Discovery Compilation ALLCO Set 13, 16, 18, CIEC Set 7, DEEP Set 1, NECTA Set 6, OCC Set 29, PURA 8
Files9
Docket No. 26-05-10 Discovery Compilation November 6 2026.pdf
PDF · 134 KB · 1 pageText searchable
Download Docket No. 26-05-10 Discovery Compilation November 6 2026.pdfRead the text of Docket No. 26-05-10 Discovery Compilation November 6 2026.pdf
ALLCO Set 13_COMBINED.pdf
PDF · 801 KB · 49 pagesText searchable
Download ALLCO Set 13_COMBINED.pdfRead the text of ALLCO Set 13_COMBINED.pdf
ALLCO Set 16_COMBINED.pdf
PDF · 642 KB · 22 pagesText searchable
Download ALLCO Set 16_COMBINED.pdfRead the text of ALLCO Set 16_COMBINED.pdf
ALLCO Set 18_COMBINED.pdf
PDF · 306 KB · 25 pagesText searchable
Download ALLCO Set 18_COMBINED.pdfRead the text of ALLCO Set 18_COMBINED.pdf
CIEC Set 7_COMBINED.pdf
PDF · 230 KB · 7 pagesText searchable
Download CIEC Set 7_COMBINED.pdfRead the text of CIEC Set 7_COMBINED.pdf
DEEP Set 1 (BETP)_COMBINED.pdf
PDF · 1.9 MB · 174 pagesText searchable
Download DEEP Set 1 (BETP)_COMBINED.pdfRead the text of DEEP Set 1 (BETP)_COMBINED.pdf
NECTA Set 6_COMBINED.pdf
PDF · 446 KB · 22 pagesText searchable
Download NECTA Set 6_COMBINED.pdfRead the text of NECTA Set 6_COMBINED.pdf
OCC Set 29_COMBINED.pdf
PDF · 499 KB · 30 pagesText searchable
Download OCC Set 29_COMBINED.pdfRead the text of OCC Set 29_COMBINED.pdf
PURA Set 8_COMBINED.pdf
PDF · 2.5 MB · 230 pagesText searchable
Download PURA Set 8_COMBINED.pdfRead the text of PURA Set 8_COMBINED.pdf
Page 31 of 49
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set ALLCO-13 Date Issued October 13, 2026 ALLCO-183 Page 3 of 5 ii ALLCO-007 Question: State the number of pending distribution interconnection applications in Connecticut that have been pending for more than one year, more than three years, and more than five years, respectively, as of the most recent date available, and for each application pending more than five years, identify the application number, application date, requested capacity (MW), substation and circuit, and current status. ALLCO-007 Response: CL&P objects to this request on the ground that it is an improper effort by Allco to use this rate case proceeding to obtain discovery for purposes of a lawsuit that it filed against the Company on August 10, 2026, in the United States District Court for the District of Connecticut (Civil Action No. 3:26-cv-1277), outside of and in contravention of the rules of procedure that govern discovery in that lawsuit. Without waiving said objection, the Company maintains and publishes an active interconnection queue for generators greater than 25 kW. The published queue identifies, among other information, the applicable substation, circuit, queue date, and project capacity. The Company also publishes hosting capacity maps that provide location-specific information, including hosting capacity values and DER currently online or in the queue. The information requested regarding individual projects and the applicable substations and circuits is available through the Company’s publicly available interconnection resources.1 iii ALLCO-119 Question: (Follow-up to ALLCO-057 — Level 2 and Level 3 applications.) The Company’s response to ALLCO-057 confined its figures to Level 1 applications and defined “completed or otherwise closed” as applications that received Permission to Operate. ALLCO-057 asked for all Connecticut DG interconnection applications. For each calendar year 2020 through 2025, separately for Level 2 applications, Level 3 applications, and any other category ofPage 32 of 49
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set ALLCO-13 Date Issued October 13, 2026 ALLCO-183 Page 4 of 5 application that is not Level 1, state: (a) the number and aggregate MW AC of applications received; (b) the number that received Permission to Operate; (c) the number withdrawn; (d) the number denied, rejected, or cancelled by the Company; (e) the number pending at December 31 of that year; (f) the number and aggregate MW AC that required electric power system modifications or upgrades; and (g) item (f) as a percentage of items (a), (b), and (e). Provide the schedule in native Excel format derived from PowerClerk, and state why the Company’s response to ALLCO-057 omitted Level 2 and Level 3 applications. ALLCO-119 Response: Eversource has only Level 1 and Level 2 applications. The reporting included in this response is for Level 2. The Level 1 applications were previously reported in the Company’s response to ALLCO-057i. c. Please refer to the Company’s responses to subparts (a) and (b) above. d. The Company does not deny, reject or cancel projects. The Company notifies the customer/developer of action needed, including investments, for the project to move forward. The customer/developer decides if the actions are a viable option for the project. e. Please refer to the Company’s responses to subparts (a) and (b) above. f. This data is not tracked in Power Clerk. g. The percentages cannot be calculated.Page 33 of 49
