  1. Page 21 of 49

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set ALLCO-13 Date Issued October 13, 2026 ALLCO-179 Page 1 of 3 Date Filed: November 03, 2026 Witness: Brendan J. O’Brien, Garrett J. Murray, Leanne M. Landry, Warren R. Boutin, and Jeffrey D. Turano Request from: ALLCO Question: (Follow-up to ALLCO-108 and ALLCO-004 — refund liabilities.) The Company confirms (ALLCO-004) that a refund obligation determined on final accounting “is recorded as a liability on the Company’s books until the payment is issued,” but did not answer subparts (a), (b), or (d) of ALLCO-108. For refund obligations to interconnection customers generally (not limited to Allco or its affiliates), state: (a) the FERC account and sub-account in which such liabilities are recorded; (b) the balance of computed but unpaid interconnection refunds at the end of each year 2019 through 2025 and at the most recent month-end; (c) whether and where that balance is reflected in the Test Year and Rate Year balance sheet, rate base, cash working capital, or lead-lag study in this docket; (d) the Company’s policy and standard timeline for paying a computed refund, by reference to Section 5.3.2 of the Interconnection Agreement and any internal procedure, and the person by title who authorizes payment; and (e) a schedule, in native format and with customers other than Allco anonymized, of each interconnection refund computed from January 1, 2017 to the present, showing the date computed, the amount, the date paid, and the amount outstanding. Response: CL&P objects to this request on the ground that it is an improper effort by Allco to use this rate case proceeding to obtain discovery for purposes of a lawsuit that it filed against the Company on August 10, 2026, in the United States District Court for the District of Connecticut (Civil Action No. 3:26-cv-1277), outside of and in contravention of the rules of procedure that govern discovery in that lawsuit. CL&P further objects to this request on the ground that it is not within the scope of the proceeding to review the Company’s application to amend its existing rates schedules because the interrogatory either seeks information specific to Allco projects or seeks information that Allco views as relevant to its specific projects. Without waiving said objections, the Company responds as follows: a. Please refer to the Company’s response to ALLCO-001 i for the FERC accounts. b. Please refer to the above-stated objections.
  2. Page 22 of 49

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set ALLCO-13 Date Issued October 13, 2026 ALLCO-179 Page 2 of 3 c. Please refer to the Company’s response to ALLCO-157 ii, sub part (d), where these balances are addressed. d. The PURA-approved form of Interconnection Agreement requires that a refund be issued within thirty (30) days of the provision of the final accounting report. Unless the refund is the subject of a dispute, Eversource issues the refund in accordance with the Interconnection Agreement. e. Please refer to the above-stated objections. Prior Referenced Responses: i ALLCO-001 Question: Identify each FERC account in which the Company records CIAC and other amounts collected from interconnection customers for interconnection studies, upgrades, and overheads, and state the balance in each such account at the end of each year 2018 through 2025 and as of the most recent month available. ALLCO-001 Response: CL&P objects to this request on the ground that it is an improper effort by Allco to use this rate case proceeding to obtain discovery for purposes of a lawsuit that it filed against the Company on August 10, 2026, in the United States District Court for the District of Connecticut (Civil Action No. 3:26-cv-1277), outside of and in contravention of the rules of procedure that govern discovery in that lawsuit. Without waiving said objection, the Company records CIAC activity from interconnection customers to FERC Account No. 252500. The table below summarizes the end of year balance in FERC Account No. 252500 from 2018 through June 2026. ii ALLCO-157 Question: (Follow-up to OCC-676 and ALLCO-059 — customer advances and interconnection deposits.) OCC-676 states that the Company has excluded customer advances from rate base since Docket No. 14-05-06 because “they are refundable
  3. Page 23 of 49Match

