  1. Page 1 of 36

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set ALLCO-15 Date Issued October 19, 2026 ALLCO-195 Page 1 of 3 Date Filed: November 02, 2026 Witness: Counsel Request from: ALLCO Question: (Treatment of behind-the-meter solar generation that is consumed on site.) For a customer with a rooftop or other behind-the-meter solar facility, describe step by step — by reference to the specific sections of Market Rule 1, Manual M-28, ISO-NE Operating Procedure No. 18, and the Company’s own load settlement procedures on which the Company relies, which should be produced — how the energy generated by the facility and consumed on the premises (not exported to the distribution system) is treated in the Company’s Load Settlement Process under Market Rule 1, separately for each of the following four cases: (i) a customer without interval metering served by a licensed third-party supplier; (ii) a customer without interval metering taking Standard Service or Last Resort Service from the Company; (iii) a customer with interval metering served by a third-party supplier; and (iv) a customer with interval metering taking Standard Service. For each case state: (a) the Load Asset to which the customer’s load is assigned and the entity that holds it; (b) whether the on-site generation reduces the hourly load reported for that Load Asset, and if so how the hourly reduction is determined — in particular, for a profiled customer, whether the reduction in billed kilowatt-hours is spread across all hours of the month according to the rate-class load profile rather than assigned to the daylight hours in which the generation occurred, and whether the Company applies any solaradjusted or net-metered-customer load profile; (c) which load-serving entity’s wholesale energy, capacity, and regional-network-service obligations are reduced as a result, and by what amount per kilowatt-hour of on-site consumption; and (d) a worked example for a customer consuming 1,000 kWh in a month of which 400 kWh is supplied by on-site solar, showing the kilowatt-hours reported to ISO-NE for the customer’s Load Asset in each case. Response: Eversource objects to this request. The requested information regarding load settlement for behind-the-meter solar generation is not probative of any material or disputed issue relevant to the Company’s application in this proceeding, which PURA is conducting as a general distribution rate proceeding pursuant to Conn. Gen. Stat. § 16-19, to amend the Company’s base-rate schedules. Absent such a connection, the requested information is not reasonably calculated to advance the evidentiary record upon which PURA must base its decision. The purpose of discovery is to provide PURA, the parties, and intervenors with access to relevant, probative information necessary to develop a complete and accurate record -- not to allow repetitive or irrelevant requests that divert time and resources from that objective. By statute,
  2. Page 2 of 36

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set ALLCO-15 Date Issued October 19, 2026 ALLCO-195 Page 2 of 3 administrative agencies must exclude “irrelevant, immaterial or unduly repetitious evidence.” Conn. Gen. Stat. § 4-178(1); see also Conn. Agencies Regs. § 16-1-38(a). Connecticut judicial precedent explains that evidence is relevant only if it has a tendency to establish the existence of a material fact. United Technologies Corp. v Commission on Human Rights & Opportunities, 72 Conn. App. 212, 229 (2002). Discovery must advance the efficiency of the proceeding and provide the factual foundation upon which an agency decision may rely. Therefore, a party is required to produce discovery documents only if they are “material and necessary to [an] action.” Dotson v. Hartford Roman Catholic Diocesan Corp., No. CV106012742S, 2011 WL 1021745, (Conn. Super. Ct. Feb. 17, 2011) (citing, Berger v. Cuomo, 230 Conn. 1, 7 (1994)); see also Conn. Gen. Stat. § 4-177c(a)(1) (permitting discovery of “relevant and material records, papers and documents[.]”). Additionally, discovery “does not afford an open invitation to delve into [CL&P’s] affairs”. J. Pub. Co. v. Hartford Courant Co., 261 Conn. 673, 681 (2002). Allco “must be able to demonstrate good faith as well as probable cause that the information sought is both material and necessary” to this rate case. Id. Practice Book § 13-2, which defines the scope of discovery, provides in relevant part that a party may only seek discovery of nonprivileged information that is “material to the subject matter involved in the pending action . . . .” “It is axiomatic that [e]vidence is admissible only to prove material facts, that is to say, those facts directly in issue or those probative of matters in issue; evidence offered to prove other facts is immaterial.” Salmon v. Dept. of Public Health & Addiction Services, 259 Conn. 288, 316 (2002) (internal quotation marks omitted; emphasis added.) Further, discovery may not be used to conduct an unrestricted search for information. As the Connecticut Supreme Court has explained, a party “should not be allowed to indulge a hope that a thorough ransacking of any information and material which . . . [CL&P] may possess would turn up evidence helpful to [his] case”. J. Pub. Co. v. Hartford Courant Co., 261 Conn. at 681. Simiarly, “[i]nterrogatories should not be used to . . . permit a party to go on a fishing expedition.” Mfr.'s Advert., Inc. v. Pancoast, 4 Conn. Cir. Ct. 668, 670 (1967) (internal quotation marks omitted). Here, Allco’s request pertains to load settlement for behind-the-meter solar generation, which is not relevant to PURA’s evaluation of either the Company’s application as a whole or its proposed revenue requirement. Thus, the information requested in this interrogatory is not relevant or material to the Company’s rate application as it does not advance the factual foundation upon which PURA’s decision will rely. Office of Consumer Counsel v. Department of Public Utility Control, 44 Conn. Supp. 21, 26-27 (1994). As the information is irrelevant and immaterial, this discovery must be excluded. See General Statutes § 4-178(1); see also Conn. Agencies Regs. § 161-38(a). In addition, the statutory 350-day timeframe for issuing a final decision on the Company’s application, coupled with the volume of interrogatories issued, strongly weighs against devoting
  3. Page 3 of 36

