Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Files2

Search terms highlighted
Eversource rate increase is on 5 pages of the text below, highlighted. Go to the first matchClear highlighting
Words on different pages
5 pages match
  1. Page 16 of 35Match

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set PURA-11 Date Issued October 06, 2026 UPA-072 Page 1 of 3 Date Filed: October 22, 2026 Witness: Douglas P. Horton, Matthew Nelson and Michael Goldman Request from: Public Utilities Regulatory Authority Question: (CONSUMER DIVIDEND) Exhibit CLP-ELP-1. The Consumer Dividend is capped so that it does not exceed the applicable I-Factor for the year. Explain how the cap operates when the Consumer Dividend resulting from the ratchet exceeds the I-Factor (e.g., is it temporarily blocked, does it disappear, etc.). Provide an illustrative calculation and identify the Consumer Dividend used as the starting point for the following year’s ratchet. Provide the results in an unlocked Excel workbook with all equations, calculations, links, and underlying assumptions/workpapers unhidden, unprotected, and in a reproducible format. Response: The Consumer Dividend has two values in any year, which are: (1) the ratchet level; and (2) the applied Consumer Dividend. The Consumer Dividend is 30 basis points. The Consumer Dividend ratchet level is set by the Company’s performance against the Core Operating Expense per customer benchmark. Combined, the value starts at 0.30 percent, increases by 0.10 percentage points for a year in which Core Operating Expense per customer is below the benchmark, decreases by 0.05 percentage points for a year in which it is at or above the benchmark, and never falls below 0.30 percent (Exh. CLP-ELP-1, at 94, line 2–9; 96, line 3–13). The applied Consumer Dividend is the amount deducted in that year’s PBR adjustment and it equals the Consumer Dividend ratchet level unless the PBR cap applies. The PBR cap ensures that the annual O&M revenue adjustment is never negative. Under the PBR formula, the O&M revenue requirement is adjusted each year by I − X − CD (Ex. CLP-ELP-1, at 86, line 11–21). If the Consumer Dividend could exceed the inflation adjustment net of the productivity offset, the formula would reduce the Company’s O&M revenue in nominal terms in a year of very low inflation. That result would be inconsistent with the purpose of the PBMRP, which is to provide predictable rate changes for customers and revenue support for the Company’s operating costs over a multi-year term, while also enabling a multi-year rate case stay-out and the performance commitments provided for in the PBMRP (Exh. CLP-ELP-1, at 92, line 1–8). The PBR cap therefore limits the applied Consumer Dividend to I − X for the year, so that the total adjustment is not negative. When the Consumer Dividend ratchet level exceeds I − X for a year, the PBR cap operates as follows.
  2. Page 17 of 35Match

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set PURA-11 Date Issued October 06, 2026 UPA-072 Page 2 of 3 1. The applied Consumer Dividend for that year equals I − X, and the PBR adjustment for that year is zero percent. 2. The portion of the Consumer Dividend ratchet level above I − X is not applied in that year. It is temporarily blocked, not eliminated; the Consumer Dividend ratchet level itself is unchanged. The blocked portion is not deferred, banked, or recovered in a later year, and no regulatory asset or liability is created (Exh. CLP-ELP-1, at 93, line 16– 18). 3. The following year’s Consumer Dividend ratchet starts from the Consumer Dividend ratchet level, not from the capped amount applied. Adjustments to the level accumulate over the plan term (Exh. CLP-ELP-1, at 96, line 10–12). If I − X in a subsequent period increases such that the PBR cap is not triggered, the full Consumer Dividend ratchet level is applied again prospectively in the applicable PBR rate change. The table below illustrates the PBR cap using the third performance year, assuming the Company has been below the benchmark in each year and the Consumer Dividend ratchet level has reached 0.60 percent. This is an illustrative example (not a forecast) to show how component works together. In every scenario, the starting point for the following year’s Consumer Dividend ratchet is the 0.60 percent level. (*) Illustrative scenario I – X (percent) (presented at different levels for illustration) Consumer Applied Portion Dividend Consumer not ratchet Dividend applied level, Y3 PBR-O adjustment (a) Inflation above the 2.20 dividend range 0.60 0.60 0.00 1.60 (b) Inflation inside the 0.45 dividend range 0.60 0.45 0.15 0.00 (c) Inflation below the 0.20 0.30 percent starting level 0.60 0.20 0.40 0.00 (d) Inflation at the zero 0.00 0.60 0.00 0.60 0.00 floor (*) For a full illustration of the operation of the S Factor please see Attachment 1, to response UPA – 71.
  3. Page 18 of 35