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set ALLCO-13 Date Issued October 13, 2026 ALLCO-179 Page 3 of 3 and the Company does not have use of these dollars.” ALLCO-059 states that Account 252500 held ($28,277,769) of interconnection customers’ payments at June 30, 2026. (a) State whether the funds recorded in Account 252500 and in any other customer-advance or CIAC-deposit account are held in a segregated or escrow account or are commingled with the Company’s general funds, and identify the account(s) and institution(s). (b) If commingled, state whether those funds are available to and used by the Company for working capital, construction, or any other purpose pending final accounting, and reconcile that use with the statement that the Company “does not have use of these dollars” and with OCC-677, which attributes the increase in customer advances since December 2025 to $14.5 million received from five NB-12 line-extension customers for projects that “are currently in construction.” (c) State whether any interest is paid or credited to interconnection customers on advances held pending final accounting or refund, and the tariff, agreement, or policy provision governing it. (d) State whether customer advances and CIAC deposits are reflected in the Company’s cash working capital or lead-lag analysis in this Application and, if so, where; if not, explain why customer funds held for months or years are excluded from the working-capital determination. (e) Produce the Company’s response to OCC-072 in Docket No. 14-05-06 and identify the page of the Final Decision in that docket on which the Company relies. ALLCO-157 Response: a. Please refer to the Company’s responses to ALLCO-001i, ALLCO-002ii, and ALLCO 004iii. b. Please refer to the Company’s response to subpart (a) and OCC-935iv. The Company keeps enough cash on hand in order to refund customer advances if/when they come due. For primary extensions and modifications under PURA-approved New Business Policy NB-12 (“NB-12 Policy”), a customer may make the required advance payment to the Company via wire transfer or letter of credit. For advance payments made via wire transfer, per the NB-12 Policy, the Company credits advances to: The Company also authorizes refunds, when appropriate, charging to this same account. This advance payment is refunded in full, without interest, when the extensions and modifications are considered by the Company to have been put into full use. c. The PURA-approved Interconnection Guidelines and form of Interconnection Agreement do not authorize the payment of interest on final accountings that result in an Overpayment to be refunded to the interconnecting customer, and the PURA-approved NB-12 Policy states that advances will not accumulate interest. d. Customer advances and CIAC deposits are not reflected within the Company’s cash working capital or leadlag analysis. e. The relevant language from the Company’s response to OCC-072 in Docket No. 14-05-06 is provided in the Company’s response to OCC-676v. Monthly balances of customer advances between 2009 and 2014 are not relevant to the instant proceeding. To answer the remainder of the subpart, OCC-072 stated, in relevant part “The Company has not included customer advances in the test year or rate year as they are refundable and the Company does not have use of these dollars.” The Final Decision in Docket No. 14-05-06 did not comment on the treatment of customer advances.
  4. Page 24 of 49

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set ALLCO-13 Date Issued October 13, 2026 ALLCO-180 Page 1 of 1 Date Filed: October 27, 2026 Witness: Counsel Request from: ALLCO Question: (Follow-up to ALLCO-110 — Form 556 and the CIAC fee.) Subparts (b) and (c) of ALLCO-110 concern all interconnection customers, not Allco alone. State: (a) the written policy, tariff provision, or Authority order under which a “CIAC Fee” or percentage CIAC is collected from interconnection customers and later refunded upon submission of FERC Form 556, or state that none exists and describe the practice, its origin, and the person by title who established it; (b) for each year 2017 through 2025, the number of interconnection projects for which a CIAC fee or percentage CIAC was collected from a customer that had submitted, or later submitted, Form 556, the total amount collected, the total refunded, the average interval between collection and refund, and the amount still held; (c) the FERC account in which CIAC-fee collections and refunds are recorded and whether the balance is included in Account 252500 as reported in ALLCO-001; (d) why percentage CIAC is collected at the outset from qualifying facilities whose Form 556 certification is on file rather than not charged; and (e) whether any interest or carrying charge is paid to the customer on the refunded amount for the period it was held. Response: CL&P objects to this request on the ground that it is an improper effort by ALLCO to use this rate case proceeding to obtain discovery for purposes of a lawsuit that it filed against the Company on August 10, 2026, in the United States District Court for the District of Connecticut (Civil Action No. 3:26-cv-1277), outside of and in contravention of the rules of procedure that govern discovery in that lawsuit. CL&P further objects to this request on the ground that it is not within the scope of the proceeding to review the Company’s application to amend its existing rates schedules because the interrogatory either seeks information specific to Allco projects or seeks information that Allco views as relevant to its specific projects.
  5. Page 25 of 49

