  1. Page 23 of 52

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set ALLCO-12 Date Issued October 08, 2026 ALLCO-159 Page 1 of 2 Date Filed: October 27, 2026 Witness: Warren R. Boutin and Andrew C. Belden Request from: ALLCO Question: (Follow-up to ICC-013 and ICC-016 — application-to-agreement timing by category.) ICC013, Attachment 1, reports the business days from application receipt to issuance of an Interconnection Agreement for all applications (78,740 since January 2020; mean 17.7 business days), and ICC-016 reports agreement-to-Permission-to-Operate timing separately for four categories. (a) Provide the ICC-013 schedule (projects, mean, and median business days by month) separately for the same four categories used in ICC-016 — residential inverterbased generators of 50 kW or less; Fast Track residential above 50 kW; commercial and industrial of 2 MW or less; and study-process projects above 2 MW — and, for the last two categories, separately for applications that required electric power system modifications or upgrades. (b) For each category, state the number of applications received since January 1, 2020, for which no Interconnection Agreement has been issued as of the date of the response, the number of those that the Company has tendered but not countersigned, and the mean and maximum elapsed business days for each group. (c) Explain why ICC-013, Attachment 1, reports a monthly median that exceeds the monthly mean in numerous months (e.g., January 2020: mean 5.98, median 22.5), identify any negative or zero durations in the underlying data and their cause, and state whether the “Mean” and “Average” columns are computed differently. Response: CL&P objects to this request on the ground that it is an improper effort by Allco to use this rate case proceeding to obtain discovery for purposes of a lawsuit that it filed against the Company on August 10, 2026, in the United States District Court for the District of Connecticut (Civil Action No. 3:26-cv-1277), outside of and in contravention of the rules of procedure that govern discovery in that lawsuit. Without waiving said objection, the Company states as follows: a. Please refer to ALLCO-159, Attachment 1, through ALLCO-159, Attachment 4, for the requested information. a. ALLCO-159, Attachment 1 – Residential Less than 50kW i. Please note, in ALLCO-159, Attachment 1. The median business day column shows 0 or 1 or 2 days for some months. These numbers are correct
  2. Page 24 of 52

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set ALLCO-12 Date Issued October 08, 2026 ALLCO-159 Page 2 of 2 as the applications were processed on the same day or within one or two days from receipt. b. ALLCO-159, Attachment 2 – Fast track Greater than 50kW c. ALLCO-159, Attachment 3 – Less than 2MW d. ALLCO-159, Attachment 4 – Greater than 2MW b. Please refer to the Company’s response to ALLCO-017 i. c. The mean and the median are derived differently. The mean is the average of the total days divided by the number of projects. Whereas the median is the middle number when the numbers are arranged from smallest to largest, or the average of the two middle numbers if it is an even number. The “Mean” and “Average” were requested by the intervenor, which are the same. Thus, the Average column repeats the information in the Mean column. Prior Referenced Response: i ALLCO-017 Question: State the average and maximum elapsed time, in each year 2019 through 2025, between the Company’s receipt of an interconnection agreement executed by a Connecticut generator and the Company’s countersignature and return of that agreement, and identify each instance exceeding 180 days, including project LEG-22708. ALLCO-017 Response: CL&P objects to this request on the ground that it is an improper effort by Allco to use this rate case proceeding to obtain discovery for purposes of a lawsuit that it filed against the Company on August 10, 2026, in the United States District Court for the District of Connecticut (Civil Action No. 3:26-cv-1277), outside of and in contravention of the rules of procedure that govern discovery in that lawsuit. Without waiving said objection, the Company does not track information on the average and maximum elapsed time between the receipt of a partially-executed interconnection agreement (“IA”) from a Generator and the Company’s countersignature and return of the fully-executed IA to the Generator. Starting in early 2026, the IA execution process was enhanced to leverage automation available in PowerClerk; therefore, the execution dates are now recorded electronically in a software platform.
  3. Page 25 of 52

