  1. Page 11 of 36

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set ALLCO-15 Date Issued October 19, 2026 ALLCO-198 Page 2 of 3 rate schedules. Absent such a connection, the requested information is not reasonably calculated to advance the evidentiary record upon which PURA must base its decision. The purpose of discovery is to provide PURA, the parties, and intervenors with access to relevant, probative information necessary to develop a complete and accurate record -- not to allow repetitive or irrelevant requests that divert time and resources from that objective. By statute, administrative agencies must exclude “irrelevant, immaterial or unduly repetitious evidence.” Conn. Gen. Stat. § 4-178(1); see also Conn. Agencies Regs. § 16-1-38(a). Connecticut judicial precedent explains that evidence is relevant only if it has a tendency to establish the existence of a material fact. United Technologies Corp. v Commission on Human Rights & Opportunities, 72 Conn. App. 212, 229 (2002). Discovery must advance the efficiency of the proceeding and provide the factual foundation upon which an agency decision may rely. Therefore, a party is required to produce discovery documents only if they are “material and necessary to [an] action.” Dotson v. Hartford Roman Catholic Diocesan Corp., No. CV106012742S, 2011 WL 1021745, (Conn. Super. Ct. Feb. 17, 2011) (citing, Berger v. Cuomo, 230 Conn. 1, 7 (1994)); see also Conn. Gen. Stat. § 4-177c(a)(1) (permitting discovery of “relevant and material records, papers and documents[.]”). Additionally, discovery “does not afford an open invitation to delve into [CL&P’s] affairs”. J. Pub. Co. v. Hartford Courant Co., 261 Conn. 673, 681 (2002). Allco “must be able to demonstrate good faith as well as probable cause that the information sought is both material and necessary” to this rate case. Id. Practice Book § 13-2, which defines the scope of discovery, provides in relevant part that a party may only seek discovery of nonprivileged information that is “material to the subject matter involved in the pending action . . . .” “It is axiomatic that [e]vidence is admissible only to prove material facts, that is to say, those facts directly in issue or those probative of matters in issue; evidence offered to prove other facts is immaterial.” Salmon v. Dept. of Public Health & Addiction Services, 259 Conn. 288, 316 (2002) (internal quotation marks omitted; emphasis added.) Further, discovery may not be used to conduct an unrestricted search for information. As the Connecticut Supreme Court has explained, a party “should not be allowed to indulge a hope that a thorough ransacking of any information and material which . . . [CL&P] may possess would turn up evidence helpful to [his] case”. J. Pub. Co. v. Hartford Courant Co., 261 Conn. at 681. Simiarly, “[i]nterrogatories should not be used to . . . permit a party to go on a fishing expedition.” Mfr.'s Advert., Inc. v. Pancoast, 4 Conn. Cir. Ct. 668, 670 (1967) (internal quotation marks omitted). Here, Allco’s request pertains to the treatment of distributed energy resources as load reducers, which is not relevant to PURA’s evaluation of either the Company’s application as a whole or its proposed revenue requirement. Thus, the information requested in this interrogatory is not relevant or material to the Company’s rate application as it does not advance the factual foundation upon which PURA’s decision will rely. Office of Consumer Counsel v. Department of Public Utility
  2. Page 12 of 36

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set ALLCO-15 Date Issued October 19, 2026 ALLCO-198 Page 3 of 3 Control, 44 Conn. Supp. 21, 26-27 (1994). As the information is irrelevant and immaterial, this discovery must be excluded. See General Statutes § 4-178(1); see also Conn. Agencies Regs. § 16-1-38(a). In addition, the statutory 350-day timeframe for issuing a final decision on the Company’s application, coupled with the volume of interrogatories issued, strongly weighs against devoting the time and resources of the parties and PURA to discovery that does not advance the resolution of this proceeding. Requiring the Company to collect, review, and produce information that has not been shown to be material or relevant would imposse uneccesary administrative burdens and divert resources from the important issues PURA must evaluate and resolve within the statutory timeframe. Accordingly, in the interest of the orderly and efficient conduct of this proceeding, Eversource respectfully requests that this objection be sustained.
  3. Page 13 of 36