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set PURA-11 Date Issued October 06, 2026 UPA-072 Page 3 of 3 Under inflationary conditions that the Company expects over the plan term, the PBR cap is not expected to be triggered. Thus, Scenario A is the most likely outcome. Scenarios B through D have the potential to occur only when inflation falls below the Consumer Dividend ratchet level, which is at most 0.60 percent. The PBR cap matters only when I − X falls below the Consumer Dividend ratchet level (Scenarios B through D). In those years, customers receive the full available adjustment; the Company’s O&M revenue is held flat rather than reduced; and the Consumer Dividend ratchet level is preserved so that the full dividend resumes when inflation recovers. Lastly, the PBR cap and the Consumer Dividend ratchet operate independently year over year. The Consumer Dividend ratchet level moves only on the Company’s performance against the benchmark; the PBR cap limits only the amount applied in a year’s rate adjustment. In a year of low inflation, the Company’s performance is still measured, the Consumer Dividend ratchet level still steps up or down, and the capped amount is applied. When I − X returns above the Consumer Dividend ratchet level in the following year, the full Consumer Dividend ratchet level is applied in that year. There is no catch-up adjustment for the amount blocked in the prior year and no reset of the level.
  4. Page 19 of 35

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set PURA-11 Date Issued October 06, 2026 UPA-073 Page 1 of 1 Date Filed: October 21, 2026 Witness: Douglas P. Horton, Brendan J. O' Brien and Garrett J. Murray Request from: Public Utilities Regulatory Authority Question: (REVENUE CAP FORMULA) Exhibit CLP-ELP-1, p. 95. “Core Operating Expense” includes “O&M costs recovered through the existing capital recovery mechanism.” Identify the O&M costs referenced by this statement, including the applicable FERC accounts or subaccounts, and identify the capital recovery mechanism through which each such expense is recovered. Explain how these O&M costs are treated in calculating the O&M Revenue Requirement subject to the I-X-Consumer Dividend Formula. Response: The Company’s cost of service filed in this proceeding for the rate year July 1, 2027 through June 30, 2028 reflects the discontinuation of the existing Electric System Improvements (“ESI”) recovery mechanism. Costs previously recovered through the ESI recovery mechanism, including costs associated with ESI-related capital investments, have been incorporated into the Company’s proposed base distribution revenue requirement. The only O&M expense associated with the ESI recovery mechanism was uncollectible expense recorded in FERC Account 904000 (Uncollectible Accounts) related to the ESI revenue requirement. Historically, this expense was recovered through the ESI recovery mechanism. With the discontinuation of the ESI mechanism, these O&M costs are reflected in the Company’s filed cost of service and recovered through base distribution rates. Accordingly, the associated uncollectible expense in FERC Account 904 is included in the Company’s O&M Revenue Requirement and is treated no differently than any other uncollectible expense reflected in the filed cost of service.
  5. Page 20 of 35

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set PURA-11 Date Issued October 06, 2026 UPA-074 Page 1 of 5 Date Filed: October 20, 2026 Witness: Julia Frayer Request from: Public Utilities Regulatory Authority Question: (TFP Study) Exhibit CLP-PBR-2; Interrog. Resp. OCC-560. London Economics International (LEI) states that it did not evaluate the possibility of a structural break in the total factor productivity (TFP) series associated with the COVID-19 pandemic and its economic disruptions. Explain the basis for assuming that TFP followed a stable multiplicative growth process throughout 2005-2024, despite the large, non-cyclical shock observed during the pandemic years. Response: LEI did not assume that the TFP followed a stable or constant growth process throughout the 2005– 2024 study period. As explained in Exhibit CLP-PBR-2, LEI used a chained Fisher Ideal index to measure annual changes in industry inputs, outputs, and productivity. Under this methodology, the index is constructed by linking successive annual changes calculated using observed data from adjacent years. Accordingly, the methodology does not impose a constant annual rate of productivity growth but instead captures the year-to-year variations reflected in the underlying data. This approach is consistent with established index-number methodology, as described by the U.S. Bureau of Economic Analysis. 1 The 20-year average represents the historical average of these annual growth rates rather than evidence that productivity growth was constant or statistically stable throughout the study period. LEI recognizes that certain business operations and patterns of consumer behavior changed during the COVID-19 pandemic. However, as previously stated in response to OCC-560 i, LEI did not perform a formal structural-break analysis to determine whether these disruptions resulted in a permanent change in the underlying productivity trend. Such an analysis was not necessary to implement LEI's index-based methodology, which measures observed annual productivity changes, including those occurring during the pandemic, rather than assuming a constant rate of productivity growth. The objective of the Industry TFP Study was to estimate the long-term historical industry productivity trend over a consistently defined period, rather than establish whether productivity growth remained statistically stable throughout that period. U.S. Bureau of Economic Analysis (BEA), NIPA Handbook: Concepts and Methods, Chapter 4 (December 2023). < https://www.bea.gov/resources/methodologies/nipa-handbook/pdf/chapter-04.pdf> 1
  6. Page 21 of 35