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set ALLCO-12 Date Issued October 08, 2026 ALLCO-160 Page 1 of 3 Date Filed: October 22, 2026 Witness: Brendan J. O’Brien and Garrett J. Murray Request from: ALLCO Question: (Follow-up to ALLCO-076, ALLCO-077, and ALLCO-028 — outside counsel matters in the revenue requirement.) ALLCO-076, Attachment 1 reports outside counsel expense charged to the Company of $3,834,493 (2021), $2,287,868 (2022), $4,257,622 (2023), $2,678,448 (2024), and $5,185,192 (2025), and a Rate Year amount of $5,121,457, and lists, among others, Day Pitney LLP (“Regulatory / Litigation,” direct charge: $79,724 in 2023, $204,831 in 2024, $164,213 in 2025, $174,796 in the Rate Year), Cowdery Murphy & Healy LLC (“Regulatory / Litigation,” direct charge: $147,160 in 2024, $511,973 in 2025, $544,967 in the Rate Year), and Keegan Werlin LLP (“Regulatory Matters,” direct charge: $1,210,144 in 2025, $1,288,132 in the Rate Year). ALLCO-077 states that the Rate Year legal costs “include litigation or other proceedings in which the Company is a plaintiff or defendant” and that the Company “does not track legal costs that would allow the Company to identify the portion of costs that relate to litigation or other proceedings and then separate that portion by specific matters.” (a) For each of Day Pitney LLP, Cowdery Murphy & Healy LLC, and Keegan Werlin LLP, and for each year 2023 through 2025 and the Rate Year, identify each matter (by Legal Tracker Matter # and Eversource Matter Name, or, if privilege is asserted as to a name, by category and forum) to which the amounts in ALLCO076, Attachment 1 were charged, and the amount charged to each matter. (b) State whether any portion of the amounts in subpart (a) was incurred in connection with (i) Allco Finance Limited or any of its affiliates, including the matters settled in Docket No. 16-03-08RE01, the February 2025 settlement filed in Docket No. 25-03-12, the Company’s disqualification of SCEF Year 7 bids, the retention of SCEF Year 6 bid deposits, or the interconnection, LREC/ZREC, or power purchase agreements of Allco’s affiliates; (ii) Windham Solar LLC or any affiliate; (iii) any other interconnection, net-metering, SCEF, or renewable-energy-contract dispute with a customer or developer; or (iv) any proceeding in which the Company defended the prudence or lawfulness of its own conduct — and state the amount for each. (c) State the basis on which the Company contends that the Rate Year amount of $5,121,457 is a reasonable and prudent level of outside counsel expense to be recovered from ratepayers when, by its own account in ALLCO-077, it cannot identify what portion of that amount was incurred to litigate against its own customers or to defend its own conduct, and identify every adjustment the Company made to remove such costs from the Rate Year, with the amount and workpaper reference, or state that no adjustment was made. (d) State whether any fee or disbursement of Day Pitney LLP incurred in Allco Finance Limited Inc. v. The Connecticut Light and Power Company, et al., No. 3:26-cv-01277 (D. Conn.), or in the Rule 11 and related correspondence preceding it, has been or will be charged to the Company, recorded above the line, included in any deferral, or sought in this or any future rate proceeding, and identify the account(s) used. (e) Produce the Legal Tracker matter list and budget-
  4. Page 26 of 52Match

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set ALLCO-12 Date Issued October 08, 2026 ALLCO-160 Page 2 of 3 versus-actual report for each matter identified in subpart (a) in native format. Response: CL&P objects to this request on the ground that it is an improper effort by ALLCO to use this rate case proceeding to obtain discovery for purposes of a lawsuit that it filed against the Company on August 10, 2026, in the United States District Court for the District of Connecticut (Civil Action No. 3:26-cv-1277), outside of and in contravention of the rules of procedure that govern discovery in that lawsuit. CL&P further objects to this request on the ground that it is not within the scope of the proceeding to review the Company’s application to amend its existing rates schedules because the interrogatory either seeks information specific to Allco projects or seeks information that Allco views as relevant to its specific projects. (a) Only the costs incurred in 2025 are at issue in this proceeding. Costs included in the Rate Year are escalated by the rate of inflation from the test year. Day Pitney LLP assists the Company in three areas – routine business and litigation matters, regulatory matters and appellate work. Cowdery Murphy & Healy LLC assists the Company with regulatory and appellate work, and Keegan Werlin LLP assists the Company with specialized regulatory work. (b) The Company objects to this request on the ground that it is not within the scope of the proceeding to review the Company’s application to amend its existing rates schedules because the interrogatory either seeks information specific to Allco projects or seeks information that Allco views as relevant to its specific projects. (c) The Company intends to address the prudence of costs as a legal matter. In addition, the question posed in ALLCO-077 asked for a breakdown of “the proceedings in which the Company defends the prudence or lawfulness of its own conduct…,” which are false categories of legal work. The Company does not “litigate against its own customers,” nor does it incur legal costs to impermissibly, improperly or inappropriately “defend its own conduct” and the Company is able to state categorically that there are zero legal costs incurred for these stated purposes. In preparing its rate filing, the Company reviewed all of its legal costs to determine that the costs were reasonable, necessary, efficiently incurred and expected to be routinely occurring, primarily due to the need to meet increased regulatory requirements, as well as other compliance matters. The legal costs were incurred in the course of operating as a public service company in the State of Connecticut and to provide safe and reliable service to customers as a company that is rateregulated by PURA. All of the Company’s legal costs included in the revenue requirement fall within this category.
  5. Page 27 of 52