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set ALLCO-13 Date Issued October 13, 2026 ALLCO-183 Page 5 of 5 The Company notes that the Company’s response to ALLCO-057, which was a follow-up to the Company’s response to ALLCO-016ii regarding the proposed Level 1 DER Interconnection Processing metric, requested additional information to what the Company provided in ALLCO016, Attachment 1. ALLCO-057 did not request that Eversource provide information on Level 2 applications, which is irrelevant to the proposed metric. There are no Level 3 applications.Page 34 of 49
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set ALLCO-13 Date Issued October 13, 2026 ALLCO-184 Page 1 of 2 Date Filed: November 03, 2026 Witness: Warren R. Boutin and Andrew C. Belden Request from: ALLCO Question: (Follow-up to ALLCO-122, ALLCO-132, and ALLCO-135 — ISO- New England review and Guideline timelines, for applications generally.) State: (a) the statute, regulation, Guideline provision, ISO-New England tariff provision or procedure, or Company practice on which the Company relies for the statement in ICC-005 that ISO-New England review is required for generating facilities “over 1 MW,” and the date on which the Company first applied that threshold (ALLCO-122, subpart (b)); (b) whether, and under what circumstances, the Company applies ISONew England review to applications of 1 MW or less (ALLCO-132, subpart (d); ALLCO-135, subpart (d)); (c) for each year 2018 through 2025, the number of applications for which the Company withheld an executable Interconnection Agreement pending an ISO-New England screening, study, or determination, by size class (≤1 MW; >1 MW to 2 MW; >2 MW to 5 MW; >5 MW), and the average and median elapsed time from application to issuance of an executable agreement for those applications; (d) the metrics, timelines, and milestones contained in the monthly PowerClerk report that management reviews (ICC-010; ALLCO-132, subpart (a)), the recipients of that report, and, for each month from January 2024 to the present, the percentage of applications for which each Guideline timeline was met; and (e) each instance since January 1, 2020 in which the Company has notified the Authority that a Guideline timeline was not met, and the reason stated. Response: CL&P objects to this request on the ground that it is an improper effort by ALLCO to use this rate case proceeding to obtain discovery for purposes of a lawsuit that it filed against the Company on August 10, 2026, in the United States District Court for the District of Connecticut (Civil Action No. 3:26-cv-1277), outside of and in contravention of the rules of procedure that govern discovery in that lawsuit. CL&P further objects to this request on the ground that it is not within the scope of the proceeding to review the Company’s application to amend its existing rates schedules because the interrogatory either seeks information specific to Allco projects or seeks information that Allco views as relevant to its specific projects. Without waiving said objections, generators greater than 1 MW interconnected to the distribution system may be subject to applicable provisions of ISO-NE's Open Access Transmission TariffPage 35 of 49
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set ALLCO-13 Date Issued October 13, 2026 ALLCO-184 Page 2 of 2 (OATT), Planning Procedures as required by ISO-NE. Please refer to the Company’s response to ALLCO-135 i. Prior Referenced Response: i ALLCO-135 Question: (Follow-up to ICC-005 — applications held pending ISO-NE requirements.) The Company’s response to ICC-005 states that any generating facility over 1 MW “must comply with ISO-NE rules, including Tariff Section I.3.9 and Planning Procedure 5,” and that “[t]he EDC cannot issue an executable Interconnection Agreement until applicable ISO-NE requirements are met.” (a) State the date on which the Company first withheld, delayed, or declined to issue an executable Interconnection Agreement on the ground that ISO-NE requirements had not been met, identify the application to which that first occurred, and, if that date differs from the policy adoption date given in response to QALLCO-132(b), explain the difference. (b) Identify, in native (Excel) format, every distribution interconnection application in Connecticut, from January 1, 2018 to the present, to which the practice described in ICC-005 has been applied — that is, every application for which the Company has declined to issue, or has withheld, an executable Interconnection Agreement pending an ISO-NE review, screening, study, determination, or other requirement — stating for each: (i) the application number and PowerClerk identifier; (ii) the nameplate capacity in kW; (iii) the date the application was filed; (iv) the date the Company completed its own Guidelines-process review (or the current Guidelines milestone); (v) the date the Company referred the application to ISO-NE, the ISO-NE process