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set ALLCO-15 Date Issued October 19, 2026 ALLCO-199 Page 1 of 3 Date Filed: November 02, 2026 Witness: Counsel Request from: ALLCO Question: (Load settlement systems and the Omni conversion.) (a) Identify each Load Settlement System used for the Company’s Metering Domain in each year 2019 through 2026, its vendor, the ESC or Company organization that operates it, the number of personnel assigned, and the portion of its cost charged or allocated to the Company in the Test Year and Rate Year, with schedule references; (b) state whether the Omni retail billing platform, or the same platform under another name, has been or is scheduled to be implemented for the Company’s Connecticut customers, the actual or scheduled implementation date, the project budget and amounts spent through the most recent date available, the amount included in the Test Year, Test Year Pro Forma, or Rate Year (expense or plant), and the schedule and workpaper references; (c) state whether the Load Settlement System used for the Company is the same system (Retail Operations, developed by Hitachi) that Eversource Energy identified in EL26-5 as the system NSTAR Electric Company uses, and whether the defects described in EL26-5 — load “assigned to the same accounts multiple times” and “a doubling of customer loads for certain commercial, industrial, and residential customers” — were present in, tested for, or corrected in the Company’s system; and (d) describe the “enhanced monitoring, validation, and review procedures for load settlement data” that Eversource Energy told the Commission NSTAR has implemented, state whether and when each was implemented for the Company’s Metering Domain, and produce the procedures. Response: Eversource objects to this request. The requested information regarding load settlement is not probative of any material or disputed issue relevant to the Company’s application in this proceeding, which PURA is conducting as a general distribution rate proceeding pursuant to Conn. Gen. Stat. § 16-19, to amend the Company’s base-rate schedules. Absent such a connection, the requested information is not reasonably calculated to advance the evidentiary record upon which PURA must base its decision. The purpose of discovery is to provide PURA, the parties, and intervenors with access to relevant, probative information necessary to develop a complete and accurate record -- not to allow repetitive or irrelevant requests that divert time and resources from that objective. By statute, administrative agencies must exclude “irrelevant, immaterial or unduly repetitious evidence.” Conn. Gen. Stat. § 4-178(1); see also Conn. Agencies Regs. § 16-1-38(a). Connecticut judicial precedent explains that evidence is relevant only if it has a tendency to establish the existence of a
  4. Page 14 of 36

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set ALLCO-15 Date Issued October 19, 2026 ALLCO-199 Page 2 of 3 material fact. United Technologies Corp. v Commission on Human Rights & Opportunities, 72 Conn. App. 212, 229 (2002). Discovery must advance the efficiency of the proceeding and provide the factual foundation upon which an agency decision may rely. Therefore, a party is required to produce discovery documents only if they are “material and necessary to [an] action.” Dotson v. Hartford Roman Catholic Diocesan Corp., No. CV106012742S, 2011 WL 1021745, (Conn. Super. Ct. Feb. 17, 2011) (citing, Berger v. Cuomo, 230 Conn. 1, 7 (1994)); see also Conn. Gen. Stat. § 4-177c(a)(1) (permitting discovery of “relevant and material records, papers and documents[.]”). Additionally, discovery “does not afford an open invitation to delve into [CL&P’s] affairs”. J. Pub. Co. v. Hartford Courant Co., 261 Conn. 673, 681 (2002). Allco “must be able to demonstrate good faith as well as probable cause that the information sought is both material and necessary” to this rate case. Id. Practice Book § 13-2, which defines the scope of discovery, provides in relevant part that a party may only seek discovery of nonprivileged information that is “material to the subject matter involved in the pending action . . . .” “It is axiomatic that [e]vidence is admissible only to prove material facts, that is to say, those facts directly in issue or those probative of matters in issue; evidence offered to prove other facts is immaterial.” Salmon v. Dept. of Public Health & Addiction Services, 259 Conn. 288, 316 (2002) (internal quotation marks omitted; emphasis added.) Further, discovery may not be used to conduct an unrestricted search for information. As the Connecticut Supreme Court has explained, a party “should not be allowed to indulge a hope that a thorough ransacking of any information and material which . . . [CL&P] may possess would turn up evidence helpful to [his] case”. J. Pub. Co. v. Hartford Courant Co., 261 Conn. at 681. Simiarly, “[i]nterrogatories should not be used to . . . permit a party to go on a fishing expedition.” Mfr.'s Advert., Inc. v. Pancoast, 4 Conn. Cir. Ct. 668, 670 (1967) (internal quotation marks omitted). Here, Allco’s request pertains to load settlement, which is not relevant to PURA’s evaluation of either the Company’s application as a whole or its proposed revenue requirement. Thus, the information requested in this interrogatory is not relevant or material to the Company’s rate application as it does not advance the factual foundation upon which PURA’s decision will rely. Office of Consumer Counsel v. Department of Public Utility Control, 44 Conn. Supp. 21, 26-27 (1994). As the information is irrelevant and immaterial, this discovery must be excluded. See General Statutes § 4-178(1); see also Conn. Agencies Regs. § 16-1-38(a). In addition, the statutory 350-day timeframe for issuing a final decision on the Company’s application, coupled with the volume of interrogatories issued, strongly weighs against devoting the time and resources of the parties and PURA to discovery that does not advance the resolution of this proceeding. Requiring the Company to collect, review, and produce information that has not been shown to be material or relevant would impose unnecessary administrative burdens and divert resources from the important issues PURA must evaluate and resolve within the statutory
  5. Page 15 of 36