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set ALLCO-12 Date Issued October 08, 2026 ALLCO-160 Page 3 of 3 (d) The Company objects to this request on the ground that it is not within the scope of the proceeding to review the Company’s application to amend its existing rates schedules because the interrogatory either seeks information specific to Allco projects or seeks information that Allco views as relevant to its specific projects.
  6. Page 28 of 52

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set ALLCO-12 Date Issued October 08, 2026 ALLCO-161 Page 1 of 5 Date Filed: October 27, 2026 Witness: Brendan J. O’Brien and Garrett J. Murray Request from: ALLCO Question: (Follow-up to ALLCO-078 and ALLCO-034 — rate-proceeding costs outside Exhibit CLPREVREQ-9.) ALLCO-078 states that the $3.1 million of rate case expense in Exhibit CLPREVREQ-9 consists solely of external vendor charges; that the Company “does not incur incremental payroll, labor or benefits costs when preparing, filing or adjudicating a rate case” because the work is performed by permanent employees of the Connecticut revenue requirements group, the Connecticut rates group, and the internal legal department; that internal rate-case work is “exclusively contained in fiscal year 2026”; and that, applying the OCC-332 payroll methodology, “there are no payroll, labor or benefit costs pertaining to the rate case in the proposed revenue requirement.” The response did not identify the positions, amounts, or accounts the interrogatory asked for. (a) Identify by title each position in the Connecticut revenue requirements group, the Connecticut rates group, the internal legal department, and any other Company or ESC group whose incumbent has recorded or is expected to record time on this proceeding in 2026, and state for each the Test Year Pro Forma and Rate Year salary, incentive compensation, and benefits included in the revenue requirement (Exhibit CLP-REVREQ-2, WP C-3.5 and related), and the percentage of 2026 working time the Company estimates each will devote to this proceeding. (b) Confirm that the Rate Year payroll, incentive compensation, and benefits of the positions identified in subpart (a) are included in the proposed revenue requirement without any adjustment to exclude time devoted to this or any other rate proceeding; if the Company contends an adjustment was made, identify it by amount and workpaper. (c) State whether the Company contends that Conn. Gen. Stat. § 16-243p(b) permits recovery through rates of the salaries, incentive compensation, and benefits of employees for the time they devote to attendance in, participation in, or preparation for a rate proceeding, and state the basis for that contention. (d) Identify every cost associated with any rate proceeding initiated on or after January 1, 2024 — including Docket Nos. 26-05-10, 24-12-01, 25-01-03, and 26-01-03, any RAM, storm-cost, or reconciliation proceeding, and any appeal — that is recorded in Test Year or Rate Year O&M, A&G, service-company charges, regulatory assets, or deferrals, stating the amount, account, and schedule or workpaper for each, and the total. (e) Produce the Company’s 2026 time records, project codes, or other records (or state that none exist) showing employee time charged to this proceeding, and identify the project or workorder code(s), if any, under which such time is recorded.
  7. Page 29 of 52