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set ALLCO-13 Date Issued October 13, 2026 ALLCO-181 Page 1 of 1 Date Filed: October 27, 2026 Witness: Counsel Request from: ALLCO Question: (Follow-up to ALLCO-111 — records and substantiation requests of interconnection customers generally.) State: (a) whether the Company maintains, for distribution-generation interconnection work orders, the construction work-order records described in 18 C.F.R. Part 101, Electric Plant Instruction 4(C), and the Company’s retention period for such records; (b) the Company’s policy, if any, on furnishing invoices, general-ledger detail, work-order cost detail, or other transactionlevel substantiation to an interconnection customer that disputes a charge or requests support for a final accounting, and the person by title who decides whether to furnish it; (c) the number of requests for such substantiation received from interconnection customers in each year 2017 through 2025 and, of those, the number granted in full, granted in part, and refused; and (d) whether any Authority order, Guideline provision, or Interconnection Agreement term, in the Company’s view, entitles an interconnection customer to such substantiation, identifying each. Response: CL&P objects to this request on the ground that it is an improper effort by ALLCO to use this rate case proceeding to obtain discovery for purposes of a lawsuit that it filed against the Company on August 10, 2026, in the United States District Court for the District of Connecticut (Civil Action No. 3:26-cv-1277), outside of and in contravention of the rules of procedure that govern discovery in that lawsuit. CL&P further objects to this request on the ground that it is not within the scope of the proceeding to review the Company’s application to amend its existing rates schedules because the interrogatory either seeks information specific to Allco projects or seeks information that Allco views as relevant to its specific projects.
  6. Page 26 of 49

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set ALLCO-13 Date Issued October 13, 2026 ALLCO-182 Page 1 of 3 Date Filed: October 27, 2026 Witness: Warren R. Boutin and Andrew C. Belden Request from: ALLCO Question: (Follow-up to ALLCO-113 and ICC-019 — complaints and disputes concerning interconnection charges.) ICC-019 states that since January 2020 “there have been instances of customers reaching out to PURA EOE to help resolve an issue between CL&P and the customer,” but that the Company counts none of them as a “formal interconnection dispute” because it excludes, among other things, “a claim for breach of the Interconnection Agreement.” State: (a) the number of such instances in each year 2020 through 2026, by subject matter (including percentage overhead or CIAC charges, differences between estimated and actual cost, delay in final accounting or refund, and requests for substantiation); (b) the number of complaints, disputes, objections, or inquiries on those subjects received directly by the Company, its interconnection group, its customer-advocate or ombudsperson function, or its counsel in each year 2017 through 2026, from customers other than Allco, and the resolution of each; (c) whether the Company tracks such contacts in any system, identifying it; and (d) whether any interconnection customer other than Allco has asserted that the Company breached an Interconnection Agreement, in correspondence, in a regulatory proceeding, or in litigation, since January 1, 2017, identifying each by anonymized identifier, date, subject, and outcome. Response: Eversource interprets this question to request information on non-Allco interconnection complaints and disputes, whether formal or informal, that have been escalated internally to Eversource Legal. Such complaints and disputes are handled by a single, internal Legal employee. The Company does not use outside counsel for such complaints and disputes, and the Company does not track interconnection complaints/disputes in any system. The same Legal employee has handled interconnection complaints and disputes since 2024; therefore, the Company is providing information on complaints/disputes from 2024 to date. (a) – (b) In the table below, the Company provides the year that the dispute was initiated, whether the dispute is formal or informal (under the Company’s analysis in ICC-019 i), and the subject matter of the dispute. Neither PURA nor PURA EOE has issued a ruling on any of these disputes. In addition, since the Company’s submission of ICC-019 on September 22, 2026, there has been a formal dispute submitted to EOE for resolution. This rate case proceeding and the One Big Beautiful Bill Act are the likely impetuses for most of the 2026 disputes.
  7. Page 27 of 49