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set PURA-11 Date Issued October 06, 2026 UPA-074 Page 2 of 5 The inclusion of the pandemic years is also consistent with practices followed by other productivity experts and statistical agencies. 2 Furthermore, the U.S. Bureau of Labor Statistics (“BLS”), the BEA, and Statistics Canada have retained the pandemic years in their published TFP or multifactor productivity (“MFP”) series, notwithstanding the economic disruptions associated with COVID-19. 3 Consistent with LEI’s responses to OCC-445 ii, OCC-446 iii, and OCC-538 iv(d), the 2005–2024 study period was selected to measure long-term industry productivity trends while reducing the influence of unusual individual years and short-term fluctuations. Pandemic-period observations were therefore treated consistently with all other observations in the study period, allowing both positive and negative annual productivity changes to contribute to the calculation of the historical industry average. Prior Referenced Responses: i OCC-560 Question: (Total factor productivity) In Exhibit CLP-PBR-1, Page 32, LEI states that “On the other hand, a longer term (e.g., more than 20 years) would also not capture significant changes in the industry such as widespread AMI deployment, distributed energy resources (“DERs”), increased cybersecurity requirements, resilience and climate adaptation investments, and modern vegetation management practices.”. a. Please identify each formal statistical test for structural breaks or parameter instability performed by LEI across the 2005–2024 study period to evaluate the timing and statistical significance of the alleged structural breaks. If no such tests were conducted, please explain the empirical basis for LEI’s assertion. b. Please provide any empirical or quantitative analysis performed by LEI or the Company evaluating the specific impact of AMI deployment, automation, and DER integration on OM&A efficiency and labor productivity. c. Given that large-scale AMI deployment, advanced DER integration, and heightened cybersecurity requirements emerged primarily within the last 5 to 10 years, please explain why a 20-year historical average (2005–2024)—which incorporates a decade of pre-AMI/pre-DER data—is more representative of forwardlooking operating conditions than a 5- or 10-year period. For example, TFP studies prepared by NERA Economic Consulting, Christensen Associates, and PEG for the Alberta Utilities Commission's 2024–2028 performance-based regulation proceeding included data through 2021. [Sources: Pacific Economics Group Research LLC, Statistical Cost Research for THESL's New CIR Plan, May 6, 2024, Section 6, Table 11a, p. 69, Ontario Energy Board Proceeding EB-2023-0195. PEG study. See also Alberta Utilities Commission, Decision 27388-D01-2023, October 4, 2023, Table 5, p. 35. AUC decision. 3 U.S. Bureau of Labor Statistics, Total Factor Productivity—2024, March 21, 2025. BLS publication; BEA, Integrated BEA-BLS Industry-Level Production Account, 1997–2023, April 25, 2025. BEA publication; Statistics Canada, Multifactor Productivity Growth Estimates and Industry Productivity Database, 2022, April 16, 2024. Statistics Canada publication. 2
  7. Page 22 of 35