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set ALLCO-12 Date Issued October 08, 2026 ALLCO-161 Page 2 of 5 (f) State whether the principle stated in ALLCO-078 — that the Company “does not incur incremental payroll, labor or benefits costs” when work is performed by permanent employees whose salaries are in the payroll base — applies to the time of permanent Company and ESC employees, and to the pooled supervisory, engineering, administrative, fleet, stores, and other overhead costs, that the Company charges to interconnecting customers through percentage loaders on interconnection work orders; if the Company contends it does not, explain why the same cost is not incremental when recovered from ratepayers but is incremental when recovered from an interconnecting customer, and identify every document on which that contention rests. Response: (a), (c), and (e). Please refer to the Company’s response to RRU-070 i. (b) The Company confirms no adjustment has been made to exclude labor related to this proceeding. Please refer to the Company’s responses to ALLCO-078 ii and RRU-070 for additional information regarding the internal labor specific to this proceeding. (d) Please refer to the Company’s responses to OCC-438 iii and RRU-070. (f) The Company disagrees with the characterization of subpart f in this question. There are no incremental labor costs in either scenario represented in this question. Prior Referenced Responses: i RRU-070 Question (RATE PROCEEDING SALARIES) Application, Sch. C-3.5; Interrog. Resp. OCC-199; Public Act 23-102, Sec. 2. Regarding employee salaries associated with attendance in, participation in, preparation for, or appeal of a rate proceeding: a. b. c. d. Provide the total charges to work order CT260N11 and to each other work order, cost center or account used to record labor associated with this proceeding. Show by month, by employee classification, and by hours and dollars. State whether any portion of those amounts is included in the payroll expense in Schedule C-3.5 for the Test Year or Rate Year. Identify the line on which it appears and the amount. Identify the EESCO services listed in Attachment 1 of the response to Interrogatory EOE-066 under the captions Legal and Regulation that relate to regulatory proceedings and appeals. State the amount charged to CL&P in the Test Year and Rate Year and the amount removed as non-recoverable. State the EESCO labor charged to work order PURAAN11 identified in Attachment 1 of the response to Interrogatory OCC-355 as established for employees supporting the Connecticut Management Audit in each calendar year from 2021 through 2025. State whether any portion of the charge is included in Schedule C-
  8. Page 30 of 52

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set ALLCO-12 Date Issued October 08, 2026 ALLCO-161 Page 3 of 5 3.5 or Schedule C-3.11 while management audit cost is treated as a deferred expense in Exhibit CLPREVREQ-11. RRU-070 Response: a. Please refer to RRU-070, Attachment 1, for the total internal labor charges to work order CT260N11 by month, employee classification, hours and dollars. b. As outlined within Exhibit CLP-REVREQ-9, all rate case expenses requested for recovery in the Rate Year are from external vendors/contractors. There are no internal payroll, labor or benefits costs included within the $3.1 million rate case expense outlined in Exhibit CLP-REVREQ-9. Please note that the Company does not incur incremental payroll, labor or benefits costs when preparing, filing or adjudicating a rate case. All internal labor associated with this proceeding is staffed with current employees that work for the Company on a permanent basis, which means that there is no additional internal cost caused by the rate case. The Company’s departments handling the rate case are the Connecticut revenue requirements group; the Connecticut rates group; and the internal legal department. The Test Year for this case is fiscal year ending December 31, 2025, and the internal work on the rate case is exclusively contained in fiscal year 2026, and the Company has confirmed that there is less than $10,000 recorded in 2025 in relation to the rate case. Please refer to the Company’s response to OCC-332 for a detailed explanation as to how the Company calculates its Test Year pro-forma and Rate Year payroll expense. Applying the Company’s calculation of payroll expense, there are no payroll, labor or benefit costs pertaining to the rate case in the proposed revenue requirement. c. All of the costs identified in RRU-070, Attachment 1, are direct charged from the Service Company and represent non-incremental charges (see response part b.). The Company does not track the Service Company costs recorded to work order CT260N11 based on each category identified in EOE-066, Attachment 1. d. Please see Table 1 below for the total EESCO internal labor charges to work order PURAAN11 for each of the years 2021 through 2025. There are no internal payroll, labor or benefits costs included within the $901,194 expense outlined in Exhibit CLP-REVREQ-11. As shown in Exhibit CLP-REVREQ-11, the only Management Audit costs deferred and sought for recovery in this case are incremental costs billed to the Company by PURA for professional services provided by FTI Consulting, Inc. Consistent with the Company’s response to part b. above, the Company does not incur incremental payroll, labor or benefits costs when participating in a PURA Management Audit. All internal labor associated with that work effort is staffed with current employees that work for the Company on a permanent basis, which means that there is no additional internal cost caused by the Management Audit. Year 2021 2022 2023 2024 2025 Total Table 1 EESCO Labor Charged to PURAAN11 Calendar Years 2021 – 2025 Amount $20,446 $72,075 $107,932 $1,069 $236 $201,800
  9. Page 31 of 52