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set ALLCO-15 Date Issued October 19, 2026 ALLCO-195 Page 3 of 3 the time and resources of the parties and PURA to discovery that does not advance the resolution of this proceeding. Requiring the Company to collect, review, and produce information that has not been shown to be material or relevant would impose unnecessary administrative burdens and divert resources from the important issues PURA must evaluate and resolve within the statutory timeframe. Accordingly, in the interest of the orderly and efficient conduct of this proceeding, Eversource respectfully requests that this objection be sustained.
  4. Page 4 of 36

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set ALLCO-15 Date Issued October 19, 2026 ALLCO-196 Page 1 of 3 Date Filed: November 02, 2026 Witness: Counsel Request from: ALLCO Question: (Treatment of behind-the-meter solar generation that is exported.) For the same four cases, describe step by step, with the same citations, how energy generated by the facility and exported to the distribution system is treated in the Company’s Load Settlement Process, and state: (a) whether the exported kilowatt-hours are metered as a separate channel and, if so, whether they are reported to ISO-NE as generation, as negative load on the host customer’s Load Asset, as a reduction of the Metering Domain total that is allocated among all Load Assets, or otherwise; (b) the precise mechanism — section of Manual M-28 or other authority — by which, as the Company stated in ALLCO-095(a), “[t]he excess wholesale generation is distributed amongst all LSEs in the load zone,” including whether the distribution is made in proportion to each LSE’s share of load in the Company’s Metering Domain, in the Connecticut load zone, or otherwise, and whether it is made hourly or monthly; (c) whether the exported energy is reflected in any Load Asset’s coincident-peak contribution used to set capacity load obligations and regional network service charges, and for whose benefit; (d) whether the same treatment applies to the entire output of a facility that exports all of its generation — including facilities compensated under the buy-all option of the Non-Residential Renewable Energy Solutions, Shared Clean Energy Facility, and Residential Renewable Energy Solutions tariffs, LREC/ZREC facilities, and qualifying facilities selling under power purchase agreements — and if not, how the output of each such category is treated; and (e) a worked example for a 2 MW facility exporting 300 MWh in a month, showing the kilowatt-hours by which each Load Asset in the Company’s Metering Domain is reduced, assuming Standard Service and Last Resort Service represent the percentage of Metering Domain load that they represented in the Test Year (state that percentage). Response: Eversource objects to this request. The requested information regarding load settlement for behind-the-meter solar generation is not probative of any material or disputed issue relevant to the Company’s application in this proceeding, which PURA is conducting as a general distribution rate proceeding pursuant to Conn. Gen. Stat. § 16-19, to amend the Company’s base-rate schedules. Absent such a connection, the requested information is not reasonably calculated to advance the evidentiary record upon which PURA must base its decision. The purpose of discovery is to provide PURA, the parties, and intervenors with access to relevant, probative information necessary to develop a complete and accurate record -- not to allow
  5. Page 5 of 36