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set ALLCO-15 Date Issued October 19, 2026 ALLCO-199 Page 3 of 3 timeframe. Accordingly, in the interest of the orderly and efficient conduct of this proceeding, Eversource respectfully requests that this objection be sustained.
  6. Page 16 of 36Match

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set ALLCO-15 Date Issued October 19, 2026 ALLCO-200 Page 1 of 3 Date Filed: November 02, 2026 Witness: Counsel Request from: ALLCO Question: (Meter Data Errors and resettlements in the Company’s Metering Domain.) For each calendar year 2019 through 2026 (year to date), state in native format: (a) the number of Meter Data Error correction requests, Requested Billing Adjustments, and resettlement submissions made by or on behalf of the Company as Assigned Meter Reader or Host Participant for its Metering Domain, the month(s) of load affected, the megawatt-hours and dollar amount of each correction, and the Load Assets (by LSE category: Standard Service, Last Resort Service, thirdparty supplier) whose load was increased or decreased; (b) the number of inquiries, disputes, or complaints received from licensed third-party suppliers concerning the load assigned to their Load Assets, and their disposition; (c) whether any error in the Company’s reported load affected the load assigned to the Company’s Standard Service or Last Resort Service Load Assets, the megawatt-hours and dollar effect, and how any resulting over- or under-collection was treated in the Standard Service, Last Resort Service, or Generation Services Charge reconciliations; (d) whether the Company’s reported load affected the Company’s or any supplier’s Renewable Portfolio Standard obligation under Conn. Gen. Stat. § 16-245a, and whether any correction was reported to the Authority or the Department of Energy and Environmental Protection; and (e) each notice given to the Authority, the Office of Consumer Counsel, or ISO-NE concerning errors in the Company’s load settlement data since January 1, 2024, with the date and a copy. Response: Eversource objects to this request. The requested information regarding reported load and load settlements is not probative of any material or disputed issue relevant to the Company’s application in this proceeding, which PURA is conducting as a general distribution rate proceeding pursuant to Conn. Gen. Stat. § 16-19, to amend the Company’s base-rate schedules. Absent such a connection, the requested information is not reasonably calculated to advance the evidentiary record upon which PURA must base its decision. The purpose of discovery is to provide PURA, the parties, and intervenors with access to relevant, probative information necessary to develop a complete and accurate record -- not to allow repetitive or irrelevant requests that divert time and resources from that objective. By statute, administrative agencies must exclude “irrelevant, immaterial or unduly repetitious evidence.” Conn. Gen. Stat. § 4-178(1); see also Conn. Agencies Regs. § 16-1-38(a). Connecticut judicial precedent explains that evidence is relevant only if it has a tendency to establish the existence of a
  7. Page 17 of 36