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set PURA-11 Date Issued October 06, 2026 UPA-074 Page 3 of 5 OCC-550 Response: a. LEI did not perform a formal statistical test for structural breaks or parameter instability in selecting the 2005– 2024 study period, as previously stated in the Company’s response to information request OCC-538i, in subpart d. The Industry TFP Study uses index-number techniques to measure changes in aggregate industry inputs and outputs over time; it does not estimate statistical relationships or coefficients whose stability would need to be tested. The statement in Exhibit CLP-PBR-1, was not intended to assert that a discrete statistical structural break occurred in 2005, or in any other particular year. Rather, the cited developments-such as AMI deployment, DER integration, cybersecurity requirements, resilience and climate-adaptation investments, and modern vegetationmanagement practices-were examples of material changes in industry operating conditions that have occurred over time. As explained in the responses to OCC-534ii and OCC-538 and in Section 2.4 of Exhibit CLP-PBR-2, LEI selected the 2005-2024 period to balance the benefits of a sufficiently long period for measuring long-run industry productivity trends with the relevance of the historical period to current and prospective industry conditions. LEI also evaluated 10-, 15, and 20-year productivity trends as sensitivity periods. b. LEI did not perform a causal or econometric analysis that separately quantified the effect of AMI deployment, distribution automation, or DER integration on OM&A efficiency or labor productivity. Based on information LEI has available, it would not be possible to pinpoint in time when these specific events and changes occurred for every individual EDC and therefore make it intractable to perform such a study. The Industry TFP Study was designed to measure the aggregate historical productivity trend of the electric distribution industry, rather than to attribute that trend to individual technologies or operational initiatives. OM&A includes both labor and non-labor costs, and the available FERC Form 1 data do not separately identify the labor and non-labor costs attributable to AMI, distribution automation, or DER integration. As a result, LEI could not isolate the effects of those individual initiatives on labor productivity. c. LEI does not contend that every year from 2005 through 2024 is equally representative of each technology or operating practice expected during the PBMRP term. Rather, the purpose of the selected period is to estimate a representative long-run industry productivity trend. As explained in response to part (a) and in the Company’s responses to OCC-534 and OCC-538, LEI selected the 20-year period to balance relevance to current industry conditions with the need to reduce sensitivity to short-term volatility and one-off events. For the overall TFP analysis, a longer period also reduces the influence of uneven capital-investment timing, while for OM&A productivity it reduces sensitivity to unusual expense years or unusual operating circumstances. The selected period remains recent enough to reflect evolving industry conditions while providing a broader basis for estimating the long-run productivity trend. A five-year period would contain only four annual year-over-year productivity observations, and a ten-year period would contain nine data points, making those estimates more sensitive to individual years and short-term conditions. In contrast, the selected 2005–2024 period contains 19 annual growth observations. LEI nevertheless presented shorter-period results as sensitivities rather than selecting among time periods after observing their results.
  8. Page 23 of 35

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set PURA-11 Date Issued October 06, 2026 UPA-074 Page 4 of 5 ii OCC-445 Question: Exhibit CLP-PBR-1 PBR Testimony Please provide a sensitivity analysis showing the US industry OM&A PFP over the 2005–2024 study period excluding the 2019–2020 observation. Please provide the resulting average annual OM&A PFP and corresponding X Factor. OCC-445 Response: LEI does not consider excluding the 2019–2020 observation to be an appropriate sensitivity for purposes of estimating the industry OM&A PFP trend. The purpose of the TFP/PFP study is to measure industry productivity performance over time. As explained in Exhibit CLP-PBR-2, productivity trends are inherently long term and the use of 20 years of data is intended specifically to reduce the influence of unusual individual years, numerical outliers and one-time events. Selectively excluding particular years, as suggested by this request, would undermine the objective of this analysis and could introduce selection bias. Industry productivity is affected over time by a variety of unusual conditions such as economic cycles and there is no objective basis for excluding one particular period while retaining other years that may also reflect unusual circumstances. A consistently defined study period allows both favorable and unfavorable annual observations to contribute to the measured long-run trend. As discussed in Exhibit CLP-PBR-2, the 20-year period was selected to reduce the effects of year-to-year variability while remaining sufficiently recent to reflect industry conditions relevant to the prospective PBR period. iii OCC-446 Question: Exhibit CLP-PBR-1 PBR Testimony Please explain the extent to which the 2019–2020 observation affected the magnitude and direction of the 2005–2024 average OM&A PFP. Did LEI evaluate whether productivity changes during the COVID-19 pandemic period is representative of the productivity trends that may reasonably be expected during the proposed PBMRP term? If yes, a. Please provide all underlying data and calculations in an unlocked Excel workbook with formulas intact. OCC-446 Response: Please refer to response OCC-445i, which explains why LEI does not consider the selective exclusion of the 2019– 2020 observation as an appropriate or relevant analysis. LEI did not evaluate any adjustments to the cost or customer count data during the COVID-19 pandemic period. In LEI’s professional opinion, and consistent with the theoretical foundation of TFP analysis, the annual productivity changes observed in 2019–2020, viewed in isolation, is not representative of productivity that could be expected during the proposed PBMRP term. However, it is equally invalid to remove those years from the sample as discussed in response to OCC-445. iv OCC-538 Question: Performance Based Ratemaking Panel Exhibit CLP-PBR-1 Please provide a sensitivity analysis showing the effect of unusually volatile pandemic-period observations on LEI’s reported 2005–2024 average OM&A PFP growth rate of -0.03%. At a minimum, please provide:
  9. Page 24 of 35