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set ALLCO-15 Date Issued October 19, 2026 ALLCO-196 Page 2 of 3 repetitive or irrelevant requests that divert time and resources from that objective. By statute, administrative agencies must exclude “irrelevant, immaterial or unduly repetitious evidence.” Conn. Gen. Stat. § 4-178(1); see also Conn. Agencies Regs. § 16-1-38(a). Connecticut judicial precedent explains that evidence is relevant only if it has a tendency to establish the existence of a material fact. United Technologies Corp. v Commission on Human Rights & Opportunities, 72 Conn. App. 212, 229 (2002). Discovery must advance the efficiency of the proceeding and provide the factual foundation upon which an agency decision may rely. Therefore, a party is required to produce discovery documents only if they are “material and necessary to [an] action.” Dotson v. Hartford Roman Catholic Diocesan Corp., No. CV106012742S, 2011 WL 1021745, (Conn. Super. Ct. Feb. 17, 2011) (citing, Berger v. Cuomo, 230 Conn. 1, 7 (1994)); see also Conn. Gen. Stat. § 4-177c(a)(1) (permitting discovery of “relevant and material records, papers and documents[.]”). Additionally, discovery “does not afford an open invitation to delve into [CL&P’s] affairs”. J. Pub. Co. v. Hartford Courant Co., 261 Conn. 673, 681 (2002). Allco “must be able to demonstrate good faith as well as probable cause that the information sought is both material and necessary” to this rate case. Id. Practice Book § 13-2, which defines the scope of discovery, provides in relevant part that a party may only seek discovery of nonprivileged information that is “material to the subject matter involved in the pending action . . . .” “It is axiomatic that [e]vidence is admissible only to prove material facts, that is to say, those facts directly in issue or those probative of matters in issue; evidence offered to prove other facts is immaterial.” Salmon v. Dept. of Public Health & Addiction Services, 259 Conn. 288, 316 (2002) (internal quotation marks omitted; emphasis added.) Further, discovery may not be used to conduct an unrestricted search for information. As the Connecticut Supreme Court has explained, a party “should not be allowed to indulge a hope that a thorough ransacking of any information and material which . . . [CL&P] may possess would turn up evidence helpful to [his] case”. J. Pub. Co. v. Hartford Courant Co., 261 Conn. at 681. Simiarly, “[i]nterrogatories should not be used to . . . permit a party to go on a fishing expedition.” Mfr.'s Advert., Inc. v. Pancoast, 4 Conn. Cir. Ct. 668, 670 (1967) (internal quotation marks omitted). Here, Allco’s request pertains to load settlement for behind-the-meter solar generation, which is not relevant to PURA’s evaluation of either the Company’s application as a whole or its proposed revenue requirement. Thus, the information requested in this interrogatory is not relevant or material to the Company’s rate application as it does not advance the factual foundation upon which PURA’s decision will rely. Office of Consumer Counsel v. Department of Public Utility Control, 44 Conn. Supp. 21, 26-27 (1994). As the information is irrelevant and immaterial, this discovery must be excluded. See General Statutes § 4-178(1); see also Conn. Agencies Regs. § 16-1-38(a).
  6. Page 6 of 36

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set ALLCO-15 Date Issued October 19, 2026 ALLCO-196 Page 3 of 3 In addition, the statutory 350-day timeframe for issuing a final decision on the Company’s application, coupled with the volume of interrogatories issued, strongly weighs against devoting the time and resources of the parties and PURA to discovery that does not advance the resolution of this proceeding. Requiring the Company to collect, review, and produce information that has not been shown to be material or relevant would impose unnecessary administrative burdens and divert resources from the important issues PURA must evaluate and resolve within the statutory timeframe. Accordingly, in the interest of the orderly and efficient conduct of this proceeding, Eversource respectfully requests that this objection be sustained.
  7. Page 7 of 36