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set ALLCO-13 Date Issued October 13, 2026 ALLCO-182 Page 2 of 3 Year 2024 2024 2026 Formal/Informal Informal Informal Informal 2026 2026 2026 2026 2026 Informal Informal Informal Informal Formal Subject Matter Breach of Interconnection Agreement Breach of Interconnection Agreement Post-Construction – Overpayments & Underpayments Construction Timelines Responsibility for Construction Costs Breach of Interconnection Agreement Construction Timelines Responsibility for Construction Costs EOE determined that it did not have jurisdiction over one of the 2024 disputes. PURA declined to address the issue of jurisdiction and ordered mediation for the other 2024 dispute. Two of the 2026 disputes are currently being mediated by EOE. c. The Company does not track such disputes and complaints in any system. d. PURA does not have subject matter jurisdiction over claims alleging a breach of the Interconnection Agreement. 1 There have been no non-Allco lawsuits filed in federal or state courts in Connecticut since 2024, alleging a breach of an Interconnection Agreement. Prior Referenced Response: i ICC-019 Question: Provide in a chart, separated by year: 1) the number of formal interconnection disputes initiated, 2) the number of formal interconnection disputes that required mediation, 3) the number of formal interconnection disputes that required PURA adjudication. ICC-019 Response: A “formal interconnection dispute” is any dispute authorized to be adjudicated by PURA pursuant to the Interconnection Guidelines (“Guidelines”); specifically, Section 5.2 of the Guidelines authorizes PURA to adjudicate disputes related to: (1) one or both of the parties’ compliance with specified timelines set forth in the Guidelines and in the Interconnection Agreement; and (2) any EDC interconnection requirement disputed by the customer. The Company does not interpret the term “formal interconnection dispute” to include: (1) any dispute that PURA is not See, Docket No. 11-12-06, December 20, 2017, ruling on Motion Nos. 94 & 95 at 1-2 (citing Kleen Energy Systems, LLC v. Commissioner of Energy and Environmental Protection, 319 Conn. 367, 380-92 (2015) for the Connecticut Supreme Court precedent that “unless specifically authorized by statute, a state agency does not have jurisdiction to hear and decide contract disputes involving contracts approved by the agency.”). 1
  8. Page 28 of 49

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set ALLCO-13 Date Issued October 13, 2026 ALLCO-182 Page 3 of 3 authorized by statute to adjudicate, such as a claim for breach of the Interconnection Agreement; and (2) any dispute that does not follow the formal dispute resolution process set forth in the Guidelines. Since January of 2020, while there have been instances of customers reaching out to PURA EOE to help resolve an issue between CL&P and the customer, there have been no formal interconnection disputes initiated and, consequently, there has been no mediation or adjudication of such disputes. Section 21.1 of the PURA-approved form of Interconnection Agreement requires that the parties attempt to resolve all disputes promptly, equitably and in good faith prior to following the dispute resolution process in the Guidelines. The Company works with customers to resolve any disputes prior to the potential initiation of a formal interconnection dispute.
  9. Page 29 of 49