invoked (Section I.3.9 proposed plan application, Planning Procedure 5 screening, Level I/II/III study, or other), and the ISONE queue or reference number, if any; (vi) the date of each ISO-NE determination or study result received, and its substance; (vii) the current status of the application with the Company (including whether an executable Interconnection Agreement has been issued and on what date) and with ISO-NE; (viii) the elapsed time from application filing to the issuance of an executable Interconnection Agreement, or to the present if none has been issued; and (ix) whether the applicant was notified in writing that the executable Interconnection Agreement was being withheld pending ISO-NE requirements, and on what date. (c) For each application listed in (b) that was subsequently withdrawn, cancelled, or deemed withdrawn, state the date and the stated reason. (d) State the number of applications in (b) that are 1 MW or less, and for each explain why the ISO-NE requirements described in ICC-005 for facilities “over 1 MW” were applied. ALLCO-135 Response: i CL&P objects to this request on the ground that it is an improper effort by ALLCO to use this rate case proceeding to obtain discovery for purposes of a lawsuit that it filed against the Company on August 10, 2026, in the United States District Court for the District of Connecticut (Civil Action No. 3:26-cv-1277), outside of and in contravention of the rules of procedure that govern discovery in that lawsuit. CL&P further objects to this request on the ground that it is not within the scope of the proceeding to review the Company’s application to amend its existing rates schedules because the interrogatory either seeks information specific to Allco projects or seeks information that Allco views as relevant to its specific projects. Without waiving said objections, the Company complies with the requirements of the PURA-approved Interconnection Guidelines. Please refer to the Company’s response to ALLCO-132i.Page 36 of 49
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set ALLCO-13 Date Issued October 13, 2026 ALLCO-185 Page 1 of 3 Date Filed: October 27, 2026 Witness: Counsel Request from: ALLCO Question: (Follow-up to ALLCO-088, ALLCO-096, ALLCO-097, and ALLCO-098 — load-reducer treatment.) ALLCO-088, Attachment 1, presents an “Estimated CL&P Distributed Solar Output” at each ISO-New England monthly peak hour from 2021 through 2025, while the response to ALLCO-088, subpart (e) states that the Company “has not expressly estimated the effect of behindthe-meter or load-reducing generation on peaks, load obligations, or transmission billing determinants.” State: (a) the source, method, author, and date of preparation of Attachment 1, and each other purpose for which the Company or any affiliate uses that or any similar estimate (including load forecasting, standard-service procurement, and ISO-New England reporting); (b) the installed distributed-generation capacity (MW AC) assumed for each month in Attachment 1, reconciled to the capacity reported in ALLCO-095; (c) why the estimated output at the monthly peak hour is reported as zero in most months, including months in which the peak hour is 18:00 or 19:00 and daylight remains, and the estimated output at the ISO-New England annual peak hour and at the hour of the Company’s own monthly distribution-system peak in each year 2021 through 2025; (d) the mechanism by which, as stated in ALLCO-098, subpart (b), excess generation delivered to the grid by a customer served by one load-serving entity “reduces load and capacity obligations for all load-serving entities” rather than the obligation of the load-serving entity that serves the host customer, by reference to the ISO-New England settlement rules the Company relies on; (e) whether the Company, as standard-service and last-resort-service provider, receives the reduction in energy, capacity, and transmission settlement attributable to load-reducing generation at the premises of its standard-service customers, and where in the standard-service rate or reconciliation that reduction is credited; and (f) whether the Company’s standard-service procurement solicitations disclose to bidders any forecast of behind-the-meter generation, and if so produce the most recent such disclosure. Response: Eversource objects to this request on the basis of relevance and administrative burden. In terms of relevance, this request seeks information that is not relevant to any request of the Company in this proceeding, which PURA is conducting as a general distribution rate proceeding pursuant to Conn. Gen. Stat. § 16-19, to amend the Company’s base-rate schedules. This discovery request is seeking information regarding solar generation, electric generation and supply and load settlement issues and is, therefore, not reasonably calculated to lead to the discovery of evidence that would further the purposes of this proceeding or be relevant to any issue that will be decided in this proceeding.Page 37 of 49