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set ALLCO-12 Date Issued October 08, 2026 ALLCO-161 Page 4 of 5 ii ALLCO-078 Question (Follow-up to ALLCO-030.) The response cross-referenced OCC-438, which contains no itemization. Itemize the approximately $3.1 million of rate case expense in Exhibit CLP-REVREQ-9 by vendor or firm, matter or workstream, and amount; identify each Company or ESC position (by title) whose Test Year or Rate Year payroll, incentive compensation, or benefits include time associated with attendance in, participation in, or preparation for rate proceedings, and the amounts included; state whether any rate-proceeding-associated costs are recorded outside Exhibit CLP-REVREQ-9 — including in payroll, A&G, service-company charges, or any deferral — and identify the amounts and locations; and state the total of all costs associated with rate proceedings initiated on or after January 1, 2024 that are included anywhere in the proposed revenue requirement. ALLCO-078 Response: The rate case expense in Exhibit CLP-REVREQ-9 in the amount of $3.1 million is itemized by vendor and Exhibit CLP-REVREQ-2, WP C-3.36, at page 10, shows the annual amortized rate case expense proposed in the revenue requirement. Additionally, please refer to ALLCO-027, Attachment 9, for a summary of billed rate-case expenses by vendor through June 30, 2026. As outlined within Exhibit CLP-REVREQ-9, all rate case expenses requested for recovery are from external vendors/contractors. There are no internal payroll, labor or benefits costs included within the $3.1 million rate case expense outlined in Exhibit CLP-REVREQ-9. Please note that the Company does not incur incremental payroll, labor or benefits costs when preparing, filing or adjudicating a rate case. All internal labor associated with this proceeding is staffed with current employees that work for the Company on a permanent basis, which means that there is no additional internal cost caused by the rate case. The Company’s departments handling the rate case is the Connecticut revenue requirements Group; the Connecticut rates group; and the internal legal department. The Test Year for this case is fiscal year ending December 31, 2025, and the internal work on the rate case is exclusively contained in fiscal year 2026, and the Company has confirmed that there is less than $10,000 recorded in 2025 in relation to the rate case. Please refer to the Company’s response to OCC-332i for a detailed explanation as to how the Company calculates its Test Year pro-forma and Rate Year payroll expense. Applying the Company’s calculation of payroll expense, there are no payroll, labor or benefit costs pertaining to the rate case in the proposed revenue requirement. iii OCC-438 Question: Exhibit CLP-REVREQ-1 Please explain why the Company has not excluded costs associated with its participation in rate case proceedings from the revenue deficiency calculation in this proceeding. In your response, please explain how the Company's proposed treatment of such costs complies with the requirements of SB 7, An Act Strengthening Protections For Connecticut's Consumers Of Energy, concerning recovery of costs associated with participation in rate case proceedings. OCC-438 Response: The Company has not removed costs associated with the preparation and participation in this rate case proceeding from the revenue deficiency calculation as these costs are necessary operating costs ensuring that rates are set at a just and reasonable level to enable the ongoing investment into the system to maintain a safe and reliable electric system, benefiting customers. As such, these costs are appropriately recovered from customers and are therefore included in the Company’s proposed revenue deficiency. In this regard, the Company plans to provide legal argument on the plain
  10. Page 32 of 52

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set ALLCO-12 Date Issued October 08, 2026 ALLCO-161 Page 5 of 5 language of the statute at the appropriate juncture in this proceeding. In the meantime, the Company plans to submit to the record the documentary support necessary to support recovery of the costs. The Company justifies its recovery for costs associated with the preparation and participation in this rate amendment proceeding as prudently incurred and normal operating costs to litigate this rate amendment application. The Company is entitled to a reasonable opportunity, but not a guarantee, to recover its operating costs and maintain its credit integrity. Further, the Company should be allowed to demonstrate that the costs incurred to adjudicate this rate case proceeding are just and reasonable and affording PURA the opportunity to set equitable rates and establish innovative rate mechanisms and programs for the benefit of our customers.
Words on different pages
Words on different pages

As listed on the current system

Corres. 11/02/2026 [26-05-10] (Keegan Werlin LLP) - Discovery Compilation (ALLCO Set 12, PURA Set 9, PURA Set 10).

This filing on the current system (opens in a new tab)