  1. Page 15 of 24

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-27 Date Issued October 07, 2026 OCC-954 Page 1 of 1 Date Filed: October 21, 2026 Witness: Mark P. Baldwin, Clifford G. Williams, Leanne M. Landry and John G. Griffin Request from: Office of Consumer Counsel Question: (MS24E) Please refer to the Response to OCC-714(b). If the crew split in two and both worked the two jobs ending at 21:30 (one of which started at 13:00 and the other at 14:30), who worked the other three jobs listed on the timesheet? Response: For the two events referenced in the question that both ended at 9:30pm, one of the two crews was assigned to both tickets. As both jobs were in approximately the same geographic location (the transformers being approximately 500’ away from each other), they were assigned to the contractor at the same time with the expectation that one crew would handle both events to maximize efficiency by reducing travel time between jobsites. The contractor did not separate the times between the two tickets for the crew and considered the end time the same for both jobs. The other crew handled the overlapping work listed on the timesheet.
  2. Page 16 of 24

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-27 Date Issued October 07, 2026 OCC-955 Page 1 of 3 Date Filed: October 26, 2026 Witness: Mark P. Baldwin, Clifford G. Williams, Leanne M. Landry and John G. Griffin Request from: Office of Consumer Counsel Question: (MS24E) Please refer to the Response to OCC-716. What did this crew do between 6 am and 8 am and between 8 pm and 10 pm? To the extent the Company can answer the question, please provide evidence and/or substantiation for how it knows the answer. Response: For convenience of this response, the timesheet referenced in OCC-716 i is provided here as OCC955, Attachment 1 (Exhibit ACCT-2(CLP-5A-02) (MS24E), p. 155). On this timesheet, the crew properly documented the specific trouble events assigned to them through the OMS, which show a timespan of 8am to 8pm, which is a span of time within the crew’s 16-hour workshift running between 6am and 10pm on that same day. Putting all else aside, the two hour increments referenced in the question between 6am and 8 am, and 8pm and 10pm, have to contemplate travel time. Note that the seven jobs listed on the timesheet were located in five different towns, starting in Canaan and Cornwall, CT and ending in Sharon, CT – all located in the remote Northwest section of Connecticut, on the border of New York State, where the closest Eversource work center is at least 25 miles away in Torrington, CT (almost one hour’s drive). Typically, the Company does not house crews in that remote location and, instead, the crew would have been working out of a work location and/or hotel further south near the Company’s work centers. In the two-hour intervals at the start and end of the work shift, the crews would have had to travel from their “show up” location to this area to perform work throughout the day and then would have had to travel back to an Eversource work location and/or to their hotel, which in itself would have consumed the better part of the two-hour interval on each end. Note also, that the timesheet indicates that the crews are from Wallingford, CT and may have dispatched directly to, or from, that location, which is 65 miles away, or at least 90 minutes by bucket truck. In addition, crews cannot just show up at a job site and undertake work on high-voltage equipment without preparation of their truck at the report-in location, a safety instruction, or food – or without then cleaning up their worksite, cleaning up their trucks, potentially reporting back to the Company’s work site to check in and grabbing a meal. Given the location of the work performed, the two-hour intervals at each end of the shift are exactly what is expected of the crews, which is
  3. Page 17 of 24