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set ALLCO-13 Date Issued October 13, 2026 ALLCO-185 Page 2 of 3 Under Connecticut case law, evidence is relevant only if it has a tendency to establish the existence of a material fact. United Technologies Corp. v Commission on Human Rights & Opportunities, 72 Conn. App. 212, 229 (2002). Discovery must advance the efficiency of the hearing and provide the factual foundation upon which an agency decision may rely. Therefore, a party is required to produce discovery documents only if they are “material and necessary to [an] action.” Dotson v. Hartford Roman Catholic Diocesan Corp., No. CV106012742S, 2011 WL 1021745, (Conn. Super. Ct. Feb. 17, 2011) (citing, Berger v. Cuomo, 230 Conn. 1, 7 (1994)). Additionally, discovery “does not afford an open invitation to delve into [CL&P’s] affairs”. J. Pub. Co. v. Hartford Courant Co., 261 Conn. 673, 681 (2002). Allco “must be able to demonstrate good faith as well as probable cause that the information sought is both material and necessary” to this rate case. Id. Practice Book § 13-2, which defines the scope of discovery, provides in relevant part that a party may only seek discovery of nonprivileged information that is “material to the subject matter involved in the pending action . . . .” “It is axiomatic that [e]vidence is admissible only to prove material facts, that is to say, those facts directly in issue or those probative of matters in issue; evidence offered to prove other facts is immaterial.” Salmon v. Dept. of Public Health & Addiction Services, 259 Conn. 288, 316 (2002) (internal quotation marks omitted; emphasis added.) Also, Allco “should not be allowed to indulge a hope that a thorough ransacking of any information and material which . . . [CL&P] may possess would turn up evidence helpful to [his] case”. J. Pub. Co. v. Hartford Courant Co., 261 Conn. at 681. “Interrogatories should not be used to . . . permit a party to go on a fishing expedition.” Mfr.’s Advert., Inc. v. Pancoast, 4 Conn. Cir. Ct. 668, 670 (1967) (internal quotation marks omitted). The information requested in this interrogatory is not material to the Company’s rate application as it does not advance the factual foundation upon which PURA’s decision will rely. Office of Consumer Counsel v. Department of Public Utility Control, 44 Conn. Supp. 21, 26-27 (1994). As the information is irrelevant and immaterial, this discovery must be excluded. See General Statutes § 4-178(1); see also Conn. Agencies Regs. § 16-1-38(a). PURA has also previously ruled that interrogatories must pertain to the evidence and testimony submitted by a witness in the proceeding. See, Ruling on Motion No. 73, Docket No. 23-11-02 – Application of Connecticut Natural Gas Corporation and The Southern Connecticut Gas Company to Amend Their Rate Schedules, April 3, 2024, citing, General Statutes § 4-177c(a)(2); Motion Ruling Nos. 15 and 17, Jan. 2, 2009, Docket No. 08-07-15, Petition of the Office of Consumer Counsel for Enforcement of Quality of Service Standards for The Southern New England Telephone Company d/b/a AT&T Connecticut.Page 38 of 49
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set ALLCO-13 Date Issued October 13, 2026 ALLCO-185 Page 3 of 3 In addition, considering the statutory 350-day timeframe to issue a final decision on the Company’s application and the number of interrogatories issued in this proceeding to-date, the litigation of issues irrelevant to the Company’s application threatens to adversely impact the orderly conduct of this proceeding. 1 Allco previously litigated renewable energy projects as load reducers in the Company’s Docket No. 24-01 03, Revenue Adjustment Mechanism proceeding. See, Docket No. 24-01-03, Eversource responses to ALLCO-04, and ALLCO-027. Eversource objected to both of these questions. 1Page 39 of 49
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set ALLCO-13 Date Issued October 13, 2026 ALLCO-186 Page 1 of 4 Date Filed: November 05, 2026 Witness: Craig Dikeman and Matthew J. Correia Request from: ALLCO Question: (Follow-up to ALLCO-090, ALLCO-092, and ALLCO-093 — procurement controls.) State: (a) for each of the 47 vendors listed in ALLCO-092, subpart (b), the purchase-order data (purchaseorder number, date, amount, and description) for each purchase order below $50,000 issued in 2023 through 2026, and whether an Ariba contract or sole-source justification covered the vendor during the period, in native format; (b) for each year 2023 through 2026, the number and total value of purchase orders below $50,000 released by the Procurement organization and the number of vendors whose sub-threshold purchase orders aggregated above $50,000 within a rolling twelvemonth period; (c) what control, if any, performed the function of the Maximo purchase-order release control before its implementation in September 2025, and the number of purchase orders over $50,000 released from