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set PURA-11 Date Issued October 06, 2026 UPA-074 Page 5 of 5 a. b. c. d. The average OM&A PFP growth rate excluding the 2019–2020 observation; The average OM&A PFP growth rate excluding both the 2019–2020 and 2020–2021 observations; The median annual OM&A PFP growth rate over the 2005–2024 study period; and An explanation of whether LEI performed any outlier, structural-break, or other sensitivity analysis to determine whether the long-run OM&A PFP result is representative of expected productivity during the Company’s proposed PBMRP term. OCC-538 Response: a. Please refer to OCC-445i. As mentioned, “LEI does not consider excluding the 2019–2020 observation to be an appropriate sensitivity for purposes of estimating the industry OM&A PFP trend. The purpose of the TFP/PFP study is to measure industry productivity performance over time”. b. Please refer to the response to subpart (a). c. The median annual OM&A PFP observation over the time horizon of 2005 to 2024 is approximately 0.02%. Please refer to Exhibit CLP-PBR-2A, TFP_Calc tab, cells BN16:BN34. d. LEI did not perform a formal structural-break or outlier test for the TFP study. As explained in OCC-445 and OCC-446ii, LEI does not consider selective exclusion of individual observations as an appropriate basis for estimating the long-run industry productivity trend.
  10. Page 25 of 35

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set PURA-11 Date Issued October 06, 2026 UPA-075 Page 1 of 3 Date Filed: October 20, 2026 Witness: Julia Frayer Request from: Public Utilities Regulatory Authority Question: (TFP Study) Exhibit CLP-PBR-2; Interrog. Resp. OCC-560. LEI states that an industry TFP study “reports historical trends.” Since the proposed performance-based rate (PBR) term spans 4 years, projecting a forward-looking productivity factor requires identifying an appropriate trend rather than selecting a single historical average. Explain why a single historical value is considered appropriate for projection, especially given periods of atypical conditions (such as the COVID-19 pandemic) in the selected timeframe. Response: LEI agrees that the productivity factor used in a forward-looking PBR framework should reflect an appropriate industry productivity trend. The proposed -0.03% OM&A PFP factor is not based on a single historical observation, but represents the average of 19 annual productivity growth observations over the 2005–2024 study period. The objective is to establish a reasonable estimate of the long-term industry productivity trend to inform the X Factor applied during the Company’s four-year PBMRP, rather than to forecast the precise productivity growth rate in each individual year of the plan. As discussed in Section 2 of Exhibit CLP-PBR-2, the theoretical foundation of PBR is to replicate the competitive pressures that firms face in competitive markets. In competitive markets, individual firms generally cannot unilaterally determine market prices and must manage their costs and improve efficiency to remain competitive. Similarly, under an index-based PBR framework, an industry productivity trend serves as an external benchmark for setting the X Factor, rather than relying on the regulated utility’s own historical productivity performance. By linking the Company’s revenue adjustments to industry-wide productivity trends and inflation, the PBR framework creates incentives for the Company to manage costs and improve efficiency, while allowing customers to benefit from productivity improvements. As discussed in Section 2.4 of Exhibit CLP-PBR-2 and in response to OCC-534 i, LEI considered alternative 10-year and 15-year productivity trends but selected the 20-year period because it provides a balance between reducing the influence of short-term volatility and retaining sufficiently recent observations to reflect evolving industry conditions. The use of a longer study period also reduces the influence of atypical individual years, whether favorable or unfavorable, by incorporating a broader range of economic and operating conditions into the calculation of the historical average productivity trend.

As listed on the current system

Corres. 10/23/2026 [26-05-10] (Keegan Werlin LLP) - Discovery Compilations

This filing on the current system (opens in a new tab)