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-27 Date Issued October 07, 2026 OCC-955 Page 2 of 3 that – in a 16-hour shift – it would be completely routine for the crews to complete 12 hours of “wrench” work directly on the system with a lead time and finish time on each end to complete other work tasks and travel between locations. Prior Referenced Response: i OCC-716 Question: (MS24E) Please refer to Exhibit ACCT-2(CLP-5A-02) (MS24E), p. 155. Box 12 indicates a total work time of 16 hours, but boxes 24 and 25 appear to total a maximum work time of 12 hours. a. Was this crew on standby from 6 a.m. to 8 a.m.? If yes, please explain why this time was billed as work time and not standby time? If no, please explain what occurred in those two hours and how Eversource is now aware of what occurred. b. Please explain why the crew ended work at 8 p.m. but billed until 10 p.m. OCC-716 Response: a. Based on the Company’s review of the specified timesheets, there is no significant missing information within the “Work Distribution” section. The timesheets are not a contemporaneous record of every minute, task, or discrete activity undertaken by a crew in the course of performing its work. Nor is the timesheet the method by which the Company manages the crews or assures that the crew is working how and where the crews are supposed to be. The timesheets are used to document the time worked and general nature of the work performed. Timesheets are typically completed at the end of each workday, with time allotted to the major work assignments completed that day. Given the nature of storm restoration work, it would be impractical and inconsistent with the crews’ primary responsibility of safely and efficiently restoring electric service to require personnel to contemporaneously record every minute task or discrete activity performed throughout the workday. The Company manages the crews through the oversight of the employee dispatching the crews and the External Field Resource Coordinator (EFRC), who is physically in the field with the crews, ensuring that the crews are properly engaged and assigned work to restore the system from storm damage. The linemen who are filling out the timesheets are primarily focused on ensuring that their crews are working safely in a dynamic environment that is full of potentially lethal hazards. The EFRC is the Company representative that is responsible for signing the timesheets and have personal knowledge of the work that the crews have performed and the activities the crews have engaged in, particularly in relation to the hours stated in boxes 24 and 25. Importantly, the crews are in “working” status for the entire duration of their shift – from start to finish. The Company does not compensate crews based on the specific restoration event to which they are assigned, nor are crews expected to be actively engaged in an “event” every minute of their shift. Time must be allocated at the start and end of each day, as well as between restoration “events,” to complete all necessary steps to ensure safe working conditions in the field. For the Resource Management Teams identifying the jobs and deploying crews and the EFRC, the critical focus is to follow procedures, keep the crews safe, and keep them moving efficiently throughout the working shift. In this context, there is no bright line that separates one event from another and neatly segmenting the day from an “event” perspective – all activities whether in preparation of, or “on the pole,” are proper work activities that are undertaken during the work shift and will not be specified on the timesheet.
  4. Page 18 of 24

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-27 Date Issued October 07, 2026 OCC-955 Page 3 of 3 b. Please refer to subpart (a), above. Further, all contractor crews and non-Connecticut based Company employees working storm restoration in Connecticut are required to be lodged in hotel rooms. Prior to beginning their first job of the day, the crews eat a meal, conduct safety briefings, perform U.S. Department of Transportation mandated pre-trip inspections on their trucks, and restock trucks as necessary with material needed for their day. This takes time and the crews are methodical because they don’t want to get out into the field without the right equipment or materials. The crews start the work shift by driving from their hotel rooms to the job site and depending on the availability of hotel rooms, that can add an additional 30 minutes or more. At the end of the last job of the day, the crews are required to clean up the job site, properly store all equipment and tools, eat a meal after performing physical labor all day in situations where the personal safety is continually at risk and often in unforgiving conditions; and drive back to the hotel rooms, which again, could be 30 minutes or more away from the jobsite. Therefore, intervals of time at the start and end of the work shift and between restoration “events” is an expected and necessary part of the work shift, for which the crews are paid. Within a work shift, the crews do not get paid differently for different types of work. Therefore, from a field perspective, the start and stop time is the critical data point for the timesheet.
  5. Page 19 of 24

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-27 Date Issued October 07, 2026 OCC-956 Page 1 of 3 Date Filed: October 21, 2026 Witness: Mark P. Baldwin, Clifford G. Williams, Leanne M. Landry and John G. Griffin Request from: Office of Consumer Counsel Question: (MS24E) Please refer to the Response to OCC-717. What did this crew do between 6am and 8am and between 6 pm and 10 pm? To the extent the Company can answer the question, please provide evidence and/or substantiation for how it knows the answer. Response: As evidenced by the approved timesheet, these crews were engaged by the Company in restoration efforts from 6:00am until 10:00pm and were paid according to their respective contract. Part of the Company’s review process is to verify the accuracy and reasonableness of contractor labor charges using the billable hours per day (Timesheet boxes 10, 11, and 12), dates and times of service (Timesheet boxes 2, 6, and 7), crew information (Timesheet boxes 8 and 9), validation from field supervision overseeing the contractors work, and through consultation with supervisory personnel, as necessary. This review process serves as a key control to ensure that contractor invoices are reasonable, supported, and accurately associated with the applicable event. Boxes 20 through 25, on the timesheet (“Work Distribution”) serve as supporting information but are not representative of the total hours the contractors are entitled to be paid. Contractors are paid for their full shift regardless of whether they are working a specific OMS event. Many required work activities are performed outside of specific OMS event times. For instance, prior to beginning their first job of the day, the crews eat a meal, conduct safety briefings, perform U.S. Department of Transportation mandated pre-trip inspections on their trucks, and restock their trucks as necessary with material needed for their day. This takes time and the crews are methodical because they do not want to get out into the field without the right equipment or materials. The crews start the work shift by driving from their hotel rooms to the job site and depending on the availability of hotel rooms, that can add an additional 30 minutes or more. At the end of their last job of the day, the crews are required to clean up their job site, properly store all equipment and tools, eat a meal after performing physical labor all day in situations where their personal safety is continually at risk and often in unforgiving conditions; and drive back to their hotel rooms, which again, could be 30 minutes or more away from the jobsite. Therefore, intervals of time at the start and end of the work shift and between restoration “events” is an expected and necessary part of the work shift, for which the crews are paid. Within
  6. Page 20 of 24