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set ALLCO-15 Date Issued October 19, 2026 ALLCO-197 Page 1 of 3 Date Filed: November 02, 2026 Witness: Counsel Request from: ALLCO Question: (Who receives the value of exported generation the Company pays for.) With respect to facilities whose entire output the Company purchases or credits under a PURA-approved tariff or contract and whose cost is recovered from all distribution customers through the NonBypassable Federally Mandated Congestion Charge or otherwise: (a) confirm that, under the treatment described in ALLCO-095(a), the wholesale energy value of that output is distributed to every load-serving entity in the load zone, including third-party suppliers that bear none of the tariff cost, in proportion to their load; (b) state, for each calendar year 2020 through 2025, the total megawatt-hours of such exported output in the Company’s Metering Domain, the share distributed to Load Assets held by third-party suppliers, and the value of that share at the applicable hourly real-time locational marginal prices; (c) state whether the Company’s Standard Service and Last Resort Service procurement and reconciliation reflect any credit for that output, and where; and (d) state whether any portion of the capacity value, forward-reserve value, or regional network service reduction associated with that output accrues to third-party suppliers, and quantify it. If the Company contends that it cannot perform any of these calculations, state what data would be required, whether the Company possesses it, and why the calculation was not performed before the Company asserted in ALLCO-098(c) and (d) that “[t]here is no cost-benefit asymmetry” and that existing mechanisms “already align” costs and savings. Response: Eversource objects to this request. The requested information regarding generation purchased by the Company under PURA-approved contracts is not probative of any material or disputed issue relevant to the Company’s application in this proceeding, which PURA is conducting as a general distribution rate proceeding pursuant to Conn. Gen. Stat. § 16-19, to amend the Company’s baserate schedules. Absent such a connection, the requested information is not reasonably calculated to advance the evidentiary record upon which PURA must base its decision. The purpose of discovery is to provide PURA, the parties, and intervenors with access to relevant, probative information necessary to develop a complete and accurate record -- not to allow repetitive or irrelevant requests that divert time and resources from that objective. By statute, administrative agencies must exclude “irrelevant, immaterial or unduly repetitious evidence.” Conn. Gen. Stat. § 4-178(1); see also Conn. Agencies Regs. § 16-1-38(a). Connecticut judicial precedent explains that evidence is relevant only if it has a tendency to establish the existence of a
  8. Page 8 of 36

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set ALLCO-15 Date Issued October 19, 2026 ALLCO-197 Page 2 of 3 material fact. United Technologies Corp. v Commission on Human Rights & Opportunities, 72 Conn. App. 212, 229 (2002). Discovery must advance the efficiency of the proceeding and provide the factual foundation upon which an agency decision may rely. Therefore, a party is required to produce discovery documents only if they are “material and necessary to [an] action.” Dotson v. Hartford Roman Catholic Diocesan Corp., No. CV106012742S, 2011 WL 1021745, (Conn. Super. Ct. Feb. 17, 2011) (citing, Berger v. Cuomo, 230 Conn. 1, 7 (1994)); see also Conn. Gen. Stat. § 4-177c(a)(1) (permitting discovery of “relevant and material records, papers and documents[.]”). Additionally, discovery “does not afford an open invitation to delve into [CL&P’s] affairs”. J. Pub. Co. v. Hartford Courant Co., 261 Conn. 673, 681 (2002). Allco “must be able to demonstrate good faith as well as probable cause that the information sought is both material and necessary” to this rate case. Id. Practice Book § 13-2, which defines the scope of discovery, provides in relevant part that a party may only seek discovery of nonprivileged information that is “material to the subject matter involved in the pending action . . . .” “It is axiomatic that [e]vidence is admissible only to prove material facts, that is to say, those facts directly in issue or those probative of matters in issue; evidence offered to prove other facts is immaterial.” Salmon v. Dept. of Public Health & Addiction Services, 259 Conn. 288, 316 (2002) (internal quotation marks omitted; emphasis added.) Further, discovery may not be used to conduct an unrestricted search for information. As the Connecticut Supreme Court has explained, a party “should not be allowed to indulge a hope that a thorough ransacking of any information and material which . . . [CL&P] may possess would turn up evidence helpful to [his] case”. J. Pub. Co. v. Hartford Courant Co., 261 Conn. at 681. Simiarly, “[i]nterrogatories should not be used to . . . permit a party to go on a fishing expedition.” Mfr.'s Advert., Inc. v. Pancoast, 4 Conn. Cir. Ct. 668, 670 (1967) (internal quotation marks omitted). Here, Allco’s request pertains to generation purchased by the Company under PURA-approved contracts, which is not relevant to PURA’s evaluation of either the Company’s application as a whole or its proposed revenue requirement. Thus, the information requested in this interrogatory is not relevant or material to the Company’s rate application as it does not advance the factual foundation upon which PURA’s decision will rely. Office of Consumer Counsel v. Department of Public Utility Control, 44 Conn. Supp. 21, 26-27 (1994). As the information is irrelevant and immaterial, this discovery must be excluded. See General Statutes § 4-178(1); see also Conn. Agencies Regs. § 16-1-38(a). In addition, the statutory 350-day timeframe for issuing a final decision on the Company’s application, coupled with the volume of interrogatories issued, strongly weighs against devoting the time and resources of the parties and PURA to discovery that does not advance the resolution of this proceeding. Requiring the Company to collect, review, and produce information that has not been shown to be material or relevant would impose unnecessary administrative burdens and
  9. Page 9 of 36