January 1, 2023 to September 2025 without an Ariba contract, a solesource justification, or a documented exception; (d) whether the June 4, 2026 Privileged Procurement Report examined purchase-order splitting, aggregation of sub-threshold purchase orders, or milestone and advance payments, and whether any corrective action on those subjects has been taken since; and (e) each contract or purchase order entered into since January 1, 2020 under which the Company or ESC paid, or committed to pay, more than $1,000,000 in advance of the vendor’s performance or incurrence of cost, with the vendor, amount, and date, and the person by title who approved it; if the Company maintains that this cannot be determined from its records, state how the invoice approvers described in ALLCO-090 verify that a milestone has been satisfied before approving payment. Response: a. Please refer to ALLCO-186, Attachment 1 CONFIDENTIAL, which includes the requested purchase order data for the 41 vendors identified in ALLCO-092-RV01. i The attachment identifies, for each purchase order below $50,000 issued from 2023-2026, the purchase order number, order date, transaction amount, purchase order description, and whether an Ariba contract or sole-source justification covered the vendor during the applicable period. b. Please refer to the detail in ALLCO-186, Attachment 1 CONFIDENTIAL, which can be used to identify the detail requested. c. The control feature was accomplished by the procurement agent managing the purchases to the policy and reporting was made available to the team to identify and oversee instancesPage 40 of 49
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set ALLCO-13 Date Issued October 13, 2026 ALLCO-186 Page 2 of 4 where the purchase order where valued over $50,000 without the support of a sole source justification and a contract. Before implementation of the Maximo purchase order release control in September 2025, compliance with the applicable competitive-bidding requirements was primarily managed by the responsible procurement agent. Procurement agents were responsible for determining whether purchases exceeding $50,000 were supported by an Ariba contract, an approved sole-source justification, or another documented exception. Procurement management also had access to reporting used to identify and review purchase orders exceeding $50,000 that were not associated with an Ariba contract or sole-source justification. These controls were based on procurement agent review and management reporting rather than an automated system restriction preventing release of the purchase order. d. No. The June 4, 2026 Privileged Procurement Report did not examine purchase-order splitting, aggregation of sub-threshold purchase orders, or milestone and advance payments. e. The Company does not maintain a centralized report or data field that identifies contracts or purchase orders based on whether payments exceeding $1,000,000 were made in advance of vendor performance or the vendor’s incurrence of cost. Accordingly, the requested population cannot be identified through a standard system report. Identifying such transactions would require a manual review of potentially responsive contracts, purchase orders, invoices, payment terms, and supporting documentation. Invoice approvers are responsible for confirming that the applicable payment requirements have been satisfied before approving an invoice. Depending on the nature of the purchase and the applicable contractual terms, this may include reviewing evidence that services have been performed, contractual milestones have been completed, materials have been purchased or delivered, or other agreed-upon payment conditions have been satisfied. Prior Referenced Response: i ALLCO-092-RV01 Question: With respect to purchase orders below the competitive-bid threshold: (a) state whether the Ariba or Maximo controls described in EOE-166 include any systemic detection of multiple purchase orders to the same vendor that individually fall below the $50,000 threshold but aggregate above it, and if not, state whether and how the “no policy violations” assertion accounts for such aggregation; (b) identify each vendor that received three or more purchase orders, each below $50,000, aggregating to more than $150,000 within any rolling twelve-month period during 2023 through 2026,
Text of CIEC Set 7_COMBINED.pdf
Extracted from the file · 7 pages · 8,262 characters
Text of DEEP Set 1 (BETP)_COMBINED.pdf
Extracted from the file · 174 pages · 446,641 characters
Text of NECTA Set 6_COMBINED.pdf
Extracted from the file · 22 pages · 43,545 characters
Text of OCC Set 29_COMBINED.pdf
Extracted from the file · 30 pages · 65,312 characters
Text of PURA Set 8_COMBINED.pdf
Extracted from the file · 230 pages · 511,861 characters
As listed on the current system
Corres. 11/06/2026 [26-05-10] (Keegan Werlin LLP) - Discovery Compilation ALLCO Set 13, 16, 18, CIEC Set 7, DEEP Set 1, NECTA Set 6, OCC Set 29, PURA 8