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-27 Date Issued October 07, 2026 OCC-956 Page 2 of 3 a work shift, the crews do not get paid differently for different types of work. Therefore, from a field perspective, the start and stop time is the critical datapoint for the timesheet. This crew documented the OMS tickets ranging from 8am to 6pm on their timesheet referred to in OCC-716 i. When the crew’s shift begins, they need to have a safety tailboard and prepare for their first job of the day. Then they head to their first job. When they complete their final ticket of the day, there is still work that needs to be done before they are finished with their shift. This includes cleaning up their worksite, cleaning up their trucks and grabbing a meal. This was also the final day of the storm and the crews are required to perform demobilization activities including the return of unused materials and any other Company property. Prior Referenced Response: i OCC-716 Question: (MS24E) Please refer to Exhibit ACCT-2(CLP-5A-02) (MS24E), p. 155. Box 12 indicates a total work time of 16 hours, but boxes 24, and 25, appear to total a maximum work time of 12 hours. a. Was this crew on standby from 6 a.m. to 8 a.m.? If yes, please explain why this time was billed as work time and not standby time? If no, please explain what occurred in those two hours and how Eversource is now aware of what occurred. b. Please explain why the crew ended work at 8 p.m. but billed until 10 p.m. OCC-716 Response: a. Based on the Company’s review of the specified timesheets, there is no significant missing information within the “Work Distribution” section. The timesheets are not a contemporaneous record of every minute, task, or discrete activity undertaken by a crew in the course of performing its work. Nor is the timesheet the method by which the Company manages the crews or assures that the crew is working how and where the crews are supposed to be. The timesheets are used to document the time worked and general nature of the work performed. Timesheets are typically completed at the end of each workday, with time allotted to the major work assignments completed that day. Given the nature of storm restoration work, it would be impractical and inconsistent with the crews’ primary responsibility of safely and efficiently restoring electric service to require personnel to contemporaneously record every minute task or discrete activity performed throughout the workday. The Company manages the crews through the oversight of the employee dispatching the crews and the External Field Resource Coordinator (EFRC), who is physically in the field with the crews, ensuring that the crews are properly engaged and assigned work to restore the system from storm damage. The linemen who are filling out the timesheets are primarily focused on ensuring that their crews are working safely in a dynamic environment that is full of potentially lethal hazards. The EFRC is the Company representative that is responsible for signing the timesheets and have personal knowledge of the work that the crews have performed and the activities the crews have engaged in, particularly in relation to the hours stated in boxes 24 and 25. Importantly, the crews are in “working” status for the entire duration of their shift – from start to finish. The Company does not compensate crews based on the specific restoration event to which they are assigned, nor are crews expected to be actively engaged in an “event” every minute of their shift. Time must be allocated at the start and end of each day, as well as between restoration “events,” to complete all necessary steps to
  7. Page 21 of 24