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set ALLCO-13 Date Issued October 13, 2026 ALLCO-183 Page 1 of 5 Date Filed: November 03, 2026 Witness: Warren R. Boutin and Andrew C. Belden Request from: ALLCO Question: (Follow-up to ALLCO-119 and ALLCO-120 — pending and withdrawn applications.) State: (a) the precise definition of each row in the ALLCO-120 tables (“Pending >5yrs,” “Pending 5 yrs,” “Pending 3 yrs,” “Pending 1 yr,” “Pending <1yr”), including the lower and upper bound of each interval and the date as of which pendency was measured; (b) for each of the 23 Level 2 applications pending more than five years and the 56 pending in the “5 yrs” category, the application number (or an anonymized identifier), the nameplate capacity, the year filed, the substation (which may be anonymized), the current PowerClerk status, the date of the most recent Company action, and the reason the application remains pending; (c) for each of the 94 applications over 2 MW withdrawn between 2020 and 2025, the year filed, the year withdrawn, the stated reason if any, and whether the withdrawal followed the Company’s issuance of an upgrade-cost estimate, a system-impact study, or notice of an ISO-New England requirement; (d) given the Company’s statement that it “does not deny, reject or cancel projects,” the number of applications in each year 2020 through 2025 that were deemed withdrawn, closed, or removed from the queue by the Company for non-payment, non-response, expiration, or any other reason, and the Guideline provision relied on; and (e) the system, other than PowerClerk, in which the Company records whether an application requires electric-power-system modifications or upgrades (ALLCO-119, subpart (f)), and the counts requested in ALLCO-119 subparts (f) and (g) derived from that system. Response: CL&P objects to this request on the ground that it is an improper effort by ALLCO to use this rate case proceeding to obtain discovery for purposes of a lawsuit that it filed against the Company on August 10, 2026, in the United States District Court for the District of Connecticut (Civil Action No. 3:26-cv-1277), outside of and in contravention of the rules of procedure that govern discovery in that lawsuit. CL&P further objects to this request on the ground that it is not within the scope of the proceeding to review the Company’s application to amend its existing rates schedules because the interrogatory either seeks information specific to Allco projects or seeks information that Allco views as relevant to its specific projects. Without waiving said objections,
  10. Page 30 of 49

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set ALLCO-13 Date Issued October 13, 2026 ALLCO-183 Page 2 of 5 a. The information provided in ALLCO-120 i was referenced from the data originally provided in ALLCO-007 ii. The interrogatory requested information for pending projects since the application-received date. As an example, pending > 5yrs are projects that are still pending more than 5 years after the application was received. b-d. CL&P objects to these subparts on the ground that they is not within the scope of the proceeding to review the Company’s application to amend its existing rates schedules because the interrogatory seeks information that Allco views as relevant to its specific projects. e. The name of the system is Maximo. The data that is included in ALLCO-119 iii subparts (f) and (g) is not found in Maximo. Prior Referenced Responses: i ALLCO-120 Question: (Follow-up to ALLCO-057 and ALLCO-007 — pendency.) For all applications pending at December 31, 2025, separately for Level 1, Level 2, and Level 3: (a) state the number pending less than one year, one to three years, three to five years, and more than five years after the application received date recorded in PowerClerk; and (b) for each Level 2 or Level 3 application pending more than three years, identify the application number, the MW AC, the circuit and substation, the current PowerClerk status, the date of the most recent Company action, and the reason the application remains pending. Applicant identities other than Allco and its affiliates may be anonymized. ALLCO-120 Response: CL&P objects to this request on the ground that it is an improper effort by Allco to use this rate case proceeding to obtain discovery for purposes of a lawsuit that it filed against the Company on August 10, 2026, in the United States District Court for the District of Connecticut (Civil Action No. 3:26-cv-1277), outside of and in contravention of the rules of procedure that govern discovery in that lawsuit. CL&P further objects to this request on the ground that it is not within the scope of the proceeding to review the Company’s application to amend its existing rates schedules because the interrogatory either seeks information specific to Allco projects or seeks information that Allco views as relevant to its specific projects. Without waiving said objections, the Company states as follows: a. Please refer to the tables below. Please also refer to the Company’s response to ALLCO-119i . There are no level 3 projects. b. Refer to the Company’s response to ALLCO-007ii.
2 pages match
Words on different pages

Text of CIEC Set 7_COMBINED.pdf

Extracted from the file · 7 pages · 8,262 characters

Text of DEEP Set 1 (BETP)_COMBINED.pdf

Extracted from the file · 174 pages · 446,641 characters

Text of NECTA Set 6_COMBINED.pdf

Extracted from the file · 22 pages · 43,545 characters

Text of OCC Set 29_COMBINED.pdf

Extracted from the file · 30 pages · 65,312 characters

Text of PURA Set 8_COMBINED.pdf

Extracted from the file · 230 pages · 511,861 characters

As listed on the current system

Corres. 11/06/2026 [26-05-10] (Keegan Werlin LLP) - Discovery Compilation ALLCO Set 13, 16, 18, CIEC Set 7, DEEP Set 1, NECTA Set 6, OCC Set 29, PURA 8

This filing on the current system (opens in a new tab)