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set ALLCO-15 Date Issued October 19, 2026 ALLCO-200 Page 2 of 3 material fact. United Technologies Corp. v Commission on Human Rights & Opportunities, 72 Conn. App. 212, 229 (2002). Discovery must advance the efficiency of the proceeding and provide the factual foundation upon which an agency decision may rely. Therefore, a party is required to produce discovery documents only if they are “material and necessary to [an] action.” Dotson v. Hartford Roman Catholic Diocesan Corp., No. CV106012742S, 2011 WL 1021745, (Conn. Super. Ct. Feb. 17, 2011) (citing, Berger v. Cuomo, 230 Conn. 1, 7 (1994)); see also Conn. Gen. Stat. § 4-177c(a)(1) (permitting discovery of “relevant and material records, papers and documents[.]”). Additionally, discovery “does not afford an open invitation to delve into [CL&P’s] affairs”. J. Pub. Co. v. Hartford Courant Co., 261 Conn. 673, 681 (2002). Allco “must be able to demonstrate good faith as well as probable cause that the information sought is both material and necessary” to this rate case. Id. Practice Book § 13-2, which defines the scope of discovery, provides in relevant part that a party may only seek discovery of nonprivileged information that is “material to the subject matter involved in the pending action . . . .” “It is axiomatic that [e]vidence is admissible only to prove material facts, that is to say, those facts directly in issue or those probative of matters in issue; evidence offered to prove other facts is immaterial.” Salmon v. Dept. of Public Health & Addiction Services, 259 Conn. 288, 316 (2002) (internal quotation marks omitted; emphasis added.) Further, discovery may not be used to conduct an unrestricted search for information. As the Connecticut Supreme Court has explained, a party “should not be allowed to indulge a hope that a thorough ransacking of any information and material which . . . [CL&P] may possess would turn up evidence helpful to [his] case”. J. Pub. Co. v. Hartford Courant Co., 261 Conn. at 681. Simiarly, “[i]nterrogatories should not be used to . . . permit a party to go on a fishing expedition.” Mfr.'s Advert., Inc. v. Pancoast, 4 Conn. Cir. Ct. 668, 670 (1967) (internal quotation marks omitted). Here, Allco’s request pertains to reported load and load settlements, which are not relevant to PURA’s evaluation of either the Company’s application as a whole or its proposed revenue requirement. Thus, the information requested in this interrogatory is not relevant or material to the Company’s rate application as it does not advance the factual foundation upon which PURA’s decision will rely. Office of Consumer Counsel v. Department of Public Utility Control, 44 Conn. Supp. 21, 26-27 (1994). As the information is irrelevant and immaterial, this discovery must be excluded. See General Statutes § 4-178(1); see also Conn. Agencies Regs. § 16-1-38(a). In addition, the statutory 350-day timeframe for issuing a final decision on the Company’s application, coupled with the volume of interrogatories issued, strongly weighs against devoting the time and resources of the parties and PURA to discovery that does not advance the resolution of this proceeding. Requiring the Company to collect, review, and produce information that has not been shown to be material or relevant would imposse uneccesary administrative burdens and divert resources from the important issues PURA must evaluate and resolve within the statutory
  8. Page 18 of 36

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set ALLCO-15 Date Issued October 19, 2026 ALLCO-200 Page 3 of 3 timeframe. Accordingly, in the interest of the orderly and efficient conduct of this proceeding, Eversource respectfully requests that this objection be sustained.
  9. Page 19 of 36

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set ALLCO-15 Date Issued October 19, 2026 ALLCO-201 Page 1 of 3 Date Filed: November 02, 2026 Witness: Counsel Request from: ALLCO Question: (The Load Settlement Report and EL26-5 — facts and costs.) Without regard to any privilege claimed for the report itself: (a) state whether the Internal Audit review of the ISO-NE load settlement process that the Company identified in ALLCO-065, through ALLCO-067 (requested April 25, 2025; engagement memorandum May 19, 2025; final report January 7, 2026) examined the Company’s Connecticut Metering Domain, the NSTAR Metering Domains, or both, and whether it examined the Omni-related defects at issue in EL26-5; (b) state whether the Company’s response to ALLCO-068, — that EL26-5 is the only litigation and that it concerns load settlement “solely in Massachusetts” — remains accurate in light of the fact that Eversource Energy, the parent whose service-company costs are allocated to the Company, is a named respondent, and identify every other complaint, dispute, or proceeding since January 1, 2024 concerning load settlement data reported by any Eversource electric distribution company; (c) state the total cost incurred by Eversource Energy, ESC, NSTAR, and the Company in connection with EL26-5 and the related reconciliation work described in Eversource’s March 6, 2026 answer (dedicated processing environment; rerunning settlement data; integrity checks; meetings with the Massachusetts Department of Energy Resources), including outside counsel, consultants, vendor remediation, and internal labor, and the portion of each charged or allocated to the Company, with FERC account and schedule references; and (d) state whether any cost of remediating load settlement defects, of resettling Massachusetts invoices, or of defending EL26-5, is included in the Test Year, Test Year Pro Forma, or Rate Year cost of service of the Company, directly or through ESC allocation, and if so the amount and the basis for charging it to Connecticut customers.Interconnection Applications Referred to ISO New England for Transmission-Level Review. Response: Eversource objects to this request. The requested information regarding metering domains and load settlements is not probative of any material or disputed issue relevant to the Company’s application in this proceeding, which PURA is conducting as a general distribution rate proceeding pursuant to Conn. Gen. Stat. § 16-19, to amend the Company’s base-rate schedules. Absent such a connection, the requested information is not reasonably calculated to advance the evidentiary record upon which PURA must base its decision. The purpose of discovery is to provide PURA, the parties, and intervenors with access to relevant, probative information necessary to develop a complete and accurate record -- not to allow
  10. Page 20 of 36