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-27 Date Issued October 07, 2026 OCC-956 Page 3 of 3 ensure safe working conditions in the field. For the Resource Management Teams identifying the jobs and deploying crews and the EFRC, the critical focus is to follow procedures, keep the crews safe, and keep them moving efficiently throughout the working shift. In this context, there is no bright line that separates one event from another and neatly segmenting the day from an “event” perspective – all activities whether in preparation of, or “on the pole,” are proper work activities that are undertaken during the work shift and will not be specified on the timesheet. b. Please refer to subpart (a), above. Further, all contractor crews and non-Connecticut based Company employees working storm restoration in Connecticut are required to be lodged in hotel rooms. Prior to beginning their first job of the day, the crews eat a meal, conduct safety briefings, perform U.S. Department of Transportation mandated pre-trip inspections on their trucks, and restock trucks as necessary with material needed for their day. This takes time and the crews are methodical because they don’t want to get out into the field without the right equipment or materials. The crews start the work shift by driving from their hotel rooms to the job site and depending on the availability of hotel rooms, that can add an additional 30 minutes or more. At the end of the last job of the day, the crews are required to clean up the job site, properly store all equipment and tools, eat a meal after performing physical labor all day in situations where the personal safety is continually at risk and often in unforgiving conditions; and drive back to the hotel rooms, which again, could be 30 minutes or more away from the jobsite. Therefore, intervals of time at the start and end of the work shift and between restoration “events” is an expected and necessary part of the work shift, for which the crews are paid. Within a work shift, the crews do not get paid differently for different types of work. Therefore, from a field perspective, the start and stop time is the critical data point for the timesheet.
  8. Page 22 of 24Match

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-27 Date Issued October 07, 2026 OCC-957 Page 1 of 1 Date Filed: October 21, 2026 Witness: Jessica B. Cain and Daniel M. Traynor Request from: Office of Consumer Counsel Question: (AFFORDABILITY) For each residential rate class, assuming an average monthly usage of 750 kWh and assuming the remaining three components of the bill remain at current charges (i.e., standard service at current rate, transmission and public benefits at current rates), please provide an analysis showing the energy burden for each income threshold in $10,000 increments from $30,000 to $250,000 associated with the proposed rate increase. Response: Please refer to OCC-957, Attachment 1, for the requested analysis.
  9. Page 23 of 24

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-27 Date Issued October 07, 2026 OCC-958 Page 1 of 1 Date Filed: October 21, 2026 Witness: Jessica B. Cain and Timothy W. McGrath Request from: Office of Consumer Counsel Question: (HARDSHIP DOCUMENTATION REVIEW) Presently, does Alorica or the Company review hardship income documents submitted by customers to either verify hardship status or move to a different LIDR tier? If both the Company and Alorica review the documents, please estimate the allocated percentage of review during the test year. Response: Financial hardship documents are primarily processed by the Company’s third-party vendor partner, Alorica. During annual peak 1 periods, the Company also leverages employees to help complete reviews within the Company’s goal of two business days. For example, in 2025, of the 59k total financial hardship documents submitted by customers directly to the Company in 2025: • • 64% (38k) were processed by the Company’s third-party partner, Alorica. 36% (21k) were processed by Company employees. Peak annual financial hardship documentation periods typically occur at the beginning and end of the “winter protection” collections moratorium. 1
  10. Page 24 of 24

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-27 Date Issued October 07, 2026 OCC-959 Page 1 of 1 Date Filed: October 21, 2026 Witness: Christopher E. Colorio, Mark P. Baldwin, John G. Griffin and Leanne M. Landry Request from: Office of Consumer Counsel Question: (STORM) a. How do vendors know and/or how does Eversource inform vendors of the storm event number to which to bill storm work? b. Does this process vary for the type of vendor? c. If Eversource communicates the event number to vendors in advance of the event, please provide that communication for each event for which the Company is seeking recovery in this proceeding. Response: a. The general practice is that line contractors, service crew contractors, damage assessor contracts and wire down guard contractors receive the applicable storm workorder in their demobilization email. A demobilization email is issued to each contractor at the conclusion of their final shift worked for the storm event. The storm workorder provided in that communication serves as the reference number for billing and invoicing purposes. Similarly, vegetation management supervision emails the appropriate storm workorder to all tree contractor vendors responding to the event. For fooding and lodging vendors, the correct storm workorders are assigned to each invoice based on dates and verified by the food and lodging team as part of the invoice review process. b. Yes. The process is consistent across line, service, wire down guard, damage assessor and vegetation contractors engaged through the hiring process. The difference is in who communicates the storm workorder numbers to the vendors. Storm workorders are not provided to food and lodging vendors. The appropriate workorder numbers are applied to the invoice as part of the invoice review process. c. Eversource does not provide storm workorders to vendors in advance of a storm event.