tradeoffs between funding recovery for NonCatastrophic and NonPreStaging through base rates and the threshold for accessing the reserve fund. The Connecticut threshold has historically been much higher than Massachusetts (i.e., $1.3M vs. $4M). The Company’s proposed threshold aligns with historical practice, maintaining continuity in the design of the mechanism. Specifically, the proposed $5.4M threshold for Connecticut was calculated by escalating the current catastrophic storm threshold of $4 million using inflation factors based on GDP-PI from 2018 through the Rate Year.Page 13 of 41
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-24 Date Issued October 02, 2026 OCC-905 Page 3 of 14 Category Storm Cost Recovery Deductible Massachusetts For each of the first eight Storm Fund-eligible events in a calendar year—that is, storms meeting the $1.3 million threshold—NSTAR must deduct the first $1.3 million from its recovery request for each event. To provide for recovery of those “thresholds,” the MDPU incorporated $7.8 million in base rates, representing six storms at $1.3 million storm deductibles per storm. For each Storm Fund-eligible event after the eighth in a calendar year (i.e., events 9 and beyond), NSTAR is allowed to recover the total costs for each event; i.e., the $1.3 million deductible no longer applies. If there are fewer than five Storm Fund-eligible events in a calendar year, customers receive a $1.3 million credit for each event below the fiveevent threshold that did not occur. CL&P Connecticut Proposal Comments N/A From a practical perspective, the framework in CT is no different because the Company is allowed to recover the full cost of catastrophic storm events, so long as the threshold is surpassed (i.e., there is no so-called “deductible” that is collected through base rates). PURA has implemented a higher per-storm threshold than the MDPU ($4 million versus $1.3 million), allowing for recovery of all costs (including the $4 million) once the threshold is reached. Thus, the only real difference is that there are two storm deductibles in MA (i.e., storms # 7 and #8) that the Company does not recover, totaling $2.6 million. All other costs are recoverable, including prestaging regardless of whether the storm materializes.Page 14 of 41
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-24 Date Issued October 02, 2026 OCC-905 Page 4 of 14 Category Amount Fixed in Base Rates for NonCatastrophic and NonPrestaging Storm Costs Massachusetts NSTAR includes $7.8 million annually in base distribution rates to recover a representative level of the Storm Fund threshold that occurs each year ($1.3 million cost-per-storm threshold amount multiplied by six Storm Fund eligible storms per year). The six eligible events represent the average number of storm-fund-eligible events from 2017 through 2020). CL&P Connecticut Proposal CL&P has proposed to include $38 million in the Rate Year annually to cover Non-Catastrophic and Non-Pre-Staging storms costs, assuming a $5.4 million threshold. Comments Because the Massachusetts Storm Fund threshold is lower ($1.3 million), this design should, in theory, result in a greater proportion of storm costs being recovered through the Storm Fund, allowing the amount of NonCatastrophic and NonPrestaging storm costs fixed in base rates to be set lower. For Connecticut, the Company calibrated its proposal to strike an appropriate balance between recovery through rates and recovery through the Storm Reserve.Page 15 of 41
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-24 Date Issued October 02, 2026 OCC-905 Page 5 of 14 In aggregate, NSTAR collects $31 million per year in annual base distribution rate contributions to the Storm Fund. Storm Fund Contributions through Base Rates In approving the $31 million, the DPU considered the number of storms that occurred between the Company’s 2017 rate case and the end of the test year in D.P.U. 22-22 (12/31/20); the incremental cost of these storms; the number of storms with incremental O&M costs that were so extraordinarily high that they should be deemed statistical outliers; and the number of storms that would not have been eligible for storm fund recovery had the $1.3 million storm-fundeligible threshold been in effect. The Company is proposing that the annual customer contribution to the catastrophic storm reserve be set at $60 million in base rates. The Company proposes that the annual customer contribution to the prestaging reserve be set at $4 million in base rates. Storm fund design involves tradeoffs between funding recovery for NonCatastrophic and NonPrestaging and the threshold for accessing the reserve fund. As discussed in the Company’s response to OCC-521, the Company’s average annual catastrophic storm activity is approximately $151.5 million (Exhibit CLPREVREQ-2, WP C-3.26, lines 27 through 35). However, the Company proposes to maintain catastrophic storm funding at approximately the same level as is currently in base rates, recognizing that annual activity is variable and difficult to predict. This approach is designed to mitigate customer bill impacts amid the myriad factors that are putting upward pressure on costs. The Company presented its proposal for pre-staging event reserve accrual in Exhibit CLP-REVREQ-1, pages 107-108. The testimony calculated an average annual prestaging event expense of $4.097 million (Exhibit CLPREVREQ-2, WP C-3.27, lines 27 through 35), based on actual pre-staging event
As listed on the current system
Corres. 10/22/2026 [26-05-10] (Keegan Werlin LLP) - Discovery Compilations (ALLCO Set 11, CLF-SC Set 3, OCC Set 24).