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set ALLCO-15 Date Issued October 19, 2026 ALLCO-197 Page 3 of 3 divert resources from the important issues PURA must evaluate and resolve within the statutory timeframe. Accordingly, in the interest of the orderly and efficient conduct of this proceeding, Eversource respectfully requests that this objection be sustained.
  10. Page 10 of 36

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set ALLCO-15 Date Issued October 19, 2026 ALLCO-198 Page 1 of 3 Date Filed: November 02, 2026 Witness: Counsel Request from: ALLCO Question: (The claimed ratepayer benefit of load-reducer treatment.) The Company stated in ALLCO040, and ALLCO-041, that treating distribution-connected resources under five megawatts as unregistered load reducers “produces benefits for customers by reducing wholesale load obligations,” and in ALLCO-087, that it is the “general Company practice to not register” such resources with ISO-NE and that this practice has been “acknowledged and accepted by PURA.” Explain how the Company’s treatment of projects under 5 MW as load reducers results in benefits to ratepayers, and in doing so: (a) identify the customers who receive the benefit — the Company’s Standard Service and Last Resort Service customers, customers of third-party suppliers, all distribution customers, or some other group — and quantify the benefit to each group for each year 2020 through 2025 in megawatt-hours, in capacity megawatts, and in dollars; (b) identify the docket, decision, or ruling in which the Authority “acknowledged and accepted” the practice of not registering resources under 5 MW, and produce it; (c) compare the treatment in (a) with the treatment that would result if a facility whose output the Company purchases were registered as a Settlement Only Resource — in which case its metered output would be settled at the locational marginal price to the account of the Company as purchaser — and state whether the Company has ever evaluated registering, as Settlement Only Resources or otherwise, facilities whose output it purchases under buy-all tariffs or power purchase agreements, so that the energy and capacity value of that output accrues to the customers who pay for it; produce each such evaluation or state that none exists; (d) state whether the Company’s load forecasts used for Standard Service procurement, and the Standard Service bids it receives, reflect the load-reducing effect of behind-the-meter generation, and if so how, so that the Authority can determine whether the claimed benefit reaches Standard Service customers in the price they pay; and (e) state whether the Company’s statement in ALLCO-087, that “no individual or group determines” whether a resource under 5 MW is registered with ISO-NE remains accurate, and if so identify the person or group responsible for the Company’s compliance with ISO-NE registration and metering requirements for distributed resources. Response: Eversource objects to this request. The requested information regarding the treatment of distributed energy resources as load reducers is not probative of any material or disputed issue relevant to the Company’s application in this proceeding, which PURA is conducting as a general distribution rate proceeding pursuant to Conn. Gen. Stat. § 16-19, to amend the Company’s base-