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set ALLCO-15 Date Issued October 19, 2026 ALLCO-201 Page 2 of 3 repetitive or irrelevant requests that divert time and resources from that objective. By statute, administrative agencies must exclude “irrelevant, immaterial or unduly repetitious evidence.” Conn. Gen. Stat. § 4-178(1); see also Conn. Agencies Regs. § 16-1-38(a). Connecticut judicial precedent explains that evidence is relevant only if it has a tendency to establish the existence of a material fact. United Technologies Corp. v Commission on Human Rights & Opportunities, 72 Conn. App. 212, 229 (2002). Discovery must advance the efficiency of the proceeding and provide the factual foundation upon which an agency decision may rely. Therefore, a party is required to produce discovery documents only if they are “material and necessary to [an] action.” Dotson v. Hartford Roman Catholic Diocesan Corp., No. CV106012742S, 2011 WL 1021745, (Conn. Super. Ct. Feb. 17, 2011) (citing, Berger v. Cuomo, 230 Conn. 1, 7 (1994)); see also Conn. Gen. Stat. § 4-177c(a)(1) (permitting discovery of “relevant and material records, papers and documents[.]”). Additionally, discovery “does not afford an open invitation to delve into [CL&P’s] affairs”. J. Pub. Co. v. Hartford Courant Co., 261 Conn. 673, 681 (2002). Allco “must be able to demonstrate good faith as well as probable cause that the information sought is both material and necessary” to this rate case. Id. Practice Book § 13-2, which defines the scope of discovery, provides in relevant part that a party may only seek discovery of nonprivileged information that is “material to the subject matter involved in the pending action . . . .” “It is axiomatic that [e]vidence is admissible only to prove material facts, that is to say, those facts directly in issue or those probative of matters in issue; evidence offered to prove other facts is immaterial.” Salmon v. Dept. of Public Health & Addiction Services, 259 Conn. 288, 316 (2002) (internal quotation marks omitted; emphasis added.) Further, discovery may not be used to conduct an unrestricted search for information. As the Connecticut Supreme Court has explained, a party “should not be allowed to indulge a hope that a thorough ransacking of any information and material which . . . [CL&P] may possess would turn up evidence helpful to [his] case”. J. Pub. Co. v. Hartford Courant Co., 261 Conn. at 681. Simiarly, “[i]nterrogatories should not be used to . . . permit a party to go on a fishing expedition.” Mfr.'s Advert., Inc. v. Pancoast, 4 Conn. Cir. Ct. 668, 670 (1967) (internal quotation marks omitted). Here, Allco’s request pertains to load settlements and metering domains, which are not relevant to PURA’s evaluation of either the Company’s application as a whole or its proposed revenue requirement. Thus, the information requested in this interrogatory is not relevant or material to the Company’s rate application as it does not advance the factual foundation upon which PURA’s decision will rely. Office of Consumer Counsel v. Department of Public Utility Control, 44 Conn. Supp. 21, 26-27 (1994). As the information is irrelevant and immaterial, this discovery must be excluded. See General Statutes § 4-178(1); see also Conn. Agencies Regs. § 16-1-38(a). In addition, the statutory 350-day timeframe for issuing a final decision on the Company’s application, coupled with the volume of interrogatories issued, strongly weighs against devoting
Words on different pages

As listed on the current system

Corres. 11/03/2026 [26-05-10] (Keegan Werlin LLP) - Discovery Compilation (ALLCO Set 15, ALLCO Set 17)

This filing on the current system (opens in a new tab)